Loading...
HomeMy WebLinkAboutSW5210304_Supplement-EZ Form_20210617I - I A SUPPLEMENT-EZ COVER PAGE LORMS LOADED 1 Project Name Youngsville Mini Storage 2 Project Area (ac) 8.81 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 _ Is this project High or Low Density? High -6 Does this project use an off -site SCM? No COMPILIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this pmject? No 'kUMBER AND TYPE . OF SCMs: 11 Infiltration System 2 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter Silva Cell Bayfilter Filterra I FORMS LOADED :1 Certification Statement: I cerffy, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the Information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineenng plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 0"111111111111, 1 C A SEAL 38746 C,-) Q, 1% L t. K %% seal Signature of Designer 41�lwz ( - Date DRAINAGE AREAS 1 Is this a high deniki project? Yes 2 If so, number of drainage areas/SCMs 4 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No I FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 1 4 4 Type of SCM Varies Infiltration Basin Bypass Infiltration Basin Bypass 5 Total drainage area (sq ft) 383795 110767 62552 149814 60662 6 Onsite drainage area (sq ftJ 383795 110767 62552 149814 60662 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 234899sf 90693sf 27595 sf 96107sf 20504sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) New BUA not on subdivided lots (subject to permitting) (so site BUA (sq ft) 1 rBreakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq 10 234899 sf 90693sf 27595 sf 96107 sf 20504 sf 11 12 - 27479sf 10073sf 90938 sf 1416 sf - Roof (sq ft) 49146sf 9600sf - Roadway (sq ft) 6506 sf - Future (sq ft) - Other, please specify in the comment box below �N ftJ 14068sf 5169 sf 20504 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existina BUA that is already perrnifted (sq ft) 17 Existing BUA that will be removed (sq ft) 7154 sf 18 Percent BUA 61% 1.0 in 82% 1.0 in 44% 1.0 in 64% 1.0 in 34% 1.0 in 19 Design storm (inches) 20 Design volume of SCM (cu ft) 14230cf 10814 cf Simple Method Simple Method Simple Method Simple Method 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION 22 iPlease use this space to provide any additional information about the drainage area(s): ' 0 to remain. 0 L0 Other" BUA in line 12 consists of existing buildings and existing pavement t I "N,te that runoff volume match methodology is being utilized for project. —J INFILTRATION SYSTEM 1 1 Drainage area number 2" 2 1 Minimum required treatment volume (cu ffl I 29U280 ef 269-34 3 is the SCM sized to treat the SW from all surfaces at build -out? Yes Y" 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical"for trenches)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion ( 1 0-Year storm)? — i - of fh- Is there an overflow or bypass or inflow volume in excess a deslan volume? What is the method for dewatering fh—e SCIVI for maintenance? Yes Yes 8 Yes Yes 9 Pump (preferred) Pump (pro 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 14 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (1 OV Is there an O&M Agreement that complies with General MDC (11)? N/A N/A Yes Yes 1-5 Is—therean O&M Plan that complies with General MDC (112)? Yes Yes 16 Woes the SCM follow the device specific IVIDC? Yes Yes 17 lWas the SCM deslqned bv an NC licensed Drofessional? Yes 18 [Proposed slope of the subgrade surface 0% 0% 19 [Are terraces or baffles provided? No No 20 [Type of pretreatment: Forebay Forebay SOUS Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes Yes 22 SHWT elevation (fmsi) 456.50 440.00 23 _ Depth to SHWT per soils report (in) 96.00 96.00 24 Ground elevation at boring in soils report _(fmsl) 473.50 448.00 25 Is a detailed hydrogeologic study attached if the separation is lbetween 1 and 2 feet? N/A N/A 26 JSoil infiltration rate (in/hr) 0.50 1 0.50 27 lFactor of safety (FS) �2 is recommended): 2.00 J_ 2.00 Tranchas Oniv 34 _Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone �Te, if applicable 0 40 Stone porosity (%) 41 1 Is stone free of fines? 42 Is the stone wrapped in Reotextile fabric? 43 Has at least one inspection Port been p—licier"? vaiumeslurawaown 44 1 Design volume of SCM 45 Time to draw down (ho ADDITIONAL I NFORMATION 46 Please use this space t Ithe infiltration system(s any Note that required treatment volume in Line 2 is annual treatment volume required 1(runoff volume match methodol2g� Infiltration 3 9:18 AM 6/17/2021