Loading...
HomeMy WebLinkAboutNCC212854_ESC Approval Submitted_20210511ROY COOPER Governor DIONNE DELLFGATTI Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality May 5, 2021 LETTER OF APPROVAL WITH MODIFICATIONS RPM Wood Finishes Group, Inc. ATTN: Mr. Johnny Green 3194 Hickory Blvd. Hudson, NC 28638 RE: Project Name: RPM Wood Finishes Group Acres Approved: 12.15 Project ID: CALDW-2021-025 County: Caldwell City: Hudson Address: US 321 River Basin: Catawba Stream Classification: WS-IV Submitted By: Mr. Justin C. Church, P.E. Date Received by LQS: April 8, 2021 Plan Type: Industrial Dear Mr. Green, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.govfNCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas9ncdenr.gov or Paul Clark at Paul.clarkOncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. D E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office J 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 opal— 0UIT. .-may l;; /� 828.296.4500 RPM Wood Finishes Group, Inc. ATTN: Mr. Johnny Green May 5, 2021 Page 2 of 4 Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, ' V�?_ - Mich el Smith Assis ant Regional Engineer Land Quality Section RPM Wood Finishes Group, Inc. ATTN: Mr. Johnny Green May 5, 2021 Page 3 of 4 Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet cc: Mr. Justin C. Church, P.E. justin@brec.biz cc: Regional Office file MODIFICATIONS REQUIRED FOR APPROVAL Project Name: RPM Wood Finishes Group Project ID: CALDW-2021-025 County: Caldwell For final plan approval, on or before June 1. 2021, please provide to this office the requested documents listed below. 1. Please show on Part A, Line 6 of the Financial Responsibility/Ownership Form (FRO) the amount of the fees that were submitted for this site. {G.S. 113A-54}. 2. Please list on Part B 2 (b) of the Financial Responsibility/Ownership Form (FRO) the name and contact information for the Registered Agent for this company. The Registered Agent for this company can be found listed on the North Carolina Secretary of State's Business Registration website at the address copied below. {G.S. 113A-54)}. 3. Please note that the mailing addresses listed for this company by the North Carolina Secretary of State and listed on the submitted deed are different than the mailing addresses listed on Part B (1) the Financial Responsibility/Ownership Form (FRO). Please review and/or revise the FRO showing the legal mailing address for this company. {G.S. 113A-57 (3)}. 4. Please show on Part A, Line 3 of the Financial Responsibility/Ownership Form (FRO) the approximate date the land disturbing activity will commence. {G.S. 113A- 54}. 5. In accordance with Note 7 of the Erosion Control Construction Sequence, please show the locations of the silt fence stone outlets along the runs of the silt fence. {G.S. 113A-57 (3)1. 6. Please consider adding to Note 20 of the Erosion Control Construction Sequence, to remove both the sediment basin and the sediment trap. {G.S. 113A-57 (3)}. RPM Wood Finishes Group, Inc. ATTN: Mr. Johnny Green May 5, 2021 Page 4 of 4 7. Please consider using slope breaks, such as diversion or benches as appropriate to reduce the length of slopes to limit sheet and rill erosion and prevent gullying. A spacing guide is provided in Table 6.02a of the NCDEQ Erosion and Sediment Control Planning and Design Manual Section 6.02, page 6.02.2. {G.S.113A-57 (3)). 8. Please note this area is in a WS-IV, Phase 11 watershed. Please contact the Western Piedmont Council of Governments for any post construction permitting requirements. {15A NCAC 1000}. 9. The surface area provided (SApva) for the riser sediment basin appears too small. Please note for a riser sediment basin, the calculated surface area should use 435 ftz per Qio. Please review or revise the sizing of the riser -basin. For reference please see Section 6.61, page 6.61.2 of the NCDEQ Erosion and Sediment Control Planning and Design Manual. {G.S. 113A-57 (3)}. 10. Consideration should be given to avoiding Sericia Lespedeza as it is considered an invasive species, per NC State University/At&T University Cooperative Extension. The Extension recommends the following alternative native species: Switchgrass (Panicum virgatum), Splitbeard Bluestem (Andropogon ternarius), Beggarlice (Desmodium spp.), Partridge Pea (Chamaecrista fasciculata). {Comment} Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities d c N CL eD �. n ORA CL C o O f D CL CL MEW CL �D o