Loading...
HomeMy WebLinkAboutSW8130208_Historical File_20130611D I�CE�IR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Thomas A. Reeder Governor Acting Director June 11, 2013 Pastor Robert Campbell New Beginning Christian Church, Inc. 3120 Alex Trask Drive Castle Hayne, NC 28429 Subject: State Stormwater Management Permit No. SW8130208 New Beginning Christian Church High Density Commercial Wet Detention Pond Project New Hanover County 'Dear Mr. Campbell: John E. Skvarla, III Secretary The Wilmington Regional Office,received a complete Stormwater Management Permit Application for New Beginning Christian Church on May 17, 2013 with additional information submitted on June 6, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 130208 dated June 11, 2013, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until June 11, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer -the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conforms to Chapter 150B of the North Carolina General Statutes, and per NCGS 143-215(e), must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Steve Pusey; at (910) 796-7215.. Sinc rely, Thomas A. ee�cting Director Division of Water Quality GDS/sgp: S:1WQS1Stormw►ateftPermits & Project00131130208 HD12013 06 permit 130208 cc: Charles Cazier, PE — Intracoastal Engineering, PLLC New Hanover County Building Inspections Beth E. Wetherill, New Hanover County Engineering Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington; North Carolina 28405 Phone: 910-796-7215.1 FAX: 910-350-20041 DENR Assistance:1-877-623-6748 Internet www.ncwatarquality.org An Equal Opportunity 1 Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 130208 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO New Beginning Christian Church, Inc. New Beginning Christian Church 3120 Alex Trask Drive, New Hanover County FOR THE construction, operation, and maintenance of an overall 24% low density development with one (1) wet detention pond to treat a new high density parking lot, in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 11, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. The site area is described as Tract 2 of the Recombination of Tracts for New Beginning Christian Church, recorded with New Hanover County, signed and dated April 22, 2013. Tract 1 built -upon area was originally constructed before 1988, when State Stormwater rules took effect, and is therefore excluded from this permit. 2. The overall tract built -upon area percentage for the project must be maintained at or below 24% per the requirements of Section .1005 of the stormwater rules. This project is permitted for a maximum of 59,931 square feet of BUA, which is comprised of 39,148 square feet in the pocket of high density, and 20,783 square feet in the low density section. The amount of BUA remaining for future development is 127,621 square feet in keeping with the rules for this overall !ow density pen -nit. 3. The stormwater systems proposed to treat the runoff generated by the designated high density areas have been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 39,148 square feet of impervious area. 4. The project shall maintain a 50' wide vegetative buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 130208 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. Within the low density portions of the permitted project, the only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and as shown on the approved plan. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, 9cres: 2.15 Onsite, ft2: 93,585 Offsite, ft . 0 b. Total Impervious Surfa ces, ft2: 39,148 Onsite streets, tr- 4,316 Onsite parking, ft . 34,832 C. Design Storm, inches: 1.5 d. Average Pond Design Depth, feet: 3.5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMS�: 31.5 Permanent Pool Surface Areq, ft : 13,744 h. Permitted Storage Volume, ft : 19,514 at temporary pool elev. i. Temporary Storage Elevation, FMSL: 32.75 j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: 0.09 k. Controlling Orifice: VO pipe 1. Orifice fiowrate, c s: 0.02 M. Permitted Forebay Volume, ft3: 6,056 n. Fountain Horsepower N/A - PPV <30000 cf o. Receiving Stream/River Basin: Ness Creek / Cape Fear p. Stream Index Number: 18-74-62 q. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. Nobody shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 4. The permittee is responsible for verifying that the proposed built -upon area for the project does not exceed the maximum allowed by this permit. 5. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. 6. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. Decorative spray fountains will not be allowed in the wet detention pond. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 130208 7. The runoff from all built -upon area within the drainage area of the area of higher density must be directed into the permitted stormwater control system. 8. Within the low density area, all roof drains shall terminate at least 50 feet from the mean high water mark of surface waters. 9. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 13. The permittee shall submit to the Director and shall have received approval for revised plans, Specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The protect area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 14. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 15. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 16. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 17. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date may be required. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 130208 III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Water Quality at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part; b. Bankruptcy; c. Foreclosure; d. Dissolution of the partnership or corporate entity; e. A name change of the current permittee; f. A name change of the project; g. A mailing address change of the permittee; 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, ruies, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 11th day of June, 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION zn-i nomas,,A. Keeaer, Acting uirector ivision of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 Pusey, Steven From: Charlie Cazier [Charlie@intracoastalengineering.com] Sent: Thursday, June 06, 2013 4:36 PM To: Pusey, Steven Subject: RE: NBCC Permit Attachments: 20130606160644.pdf Steven, Thank you for your call today. Per our conversation this is the timeline which we have been able to obtain for the existing Church Site. • The site was in the 6o's Wrightsboro Academy. At some Point between the 6o's and early 7o's the site was occupied by Wrightsboro Private Schools, Inc. • In July of 1974 Wrightsboro Private Schools, Inc. sold the site to the Wilminton Jaycees, Inc. • The Jaycees kept the site until November of 83 in which they sold it to the Hendersons. • The Henderson family sold the site to the Rock Church in October of go. This is the timeline of what we were able to find up to now proven by deeds. The site acted as a school in the 6o's up into mid 70's. This school would have had parking and access as necessary. The site continue to be used by the Jaycees from 74-83. The Jaycees are known for gatherings and meetings and therefore would also have needed parldug accordingly. The Jaycees sold to the Henderson family and eventually the Henderson Family sold to the Rock Church in i99o. From the NBCC Pastor Campbell's discussions with the previous Rock Church personnel, the Rock Church occupied the old school building and renovated the existing building to be used for their services. I feel like there is some solid evidence that the existing Church Site should be considered as it's own site and not part of the proposed permit. Please call with any questions or comments, Charlie Intracoastal Engineering PLLC. 91 Pelican Point Rd. Wilmington, NC 28409 910-409-3567 NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is made by Intracoastal Engineering, PLLC unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Tuesday, June 04, 2013 4:32 PM To: Charlie Cazier Subject: RE: NBCC Permit Ok. No problem. Look forward to hearing about it. Steve From: Charlie Cazier [mailto:Charlie@intracoastalengineering.com] Sent: Tuesday, June 04, 2013 3:49 PM To: Pusey, Steven Subject: RE: NBCC Permit Steven, I just spoke with the Pastor. He has been away on vacation and I have a meeting with him Thursday at 11am. He promised me he would bring good documentation as to the history of the site including information prior to 1988. If you could give me till that Thursday that would be great. Thank you, Charlie Intracoastal Engineering PLLC. 91 Pelican Point Rd. Wilmington, NC 28409 910-409-3567 NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is made by Intracoastal Engineering, PLLC unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. From: Pusey, Steven (mailto:steven.pusgy@)ncdenr.gov] Sent: Friday, May 31, 2013 3:34 PM To: Charlie Cazier Subject: RE: NBCC Permit As discussed, please try to get back with me next week to provide proof of the old school building on the Church property. I will call by Wednesday, June 5, if I don't hear from you by then. Thanks, Steve From: Charlie Cazier [mailto:Charlie@intracoastalengineering.com] Sent: Friday, May 31, 2013 12:14 PM To: Pusey, Steven Subject: RE: NBCC Permit Thank you, and have a great weekend, Charlie Intracoastal Engineering PLLC. 91 Pelican Point Rd. Wilmington, NC 28409 910-409-3567 NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is made by Intracoastal Engineering, PLLC unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. From: Pusey, Steven fmailto:steven.pusey a0ncdenr.govI Sent: Friday, May 31, 2013 11:55 AM To: Charlie Cazier Subject: RE: NBCC Permit Okay. I'll go with that. Steve From: Charlie Cazier fmailto:Charlie@intracoastalengineering.com] Sent: Friday, May 31, 2013 11:47 AM To: Pusey, Steven Subject: FW: NBCC Permit Steven, Attached is the approval for the New Beginning CC Building permit. Please also find attached recent New Hanover County Stormwater and Sedimentation and Erosion Control approvals of the plan under review. I feel this is good documentation that New Hanover County is allowing the Existing site to stand on its own as we have proposed. Please let me know if you need anything else, Charlie Intracoastal Engineering PLLC. 91 Pelican Point Rd. Wilmington, NC 28409 910-409-3567 NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is made by Intracoastal Engineering, PLLC unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. From: Tammy Wynn fmailtombccexec(dgmail.com] Sent: Friday, May 31, 2013 11:10 AM To: Charlie Cazier Subject: NBCC Permit Hi Charlie, Is this the permit you are looking for? Tammy Wynn Executive Assistant (910) 341-7984 ofc (910) 489-6221 cell "Changing lives through the power of the Gospel... 11 1 1 MID ',cl gRlW, )1604— F Lf8B0. PAGE miOO9 m 46t PC am" taagaa .. as au�aws swan mu twoB. a+ PNIgFm i SC01T 3 ii' et ce .e.. 11a►atM our sd,.— _ i(L d_._ _Je1T, 117.4,_ {41U fAlYA4&_ . ---SCNOWv-1NC., • a •North •Caraliw •keg-proft"erporatloe,— w ...' . @"p n 6101 boom WA Wines WM/ so b Woe d W N.r d aM mm ._�... �..Yr.�� OIMW, twoJR1211NQ1011.JAIU 8,-1SdOgR0811T60_ m#mr" aWtt l�epa W gems, M aw.r4o,I d ha aww d.N dMp vMvet1 w�weaeat Y a W akww 1M wn�d d .rnl mw b!p an e,epeu*ee re awb Ma'b ant eMwoa.pr heab aerw,a, w�i r,f w�+a rM� Ali errN„r, wr Nw. w freWww� ��w Nw�n,, M MOM IN Wed Y Well a.agk C"16 WO CIMM is CABUC. Noysa_--.•.TewrNe. ear swaeedab ktpefaapd r Ire.e. HE3 Oylgt 8Fti18NIN0 at a iron pipe iq a dl !a the dividing line between the of Rowia Noses sad the lands -of Alex M. Trask, tea said Iran pipe 6104 loeatad South 370 42 alaaNs scat 1A28.41 feet fthe North sit eorkar of Lot 6 In Sitioo 3 of 119191111411096 Aerp, amediag to the sap thereof tamrdod y in Map gook 9 at Pap Me of the Now Neaarer County Rwatry; wad Beginning point alga bolag the North salt Corner of Alex Trask 9rlve, an the mane is f �OirYtl1 ehaak au the sap of Vtighteboro AaAW Property duly recorded Ia the Now Renewer Y S 1 1 S 5 County dogietryl ranking theaca from said Beginning point and with the 8aetere rlgbt of way like of Alex Ttook Drive, Sstth 40 02 minutes Vogt 333.S fast to I blot; thants South 490 38 nisatas Poet 262.4 feet to a point; theme North 46 02 mtkotea sit 367.68 feet to.a point in the sorthown line of Alex 2rask y ptaparty; running thwa with SAW like Meth 570 42 stash Waot 264.22 fast to � a the point of Baglosiog. eantataiag 2 mcri. •17 MW IS1i 310111111110 at A Iron pipe is a ditch in the dividing live betrom the 1aaWa of Rawls goal and the Zeds of Alex N. Trask, said iron pipe being lonated South S79 42 chutes Rest 1118.111. feet fro'the north Pit prang of lot 9 iv ' Section 3 of Melgletabore Agri. ateordiag to the smapP tbaraal rpseded ia'Nap Ronk 6, at Pap IN of the NM niowar CeYaty Roglatq; said Region," point ' aloe being the Much lastoeraw of Alai TVs* Drive, as the Sage is shook an tbe• lisp ofitoboro Aadoa Tao err duly snoardad !a the gar Ramwr County �StrYi miag pout sad with the Raaeerk right of wy ligc of Alab inet SrIlae Routh O2 edwtar ikst 333.3 ieae es a peiot; el►eaee Routh 4 38 staetaa gust 99S.t6 Ease to a poise; twoloe thsece north 26v is adnutu 43 aeakds opt i11.ra loeL to a psmt !a the nnoo��ehern ilea of the Alai Trade ptopet0; ttwplsg tkak& wlik M1d liN North S7� 4L aikeetaa mat 316.23 fort w tba point of batfssi�a= coma* �• @.6 sores net. exteptlkg a aerLOU tract of land deadad Ftes Alex N. Track sad viFa, Virginia C. 2tiaLis to WeigUshern Private gchpla, 1ac., dated Joly 3. 1972. and recorded $a Rook 943 at tags 799 of the New Ssoawor Cowry hgUtry. vet agora rsse ar eared • 943 I69 w maa+ra eat k.nei.0 x sus saw —Sit •�57� mw ww orw armor tsw Comia�wa_r a� emir we�a ee e w ar Moslem ar ammo,111611 a thwi See ASA no at pa'ie ww' v"gar.riiaraWWrw.pa..4� a�i w"ii me Will W~ IS Me awwe ease WAW agar So agree , Y Tram naaaa am dW sneer an aver go arm ea be gad air ee MMer orb mre 4 m rue er r� pla�^.FlS9011! PRICATR SCE... LNC. sums its � � m5p Nave iu.kplk r a air wwira b a" neft Male on awn Y u..rrjr en kr �l:J+• . arrlri YYIe.�.Y =� r .. MAlaer. w a.bq w�i�r.wara�dmw a..�aapw Y.rlww wr.ynd Y w veep ty w —"QmwlL ear Was alum no sad at ddplm/ orb •a ` ' `` ,rsq era. as avenge a�rr....�,.�,,,,.�,►_,,, M•� STAR N f®aea CLAN U14 C"VV or save Mweelta _ rM ar.9xa MIdWt# w Aanas . Hos�'e �+w. mkeeq ewaeM ---N" ft"=yg�...MmIR m. C. Y MOM r r MNR C• Lefty •• of .-Beoda . 4 i .r `-- aapm spoken r eare d me. "eme CwM flecolved and N000rdad ,k o July lie 1974 .1-137k - •- i=tea e:�� �'elr leagfater of oom +4V'- I 10wlook FA0E il., ' ' ' i-RIOADVIUDURIPIN 1239 0544 1 TE F NEwNhNOYERdP Nor 23 3 35 M 113 6 r1w V le S 0 0;= 5 Recoraw 7hm aw* was Her Tax LA No............_........_...._._ ... .......... ..... ............ ... . ..... ... Parcel Identlaer No. Vatfimby ...... ............................. .... ....... . .... ..... ...... County on the 'Tay of by--.— ..... . . . .................. .... . ..... . 1-,.---.. -11 ... ..... .... ........ . .. ... Mal anerneordiall to.0.4mile. 944, Acn-ft, PKFA, 94 44004- ...... . . . . ....... . ..... . . ­ . ... ... . . ..... Thk lashument was prepared by 1111?Wta- Attg=eff- Pt. XAX Brief description for the Index NORTH CAROLINA GENERAL WARRANTY DEED T= DEW made this . .... ....... dayd.. ........... n 03 . by sad between GRANTOR GRAMNE WILMINGTON JAYCEBS, INCORPORATED CLAUDE R. HENDERSON and Wife, KAREN R. HENDERSON 2282 Morning Point Book Creek, ON 44084 68 926V IS DPPWftk 1110* 18F ONk 101011. IsHiL ad&U% 104 It MW=Fbl@6 C1121021tr Of 0007, 84 Cavitation OF jaMmuhh1. The dulignation Grantor and Cranks an used berets *hall include said parties, their heir, soccesesm and asam and @Wl Include singuier, plareL mucalinq feminine or asular as required by contest WITNEMETS, that the Greater, for a valuable consideration paid by the Grantee, the neelpt of which In hereby admewhdital, ban and by Owe Fesente dean errant. bargain, all and movey unto the Grantee in fee simple, all that certain lot or panel of load Wanted in the City of .. - - I Cantle Bayne Tou-nakip. ... -AW-1111MIUM... County, North Carolina and more particularly described as folivira: MM ATTACKED EXHIBIT "A" RMNEDW '6"--frv q7 ull�7 01 —f 3 Pi BOOR PAIL 1299 0545 Tie pmspeety beniae6we dwYarlb1ad sru aquind b Grantor b! lnetrumeot rtrdrded fo ..Bf�Gilc ..�.i1.Q.�.. et .>'Itgfl.. ... l..slf.._t l !..8anioger„County-me�igtr . of„Deeds....... .................. ..... A sap showing do above dumedbod property is mended III Plat Book .- .................... pap ............: . TO HAVE AND TO HOLD the ofeeoeyii lot or parcel of lead and all privilapa and appurteoanees thereto belonging to Me Groalso in iM almpla. And the Greater eovenubs with the Grantes, that Greater Is asked of the premises in fee simple. bad the right to convey the ueM to fee aisplo, that tilt is marketable and free and clear of al encumbrances, and that Grantor will warrant and defend the title against the lawfui claim of all person wbomsowor oYcspt for the exceptions hereinafter aided. Title to the property bens cusbova deseribed Is subject to the following exceptions: Rantrictiom of record, if any. as wrrwana sumnaoe O� oraeer W aeaaw Mw No lug ar rrd. w Y arraah as arty IW WeeraMan q M eYeeS L IN b 1M dw aareaeiad NnrMe ar lea art a as aaeMMw ddrr ar ■NaNIV .� IN araN N Ylrnrrn, w do a rear rant ._..............»...-----------_-.------_--._.__-----SMKek± m asZ- ° .. rinse! .....tsrsu �ylif�' :ae..a.rrtcNp.rwaro _._.......... psad.t '." ;'•,: nsoarr eass+na...»»A/wt l-rai s!- :.. eka■r s.daa ■r rag Crew re Bea SkU act:. earnm- ,, :------------_-._.._.-._...... .....----•- aten waft sopaer dNae M ON Gar ar ad awk4gee nM a■eaYr of we airs9m aaerrnat wIYM No, -'• •ti • tlhlNt �� a rage, W Nnk1N aeup ar aa4 ear ._..---- dq N.---....»---»...-- ...............». u._-__. 4hrr:nn:nne� mre■MIAameaplM!................... —........................................... __ me" paaue aalp 1dOarY �••_�lr�, ..__.._.! _Naa9YATa...... C■ndF phillip a. gglCT ��r ; a nacre atMk N a■ Cauy AMA aa6 Marrrd4 awar Wt..................»_.........._..-....... �r1ON dr+r}e leraa4 aYn Nag M wa or and add kdard not.... k k-_-.--___..___---------- aaaaey N 1 �pS�P.F : � wra mpalIM a,d wet b awtw dw eye at.es sM as raw get N Ur eananWa4 rat rmRNaR rYa.ue wa adpel r W a.s b W ! sraoMMa1. Make VIO IN ■'a/naa ■M rY ■ am" by _..kin,._ ,Ida ----------- -----_'_—___ awrar7. 4r PUBLIC 3 Woun ar Oar Mr dead rw . ML nk ?AM, N _. l .. 63 .. .�.... n.._.—... i APAL aap.rau.WNa apIM:»�raz---- -------- ..... ..�. YNan dew. 4........................................... ..»_--_.-_.... ........... »-----...................... _.--...... .-............... .....-__.......... ..................... ..-.......... �/ . a —Ma be l- - xaY Y"Wess ad wn MWft M an ddr aeMeM at On bu Mr and aIn Iae ere 909 eye ARM a w rya P. .EMWM W aleYa p'OY..... .............MYYn p ... HAMM •--_'t_LdGiGCJ�F[7M�.................YeNV/AratW.lRMer N anB rag saraaw. gar rnw a o rela- eenind jars. - Feinted by Edwards Brolbom Inc. Caralina. 800N FADE 1239 0546 SXHiHIT A PRDPERTY DESCRIPTION ISM ONBs MINING at an iron pips in a ditch in the dividing se between the lands of Mavis Bosand the lands of Alex H. Trask, said iron pipe being located South 57. 42 minutes Bast 128.81 fast from the Korth Bast corner of Lot 9 in Section 3 of Wrightaboru Acres, according to the map thereof recorded in Map Book 6 at page 102, of the New Hanover County Registry; said Begi ning point also being the North Bast cornet of Alex Trask Drive, as the same is shown on the map of )Erightsboro Al s= duly recorded in the Nov Hanover Conner XXC 9 Ukience from said Beginning point and with the Eastern right of way line of Alex Trask Drive, South 40. 02 minutes (Pest 333.5 feat to a points thence South 49. 58 minutes Bast 262.0 feet to a point; thence North 40, 02 minutes Bast 367.60 feet to a point in the northern line of Alex Trask propertyl running thence with said line Korth 57. 42 minutes Nest 264.22 feet to the point of Begin- ning, containing 2 acres. TRACT 2=1 BEGINNING at an iron pips in a ditch in the dividing ne tween the lands of Rsavis None and the lands of Alex K. Trask, said iron pipe being located South 57. 42 minutes Bast 1128.81 feet from the North Bast corner of Lot 9 in section 3 of Nrightaboro Acres, according to the cop thereof recorded in leap Book 6, at Page 102 of. the New Hanover County Registry; said Beginning point also being the Northaest corner of Alex Trask Orivo, am the same is shoat on the llsp of Nrightsboro Academy Pro- perty duly recorded in the New Hanover County segistryi running thecae from said Beginning point and with the Eastern right of way line of Alex Trask !Drive, nth 400 02 minutes Nest 333.E feat to a paints thence South 49. 50 minutes mast 595.16 feet to a point; running thecae North 28` 18 minutes 45 seconds east 411.55 fast to a point in the northern line oY the Alex Trask Property; running thence with said lima North 57a 42 minutes went 516.25 feet two the point of beginning, containing 2.6 acres net, excepting a certain tract of land deeded from Alex N. Trask and wife, Virginia C. xrask, to Wrightsbmro Private schools, Inc., dated July 5, 1972, and recorded in -Book 943 at Page 369 of the New Hanover County t1m with a 60-foot right of way and easement for iagre b. se, sad regress to and from the above -described property over Trask Drive as the mama is shorn on the map recorded in Book at Page 719 of the Now Hanover County Registry. sea. meee:a�w • as eua.rrenr w�wwaae� ' maN1eM q- 'QUIT ot.DilUtteso, sMrt t AM49tut6m Peru No. me (Resdated 4101 99ff•CLAIM o * Claude R. Henderson, Divorced and Not Rmmied for valuable consideration pad, grants(s) to ry Divocced and not RanNrried Ok of kd*abW& Raven is. ltesdaraan 2282 Morning Point. Nods Creek. Ohio 44064 In it 2 no PH V County, Ohio . whose ton -moiling address ' the following REAL PROPERTY: Situated in the County of Nan Hanover in the State of C o o�1 na the TmMhip of Castle Hayna : M TnWr ONss WMNN= at an iron pipe in a ditch in the dividing line between the lands of 70—Homes and the lazdis of Alm M. Trask. said iron pipe being located South 57. 42 minutes Bast 1126.81 feet frost the North Seat corner adf Lot 9 in Section 3 of N'r3ghtsboso Acres. according to the map thereof recorded in Map Book 6 at Raga M. of the New Hastover County Registry; said Beginning point also being the North Sant corner of Alex Trask Drive. as the ease is shaken on the amp of ;trig h"boro J por0mR arty du7.v recorded ass the Mew Hanover County Registry; sunning troom fraas saint and with the Beatern right of way line of Alex Trask Drive. South 400 02 snin uWs treat 333.5 feet to a points thence South 490 58 minutes past 262.0 feet to a point: thence North 40' 02 minutes But ing thmee with said 11M North 5767-66 feet to a * 42 mintues Iin the n 1� 254. 22 feet tline at Alm he point aegisming, tottaininsg 2 So=. TRACT ;bps BEGGIMM at an iron pipe in a ditch in the dividing line between the lands of law" homes and the lands of Alex M. Trask, said iron pipe being located South 57' 42 adn- utes Bast 1112.81 fast frM the North Best corner of Lot 9 in Section 3 of Book G. at Page 102 of the New Hanover County Registry; said Beginning point also being the NorthBast corner of ASex Vk=k Drive, as the Base is shows an the Map Of lnksghtsbaro Aandmo 't reeo�d In the New Hannover County Registry: running thence from rrorg nat=rt men efs nee kilisFx� he 1 Alex Tr k crive, South 409 +�• age o t e R*cords of Now Hanover County, Moat North Carolina a owal No Witness my hand(s) this 26th day of January 19 87. 5i ed d� acknthe pros�rice of: ass 1> CLAUD6IL State of g1,s,'0YAe.#ayq County of&,e6rA6r.,e.11 as. BE ;T REMEMBERED, shot on this '6 — day of , 194f , before me. the subscriber, a Notary public in and for said coup , personaHenderson Hy come, Clams R. the Grontor(s) in the foregoing Deed, and acknowledged the signing thereof to be his volutifary act and deed. IN TESTIMONY THEREOF, I have hereunto subscribed my name and and year oforesoid. This instrument was prepared by 1. N— .I ar.w- W and nwda] rAhs. %. 7. enrigd�n of % d or kennel dnnM► ✓ M,undnw.� :.cccr-wMti uapguw. inner na Borne,". d Mrji. S. Or1nN . %our dw, •N .Pfau /. Suutn.. In nnndsnw *a agar Ml N du bdad GM of OYW. Aw~o nod % u.drr. sl.nM. 096138 gy 11111 NUMTO 00"y C4%r6%a 0961 ss, !iy gr2n✓ •as Suwon 5=11 oeb Swing C.r1, day Be tt PAGE 1372 0148 02 Wnutes Hest 333.5 fast to a POinto tlmae South 49' 58 Minutes, Bast 595.16 fast to a p ruasiig thaws North 28' 18 mim*w 45 seconds east 411.53 feet to a paint in the north- elcn im of tin Piet Alan to Traskhs eft cuming of Lin thmm with mW Nwth 57' 42 mkmtea txaot of land deeded frW AIM M.Trask andd wife. Virginia �k,es get�t Private 8hoou, Inc.. dated July 5. 1972. and mcmWed in Bock 943 at rage .359-cr tthe New Hanover Ow tty 0e932tey. Tcgathw with a 60-foot right of way and eaeeeattt for fngmes. egc . and resgam to and fsm the above-dauxibed property weer Alex Trask reeve as the mn is sham an the map reoceded in Book 939 at page 719 of the New ftwuar om*y Asgietzy. STATE OFRY N N CAR"A Nmr ussa,Ow The Fewpft Cmam of __-`- Rklrl=X A- as hyaA ICL_ __"----- This the 22addy or Aer11 - j9d7 Pusey, Steven From: Charlie Cazier [Charlie@intracoastalengineering.com] Sent: Friday, May 31, 2013 11:47 AM To: Pusey, Steven Subject: FW: NBCC Permit Attachments: NBCC Building Permit 2012.pdf, 20130531114103.pdf Steven, Attached is the approval for the New Beginning CC Building permit. Please also find attached recent New Hanover County Stormwater and Sedimentation and Erosion Control approvals of the plan under review. I feel this is good documentation that New Hanover County is allowing the Existing site to stand on its own as we have proposed. Please let me know if you need anything else, Charlie Intracoastal Engineering PLLC. 91 Pelican Point Rd. Wilmington, NC 28409 910-409-3567 NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information containcd within this correspondence is provided for your convenience. No assertion of accuracy is made by Intracoastal Engineering, PLLC unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. From: Tammy Wynn [mailtombmexecOgmail.coml Sent: Friday, May 31, 2013 11:10 AM To: Charlie Cazier Subject: NBCC Permit ArfcksSaf Pec,f e4 W/CGer/. C Gi 2r�r Hi Charlie, Is this the permit you are looking for? Tammy Wynn Executive Assistant (910) 341-7984 ofc (910) 489-6221 cell � s rs� t✓� ToI,C r'!r'o% we 44of 4v 4ftwr- s r� Drbo� ofC ?re -�� �rsrIc�r.a � Tdb� 1G.ecPrwc if �'ytCr�t��.Q. /'� sls•v%O� e ySIJJ� 3 b" &-S--13 . / BeA wee.', %, i✓H� : (I tT "Changing fives through the power of the Gospe&.. " M3 . y p 0 Qua 'tu �Vcxc U�c�� bract -A 1M�^ �) `.! A' C Ptir c figV r Q�K ra ®/I1 0$Tsk454;., �b�i'� 1 S go � o0 0 ill fi�Ms. p le i Z 01 1 1-� l� 163 7 5P �Ir�s. N W HANOVER COUNTY Engineering Department a Government Center Drive • Suite 160 Wilmington, North Carolina 29403 TELEPHONE (910)-798-7139 Fax (910) 798-7051 March 8, 2013 Intracoastal Engineering, PLLC 91 Pelican Point Road Wilmington, North Carolina 28409 Attn: Mr. Charles Cazier, PE RE: New Beginning Christian Church Dear Mr. Cazier: James P. Innnacd, PE, CFM County Engineer T. Jason Clark, PE ChiefProject Engineer We have reviewed the application and submittal package for the above referenced project and have issued an "Authorization to Construct". Any deviations from the approved plans will require re -submission. the approval issued by the County is that the application and supporting documents are complete and in accordance with the requirements of the ordinance. Nothing whatsoever in the approval should be construed as or be deemed to create additional duties on the part of the County of New Hanover that are the responsibilities of the Owner and the design professional. If there is a need for a change in ownership, an "'Ownership Change Form" must be submitted and a fee of $100.00 will be required. Please be advised, if the land disturbing exceeds one acre, the project will need a Sedimentation & Erosion Control Permit prior to the disturbance. Please note: Upon completion of the construction requlmd by the "Authorization -To -Construct" the design professional's cenVIcathm nn ast be delivered to the County. if you have any questions regarding the foregoing information, please contact our office. Siiefl ClarkCacer Cject New Hanover County TJC/pdj cc: File #574-03/08/13 Pastor Robert Campbell — New Beginning Christian Church, Inc. IbO --o` S NEVI HA NOVER COUNTY Engineering Department 230 Government Center Drive • Suite 160 Wilmington, North CaroUua 28403 TELEPHON% (910)-795-7139 Fax 10 798-7051 May 10, 2013 New Beginnings Christian Church, Inc. 3120 Alex Trask Drive, Castle Hayne, North Carolina 29429 RE: Grading Permit 0 3-1& Revision GP 38-90, New Beginning Christian Church Dear Mr. Robert L. Campbell: Beth E. Wetherill, C.P.E.S.0 Sod Erosion Specialist This office has reviewed the revised subject sedimentation and erosion control plan. We find the plan to be acceptable. Please read the Permit conditions carefu1A and return the sifrned blue orislna�l to nut ali7ce and keen the cm for gout recur -A The land disturbing fee of 182220 is due to be paid to New Hanover County Engineering, to Beth Wetherill's attention, upon receipt of this permit. A preconstruction meeting is required prior to any land disturbing activity on site. Please contact us at (910) 789-7139 to set this up with us. Please be advised that a copy of the approved soil erosion plan and a copy of the issued grading permit must be available at all times at the site. New Hanover County's Erosion and Sedimentation Control Program is performance oriented requiring protection of the natural resources and adjoining properties. If following the commencement of the project, it is determined that the plan is inadequate to meet the requirements of the New Hanover County's Erosion and Sedimentation Control Ordinance, this office may require revisions in the plan and its implementation to insure compliance with the ordinance. This permit will not preclude any other permits or approvals necessary for beginning or completing this development. It is the owner's responsibility to have all the approvals or permits that are required prior to beginning suit uc*.ion. Approval of an erosion control plan is conditioned on the applicant's compliance with Federal and State Water Quality laws, regulations and rules. Respectfully yours, -boq,, w xL Beth Easley Wetherill NHC Soil Erasion specialist cc: Linda Paint, NHC Zoning Charles Cazier, Inbacoastal Engineering PLLC FEe,-2=2011 01:30P FROM: TO:19193659591 P:1/4 NEW HANOVER COUNTY INSPECTION DEPARTAIFNT BUILDING PERMIT Application Number . . . . . 10 00014940 Date 2/01/11 Property Addr as® . . . . . . 3120 ALEX TRACK DR Tax Parcel 'Number . . . . . . R03308-002-009-000 Tenant nbr, name . . . . . . NEW BEGINNING CHRISTI'AN Application type description BLOC NSW CHURCHES & OTIiER RELIGIOUS BLD Property Use . . . . . . RESTDE'NMIAL Property Owner NEW BEGINNINC CHRIST'IAN CHURCI owner address 401 17TH ST S WILMINGTON NC 28401 Contrattor G & G BUILDERS OF WENDELL TNC EMAIL 7IM9GGBUILDERSp C • COM ## TO : J 1MOGGBU --- structure Intormation 000 000 CHURCH BLDG-METAL BLDG W/BRICK VENEER Occupancy Type . . . . . . ASSEMBLY TYPE 2 Flood Zone . . . . . . . NOT APPLrCASLE Other struct info ACRES DISTURBED 9 FLOOR ELEVATION X BASE FLOOD ELEV t 2 FT X BIN NUMBER C5 FAST TRACK X TS FOOD/BEVERAG9 SERVED? YES FREE. PERMIT RECIPIENT? NO SETBACK - FRONT 25' FLOOD ZONE NO SETBACK.-LH STDB !NTERIOR 20' BUFFER SETBACK -LA SIDE STRSE,r NA NC: DEPT OF INSURANCE X OCCUPATIC.Y LOAD 1442 SETBACK - RRAR 20, SUPPER SETBACK-RH SIDE INTERIOR 20' BUFFER SETBACX-RH STDE STREET NA SEVER PROVIDER CFPUA SHELL a NUMBER OF STRUCTURES X NUMBER. OF STORIES 1 TS TH18 &WEEPSTAKES PLACE No TOTAL CONSTRUCTION COST 2593534 TOTAL SQ FT UXDER ROOF 19132 NUMBER OF UXITS X UlPFIT X VALUATION CALCVLA1°10I4 R WATER PROVIDER CFPUA Permit. . . . . . . '*BLDG= COMM NEW ASSEMBLY 2ERMTT BCOl 00 Additional desc . . NEW METAL RLUG W/BRICK VENEER Prone Acceps Cade 4746301 Permit (Sin number 4746301 Issue Date . . . . a/01/1.1 Valuatian 2593524 Expiration Date . . 7/31/11 Special Notes and Comments AREA 2/NEW BEGINNING CHRISTIAN CHURCH/ ` FEB-2-2011 01:30P FROM: TO:19193659581 P:2/4 NEW HANOVER COUNTY TNSPSCTTON QEPT. 230 GOVERNMENT CENTER DRIVE SUITE 110 W16M'INGTON NC 28403 DAIS: 2/01/11 RECEIPT #: 0000169687 TIDIES: 10:13:06 CASHIER: TMOSER APAT+T-CAT10N NBR: 10-00914940 RaVERENCE: BLDG PERMTT/3120 ALEX TRASK DR ITEM DESCRIPTION PAFD --•-------------- PEP141T FEES 1573.13 TOTAL AMOUNT PAID= 1573.13 PAYMENT 'HYPE: CHECK CHECK NBR: 000003033 `F26-2-2011 01:31P FROM: TO:19193659581 P:3.14 NEW SANOVER cOUNTY TNSPECT'ON UENA(2'LMENT 5U7LDING P8RMI7'- - 2 --------------------- Date 2/01/1) _ 10-OOpigggC _ - _ _._ _•-•-- r,pplication ape Notes and Comments LW C:BURCH SLAG C0391STINC OF METAL BLDG W/BRICK VEN291/5" review #2/b, e, Mr P/o9p IN58ECTION MtNT�il�l ZONING COMMERCIAL pERHEfT REOUI!�RD, 1,or landscape islands. 20' Shrubs need to be added to intecent to residential. vegetative buffer povad edtad a ng permit i0.6974. :ep Landscape plan app ------ "Ali lnYp&etionz requeata should be made 24 hrs. in advance. ? iONE: (9 0) 798-7151 ##EN.D ' ^ FE8-2-2011 01:31P FFOH: �2211 MOW n Pussy, Steven From: Pusey, Steven Sant: Thursday, May 23, 2013 4:30 PM To: 'Charlie Cagier" subject. RE: New Beginnings Christian Church Charlie, Hopefully, the letter from New Hanover County authorizing the reconstruction will help to tie it to the pre-88 original construction. This may be all we need in order to permit the project as is. If you can find other information such as a building permit or blueprints, that would be great too. I will put on my calendar to check with you next Tuesday. Thanks, Steve From: Charlie Cazler f aiito:CharlieDintracoastalengineering.coml Sent: Thursday, May 23, 2013 4:05 PM To: Pusey, Steven Subject: RE: New Beginnings Christian Church Steven, In the February letter it was my assumption that it was built prior to 88. I will do my best to find out the exact date that it was built. Please know the original site was built by a different owner and had nothing to do with the site we are proposing at this time. The original church burned down and the current owner did rebuild the church in a similar footprint as to the original as authorized by NH County. I can obtain a letter which authorized the Church to be reconstructed in the original footprint. Please give me till Tuesday to obtain this information. Thank you, Charlie Intracoastal Engineering PLLC. 91 Pelican Point Rd. Wilmington, NC 28409 910-409-3567 NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is made by Intracoastal Engineering, PI.LC unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. From: Pusey, Steven Cmailto:steven.ou5ML ncdenr.gov] Sena: Thursday, May 23, 2013 3:50 PM To: Charlie Cagier Subject: New Beginnings Christian Church Charlie, In your response received May 17, you stated that the existing church and parking area were an offsite parcel built in the early 90's, not part of our requested permit. Earlier, on Feb. 5, you stated that the original church was built prior to 1988 and that it's reconstruction was reviewed and accepted by New Hanover County. It seems to me that the existing church and the new parking and drive are now a common plan of development. However, if the old church / parking was built prior to 1988, then it can be ignored unless it drains to the new pond, which it doesn't. So, please verify when the old church was built and/or provide a notice from the County about its approval of the reconstruction. Thanks, Steve e ve G. A"AXV Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 Before printing this email, please consider your budget and the environment E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Intracoastal Engineering PLLC April 30, 2013 NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: New Beginning Christian Church SW8 130208 PN 100-083 Dear Mr. Pusey, I response to your Additional Information request April -16, 2013 we offer the following: 1. Copy of Recorded Recombination Map (MB 58 Pg 26) accounting for the property lines provided for our project. 2. Signed Sealed Swale Calculations. Please review for approval and contact us with any questions, comments or additional information needed. Sincerely, Intracoastal Engineering PLLC (earles "D.Cazier, P. . CEI%JE MAY 01 2013 91 Pelican Point Rd. Wilmington, NC 28409 (910)409-3567 4/19/2013 CDC NBCC 10yr Swale Calculations 100-083 Swale Calculations 3 :1 swaies RH = [(3)(D) / 2(sgrt(9+1)] 0.47D A = (3D)(D) = 3D2 Q = (1.49/n)(A)(RHP(S)112 Q = (1.49/n)(3D)(0.47d)(S)"2 Dw3 = [(Q)(n/1.49)] / [(3)(.47 f(S)v21 Swale No. 1 Drainage Area = 0.88 acres Intensity "I" = 7.23 in/hr Runoff "C = 0.63 Q = CIA = 4.01 cfs swale length = 1004 ft. difference in height = 4.00 ft. Slope (S) = 0.0040 n = 0.03 D = 0.71 D = 0.88 ft. Vel. = 1.74 fps Swale No. 2 Drainage Area = 0.47 acres Intensify "I" = 7.23 in/hr Runoff "C" = 0.72 Q = CIA 2.45 cis swale length = 144 ft. difference in height = 1.00 ft. Slope (S) = 0.0069 n = 0.03 Dw = 0.33 D = 0.66 ft. Val. = 1.89 fps v 1� JID 3 3D Swale No. 3 Drainage Area = 0.46 acres Intensity "I" = 7.23 in/hr Runoff "C" = 0.72 Q = CIA = 2.39 cfs swale length = 40 ft. difference in height = 1.00 ft. Slope (S) = 0.0250 n = 0.03 D8/3 = 0.17 D = 0.51 ft. Vel. = 3.04 fps bwaie No. 4 Drainage Area = 0.14 acres Intensity "I" = 7.23 in/hr Runoff "C" = 0.5 Q = CIA = 0.51 cfs swale length = 140 ft. difference in height = 3.00 ft. Slope (S) = 0.0214 n = 0.03 Dm = 0.04 D = 0.29 ft. pQ: � ESS/6 .-P ° SEAL_ r' _ - v 032555 o - ECEIVE MAY 01 2013 BY: 4M0/2013 CDC Swale Calculations 3 :1 swales RH = [(3XD)12(sg4(9+1)1 = 0.470 A = (3DXD) - 3DP Q - (1.49/nxAKRH)O(S)112 Q - (1.491hXWX0.47d)"(S) 2 DP = [(QXn/1.49n / [(3)(V Ss m] Swale No. 1 Drainage Area = 0.88 acres Intensity "I" = 7.23 In/hr Runoff "C" a 0.63 Q = CIA = 4.01 dfs swele length = 1004 ft. difference In height = 4.00 ft. Sbpa (S) - 0.0040 n = 0.02 D&° _ 0.47 D = 0.75 fL vet. = 2.35 NSCC 10yr Swale Calculations v 1IL ID 3 3D `�1111i111j/l�. CA R 0, 4,111, Q ; •LES5/0 •a SEAL r. 032555 ' • 1 100-063 2/20/2013 NBCC 100-083 CDC Pond Calculations Total Drainage Area s . ft. acres 93,585 2.15 Impervious Area Land Use s . ft. acres buildings 0 0.00 parking/asphalt 39,148 0.90 future 0 0.00 Total 39,148 0.90 Stormwater Calculations: Time of Concentration Hydraulic Length (L) = 320 ft. change in Height (H) = 4 ft. Tc = (L' /H)a""/ 128 3.58 min. Flow for 1 year, 24 hour Storm (Q,): QPRE _ (CPRE) X (11) x (Area) 1.56 cfs QPosT = (CPosr) x (11) x (Area) 3.43 cfs Detention Pond Design: Pond Size: Elevation ft. Surface Area .ft. Normal Pool 31.50 13.744 Flood Pool 32.75 17,479 Top of Bank 35.00 21,944 Bottom of Pool 26.25 2,037 % impervious = 0.418 = 41.8% say 42.0% CPRE = 0.25 CPosT = (% imp.)(.95)+(1% imp.)(.25) 0.55 11 = 2.90 in/hr 110 = 8.13 in/hr Flow for 10 year, 24 hour Storm (Q,0): QPRE _ (CPRE) X (170) x (Area) = 4.37 cfs QPosT = (CPosT) x (110) x (Area) 9.61 cfs State Surface Area Requirement at normal pool: IPond side slopes = 3 :1 Depth below N.P. = 3.5 ft.. SA/DA = 0.0420 (Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter Required SA = (SA/DA) x (Total Drainage Area) = 3,931 s . ft. Provided Storage Volume: Average Depth Calculation: Vol. _ [(Normal pool SA + Flood Pool SA) / 2] d= [0.25 x (1+ BVS SA/NP SA)] + [((BVS SA +Btm SAY2)x(D/BVS SA)] x (F.P. elev. - N.P. elev.) - 3.42 ft 119,514 cu. ft. State Volume Required for Storage of first 1.5" of runoff: Rv = .05+ .009(% imp) 0.426483 V= (Design ralnfall)(Rv)(Drainage Area) 4,989 cu. ft. EUEIVE FEB 2 5 200 4Y: CAprt���! R ® ®sue a SEAL r`, - • 032555 _ P G I NE��:������ 2.70 100-083 pond design 1 of 2 2/20/2013 NBCC 100-083 CDC Pond Calculations Pond Volume: Bottom SA = 2,037 sq. ft. el 26.25 Btm Vag Shelf SA = 7,336 sq. ft. all 31.00 Normal Pool SA = 13,744 sq. ft. all 31.50 Vol. _ [(NP SA + BVS SA) / 2] x (NP el. - BVS el.)+[(Bottom. SA + BVS SA) / 2] x (Bottom. el. - BVS el.) = 27,531 cu. ft. Forebav: Required Volume Vol. = 20% of Temporary storage provided 5,506 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for Required Volume Q = Required Vol. / 172,800 sec. (2-days) = 0.029 cfs Required Area of Pipe for 2-dav drawdown: A= 0/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./s2 h = (F.P. elev: N.P. elev.) /3 = 0.75 ft. A = 0.0069 sq. ft. Diameter of Pipe for 2-dav drawdown: DIA. = SQRT[(A x 4) / pi] 0.0939 ft. = 1.13 in. "Use: 1"in diameter pipe Drawdown time 1" pipe = 2.7 days Provided Volume Vol. _ 6,056 cu. ft. Flow for 5-day drawdown: for Required Volume Q = Required Vol. / 432,000 sec. (5-Jays) 0.012 cfs Required Area of Pipe for 5-day drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ftJsz h = (F.P. elev. - N.P. elev.) / 3 0.75 ft. A = 0.0028 sq. ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) / pi] 0.0594 ft. 0.71 in. 100-083 pond design 2 of 2 RWIAS A 'o* i A I "I ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director April 16, 2013 Pastor Robert Campbell New Beginning Christian Church, Inc. 3120 Alex Trask Drive Castle Hayne, NC 28429 Subject: Request for Additional Information Stormwater Project No. SW8 130208 New Beginning Christian Church New Hanover County Dear Mr. Campbell: John E. Skvarla, III Secretary The Wilmington Regional Office received and accepted a State Stormwater Management Permit Application for New Beginning Christian Church on February 25, 2013. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Currently, the New Hanover County website shows this property (R3308- 002-009-000) to be 11.67 acres. Your drawings show that a large part of another tract is included with this tract. The other tract (parcel # RI3300- 003-001-000) is 51.69 acres according to the County records. Please submit a copy of the deed for the 17.94 ac tract, developed with the help of the surveyor. As you stated, the applicant is purchasing a portion of the 51.69 acres. This portion will be recombined with part of the 11.67 ac tract to create a parcel with a total of 17.94 ac as shown on our plan. This was under contract prior to us submitting the plans and it is scheduled to close on April 1, 2011 2. Please submit a copy of the swale velocity calculations for all swales on this project. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms to ensure that the numbers are consistent throughout. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to April 30, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910350-20041 DENR Assistance:1-877-623-6748 Internet: www.ncwaterquality.org A. C... 1 /1..... A...p.. I AfFrm. N% AM;— C...nl....... Nlw Beginning Christian Church, Inc. 'April 16, 2013 Stormwater Application No. SW8 130208 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at steven.pusey@ncdenr.gov. Sincerely, ie Steve G. Pusey Environmental Engineer GDS/sgp: S:MMStormwateAPermits & Projects120131130208 02013 04 addinfo 130208 cc: Charles Cazier, PE — Intracoastal Engineering PELC Wilmington Regional Office Stormwater File Pan, 7 of') Pusey, Steven From: Pusey, Steven Sent: Monday, April 15, 2013 5:46 PM To: 'Charlie Cazier' Subject: New Beginning Christian Church Importance: High Charlie, Please submit a copy of the deed for this 17.94 acre tract. The New Hanover County website shows this property (R3309-002-009-000) to be 11.67 acres. Your drawings show that a large part of another tract is included with this tract. The other tract (parcel # R3300-003-001-000) is 51.69 acres according to the County records. Please explain. I would appreciate a response ASAP but hopefully no later than Wednesday this week. Thanks, Steve Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 Before printing this email, please consider your budget and the environment E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third panties. NEW HANOVER COUNTY Engineering Department 230 Government Center Drive • Suite 160 Wilmington, North Carolina 28403 TELEPHONE (910) 798-7139 Fax (910) 798-7051 March 6, 2013 Mr. Charles D. Cazier, PE Intracoastal Engineering, PLLC 91 Pelican Point Road Wilmington, North Carolina 28409 E-Mail: Charlie@intracoastalengineering.com RE: New Hanover County Stormwater ATC Preliminary Approval New Beginnings Church Dear Mr. Cazier: James P. hanucei, PE, CPM CountyEngineer T. Jason Clark, PE Chief Project Engineer We have reviewed the submittal package for the above referenced project and are granting Preliminary Approval. We offer the following comments regarding Preliminary Approval: The plans and calculations are in agreement with the New Hanover County Stormwater Ordinance. In accordance with Section 30.3 of the New Hanover County Stomawater Design Dlanual, Designer and Ou-ner Plan Certifications are required on all stormwater design plan sheets. Please have the owner provide original signatures on the plan sheet certifications. If you have any questions, please contact the County office at 798-7139. Sincerely, . Jason Clark, PE Chief Project Engineer cc: File Intracoastal Engineering PLIE May 17, 2013 NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: New Beginning Christian Church SW8130208 PN 1oo-o83 Dear Mr. Pusey, I response to your Additional Information request May 16, 2013 we offer the following: 1. Highlighted Drainage Area map showing all drainage areas, including the existing building and parking lot, with drainage arrows indicating direction of flow. 2. This is an existing offsite parcel as far as we can tell built in the early go's. This is not part of our requested permit. 3. The additional impervious area has been added to the future section on page #3 of the application. Please find revised page #3 enclosed. Please review for approval and contact us with any questions, comments or additional information needed. Sincerely, i] AECEIVED MAY 17 2013 BY. 91 Pelican Point Rd. Wilmington, NC 28409 (910)409-3567 Pusey, Steven From: Pusey, Steven Sent: Thursday, May 16, 201311:24 AM To: 'Charlie Cazier Subject: New Beginning Christian Church Charlie, We just need a few things in order to move forward with the permit. Please provide the following information ASAP. 1. A drainage area map showing all drainage areas, including the existing building and parking lot, and show some drainage arrows describing the runoff direction for the existing BUA. 2. Please provide proof for when the existing building and parking lot were built. Google Earth only showed history back to 2/93. 3. It would be a good idea to include future area for this overall low densiy permit. I calculated an amount of 127,621 square feet in order to meet the 24% low density requirement. Please confirm and put this on your permit application if desired. Please let me know when you can get back to me on these issues. Thanks, Steve cram Q. Environmental Engineer NCDENR - Div. of Water Quality Surface Water Protection Ph (910) 796-7334 / Fax (910) 350-2004 MW Before printing this email, please consider your budget and the environment E-mail correspondence to and from this address maybe subject to the North Carolina Public Records Law and maybe disclosed to third parties. 02/20/13 Stormwater Narrative New Beginning Christian Church New Hanover County, NC PN 100-083 New Beginning Christian Church is a proposed 17.94 acre tract located in New Hanover County, NC. The tract is currently vacant and used for agriculture. The site is bordered by Alex Trask Drive to the West, Blue Clay Road to the Bast, Residential to the North, and farm land to the South. The site proposes a parking lot of ioo spaces and 20' asphalt drive for access to Blue Clay Road. The parking lot is being viewed as a pocket of high density and therefore provided a Wet Pond for stormwater treatment. The site has anexisting impervious surface of o s.f nd propose 59,931 s.f. f impervious surface for the parking and drive. The proposed percent impervious for the site is 7.67%. l.;A.wk A4,e J Runoff will be directed to a wet detention pond by means of 3:1 grassed swales. The majority of the runoff from the proposed parlcng lot •r'lill be directed by sheet flow to curb cuts located along the western parking bay. The curb cuts will direct runoff into the 3:1 grassed swales, which direct the stormwater to the wet pond. The wet pond has been designed to treat the 1.5" runoff and 25Yr 24hr pre -post requirements. Runoff from the site is discharged to Ness Creek QSW Index#18-74-62. 74 i 1�n a I /Z.eJ a .; .. A T� Tl i,NI ` all � Go3�te earth �� °oQ 00 �s ,, c< / Z/g 3 Completeness Review Checklist Project Name: 460 ettug-u Received Date: a�� 1'3 Project Location: C ,c�C � � AhA Accepted Date: Rule(s) [2008 Coastal 1:11995 Coastal ®Phase II (WiRO) ®Universal 1:31988 Coastal (Type of Permit: I0ew-)or �Mod or PR [Existing Permit # (Mod or PR): nPE Cert on File? Density: HD or «u Type: Co rcial or Residential ®NCG: %:0(90 OK?) Streamclass: �SA Map ®Offsite to SW8 Subdivided?: Subdivision or in le L MORW Map Exempt Paperwork Emailed Engineer on: n(� OSupplement(s) (1 original per BMP) BMP Type(s): (A)C-aA,u,LO �b Iu \'nN� �k CC7 -rtW (x-XxkQ,(— Do&M with correct/original signatures (1 original per BMP except LS/VFS and swales) Application with correct/original signatures ®Corp or LLC: Sig. Auth. per SoS or letter Note to Reviewer. 0$505 (within 6mo) ® 'WC uR& 11 Q,-iu P„ Q . SC .dY15 To 14,OA)E ®Soils Report with SHWT WO�'KE�J 1—ti ubGH T-h I65UI S ®Calculations (signed/sealed) • l�JEE\� IV?OU �c c� 7 rTj:jE ONoobvious errors �s�,���c3Pl�jEN7 includes common areas, etc Deed Restrictions, if subdivided: ned & Notarized Plans LJ2 Sets ®Grading ®Vicinity Map El Legend Infiltration Soils Report SHWT: Bottom: Visited: Additional Information: Permitted BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) ®Wetlands: Delineated or No Wetlands 11 Layout (proposed BUA dimensions) ®DA Maps ®Project Boundaries Wet Pond ®Soils Report SHWT: - PP: Offsite ®PE Cert for Master ®Deed Rest for Master BUA Permitted (Master): BUA Proposed (Offsite): Lot #: ®Lot # Matches Master sf sf Lp Intracoastal Engineering PLLc February 20, 2013 North Carolina Department of Environment and Natural Resources Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699 Ann: Kelly Johnson Re: New Beginning Christian Church New Hanover County PN 1oo-oft Dear Ms Johnson, RMFF3254""13 ECEIVE FEB 2 5 2013 BK Please find enclosed one (1) $Sn5.00 fee check, one (D Original and one (1) copy of stormwater application, one (1) Wet Detention Basin Supplement, one (1) Wet Detention Basin Operation and Maintenance Agreement, one (i) Low Density Supplement, one (1) Project Narrative, two (2) sets of talcs and two (2) sets of plans for the above referenced project. We are addressing your comments from your letter dated February 8th, 2013 regarding application return. 1. Existing Church: In your resubmittal please include a discussion regarding why the existing church was not included in the project area for this submittal. Google Earth shows that there was a building on the tract in 1998, that the building was torn down by 2002 leaving the parking lot in -tact, and that a new building has been built on the track since 2010. It is unclear when the original building was built. Was the church built prior to 1988 such that it was not subject to permitting, or was it built in such a way since 1988 that it did not require a pennit? If there was a building in place on the tract prior to 1988, how does the pre-1988 impervious area and drainage pattern compare to the proposed impervious area and drainage pattern? If there was no increase in impervious area on a tract constructed prior to 1988 and if the stormwater treatment is equal or better than the pre-1988 conditions, then the church tract with the original parking lot could qualify for a redevelopment exclusion. If the church tract does not qualify for a redevelopment exclusion, the please contact our office to determine how to proceed. Some impervious area will likely have to be treated if that is the case. • The original building was constructed ujior to 1 88. The original building was lost due to a fire. The current building was constructed back with a similar footprint. This building and parking area are on a separate lot and 91 Pelican Point Rd. Wilmington, NC 28409 (910)409-3567 requested to remain. These items were reviewed and accepted by New Hanover County prior to the building being built back. 2. Stream: If there is a stream on the property please label the stream with the tops of bank, and provide the appropriate buffers. • No stream on site per SEGI (Southern Environmental Group, Inc.) 3. Wet Pond: I understand that the wet pond will be installed on this overall low density project because the project collects the parking lot with curb and gutter and because the proposed development does not locate the impervious areas in upland areas and away from surface waters and drainageways per 2oo8-211, Section 2(b), (3)(a)(1). Please locate the permanent pool within six inches of the SHWT. Please see page 10-2, # 19 of the BMP Manual for further details. • The pond has been revised to meet SHWT 6" separation. Please find updated plans, calculations, supplements etc attached. Please review for approval and contact us with any questions, comments or additional information needed. Sincerely, Intracoastal Engineering PLLC Charles D. Cazier, PE RECEIVE FEB ?52op sv` �% WET DETENTION POND ANALYSIS -ALL RULES FILE NAME: SAMS111torrnwaterlPermits & ProjectsAle yearlfolder nameldoc yr mo excel WP 130208 PROJECT t SW8 130208 REVIEWER: S. Pussy Initial Run Date 4116/13 PROJECT NAME: New Begimvrig Christian CMuds Last modified 16-Apr--13 Receiving Stream: Ness Creek Drainage Basin: Cape Fear Is new DA being added? I N Y or N Rules- -AW or "Ph2" I 2M8 Buildings square feet Street 4316.0D square feet Parking or SW 3483200 Square feet Future square feet Offsite Square feet Other square feet BUA at w,u u6w square feet TOTAL 39148.00 square feet Class. Within 112 mile? Index No. New Added DA Total DA 1 0.98 0.95 n SURFACE AREA CALCULATION (Including old and new DA and BUA) Overall % Impervious 41.83% ®Average Design Depth 3 5 feet TSS, 85 or 90. 90 % ®Drainage Area BUA Post development Rv= 0.00 r 0.00 Old BUA Design Storm Old BUA Design Volume I D 1.5" New BUA Design Storm Volume 1 yr. 24 hour precipitation depth (inches) from NOAA chart Predevelopment Rv value (0.05 if no existing BUA) 1 yr. 24 hr. Pre -development volume 1 yr. 24 hr. Post -development volume 2008 Design Volume 4989 cubic feet Phase 2 Design Volume 1 4989 Icubic feet Required Volume aAgA cf Top of Sediment 2625 msl ........ Bottom of Shelf 31.00 Mel........ . Permanent Pool 3150 msl......... Top of Shelf 32.0D msl......... Temporary Pool 32.75 mud. ....... Volume met at elev, 31.84 msl *"Vol. Prov. at TPE 19514 cf only works if iPE a top of shelf elevation Average Head Flow Q2, cis Flow 05, cfs No. of Orifices Diameter, Inches Drawdown = 1 yr 24 hr intensity, in/hr Runoff Coefficient 1 yr 24 hr peak Q Orfte fiowclyfUhr ? or N user input req. formula Brealadown of BIJA old DS Buildings/Lots Street Padding I SW Other SAIDA Ratio 4.18% Req. SA 3915 Sf Prov. SA 13744 isf do not Include previously approved BUA as existir :feet :feat . Pool Volume- Forebay Volume= ded Volume= Riot cfs ifs or weir H x W days NOAA chart a unitless Q2 Ares 1.36 Q5 Ares 0.54 Orifice Area 0.79 Avg. Flow Q 0.017E in x '# of end oontra ftm, N = discharge coefCfctent, C = Effective weir length, L sq. inches sq. inches sq. inches cfS 3.32 10.00 In Southern r nvironmental Group, Inc. 5315 South College Road, juite E, • Wilmington, Nord. Carolina 28+1 2 Phone: 910.452.271 1 • [-ax: 91 OA52.2899 • Email: office@seg i.us www.segi.us October 18, 2012 Mr. Charles Cazier Intracoastal Engineering, PLLC. 91 Pelican Point Rd. Wilmington, NC 28409 RE: Seasonal High Water Table Investigation, New Beginnings Christian Church Property Alex Trask Drive and Holland Drive, Wilmington, NC Dear Mr. Cazier, This correspondence is in reference to 2 parcels of land located off of Alex Trask Drive and Holland Drive, near Wrightsboro, New Hanover County, North Carolina. There is an existing church building located at the northwestern end of the proposed project. Our firm visited the site in order to estimate the seasonal high water table level at the site of a proposed stormwater pond (see attachment). The proposed pond location is currently a cultivated farm field. A hole was dug at one location within the location of the proposed pond to a depth of 50 inches. The soil colors were measured using a Munsell Soil Color Chart. From the. soil surface down to 20 inches the soil consisted of black sandy loam. From 20 to 34 inches, the soil consisted of very dark gray sandy loam. At 34 inches, the soil changed to gray sandy clay loam, with common yellowish brown mottles. After 15 minutes, the depth to standing water in the hole was measured at 36 inches below the ground surface. Please feel free to contact me if you should have any questions about this report Sincerely, `jou n Environm tal Group, Inc. David Scibetta Project Manager Attachment: Proposed Site Plan with Soil Boring Location l FEB 2 5 2013 BY: New Beginnings Christian Church Soil Boring Location Map l p � 1 l ?ROpOS?-D I gp(71LAR Soil Boring Location All Nad �.,�, •k l USE yyNlllg OF TUBE DiSYl7RE�� /� aunssowa f � J 1 CDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director February 8, 2013 Pastor Robert Campbell, Board President New Beginning Christian Church, Inc. 3120 Alex Trask Dr. Castle Hayne, NC 28429 Subject: APPLICATION RETURN New Beginning Christian Church New Hanover County Dear Pastor Campbell: John E. Skvarla, III Secretary On February 1, 2013, the Division received an incomplete State Stormwater Management Application for the project listed above. The application and check number 10243, in the amount of $505 are being returned because the application package lacked the necessary elements to accept it for review. Please provide the following information upon the next submittal of this application package: Existing Church: In your resubmittal please include a discussion regarding why the existing church was not included in the project area for this submittal. Google Earth shows that there was a building on the tract in 1998, that the building was tom down by 2002 leaving the parking lot in -tact, and that a new building has been built on the tract since 2010. It is unclear when the original building was built. Was the church built prior to 1988 such that it was not subject to permitting, or was it built in such a way since 1988 that it did not require a permit? If there was a building in place on the tract prior to 1988, how does the pre-1988 impervious area and drainage pattern compare to the proposed impervious area and drainage pattern? If there was no increase in impervious area on a tract constructed prior to 1988 and if the stormwater treatment is equal or better than the pre-1988 conditions, then the church tract with the original parking lot could qualify for a redevelopment exclusion. If the church tract does not qualify for a redevelopment exclusion, then please contact our office to determine how to proceed. Some impervious area will likely have to be treated if that is the case. 2. Stream: If there is a stream on the property please label the stream with the tops of bank, and provide the appropriate buffers. 3. Wet Pond: I understand that the wet pond will be installed on this overall low density project because the project collects the parking lot with curb and gutter and because the proposed development does not locate the impervious areas in upland areas and away from surface waters and drainageways per 2008-211, Section 2(b), (3)(a)(1). Please locate the permanent pool within six inches of the SHWT. Please see page 10-2, #19 of the BMP Manual for further details. Please visit DWQ's website at httD://h2o.enr.state.nc.us/sulbmo forms.htm to download the latest available forms, Please provide the requested information and return the package to the address below. Note that the 90-day statutory permit review time begins upon receipt of a complete application. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One Phone: 919-807-63001 FAX: 91M07-64921 DENR Assistance:1-877-623-6748 NorthCarohna Internet www.ncwateroualiltr.oro Campbell February 7, 2013 Page 2 of 2 If you have any questions, please do not hesitate to call me at (910) 796-7331 or email me at kelly.p.johnson@ncdenr.gov. GDSlkpj: S:1WQS1StormwateAPermits & Projects\Application Return12013 02 New Beginning Christian cc: Charles D. Cazier, PE, Intracoastal Engineering Wilmington Regional Office Stormwater File NEW BEGINNING CHRISTIAN CHURCH INC eeaT 10243 3120 ALEX TRASK DR BS 910-341-7984 BRANCH BANKING AND TRUST COMPANY CASTLE HAYNE, NC 28429 1-800-BANK BBT BBT.com 66-112J531 1 /3/2013 Y TO THE NCDENR ;DER OF $ **505.00 Five Hundred Five and 00/100**************** NCDENR DOLLARS °MO Stormwater II'0LO24Ps 1:053LOLL20:0005LO266602;II0 DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina l/ Department of Environment and Natural Resources Division of Water Quality I J STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): New Beginning Christian Church 2. Location of Project (street address): 3120 Alex Trask Drive City:Castle Hayne County:New Hanover Zip:28429 3. Directions to project (from nearest major intersection): Site is located approx. 5001.f. Northeast of the intersection of Alex Trask Drive (R. 23. 5) and Holland Drive (S.R. 1358). 4. Latitude:34° 17' 58" N Longitude:77° 54' 43" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberN/A , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density [-]Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 5.50 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:N/A ECEIVE FEB 01 200 BY: Form SWU-101 Version 07Jun2010 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:New Beginning Christian Church, Inc. Signing Official & Title:Pastor Robert Campbell b. Contact information for person listed in item 1a above: Street Address: 3120 Alex Trask Drive City:Castle Hayne State:NC Zip:28429 Mailing Address (if applicable): 3120 Alex Trask Drive City:Casetle Hayne State:NC Zip:28429 Phone: (910 ) 264-0732 Fax: ( ) Email: nbcc401pastor®gmail.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Or anization:N jA Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City:_ Phone: Email: State: Zip: Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person ,riho can answer questions about the project: Other Contact Person/Organization:N/A Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: Email: Fax: ( ) 4. Local jurisdiction for building permits: New Hanover County Point of Contact:Linda Painter Phone #: (910 ) 798-7068 Form SWU-101 Version 07Jun2010 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be treated by means of 3:1 Grassed Swales directed to a Wet Pond. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PLDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: N/A Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW —1995 ❑ Ph II — Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 17.94 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area+: 17.94 acres Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Higgh Water (NHW) line or Mean HiXh Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 7.67 % 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area _ Receiving Stream Name Ness Creek Ness Creek Stream Class * QSW C,SW Stream Index Number * 18-74-62 18-74-62 Total Drainage Area (sf) 93585 297407 On -site Drainage Area (sf) 93585 297407 Off -site Drainage Area (sf) 0 0 Proposed Impervious Area** (sf) 39148 20783 % Impervious Area** (total) 41.83% 7.00% Im m—dour'" Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _ Dramage Area On -site Buildings/Lots (sf) 0 0 _ On -site Streets (sf) 4316 20783 0 0 On -site Parking (sf) 34832 0 0 0 On -site Sidewalks (sf) 0 0 0 0 Other on -site (sf) 0 0 0 0 Future (sf) 0 0 0 0 Off -site (sf) Q 0 0 0 Existing BUA*** (sf) 0 0 1 0 0 Total (sf): 1 39148 20783 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wg4s/csu/classifications ** Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SW-101 Version 07Jun2010 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhU://12ortal.ncdenr.org/web/­3y-q/ws/su/bop-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://12ortal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from b-U://12ortal.ncdenr.org/web/wg/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. le-1; 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants &4 Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/naves/oneaWeVress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1h mile of the site boundary, include the 1h mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. e Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Form SWU-101 Version 07Jun2010 Page 4 of 6 - LS 4 L '.Jt-S 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a.site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 2683 Page No: 396_ 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htW://www secre= state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from bttp://portal.ncdenr.gm/web/wq/ws/­su/statesw/forms docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Charles D. Cagier Consulting Firm: Intracoastal Engineering Mailing Address:91 Pelican Point City:Wihnington State:NC Zip:28409 Phone: (910 ) 409-3567 Fax: L N/A Email:Charlie®intracoastalengineering.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) N/A , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of . County of do hereby certify that before me this _ day of personally appeared , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Pastor Robert Campbell certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwalgr rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Date: -A•v 1, 2013 v —�� 1 I, l a lm m y V }�y /� fy a Notary Public for the State of K o l- % r8 I IrJ 9County of NBnwicg- do hereby certify that '. A-e r-t, L . Carnphall personally appeared before me this 3kd day of 31A 1Aa r 3 and acicn dge the due xe ution of the application for a stormwater permit. Witness my hand and official seal, -N J ~ V Z A NO + SEAL My commission expires to 9 4, (? � .2, D / 3 Form SWU-101 Version 07Jun2010 Page 6 of 6 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record. will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches ( P„ Coastal County). Records of operation and maintenance should b ep PC! own set location and must be available upon request. Inspection activities shall be performed as follows. Any problems are. found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of I long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. j _ The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Ok ti Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.25 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.25 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 30.25 27.0 Pe nen Pool - - - - - - - - - - - - - Volume Sediment Removal Elevation 25.0 Volume 26.0 ft Min. ----------------------------------- ------- ------ Sediment Bottom Elevation 24.0 1-ft Storage Sedimex Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 r ay r L Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: New Beginning Christian Church BMP drainage area number: Print name:Pastor Robert Campbell Title: Address: 3120 Alex Trask Drive Castle HoMe, NC 28429 Date: A, 1, 2,01.5 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president, I, a mran V IIIy n� , a Notary Public for the State of 9b r•}h Cawb1 J niA , County of g P_W J4&At> 4R_ , do hereby certify that lobc6b L. C4w%p6e 1 personally appeared before me this 311d day of nuay%w 4013, and acknowledge the due execution of the forgoing wet ykt¢ntion basin npaintgnance requirements. Witness my hand and official seal, SEAL 10. r My commission expires -1 ua Us Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in Session Law 2008-211, 15A NCAC 2H .1000, Session Law 2006-246, and the DWQ BMP Manual. Curb and gutter systems are allowed provided they meet the requirements in 15A NCAC 2H .1008(g). I. PROJECT INFORMATION Project Name : New Beginning Christian Church Contact Person: Pastor Robert Campbell Phone Number: ( 910 ) 264-0732 Number of Lots:1 Allowable Built Upon Area (BUA) Per Lot* _187,552 s.f. Number of Dwelling Units Per Acre": Low Density Development (check one): ® without curb & gutter ❑ with curb & gutter, outlets to (check one): ® Swales ❑ Vegetated Area *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. BUA shall be shown in units of square feet. **(Phase H Post -Construction (non -SA) only) II. BUILT UPON AREA Refer to DWQ's forms and applications website for specific language that must be recorded in the deed restrictions for all subdivided projects. (http://h.2o.enr.state.nc.us/su/bmp_fo:ir.s.hL--n), Complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean High Water. • DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. of Lots - the total number of lots in the subdivision. • BUA per Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. • Total allowable lot BUA - the computed allowable built upon area for all lotsmbmed. • Total BUA from lot listing - the sum of built upon area allocated for each lot the list of non-uni in lots. Form SW401-Low Density-Rev.3-2/10/09 Page 1 of 4 " --- Caliilation: For uWform lot sizes: e (SA: 781466 ft2 x DF: 0.24)-(RA: 0 ft2) — (OA: 0 ft2) = BUA per Lot=187,552 ft2 (No of Lots: j) For non -uniform lot sizes: a. (SA: ft2 x DF: ) — (RA: ft2) — (OA: ft2) = Total allowable lot BUA = ft2 b. Total BUA from lot listing: sf b must be S a III. DESIGN INFORMATION Complete the following table. If additional space is needed the information should be provided in the same format as Table 1 and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual or at http://hdsc.nws.noaa.gov/hdsc/Pfds/ Table 1. Swale design information based on the 10-vear storm. Swale No. Drainage Area ac Impervious Area ac Grassed Area ac C Q cfs Slope N% Vallow s Vactwi s Flow Depth ft 1 0.88 0.48 0.40 0.63 4.01 0.4% 2.5 2.35 0.75 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 z b Form SW401-Low Density-Rev.3-2/10/09 Page 2 of 4 IV. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H .1000, NCDENR BMP Manual (2007), Session Law 2006-246, and Session Law 2008-211. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. If any item is not met, then justification must be attached. Only complete items n through p for projects with curb outlets. Page/Plan Initials Sheet No. &A a. t For projects in the 20 coastal counties: Per NCAC 2H.1005, a 50 foot wide vegetative buffer is provided adjacent to surface waters. For Redevelopment projects, a 30' wide vegetative buffer adjacent surface waters is provided. b. t For HQW or ORW projects outside the 20 coastal counties: A 30 foot wide vegetative buffer is provided adjacent to surface waters. C. t For Phase lI Post -Construction projects: All built upon area is located at least 30 feet landward of all perennial and intermittent surface waters. _r A d. Deed restriction language as required on form SWU-101 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to the sale of any lots. e. Built upon area calculations are provided for the overall project and all lots. f. Project conforms to low density requirements within the ORW AEC. (if applicable per 15A NCAC 2H .1007) g. Side slopes of swales are no steeper than 3:1; or no steeper than 5:1 for curb outlet swales. r h. Longitudinal slope of swales is no greater than 5%; for non -curb outlet projects, calculations for shear stress and velocity are provided if slope is greater than 5%. _ i. At a minimum, swales are designed to carry the 10 year storm velocity at a non -erosive rate. 1J1A j. Swales discharging to wetlands are designed to flow into and through the wetlands at a non - erosive velocity (for this flow requirement into wetlands, non -erosive is velocity <_ 2 ft/s). _ k. Swale detail and permanent vegetation is specified on the plans. 1. Swale detail provided on plans; includes grass type(s) for permanent vegetative cover. z m. Swales are located in recorded drainage easements. UA n.tt Length of swale or vegetated area is at least 100 feet for each curb outlet. A)J o.tt The system takes into account the run-off at ultimate built -out potential from all surfaces draining to the system (delineate drainage area for each swale). Y p.tt Curb outlets direct flow to a swale or vegetated area. :;.. Projects in the Neuse, Tar -Pamlico, Catawba River basins, and Randleman Lake may re tt Only complete these items for projects with curb outlets. Form SW401-Low Density-Rev.3-2/10/09 Page 3 of 4:` c V. -SWALE SYSTEM MAINTENANCE REQUIREMENTS 1. Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time; and grass will not be mowed too close to the ground or "scalped". 2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build-up, erosion, and trash accumulation. 3. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed and in a timely manner based on the monthly inspections. Side slopes must be maintained at the permitted slope. 5. Catch basins, curb cuts, velocity reduction devices, 'and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Water Quality. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Pastor Robert Campbell Address:3120 Alex Trask Drive Castle HMe NC 28429 Date: '3-,4nr I ZO/ 3 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of AI&f' ) -Ml *1 A , County of ALW HanDvf-2 , do hereby certify that 'Q6erA L. Camp. personally appeared before me this day of , and acknowledge the due execution of the forgoing swale maintenance requirements. Witness and and official seal, Notary signature ®�,410faeRldo0Os `eyJ 14Y��i tEALZ Ls � Z PUIeN0N Form SW401-Low Density-Rev.3-2/10/09 My commission expires uoa L 61. � 4 Page 4 of 4;; Permit (to be provided by DWQ) '7 W HCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part /I/) must be printed, filled out and submitted along with all of the required information. L PROJECT INFORMATION Project name New Beginning Christian Church Contact person Charles Cazier, P.E. Phone number (910) 4093567 Date 1/30/2013 Drainage area number 1 11. DESIGN OrFORMATiON Site Characteristics Drainage area 93,585 fe Impervious area, post -development 39,148 f? % impervious 41.83 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: )-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pod elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 4,989 fe 44,510 fe fe if ft3 fe N (Y or N) in (unitless) (unitless) in/hr 0.09 fe/sec 0.19 ffs/sec 0.10 fts/sec OF W ATLcR OK, volume provided is equal to or in excess of volume required. 33.00 fmsl 3025 fmsl 30.95 fmsl 30.75 fmsl 29.75 fmsl 25.00 fmsl 24.00 fmsl 1.00 ft Y (Y or N) 33.0 fmsl OK ' M Form SW401-Wet Detention Basin-Rev.9411 aN 2 Parts I. & rl. Design Summary, Page 1 of 2 Perrnit (to be Provided by DWQ) 1I. DESIC>*IINFOIRMATION Surface Areas Area, temporary pool 19,868 fe Area REQUIRED, permanent pool 3,931 fe SAIDA ratio 420 (unitiess) Area PROVIDED, permanent pool, Ape._pw Area, bottom of 1Oft vegetated shelf, Aye �18,, Area, sediment cleanout, top elevation (bottom of pond), A"nd Volumes Volume, temporary pool Volume, permanent pool, Vp,,,,, ., Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpe---i Area provided, permanent pool, A,,,,, Average depth calculated Average depth used in SAIDA, d.., (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Aperrn_p., Area, bottom of 1 Oft vegetated shelf, AyoLshe11 Area, sediment cleanout, top elevation (bottom of pond), Ab.yo d 'Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d., (Round to down to nearest 0,5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice ('If -non -circular) Coefficient of discharge (Cu) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C„,) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 12,503 OK 6,908 fe 1,806 fe 44,510 fe OK 25,549 fe 6,771 its 26.5% % Insufficient forebay volume. 90 % Y (Y or N) N (Y or N) 420 (unitless) N (Y or N) 25,549 ff 12,503 ff 3.38 It OK 3.5 ft OK Y (Y or N) 12,503 ff 6,908 f" 1,806 fe 4.75 ft 3.38 It OK 3.5 It OK _ (Y or N) 1.00 in _ in' 0.60 (unitless) 0.67 ft _(Y or N) _ (unitless) (unitless) -n ft 0.09 felsec 0.19 fe/sec 0.02 fe/sec 2.70 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 5 :1 OK 5.0 :1 OK Y (Y or N) OK Y ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pump r e Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2 ('80 Completeness view Project Name: ��QA� � �C� Received Date: 1;N 13 Project Location: Accepted Date: Rule(s) ®-1568 Coastal 1:11995 Coastal ®Phase II (WiRO) ®Universal ❑1988 Coastal Type of Permit: hiey or Mod or PR Existing Permit # (Mod or PR): MPE Cert on File? Density: HD or LD Type: Cor{imcial or Residential ®NCG: C. %: 00) Stream Class: C-5 uk) 1®SSA Map ®Offsite to SW8 Subdivided?: Subdivision or Si le of 1 a 10RW Map Exemot Paperwork Emailed Engineer on: a1!1 L3 upplement(s) (1 original per BMP) BMP Type(s): ON M- W with correct/original signatures (1 original per BMP except LS/VFS and swales) 15 ®Application with correct/original signatures L orp or LLC: Sie. Auth. per SoS or letter Note to Reviewer: $505 (within 6mo) _ �� � +5 �7eO Qt lA) � �W7 �'S Soils Report with SHWT ` ` D$-AeLa4Pfnf�l DaGSV T Pj�7 7D ® ation i A"t' 50 Its. is ?(toR05t�4 � I �sNp �adcul s (s fined/sealed) 0 No obvious errors Density inclu es c ' mon areas, etc - !%11 Sf{� tfo �R%nf6 �BM 17761'J.[,,� S (S W r eed Restrictio �s, if sub ed: 31XXA1'AIOr') W I Rw ser q- �1sr ' ir'3 7 ®Signed & N arized �� ? S-ri � n(�.D �L 13v12 �n�C� , o9 nfaI -} --moo Correct Tem to (Comm s� D�LD) or Dec. Covenants & Rest-' lb-4k .0 to -to Plans [- r ` Sets ®Grading ®Vicinity Map ®Legend Infiltration Report Bottom: Visited: Additional Information: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) 0DetailsNads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Wetlands: Delineated or No Wetlands Layout (proposed BUA dimensions) DA Maps Wet Pond ®Soils Report SHWT: - PP: ®Project Boundaries Offsite ®PE Cert for Master ®Deed Rest for Master BUA Permitted (Master): BUA Proposed (Offsite): Lot #: ®Lot # Matches Master sf sf Permitted Proposed: Proposed: Proposed: 30.0.5 �� Johnson, Kelly From: Johnson, Kelly Sent: Monday, February 04, 2013 12:13 PM To: 'Charlie Cazier Subject: New Beginning Christian Church Charlie, I am going through this application, and I have a couple of questions for you. Did you mean to include a soils report showing the SHWT? I did not see that in the package. The PP is at 30.25msi, but the SHWT is at 30.95msi (more than 6in apart)? Also, have you already been working with someone here about putting the development "in upland areas away from drainageways...etc" such that the pond is being installed? If not, that is fine, I just wanted to make a note on my summary sheet if you had already worked with someone here. Thanks, K1 *** My email has changed to kellv.n.iohnson@ncdenr.eov K4LIwohV1.sow Kelly Johnson Environmental Engineer Division of Water Quality Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7331 Fax: 910.350.2004 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Intracoastal. Engineering PLLC January 31, 2013 NCDENR Davision of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: New Beginning Christian Church PN 1oo-o83 Dear To Whom it May Concern, RECT F E B 01 Z013 Please find enciosed (1) original and (1) copy of the Stormwater application (SWU-lol), (1) fee ($505.00), (1) Wetpond supplement, (1) Operation & Maintenance Agreements, (1) Low Density Supplement, (1) Stormwater Narrative, (1) copy of deed, (1) USGS Map and (2) sets of plans for the above referenced project. Please review for approval and contact us with any questions, comments or additional information needed. Sincerely, Intracoastal Engineering PLLC J Charles D. Cazier, P. ECERVE FEB 01 206 BY: 91 Pelican Point Rd. Wilmington, NC 28409 (910)409-3567 01/31/13 Stormwater Narrative New Beginning Christian Church New Hanover County, NC PN 100-083 New Beginning Christian Church is a proposed 17.94 acre tract located in New Hanover County, NC. The tract is currently vacant and used for agriculture. The site is bordered by Alex Trask Drive to the West, Blue Clay Road to the Bast, Residential to the North, and farm land to the South. The site proposes a parking lot of 10o spaces and 20' asphalt drive for access to Blue Clay Road. The parking lot is being viewed as a pocket of high density and therefore provided a Wet Pond for stormwater treatment. The site has an existing impervious surface of o s..f and proposes 59,931 s.f. of impervious surface for the parking and drive. The proposed percent impervious for the site is 7.67%. Runoff will be directed to a wet detention pond by means of 3:1 grassed swales. The majatity of the ranoff f-Lom the proposed parking lot will be directed by sheei low to curb cuts located along the western parking bay. The curb cuts will direct runoff into the 3:1 grassed swales, which direct the stormwater to the wet pond. The wet pond has been designed to treat the 1.5" runoff and 25Yr 24hr pre -post requirements. Runoff from the site is discharged to Ness Creek C;SW Index#18-74-62-. �ECEIVED FEB 0 t 20f3 BY: r *31/2013 CDC NBCC Pond Calculations 100-083 Total Drainage Area sq. ft. acres 93,585 2.15 Impervious Area Land Use s . ft. acres buildings 0 0.00 parking/asphalt 38148 0.90 future 0 0.00 Total 1 39148 0.90 Stormwater Calculations: Time of Concentration: Hydraulic Length (L) = 320 ft. change in Height (H) = 4 ft. /H)aw 1128 = 3.58 min. Flow for 1 year, 24 hour Storm (Q1): QPRE _ (CPRE) X (11) x (Area) 1.56 cfs QPosT = (CPosT) x (11) x (Area) 3.43 cfs Detention Pond Design: Pond Size: Elevation ft. Surface Area (sq. ft. Normal Pool 30.25 12,503 Flood Pool 33.00 19,868 ITop of Bank 35.00 23,963 Bottom of Pool 25.00 1,806 % impervious = 0.418 = 41.8% say 42.0% CPRE = 0.25 CPosT = (% imp.)(.95)+(1 0/o imp.)(.25) 0.55 11 = 2.90 in/hr 110 = 8.13 in/hr Flow for 10 year, 24 hour Storm (010): QPRE _ (CPRE) X (110) x (Area) 4.37 cfs QPosT = (CPosT) x (110) x (Area) 9.61 cis below N.P. = (Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter) Required SA = (SAIDA) x (Total Drainage Area) Provided Storage Volume: Average Depth Calculation: Vol. _ [(Normal pool SA + Flood Pool SA) / 2] d= [0.25 x (1+ BVS SA/NP SA)] + [((BVS SA +Btm SA)/2)x(D/BVS SA)] x (F.P. elev. - N.P. elev.) = 3.38 ft 44,510 cu. ft. State Volume Required for Storage of first 1.5" of runoff: Rv = .05+ .009(% imp) = 0.426483 V= (Design rainfall)(Rv)(Dralnage Area) 4,989 cu. ft. FEB 012013 S' !� a SEAL 032555GiNS - . 16S D. 0- !llllll►���� i 100-083 pond design 1 of 2 f/31/2013 NBCC 100-083 CDC Pond Calculations Pond Volume: Bottom SA = 1,806 sq. ft. el 25.00 Btm Vag Shell SA = 6,908 sq. ft. el 29.75 Normal Pool SA = 12,503 sq. ft. el 30.25 Vol. _ [(NP SA + BVS SA) / 2] x (NP el. - BVS el.)+[(Bottom. SA + BVS SA) / 2] x (Bottom. el. - BVS el.) = 25,549 cu. ft. Forebav: Required Volume Vol. = 20% of Temporary storage provided = 5.110 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for :Required Volume Required Vol. 1172,800 sec. (2-Jays) 0.029 cfs Required Area of Pioe for 2-dav drawdown: A= Q I [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ftJsz h = (F.P. elev: N.P. elev.) /3 = 0.666667 ft. A = 0.0073 sq. ft. Diameter of Pioe for 2-dav drawdown: DIA. = SQRT[(A x 4) / pi] = 0.0967 ft. 1.16 in. 'Use: 1" In diameter pipe Drawdown time 1" pipe = 2.7 days Provided Volume Vol. _ = 6,771 cu. ft. Flow for 5-day drawdown: for Required Volume Q = Required Vol. / 432,000 sec. (5-days) 0.012 cfs Required Area of Pioe for 5-dav drawdown: A= Q/[CdxSQRT(2xgxh)] Cd = 0.6 g = 32.2 ft./s2 h = (F.P. elev. - N.P. elev.) / 3 = 0.666667 ft. A = 0.0029 sq. ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4) / pi] = 0.0612 ft. 0.73 in. 100-083 pond design 2 of 2 ACME Mapper 2.0 - 3.7 mi NxNW of New Hanover County NC Page 1 of 1 ECEIVIE FEB 0 12013 BY: AMIGIS http://mapper.acme.com/ 1/30/2013 NCDENR - NCDWQ Stormwater Permitting Map Page 1 of 1 NC Depardnent of Environment and Natural Resources Water Quality - NCDWQ Stormwater Permitting Map Back to Stormwater Permitting (http://portal.ncdonr.org/web/wq/ws/su/maps) NEW DWQ Stormwater Permitting Map Viewer Enter Address: Find Address Reset Latitude (decimal degrees, N): Longitude (decimal degrees, W): Find Location Need to convert de-,grees,Lmtnutes,�seconds to decimal. forrnat7,�hnp;/aaidnm.tQov/mb(auajaacicev000M.ug _d�dm.i.hon�.. Or, just enter coordinates in the'ADDRESS' field Like this: (deg min sec) (-deg min sec), and then click Find Addres3. Need help with this map? Contact Bethany Georgoulias at (919) 807-6372 or be.hpmr_georgouliasslncdenr,gov Click on the map to see permitting information. Please check with the local government to verify current boundaries and specific stormwater requirements. p INV n CTTC i �, to tsroRw • wliy te� J; l.lttJ✓ d Vo~*d by GW&►trpg-�.vas.lu�rtanya ae�raa.r .a. ..,yJu and-C,_oo-�Ea�RB.]Gaas mW16MVLR r..m.✓R.b..ewL Novo: ModNMd 2010 rderencg dete nem,ua.a taaa.. _ ---amrz D�JA.ELW cwraet dep* problem for epee areas (9/2rl011). N.C. Department of Environment and Natural Resources 1601 Mail Service Center, Rateigh, NC 27699.1601 Headquarters (Environment and Natural Resources Building): 217 W. Jones St. arrhdnle Ridlding: 512 N. Saulsbury St. Tait Free: (877)623-6748 FEB 01 2013 http://portal.ncdenr.org/web/wq/ws/su/sw-permitting-map 1/30/2013 t. BOOK PAGE ( 683 0399 i 1999 DEC 22 flit ! I : I I rill., SATISFACTION: The debt secured by the within Dcedoflnrauigether with the note(s) secured thereby has been satisfied in iull Ilf This the day of �.--_-- _ --_ -_ .._ ' 9.. _.. _ --..- -.-. --- -. - - - -- -. - e, i mfing. Time, Book and Page RA 3300 003 001-000 Tax Lcn No. _-- - _-- __--- _ _ _ _ .. .. Parr t +denrnier No Venfied by _..--_-- -.—_— —.- ._ _ t -nonV on the _ , day of19— by-'--'-- Mail after recording to This instrument prepared by _. Corns A- 131IMey .. AttDiney al .'.-iw Brief Description for the index -- PURiCRASE MMEZ - �7NORTH{/AROL[NA DEED OF TRUST THIS DEEDof TRUST madr•thrs .2�avof kjj_-I.,.r .1 GRAN IOR Rachel T. Gonsalves and hT7,shxnd; Stephe.Ti A. Gonsalves 00C,:;41 I RUS I:! 4xiis R. Bunt - Enter in appropriate block for each party: name, address, • nd, if appropriate, th,: at t•!r of entity. e.g. corporation or partnership The designation Grantor, Trustee, and Beneficiary as used ierem .hall include sans lanrtit!s, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH. That whereas the Granlorisindebted tothe Fenr•ficar•-ill liteprinr,..its.,ma iahty Thousand _ _ Dollars l$ 80, 000.00 ) as evidenced by a Promissoryate Nof even date herewith, the term: of whirr ,ri ncorporaled herein by reference. The final due date for payment of said Promissory Note, if not sooner paid is . January 2� _ 2003_ NOW, THLREFORE, as security for said indebtedness. Avanc.•menis and oth- .time expended by Beneficiary pursuant lu this Deed of Trust and costs w collection (including attorneys fees as provided in the Proms sxay Nou•i and other, duable consideration, the receipt of which is hereby acknowledged, the Grantor has bargained, sold. given granted and conveyed and dots by Ihtw- presents ha -gain, sell, give, grant and convey to said Truvlee, his heirs, or successors, and assigns, the parcells) of land situated in the City of _ _._- _ ._. _. .... .. _ _.---. - _CaVe.. Fear. . ___...-- . Township. New Hanover . _- _ _ _ Co.., iy 'north Catalina, ( the "Premises") and mare particularly described as follows: Exhibit "A" attached hereto. nECE1VED � f FEB o 12013 8Y: 61572'7 N. t. H., Awir Iv- 5 141h. Re—d ,$ 4yrtrmher I-", - I'll ted by Aer—, .,ill it, 16 Pm A-.. 1981 • Jam Willa rs b Co. Inc - Ito. 127 • Tada og., RC 27066 I I AVI All' t" I III I I—] V­, . ....... 8,,3 1 .... h .... .. . ... . ..... . ..... I...., .. . .... ... .. ........ ... . ­.d., 1'. 1,­, ,1 ­ ,,,I ,, the . ..... lV-.l.­ I—, h.0I 1­1 ........ ... IN. . ........ ... ..... ,,I ..... . .............. . . ... ............ .. . ...... . II I hh, .0, k 1.4 IN ...... ... I ......... ith Ili, I.— fl,,­ 1, 1, ........ . . I• I . ...... .hall :41, d h, I" III— . ...... I. . ...... .. j . . ...... ...... IN' h I'll. ­nl 0., .11,­q I.": ,AN, hAl I . . ..... ,IV ak­ .; b" 1, - .21. 71 1 I . ...... ... U: ... ..... . I I. I, I rnrlu Nrl ha J.""d 'K.It .......... .. I. . ....... h, -0,, h.111 ­ U,(.] Iw this I Inl I,( InIJ and uh,.11I. I . .... -.qlII­­, im,1­1 in IN, 'I AX! % %�Sl ­11 NI% C I IARCI .h.11l ­lll lill­ IN--, 10- d:­.11l-. P,- -I. J.11 N­­ rJ­ I Ill. 1­­1 IhlI I j­ ......... . ird I- Ill h.111 1.- 11 lillh-- will, '41xf-%vI­I I, IN—: 0 1"." .­1 NI } I I RI IN I c ANO uRl )I its f.r, I., N....... . . .... . ... .. ... ........ 1. L­1 ­d lyd ­­nl, P, -- ­..- All, r • . ., " h ­ lh,• ­v IA, Rt V4 E.­V.,hA ­41 1 ­, IlI;,1.iIl,K V Wd,d.,l d­ I I "d. IN, J; nIN W 0 . ..... ... ..... ... I %%Isll IN L ..... ... 11 ...... .. . . ­­ ... ... I. ..... lnd ..]I V11­­'11111 lb" P -1 ­4 1" 1.11 ....... .. I IN 1,, 1, 1.." ..­ "'la 4 I._ ­, I., nnulr,, & n,I. l,., I--, l, .1..Il J,­. ilvl, 11 lhn- P­ . ... ........ ­k, . ..... d t,pp . ....... I " ' I'. '. ".L..'14 ll-, , ".. . . I . . . In t"; IHlr I" tl.,. I---I, ll.... Nl l.", db..d., 40 ........... ........... -Ili- 1111 1 11 1 RI ." I I I c .."d I I— .......... . ... . .... .. I.A.h. o " I .. .. ............ .. I- I"..- ..... ..... .... ... IN, 0'.. 11 ... . . ......... -I j­11 4111 ll-ftl I" THE FOU0111ING PARAGRAPH, !I. $Air of PRIMISI i. SIIAI I NI 11 APPLI I VI I A% THE 814 )CK 10 THE LEFT MARGIN Of 11115 SENTENCE 15 MARKET) AND/OR INITIAL10. SAI I Of PRIMI'lS calrie," lw­, .1m. I. Ill.. I", ll" I— A. ... ... .............. I I— loll w th.., .. Ix., ... I ... ..... ..... 1 (6) I lilo­ In n, .r . ... ... .. ... ...... .... ...... . ....... 11 ... I . ..... .. J."., Ni'" .. ......... n. h,­n .... ... 1. 10.].. WIN ... ........... I ".I L I I . . ...... fh­4k N,I 1 1­1, I il, hAI lmr d­. m&z." "I Iv 71'.7"1 'NN ­ 111. AT)%ANf N'll" If -Ill I'd I—— .... .. . 141 . ..... ... IN.11 NI.Ll .1 .1. IN- M,w­.whoON I" d— I.- oh, h, ll ll.l:­ it, witnnn I'— ".."t,mm an ruv lloid ...... C ­nv. I.IFT 1." 41" M'11:l o.,l(fi't 0,.• 1" T­1 m lft­4,­q,hall 111­111-Aln IN- N­ ar. ...... I -Ow u., 12 1% WIM C'."'I 1 Ih4 10.111 "1 aI _11 1.4.1 I �'� If II 4 1111 V TWIN I. III.- ­N d I In'I, I ."I !Il,. I I,v 0"A h- -,—It I., 4 ­I,I­.lI'­ i N .. ... .... . N­- h 1,. 1 heI II I, I I it IT atf. No Im -I i -wh .,it I I ­A1­0 I,- c Iii A[ I Ct 61 All A I I F.S1 4ii A] I • Al I N( )R711 CAR( 114A, New 11anclive-, unt Qn T. Gonsalves and husband % La Nolaw fthlit o 11ij I c vrflix ihat , Z Stephen A. :,lzinsalves, Z IribeXtn A), J 2 pt m n,111% ill I-d 1) mledged the C. Mimi v lorvfvIilnt lowumem Will—, my hand mud L) offi, 1.11 klmillb 01 00; r 92 Nolary hibli, ­p,rt . TP N()Rlll I.ARi)IINA Coullq. Istill" I a Ntjllc%- Paildi t,l IN mv, -I at s r l Lvria) 111.11 I nalk apl.. I) I ..... ..... I ,,1 'Iml olx,Yl vial — liv is Sv, 11.1 IIv,II 40 a Ni ath ( ajoltria c I it pormion, and thm Ily atil horily duly & fit, on and I, Ili it I dil v - ri, I Ili(, I—, t ­js igned in its namp by t., '1. '1'.' .'1.. ll'y aq its Seovmr%, WilmNs my hanil onef o:r I.& n I Ili w I -,i d'N of My I umnlnNlm vqwi- ------- '4,dary Vtil.k Carol .Z_.Wi1Uam3, a Notary 1,!Iljc. i. I, I erl(fied lo by corrm I TliiY visfiunwril and IN, I qlilo Ilt. Af. .11. 0.0,- .",.11 me and In t1w hook and PaLi, hown on the fii,i page I......)I. )j. - -6;�� �-, - -�. �-- -- - -MARY-SUMTS RUAS1 ER 01 DI I IN fORNr-- Hanover (:()[jN,y 13V ­ — _.__ ­ - — . - .. m?pw,/Aq**ow Reg,,Iv,l)lDmNK % (L -'I I I'- ;- III A4111-1-.11 --Ih In ' C N. AIIIII: 1981 - J.— WON—, IS Cti_ in, - B.. 171 - hilkkumik, NC 27055 T • BOOK PAGE Imiarr 2683 Q401 A certain tract or parcel of la rid lying and being in Cape Pear Towrisbtl), New I hmovei County, North Carolina and being Ilia( tract as described in deed honk 464 limo, 522, records of New Hanover ('oonly, Norlh Cal-olilla and being more parllcularly elcsc•.ribcd as follows: Beginning al an iron on the v-estem right ory aye of Blue Clay (toad (Slate Road 1318, 60 fi, public right of way ), said iron is at the southeastern corner or lot 98, Section One Ivy Woods (map book 29 page 61), said iron is also. located S 16-49-30 W 471 0) 11. iron) the intersection of the centerline of Old Mill (toad and the western right of way af' Blue Clay Road: Proceed from said point of beginning and with the western righl ilfway or Blue Clay Road S 16-49-30 W 394.35 ft. ter all iron, thence with a curve to the west having a radius of 1,914.17 11, a chord S 21 r9-21 W 322.40 fl. lu an iron, (hence S 2()- 29-12 W 752.00 11. to an iron, llience leavinp. said right orway alld Willi file southern line of the Alex M. Trask tract N 68-57-00 W 1 160.63 ft to an iron on the casiern right of way of Holland Drive (60 n public: l ight of way), said iron is also the nor(hweslern corner of lot 80 Section 5,'A righlsboro Acre- (n)al) book 7 page 1), (hence with file eastern right orway of Holland Drive and with a curve Io the east having a radius of 545.38 R. a chord N 00-06-05 W 26.3611. t+• an iron, thence N 01-17-00 E 973.16 fl. to an iron, thence with a curve io the west having radius of462.90 fl, a chord N 15-51-00 W 272.74 fl. to an iron, lheme N 32-59-0(' rY 4 22 A. Loan iron at the inlcrsection of the western right orway of I1olland 1.b•ivc aihi (lie southern right orway of Alex Trask Drive, thence with the right )rwny of Alex 1 rask Diive N 39-30-34 E 342.46 11. loan iron at the southwestern curnei of Hie (Loch of Wilmington tract (deed book 1512 page 1936, thence with the soulhcrn fine of The R )a of Wilmington tract S 50-16-•58 L; 598 01 ft. to an iron at the southeastern count r urThe hock ol'Wihninglon tract, thence with the eastern line of said ri•act N 27-21-0 li. 409.46 ft. to an iron in the southern line of the Ivy Woods Subdivision, thence with =I a soulhen) line of the Ivy Woods Subdivision S 57-42-00 P 1,21 `+.4711. to 0 c point ol'beginning atul containing 58.66 acres according to a survey )y I hmover ]Design Service, RA in December of 1999, All bearings are magnetic relative in map lw-4 29 page 171 North Carolina Secretaryof State Maine F Marshall Secretary Date: 1 /31 /2013 North Carolina D EPARTM E T OF THE SECRETARY OF STATE PAD Box 29622 Raleigh, NC 27626-0622 (919)607-2000 :k here to: ter Document Filings I PLLC, LP and Non -Profit entities are not required to file annual reports. irporation Names Name Name Type NC NEW BEGINNING LEGAL CHRISTIAN CHURCH, INC. in -Profit Corporation Information SOSID: 0331474 Status: Current -Active Effective Date: 9/24/1993 Annual Report Due Date: citizenship: DOMESTIC State of Inc.: NC Duration: PERPETUAL Registered Agent Agent Name: WILEY, KEITH B Office Address: 401 S 17TH STREET WILMINGTON NC 28405 Mailing Address: 4610 DEAN DRIVE WILMINGTON NC 28405 rincipal Office Office Address: 3120 ALES 1RASK DRIVE CASTLE HAYNE NC 28429 Mailing Address: 401 S 17TH STREET WILMINGTON NC 28401 ricers This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 4059 www.secretery.state-ne.us/corporadoris/Corp.aspOF4twdd==5Ml79 dd=5Ml79 1/1 C201235200081 State of North Carolina Department of the Secretary of State NONPROFIT CORPORATION'S DESIGNATION OF PRINCIP SOSID: 0331474 Date Filed: 12/27/2012 9:27:00 AM Elaine F. Marshall North Carolina Secretary of State Pursuant to §55A-16-23(a) of the General Statutes of North Carolina, the undersigned nonprofit corporation does hereby submit the following for the purpose of designating its principal office address. 1. The name of the corporation is: stew Beainnin¢ Christina Church, Inc. 2. (Check only if applicable.) X The street address of the principal office is not currently on file with the Secretary of State. 3. (Check only if applicable.) The mailing address of the principal office is not currently on file with the Secretary of State. 4. The street address and county of the designated principal office of the corporation is: Number and Street: 3120 Alex Trask Drive City, State, Zip Code: Castle Hayae, NC 28429 County: New Hanover 5. The mailing address tf dl,,Q'erent from the street address of the designated principal office is: This designation will be effective upon filing, unless a later date and/or time is specified- Laning Cbristian QaMh, Inc. N e fCorpor 'o r Robert L. Campbell, Board. President Type or Pn?aName and 21de NOTES: I. Filing fee is $5;. This designation and one exact or conformed copy of it must be filed with the Secretary of State. Devised Janau i y 2000) (Form N-11) CORPORATIONS DIVISION P.O. BOX 29622 RALEIGH, NC 27626-0622 1 rMIOA- Pc 1, C16A (I 42D C4D �..: i 1 ■ 1 r -'iW--,A..m. l u PROPOSED i \0 OPEN SPACEspol— L T J t as F� i - PIAt � / 1 SUE DATA I I J PROPERTYAREA: 17.94Acres / PIN tr: R03308-002-009-000 I / \ • - 2 Ro33oo-oo3-ooi-000 I PROPOSED �T CURRENTADDRESS: 3120Ala Trask Drive I I I `Ml� /� EXISTING ZONING: R-20 1 PROPOSED ZONING: R-20 DEVELOPMENT USE: CHURCH / �DEED: DB: 4976 PG: 566 PropeAy &"C6'- DB: 2683 PG:396 SETBACKS: FRONT so' LREAR 25 LEGEND SIDE 15' PROPERT LINE NO PROPOSED BUn.DING BUFFER SIDE 20' _ _ \ 1trrStM ------------------- ERISTINGPAVEMENr 9djaceDt to any ResidevBal7cDiog EASEMENT — — — — — — — PROPOSED WATER PARKING CALCULATIONS: Proposed: loo Space — — — — — — — LIMITS OF POSEDD�VERABANCE TOTAL loo Spaces TEMPORARY SB.T FENCE RUNOFFDIRECLTON PROPOSED IMPERVIOUS: PARKING - 34,832 Sl �b b 9:1 GRASSED SWAI]? DRIVE - 25,099 s.f. PROPOSED STORM PIPE TOTAL - 59,931 s.f. i� SPOT ELEVATION TOTAL IMPERVIOUS: 5%931 81 (1.376 Ac.) ® ENERGY DISSIPATER %IMPERVIOUS: 7.67% VEGETATED SHELF LIMITS OF DISTURBANCE: 5.5o AG CLIENT INFORMATION: NEW BEGINNING CHRISTIAN CHURCH, INC. 3120 ALEX TRASK DRIVE CASTLE HAYNE, NC 28429 (910)341-7984 DRAWN: EAS stasrsm. mm CHECKED CDC DATE 01-16-13 APPROVED CDC SCALE: �:So PROJECT NUN31EL 100-m DRAWEYO NUI�at: C-2