Loading...
HomeMy WebLinkAboutSW6210503_Stormwater Narrative_20210518Townsend Estates Subdivision Storm Water Narrative The site is currently undeveloped with the exception of three turkey houses that are planned to be removed. The site is being developed as a single-family residential development. The site drains to a wet pond that is planned along the northern boundary of the property. There is currently 60,588 sf of impervious area withiin the existing site. The proposed development will increase the total impervious for the drainage area to 47.2%. Storm water will sheet drain across the lots into the roadways. Storm water will then be conveyed through an underground drainage system into an on -site wet pond in the northern portion of the site. The pond will discharge into the existing wetlands adjacent to this project. The wet pond has been designed such that the outflow from the project will not increase over the current outflow from the site for the 1-year and 10-year storms. This wet pond has been designed in accordance with the latest NCDEQ MDC Stormwater Design Manual. 409 Chicago Drive, Suite 112, rayettevi I le. NC 28306 office 1 910-426-6777 fax 1 910-426-5777 On time, every time. I www.4Dsitesolut!ons.com