Loading...
HomeMy WebLinkAboutNCC213082_ESC Approval Submitted_20210524Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: November 3" 2020 LETTER OF APPROVAL WITH MODIFICATIONS Bart Carroll DR Horton, Inc. 5025 Arrowridge Blvd. Charlotte, NC 28273 RE: Project Name: Marley Jaye Village Acres Approved with Modifications: 65.9 Project ID: TRTMN-2021-028 Project Location: PIN 4741375279.000 Submitted By: BGE, INC. Date Received: October 21512020 Plan Type: New Dear Mr. Carroll: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is Letter of Approval with Modifications Marley Jaye Village November Yd 2020 Page 2 of 4 inadequate to meet the requirements of the IredeIl County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of May 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI . Please direct questions about the NOI fort to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jonathan Williams Erosion Control inspector Il Enclosures: Modifications Fact Sheet on the New NCGO1 Permit Permit Letter of Approval with Modifications Marley Jaye Village November Yd 2020 Page 3 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Marley Jaye Village Project ID: TRTMN-2021-028 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as 11RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. I. Provide a statement from Bruce P Murdock granting permission to Beacon Investment Group LLC to perform land disturbing activity on parcels 4741375279.000 & 4741477196.000 or supply a copy of the deed as proof of ownership upon sale to Beacon Investment Group LLC prior to performing any land disturbing activity on these parcels. —RC 2. Provide a copy of the Floodplain Development Permit from the Town of Troutman prior to any land disturbance in the I00-year floodplain. —RC 3. Provide a copy of permits from NC Department of Transportation and Town of Troutman for land disturbance in the road right-of-way and utility easements as applicable. —RC 4. Add to notes/sequence that the site shall be developed in phases limiting disturbed area to 20 to 25 acres at one time. —RC 5. With a drainage area greater than 10 acres, a temporary sediment basin with a riser structure is required in place of Skimmer Basin 4 during phase 2 of development. —RC 6. Ensure all diversion entry points to basins enter the basins behind the 3'd baffle furthest from the skimmer. —RC 7. Turn silt fencing up at all basin skimmer outlets to ensure treated water leaves the site unobstructed over stabilized ground. —RC 8. Adjust all basin skimmer orifice sizes to dewater the required basin volumes in as close to 3 days' time possible using the Sediment Control Measures with Skimmer Dewatering Calculation Spreadsheet provided on the North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources Erosion & Sediment Control Downloads webpage. —RC 9. Adjust emergency spillway trial weir lengths on Basin 4 Phase I to 12 feet, Basin 1 Phase 2 to 14 feet, Basin 2 Phase 2 to 21 feet, Basin 3 Phase 2 to 26 feet and Basin 5 Phase 2 to 11 feet. —RC 10. In the Construction Sequence change all references of NCDEQ Inspector to Iredell County Erosion Control Inspector. —RC 11. In the Erosion Control Notes change all references of City of Charlotte Inspector to Iredell County Erosion Control Inspector. —RC 12. Provide an individual lot development detail. —RC Letter of Approval with Modifications Marley Jaye Village November 3" 2020 Page 4 of 4 13. Provide a diversion ditch detail. —RC 14. Provide a seeding schedule detail. —RC 15. Provide a stabilization chart. —RC 16. Delineate the 20 to 25 disturbed acre phases on the Erosion Control Plans. —SC 17. Use straw wattles in place or rock check dams for diversions and place at a minimum of every 50 feet. Provide detail. —SC 18. Install silt fence border around home sites adjacent to the development limits of disturbance. -SC