HomeMy WebLinkAboutNCS000329_MRO Copy MONITORING REPORT_20210301< ATI
February 24", 2021
N�_ptN11_R P.O. Box 5030
�anp V10e Ri y'oe jl O fice 2020 Ashcraft Avenue
�V1ooi es
e Monroe, NC 28111-5030
Division of Energy Mineral and Land Resources Phone: (704) 289-4511
Fax: (704) 290-5194
Attn: Central Files Email: mike.mcmanus@atimetals.com
1617 Mail Service Center
Raleigh, NC 27699-1617
Central Files: Tier 2 Monthly Monitoring -January 2021
Attached, please find stormwater monitoring data for Permit No NCS000329. The originals and
one copy are included. The monitoring data is for the following monitoring schedule:
Analytical monitoring includes:
• Outfall #01 (B), commingled stormwater
o Outfall #02 (B), non -commingled stormwater
• Outfall #03 (B), non -commingled stormwater
If you have any questions or need additional information, please contact me at 704-289-4511
x3800. Thank you.
Sincerely,
Michael McManus
EHS Coordinator
ion AT I
Specialty materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Sample Date:
Sample Time:
Sample Location: e
Stormwater Discharge Outfall # 01 (Commingled)
Drainage Area= 2,915,470 sq. ft. = 69 Acres
Impervious= 34%
Person Collecting Samples:
Laboratory Performing Analysis:
Analytical Techniques and Methods:
40 CFR Part 136
Results of Sample Analysis:
Parameter
Results (mg/1)
Benchmark Values (mg/1)
TSS
f�.
100
BOD
30
COD
120
Cadmium
0.003
Chromium
0.905
Total Calcium
915
Total Copper
0.01
Total Nickel
,
J f �
0.335
Total Zinc
0.126
pH
(std units)
6-9
Temperature
Deg. Celsius
Total Residual Chlorine
.017
Oil and Grease
15
Storm Date: Storm Duration: (Hrs.) Inches of Rainfall:
Duration of time preceding rain event exceeding 0.1": (Hrs.)
Estimated Flow Calculation:
Q=CIA
Q (Total) = Q (Pervious Area) + Q (Impervious Area)
Rev. 01
Date of Rev.: 1/22/2020
�`II
Specialty Materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Q (Tot., cfs) _ (A x inches rain/12 inches/ft. x 69 acres x .66) + (.9 x inches rain/12 inches/ft. x 69 x .34)
Q (Total, cfs) = 1.15180 x (Inches of rain) + 1.7595 x (Inches of rain)
cfs
Rev. 01
Date of Rev.: 1/22/2020
Al
Specialty Materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Sample Date:.
Sample Time:
}
Sample Location:<�;��
Stormwater Discharge Outfall # 02 (Non -
Commingled)
Drainage Area= 212,952 sq. ft. = 4.9 Acres
Impervious= 12%
Person Collecting Samples:
Laboratory Performing Analysis:
Analytical Techniques and Methods:
40 CFR Part 136
Results of Sample Analysis:
Parameter
Results (mg/1)
Benchmark Values (mg/1)
TSS
/" )
100
BOD
30
COD
120
Cadmium
0.003
Chromium
IQ 44
0.905
Total Calcium
915
Total Copper
0.01
Total Nickel
0.335
Total Zinc
0.126
pH
(std units)
6-9
Temperature
Deg. Celsius
Storm Date: Storm Duration: (Hrs.) Inches of Rainfall:
Duration of time preceding rain event exceeding 0.1": (Hrs.)
Estimated Flow Calculation:
Q=CIA
Q (Total) = Q (Pervious Area) + Q (Impervious Area)
Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 4.9 acres x .88) + (.9 x inches rain/12 inches/ft. x 4.9 x .12)
Rev. 01
Date of Rev.: 1/22/2020
AT I
Specialty Materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Q (Total, cfs) = 0.1437 x (Inches of rain) + 0.0441 x (Inches of rain)
cfs
Rev. 01
Date of Rev.: 1/22/2020
e� Ail
Specialty Materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Sample Date:
Sample Time:
Jt z{ * p
Sample Location: f,��?&
Stormwater Discharge Outfall # 03 (Non -
Commingled)
Drainage Area= 336,580 sq. ft. = 7.8 Acres
% Impervious= 15%
Person Collecting Samples:
Laboratory Performing Analysis:
Analytical Techniques and Methods:
40 CFR Part 136
Results of Sample Analysis:
Parameter
Results (mg/1)
Benchmark Values (mg/1)
TSS
100
BOD
_-
,.
30
COD
120
Cadmium
1
0.003
Chromium
L LI f
0.905
Total Calcium
915
Total Copper
0.01
Total Nickel
0.335
Total Zinc
0.126
pH
(std units)
6-9
Temperature
Deg. Celsius
Storm Date: Storm Duration: (Hrs.) Inches of Rainfall:
Duration of time preceding rain event exceeding 0.1": (Hrs.)
Estimated Flow Calculation:
Q=CIA
Q (Total) = Q (Pervious Area) + Q (Impervious Area)
Q (Tot., cfs) = (.4 x inches rain/12 inches/ft. x 7.8 acres x .85) + (.9 x inches rain/12 inches/ft. x 7.8 x .15)
Rev. 01
Date of Rev.: 1/22/2020
411 AT I
Specialty Materials
ATI (Allvac) — Bakers Campus (BNO)
Stormwater Monitoring Report Form
Q (Total, cfs) = 0.2210 x (Inches of rain) + 0.0878 x (Inches of rain)
cfs
Rev. 01
Date of Rev.: 1/22/2020
W
z �
A
`
W
F
W�
00
WG
W
z
O
tz7 w
.0
O
O
O
^? 2
¢ v
^C
L
O d
r
s
GOf
®
�
s
b
C y
i y
b
u
s
b
CQ C
V
H �
O
O U
Cr
d
O
1li
O a..
F"
U
�
A U
oz
v
U0
O
U
O
O O
Lo
C .°n O
.-a
u
���
� ,_.., �
V •.�. ram.+ Rl
FG+ GA
Cd
w
o Z
PC
�a WD G V
w M
.d
L '� L
•a�
G, .0 .L
d Lw
.0 O.
r- bA
O
�
rn
•CS Or �"' "�i
.�
cd
ad
y c� 0 G
% �
Im
a a
o
0
al
76,
PEcd
u
3
Cd (A Z ❑
v
. a e~
V O
O
y�
O
O»tv
cl
to
U [
cli
10
u
w CO O
A E•� W
�.
A F■ W
~ Qn
a
0
H
u
bA
N
3
Ln
O
w