Loading...
HomeMy WebLinkAboutNCG180016_Updated COC_20210416ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director Lee Industries Inc. Eric Lail PO Box 2147 Hickory NC 28603 NORTH CAROLINA Environmental Quality April 16, 2021 Subject: Certificate of Coverage (COC)NCG180016 Lee Industries PLT1 Catawba County Please see the attached new Certificate of Coverage No. NCG1800163 for coverage under Stormwater General Permit NCG180000 for this facility. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended.) You must print a copy of the new NCG180000 General Permit from our Stormwater General Permits web page: https://deQ.nc . ov about/divisions/energy-minera I- lan d-resourc esLndes -stormwater-gps. In addition to the full permit, the print package on the website includes revised Discharge Monitoring Report (DMR) forms and Qualitative Monitoring Report Forms. The General Permit authorizes discharges of stormwater, and it specifies your obligations with respectto discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all changes in the reissued permit. Your facility has six (6) months from receipt of the permit to update your Stormwater Pollution Prevention Plan (SPPP) to reflect any new permit requirements. When does electronic DMR (eDMR) reporting start, and does it affect this permit? If activities atthis facility ever require analytical monitoring, eDMR will affect you. We are setting up our database with the outfalls that permittees submitted on-line and permit parameters. Permittees will receive notification when our eDMR system is ready for permit -holders to register and begin reporting monitoring data electronically. If you have any questions about the status, please contact Bethany Georgoulias at (919) 707-3641. Sincerely, `M for Brian Wrenn Director North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 r�oarH cuvour�n � D"W*^M , f 919,707.9200 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG1800000 CERTIFICATE OF COVERAGE No. NCG180016 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Lee Industries Inc. is hereby authorized to discharge stormwater from a facility located at Lee Industries PLT1 402 W 25th Street Newton Catawba County to receiving waters designated as Hilderan Creek (Anthony Creek), class C, waters in the Catawba River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG180000 which can be downloaded by entering "deq.nc.gov/SW-industrial" in the browser window and navigating to the "NPDES Stormwater General Permits" web page. This certificate of coverage shall become effective April 16, 2021. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 16th day of April 2021. for Brian Wrenn Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission