Loading...
HomeMy WebLinkAboutNCC213176_ESC Approval Submitted_20210527L� Catawba county utilities & engineering May 14, 2021 American Fuji Seal, Inc. 1051 Bloomfield Road Bardstown, KY 40004 RE: LETTER OF APPROVAL WITH MODIFICATIONS Project Name: AFS NC Case Number: CBPR-05-2021-37682 Disturbed Area: 25.0 acres Submitted By: Donaville Group, Inc. Date Received: May 11, 2021 New Submittal X Revision Dear Mr. Yada This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The Erosion Control Permit must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deg.nc.gov/NCG01. After submittal of a complete and correct NOI Form, a COC will be emailed to you within three business days. Title 15 NCAC 4B .0018(a) requires that a copy of the approved erosion control plan, NCG01 permit and COC, and records of inspections made be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statue 113A- 51 through 66), this office may require revision to the plan and implementation of the revisions to insure compliance with the Act. catawbacoun"c.gov Catawba County Government Canter 25 Government drive i Newton NC 28658 i 828.465.8261 SLAKING. LIVING. BETTER. Acceptance and approval of this plan is conditioned upon your compliance with federal and state water quality laws, regulations and rules. In addition, local city ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form that you have provided. You are requested to file an amended form if there is any change in the information included on the form. Please ensure the approved plans and permit are picked up from the Government Center, see address above. In addition, please notify this office of the proposed start date for this project and to schedule a preconstruction conference. Your cooperation is appreciated Sincerely, Toni Norton, P.E., LEED A.P., CPESC Water Resources Engineer Cc: File Donaville Group, Inc. NC DEMLR MODIFICATIONS Calculations • Submit complete sediment basin, skimmer, outlet structure and temporary diversion designs Phase I Site Map Erosion Sedimentation & Pollution Control Plan, Sheet ES-1 • Add baffles: flow is required to cross 3 baffles • Add diversion at top of basin slope to direct flow to slope drains • Delineate slopes steeper than 3:1 requiring 7-day ground cover timing Phase II Site Map Erosion Sedimentation & Pollution Control Plan, Sheet ES-2 • Add baffles: flow is required to cross 3 baffles • Add erosion control measures at toe of slopes adjacent north and west side of proposed building to direct flow to storm drain system as installed • Additional measures may be required along toe of southern slope • Delineate slopes steeper than 3:1 requiring 7-day ground cover timing