Loading...
HomeMy WebLinkAboutNCC201440_Modification Review_20210426Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 4/23/2021 11:48:30 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany A 4/26/2021 5:42:27 PM (Construction COC ADD TO FILE Review - NCC201440) • The task was assigned to Georgoulias, Bethany. The due date is: April 28, 2021 5:00 PM 4/23/2021 11:48 AM Y. , NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC201440 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name Chatham Park Section 5.1 - Subdivision West Phase 1 Address Vine Parkway, Pittsboro, NC 27312, Pittsboro, NC County Chatham Latitude 35.7280 Longitude -79.1590 Permittee Listed Chatham Park Investors LLC Legally Responsible Tim Smith Individual NC Reference No. NCG01-2020-1440 E&SC Plan ID 2019-04807 Original NOI 24161 Tracking No.* Date COC Issued* 04/14/2020 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed r Multiple Reasons (List) Addional Ivbre information (e.g., new Site Contact details). If lots are being added, please include specific lot nunbers. Explanation Modification to Stage 3 EC construction limits You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised ERSC Approval, (lose -Out Doc, etc.) Documentation Letter of Approval Revised Plan_4-23-2021.pdf 138.62KB Mast be FDFfon-rat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto e)ceed ten thousand dollars ($10,000). rJ I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Tim Smith Title * Manager Organization* Chatham Park Investors LLC Date * 04/23/2021 Email Address* smorris@withersravenel.com Errail for confirmation Telephone Number* 9194177889 Contact nurrber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email Additional email for confirmation (Optional) Original Permittee robin@prestondev.com Email Original Site Contact robin@prestondev.com Email Review Date 04/26/2021 Rescinded Since Submitted? Request Date 20210423 Formatted Review Date 20210426 Formatted