Loading...
HomeMy WebLinkAboutSW6210501_1736-PIPE CALCS_202105181736-Rolling Springs Section 7 *Cross pipe calculations use 25-year storm intensity Tc = 4.5 min + 20.3 min = 24.8 min, use 30 min Kerby: L = 500 ft, s = 0.045, n = 0.4 Kirpich: L = 540 ft, s = 0.02 DA=5.08ac C = 0.35 1 = 4.34 in/hr Q = 7.72 cfs Pipe 2 Tc = 4.5 min + 20.3 min = 24.8 min, use 30 min Kerby: L = 500 ft, s = 0.045, n = 0.4 Kirpich: L = 540 ft, s = 0.02 DA = 4.70 ac C = 0.35 1 = 4.34 in/hr Q = 7.14 cfs