Loading...
HomeMy WebLinkAboutSW4210302_Supplemental Info Review_20210621Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/21/2021 11:45:37 AM (Supplemental Submittal) Submit by McCoy, Suzanne 6/22/2021 7:58:41 AM (Supplemental Info Submittal) • The task was assigned to McCoy, Suzanne 6/21/2021 11:46 AM Submittal from 6/21/2021 Permit Information: Rease provide specific permt details below. ........ ......... ......... ......... What Type of Choose one: Permit?* r NPDES Industrial or MS4 Permit r State Stormwater (Post -Construction) Permit f Other Permit Number* SW4210302 Begins with "SW', "NCG', or "NCS' What DEQ Office is Reviewer: Rease correct if nisidentlfied, close this review forrn and reassign taskto the appropriate contact. the Primary r Central Office Contact?* r Washington Regional Office (Attn: Carl Dunn) f Wilmington Regional Office (Attn: Christine Hall) Project Name* ASU Poplar Grove Child Development Center Expansion Owner/Operator* The Board of Trustees of the Endowment Fund of Appalachian State University County: Watauga Submitter Name:* Michael J Cain VUio is subnitting this infornation? E-mail Address:* mcain@cdcgo.com Phone Number* 8282525388 Additional E-mail for mcain@cdcgo.com Submittal (Optional) Confirmation: State Stormwater (Post -Construction) Information Uploads Choose file type and upload attachment (Reviewer nay rerrove unnecessary subnittals) File Type* Application Form File Upload Oickthe upload button, or drag and drop files to attach SWU-101 Application.pdf 425.67KB Only RDFfiles are accepted. File Type* Design Calculations File Upload Oickthe upload button, or drag and drop files to attach Detention Outlet Apron 2021-06-17.pdf 1.15MB Only RDFfiles are accepted. File Type* O&M Agreement/Plan File Upload aickthe upload button, or drag and drop files to attach 2021-06-08 Operation Maintenance 1.08MB Agreement_Signed.pdf Only FDFfiles are accepted. File Type* Response To Comments File Upload aick the upload button, or drag and drop files to attach 2021-06-17 ASU Poplar Grove - NCDEMLR 5.49MB Resubmittal.pdf Only FM are accepted. File Type* Design Calculations File Upload aickthe upload button, or drag and drop files to attach Supplemental EZ 1-3.pdf 1 AMB Only R Ffiles are accepted. File Type* Plansheet - Other File Upload aick the upload button, or drag and drop files to attach 2021-06-11 NCDEQ Resubmittal.pdf 20.53MB Only FDFfiles are accepted. Uploads contain r NO Confidential r YES Information * NOTE The following infornation cannot be claimed as confidential: the nave and address of any perrrit applicant or pernittee, pernit applications, pernits, effluent data, information required by I FDM application forms provided by the Director inclusive of all forrrs and attachments [Pef. 40 CFR 122.7(b) and (c)]. Notes about the attachments: * V By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Michael J Cain Signature: Date Submitted: 06/21/2021 Initial Review Verify Permit No.* I1\410RfANT. RE\/lRAE 2SHOLLDVMFY and revise here if necessary. SW4210302 Who needs a Reviewer selections will only be required for offices checked here. copy? * r% Central Office Staff r Regional Office Stormwater Contact State Stormwater RO Staff r No Copy Needed Central Office Reviewer:* Notifies OD Staff with 5rail Corey Anen Any Comments or Added Info for CO Staff Reviewer? Review Date * 06/22/2021