Loading...
HomeMy WebLinkAboutNCC200944_Modification Review_20210518Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 5/18/2021 9:14:35 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany A 5/18/2021 9:17:27 AM (Construction COC ADD TO FILE Review - NCC200944) • The task was assigned to Georgoulias, Bethany A. The due date is: May 21, 2021 5:00 PM 5/18/2021 9:14 AM Y . Ta4M1 w, NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC200944 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit: Project Name Phase III Rogers CCP Landfill Construction Stockpiles Address McCraw Road, Mooresboro, NC County Cleveland Latitude 35.2057 Longitude -81.7696 Permittee Listed Duke Energy Carolinas, LLC Legally Responsible David Dellario Individual NC Reference No. NCG01-2020-0944 E&SC Plan ID CLEVE-2020-014 Original NOI 22914 Tracking No.* Date COC Issued* 03/11/2020 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed r Multiple Reasons (List) Addional We information (e.g., new Site Contact details). If lots are being added, please include specific lot nunbers. Explanation Increase in LOD. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised ESCApproval, (lose -Out Doc, etc.) Documentation Cliffside Stockpile ECP Approval.pdf 115.25KB Mast be FDFformat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* David Dellario Title * GM CCP Project Management Organization* Duke Energy Carolinas, LLC Date * 05/18/2021 Email Address* David.Dellario@duke-energy.com 57ail for confirrration Telephone Number* 980 242-1764 Contact nurrber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email Robert.Wylie@duke-energy.com (Optional) Additional email for confirrration Original Permittee David.Dellario@duke-energy.com Email Original Site Contact Robert.Wylie@duke-energy.com Email Review Date 05/18/2021 Rescinded Since Submitted? Request Date 20210518 Formatted Review Date 20210518 Formatted