Loading...
HomeMy WebLinkAboutSW8961209_HISTORICAL FILE_20030731STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. i SW � DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS �iHISTORICAL FILE El COMPLIANCE EVALUATION INSPECTION DOC SATE I '73 f YYYYMMDD State Stormwater Management Systems Permit No. SW8 961209 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES a DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Primary Care Associates New Hanover Medical Group Satellite Office #2 New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 31, 2013, and shall be subject to the following specified conditions and limitations: L •DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2.,. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 86,909 square feet of impervious area. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 rz State Stormwater Management Systems Permit No. SW8 961209 Modification DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: New Hanover Medical Group Satellite Office #2 Permit Number: SW8 961209 Modification Location: New Hanover County Applicant: Dr. J William Eakins Mailing Address: Primary Care Associates 1960 South 16`h Street Wilmington, NC 28401 Application Date: July 21, 2003 Receiving Stream/River Basin: Mott Creek / Cape Fear Stream Index Number: CPF17 18-82 Classification of Water Body: "C SW" Drainage Area, acres: 3.69 Onsite, sq. ft.: 160,612 Offsite, sq. ft.: none, per engineer Total Impervious Surfaces, sq. ft.: 86,909 Pond Depth, feet: 4.0 TSS removal efficiency: 90% (no filter is required) Permanent Pool Elevation, FMSL: 22.5 Permitted Surface Area, sq. ft.: 8,388 @ Permanent Pool Permitted Storage Volume, cubic ft.: 7,889 Temporary Storage Elevation, FMSL: 23.5, Controlling Orifice: 1.625" � (drawdown in 2-5 days) Permitted Forebay Volume, cubic ft.: 7,472 K State Stormwater Management Systems Permit No. SW8 961209 Modification IL SCHEDULE OF COMPLIANCE l . The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5'. Decorative spray fountains will not be allowed in the stormwater treatment system. 6' The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7' Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to E occupancy of the facility. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 4 State Stonrnwater Management Systems Permit No. SW8 961209 Modification 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the ' purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 0. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS s 1.; This permit is not transferable except after notice to and approval by the Director. In the event of a change of owership, or a name change, the pennittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2.. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local,'state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 5 0 State Stormwater Management Systems Permit No. SW8 961209 Modification 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 31st day of July, 2003, NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, RE', Director Division of Water Quality By Authority of the Environmental Management Commission Al Wrightsville Engineering Services July 18, 2003 Ms. Laurie Munn NCDENR, Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: New Hanover Medical Group -- Addition and Remodel South College Road, New Hanover County Modification to Permit: SW8 961209 Dear Ms. Munn: File No.: 23007 As requested, please find enclosed revised data for the Addition and Remodel project. 1. Revised original and (1) copy of page 2 Stormwater Application Form showing the corrected total square footage of impervious. 2. Revised original copy of page 1 of the Wet Detention Basin Supplement Form showing 90% TSS removal design criteria (conforms to talcs and charts used). 3. Two (2) copies of revised Sheet SD1 showing dimensions for buildings, sidewalks and parking areas. Should there be any question or additional copies desired, please feel free to contact our office. Sincerely, WRIGHT ILLS ENGINEERING SERVICES, P.L.L.C. J N K. KLEI N, PE Enclosures Cc: Mr. Michael R. McLeod, AIA Ms. Jo Wilkins, Primary Care Associates 3410 Wrightsville Avenue Wilmington, North Carolina 28403 910.799.7967 Fax 910.793.0599 W A rFRp Michael F. Easley, Governor �OF William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E.,Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality July 9, 2003 Dr. J. William Eakins Phinary Care Associates 1960 South l6`'' Street Wilmington, NC 28401 Subject: REQUEST FOR ADDITIONAL, INFORMATION Stormwater Project No. SW8 961209 Modification New Hanover Medical Group Satellite Office #2 New Hanover County Dear Dr. Eakins: The Wilmington Regional Office received a Stormwater Management Permit Application for New Hanover Medical Group Satellite Office #2 on June 4, 2003, A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please provide dimensions for all buildings, parking, sidewalks, and driveways. 2. The i mpervious surface area on the application and in the calculations sum to 86,909 square feet. Please explain how you calculated 91,073 square feet. 3. For 85% TSS removal, you must provide a vegetated filter at the outlet. I have enclosed a detail of the vegetative filter. If you do not wish to provide a vegetative filter, please design the pond for 90% TSS removal. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 9, 2003, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division 'at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service AS -A Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 �'VBONTRE Dr. J. William Eakins July 9, 2003 Stormwater Project No. SW8 961209 Modification Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Laurie Munn Environmental Engineer RSS/:lsm S:1WQSlSTORMWATIADDINFO120031961209MOD.ju]y03.doc cc: Laurie Munn John Klein, P.E. Wrightsville Engineering Services June 3, 2003 Ms. Linda Lewis NCDENR, Division of Water Quality 127 Cardinal Drive Extension i Wilmington, NC 28405-3845 Re: New Hanover Medical Group — Addition and Remodel South College Road, New Hanover County Modification to Permit: SW8 961209 Dear Ms. Lewis: File No.: 23007 '�OA I'Da V cy, On behalf of the Primary Care Associates, please find enclosed submittal for modification to the above DWQ stormwater permit. Although the original pond had been constructed to permit future expansion, the level of expansion has exceeded that allowed; hence, the need to bring the pond into compliance with current requirements. Enclosed for your review are: Original and one (1) copy of the Stormwater Application Form Original copy of the Wet Detention Basin Supplement Form Permit application fee in the amount of $420 Two (2) copies of the Narrative which includes Calculations Two (2) copies of Drawings Should there be any question or additional copies desired, please feel free to contact our office. , Sincerely, WRIGHTSVILLE ENGINEERING SERVICES, P.L.L.C. RECEIVED JOHN K. KLEIN, PE Enclosures 1UN 0 4 2003 Cc: Mr. Michael R. McLeod, AIA DWQ Ms. Jo Wilkins, Primary Care Associates PROJ # I 3410 Wrightsville Avenue Wilmington, North Carolina 28403 910, 799. 7967 Fax 910. 793.0599 PRIMARY CARE ASSOCIATES 1479 ' 1960 S. 16TH ST. -)63 WILMiNGTON, N.C. 28401 66 30l531 Dat�S I Pay to the Orderof C r n j `' $ ildnoz) A�i 00 017—Dollars 8 I FIRS-Y CITIZENS 355 OO RANK E; s �ihmm saR� T,�� Gon pa ry Wilrirgton, N C. 2Ba01 For i:053L0❑3009:0035320L8L6?um ❑LL,?9 QCWIIV Arericwn GVARGIAM1p WETY BLUE VERt STORM DRAINAGE DESIGN for NEW HANOVER MEDICAL GROUP - ADDITION AND REMODEL 5145 SOUTH COLLEGE ROAD Wilmington New Hanover County, North Carolina PREPARED FOR Primary Care Associates 1960 South 16th Street WELMINGTON, NC 28401. (910) 343-9991 File Number: 23007 Date: June 2003 �•' Q� k CRR0?7�' _ t SEAL 14109 ' 1 v E ,. a V I N y�N+++H•+►1 Prepared by Wrightsville Engineering Services, PLLC 3410 Wrightsville Avenue Wilmington, North Carolina 28403 (910) 799-7967 ;1% DESIGN NARRATIVE 1. GENERAL: The project site is located near the Monkey Junction area of New Hanover County, north along South College Road. Toward the south is a tributary ofMotts Creek which discharges into the Cape Fear River. The project involves expansion of an existing DWQ permitted site with the construction of additional building area as well as expansion to the parking facility. Located on a site approximately 3.69 acres, the new ultimate development will require approximately 2.1 acres of built -upon area. Prior submittal authorized expansion to 1.7 acres; hence the need to modify the existing pond. The purpose of this submittal is to redesign the detention facility for the proposed new expansion of the site, Included within this submittal are the Drawings and Storm Drainage Calculations. All items are part of the overall plan and included by reference. 2. PROPOSED IMPROVEMENTS: Grading and drainage improvements include expansion of the building as well as pavement areas. To accommodate this additional area, the stormwaterpond will need upgradingto meet current state DWQ as well as New Hanover County (NEC) siormwater requirements. Indicated on the Drawings are the proposed expansion areas which have also been incorporated into the design Calculations. Grades have been constructed to discourage overland flow of runoff into the parking areas from non -built upon areas. 3. STORM DRAINAGE CALCULATIONS: Storm drainage calculations were aimed at satisfying NC DWQ requirements as well as considerations for NHC pre and post design. Predevelopment rates are those occurring prior utilizing the existing permitted pond and drainage areas; while, post development is the expanded pond and impervious Design considerations included, but not limited to, the following items: a. Storage of the first one (1) inch of runoff b. Release of the stored volume between two (2) and five (5) days c. Use of forebay to promote solid deposition within the pond inlet area. d. Limiting the rate of runoff to current development rates for the 2-year, 10-year and 25-year storm events. ;. r STORM DRAINAGE CALCULATIONS DWQ Runoff Calculations NHC Pre and Post Development Calculations: 2-year Storm Event NHC Pre and Post Development Calculations: 1 0-year Storm Event NHC Pre and Post Development Calculations: 25-year Storm Event Original DWQ Submittal Calculations ' Wriglftsville Engineering Services, PLLC PROJECT: New Hanover Medical Group Addition and Remodel CLIENT: Michael R. McLeod AIA PROJECT NO.: 23007 LOCATION: New Hanover County, NC DATE: June 2003 PREPARED BY: JKK SUBJECT: Stormwater Calculations GIVEN: Modify existing pond to accommodate new expansion plans. Runoff Coefficients used for Design: Postconstruction = Turf (developed) _ TOTAL PROJECT AREA = Area draining to pond = Areas not draining to pond = Design Storm Event = 10-year, Rainfall Intensity = SOLUTION: 1. Summary of Drainage Areas 0.80 0.20 160612 SF = 109053 SF = 51559 SF = 5 minute duration 7.23 inches/hour AREAS DRAINING TO POND --------------------------- AREA AREA TYPE (SF) (AC) BLDG 22874 0.525 SIDEW 3706 0.085 PVMNT 60329 1.385 TOTAL IMPERV. 93-073 2.091 ? 0 9 09 TURF 17980 0.413 TOTALS 109053 2.50 Pond Design Criteria: Percent Built -Upon: = 2.091 Ac 1 83.5 % 2. DELETED 2.504 Ac = use: 85 % 3.69 Ac 2.50 Ac 1.18 Ac . 3. DETENTION POND DESIGN: Design to store the first 1-inch of runoff from project area Imperv. 1.00 x 91073 SF x V/12" = 7589 Turf 0.20 x 17980 SF x T/12" = 300 7889 C F Based on state requirements for ponds without vegetative filter and using the design impervious percent o 85 with a depth of 4.0 feet, the ratio of surface area (SF) to drainage area to drainage area (DA) = 7.45 23007 - NH Medical: Addition and Remodel ' Wrightsville Engineering Services, PLLC Therefore, required pond surface area (SA) is: 7.45 x 2.50 / 100 = Pond Width at Design Surface: see plan Pond Length at Design Surface: see plan AVE. CUMUL. AREA AREA VOLUME VOLUME ELEV. (SF) (SF) (CF) (CF) 18.5 22.5 8388 23.5 9652 24.5 10972 25.5 12349 0 0.19 Acres 8124 SF Use: 8388 SF (Pond Design Bottom) 0 (Design Area) 9020 9020 9020 10312 10312 19332 11661 11661 30993 13066 13066 26.5 13783 44059 Depth where storage requirement met: 23.37 Depth of Required Storage. 0.87 VF or Elevation of Top of Riser: 23.50 Depth of Storage Provided: 1.00 VF or Volume of Storage Provided: 9020 CF 4. Restrictive Orifice Design: Design orifice for discharge allowed using the following equation Q= C x A x (2gh)^0.5 where: Q= CFS C = orifice coefficient A = orifice diameter (SF) g = 32.2 ft/sec2 h = pressure head (ft) Rearranging the above equation to solve for hole diameter A=Q/Cx(2gh)^0.5 For our type of discharge, C = 0.60 Pond Outlet Invert = 22.50 Design Storage Level = 23.50 Ave Reqd Storage Level = 23.00 Trial Orifice Diameter = 1.63 " (1-5/8") Trial Orifice Area = 0.0144 SF Orifice centerline = 22.57 Ave. Pressure Head (h) = 0.43 10.5 Inches 12.0 Inches Allowable discharge rate: Design discharge so that ponds drain between two (2) day and five (5) days. Pond Volume: 7889 CF Pond Volume: 7889 CF 23007 - NH Medical: Addition and Remodel Wrigtftsville Engineering Services, PLLC Time to drain: 2 days or 172800 sec Therefore, release rate = 7889 CFS / 172800 sec or 0.046 CFS A = 0.0144 SF 1.63 inches Actual Time to drain pond: Q = 0.046 CFS Time = 7889 CF ! Time to drain: 5 days or 432000 sec Therefore, release rate = 7889 CFS 1 432000 sec or 0.018 CFS A = 0.0058 SF 1.03 inches Else: 1.63 " (1-518") 0.046 CFS = 173025 Sec = 48 Hrs. 5. Forebay Design Requirements: Design forebay for 20 % of the total volume below the pool. FOREBAY VOLUME MAIN POND VOLUME AVE. CUMUL. AVE. CUMUL. AREA AREA VOLUME VOLUME AREA AREA VOLUME VOLUME ELEV. (SF) (SF) (CF) (CF) (SF) (SF) (CF) (CF) 18.5 222 0 1698 0 335 335 1985 1985 19.5 448 335 2271 1985 598 598 2590 2590 20.5 747 933 2908 4574 928 928 3338 3338 21.5 1109 1861 3768 7912 1556 2484 4581 7919 22.5 2002 4344 5393 15831 7472 30301 Total Volume Below Normal Pool Elevatior 37773 Percent Forebay vs Total Volume = 20% 6. Pond Outlet Design Existing Outlet to be retained with modifications to orifice size. Refer to routing analysis for detailed flow rates. 7. Overflow Weir Design for Forebay and Pond Emergency Spillway Design Overflow Weir based on 25-year, 10-minutes storm which produce a volume in excess of one (1) inch. Q=CxixA C= 0.80 i = 7.13 inlhr A = 2.50 Ac Q = 14.3 CFS Design weir to convey entire flow. Set weir invert above storage level. weir equation: Q = C x H1312 x (L - 0.2H) where: 23007 - NH Medical: Addition and Remodel Wrightsville Engineering Services, PLLC Q = CFS C = weir coefficient = 3.33 L = weir lenfth (FT) = 2 x H (min) H = head (FT) rearranging and solving for weir length yields the following: L=(QICXH^312)f0.2H Design weir capacity = 14.28 CFS Design weir depth = 6.0 Therefore, required weir length = 12.11 FT B. Summary: Required Pond Surface Area = 8124 SF Design Pond Surface Area = Required Storage Volume = 7889 CF Design Storage Volume = Pond Outlet Invert = 22.50 Required Storage Elev. = 23.37 Design Storage Elevation = use: 8388 SF 9020 CF 0.50 FT 12 FT Depth = 0.87 VF 23.50 Depth = 1.00 VF Pond Invert = 18.50 Outlet Orifice Diameter = 1.63 " Ave Discharge Rate = 0.046 CFS Anticipated drawdown time = 48 Hours = 2.0 Days 23007 - NH Medical: Addition and Remodel N": as au OVA. 30 FOOT VEMA72D IMLM FaKAMM 3' 3.3 4.0' 4.5' 5.0' 5.5' 6.0' 6.3' 7A' .3' 10% .9 .$ .7 16 .S 0 0 0 0 20% 1.7 1.3 1. 1.1 1.0 ,i .7 .6 .5 30% 24 2.2 1.9 1.3 1.3 1.2 1.0 .0 40% 3,4 3.0 2.6 2. 1 1.9 1.6 1.4 U 1.0 so% 4.2 3.'7 3.3 3.0 2.7 .4 2.1 1.8 1.5 1.3 W% 5.0 4.5 A1.8 3.5 3.2 2.9 2.6 2.3 12.0 1.8 70% 6.0 .2 4.3 4.1 3.7 3.1 2,9 2.5 2.1 1.8 $011 6.0 5.2 4.7 4.2 3.? 3.1 2. 2.2 2.0 90% 7.5 6.5 3.6 5.3 4.5 4.3 3.8 3.3 2. 8.2 7.4 6.8 5.2 S.6 3.0 4.4 3.8 3.2 W1.3 MS T83 OVAL NO VMMATICD FILTER DEM 3' 3.3' 4.0' 4.5' 1.6 5.0' 5.5' 6.0' 6.5' 7.0' 7.5' to% 1.3 1.0 .8 .7 .3 .4 .3 .2 .1 20% 2.4 2.0 1.8 1.7 1.3 1.1 1.2 1.0 .9 .(► 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 .9 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 I.8 1.4 1.1 30'8 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60% 7.0 6.0 5 3 4.8 4.3 S_4 3.4 2.9 2.4 1.9 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80� 9.4 3.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.9 90 % 10.7 9.0 7.9 17.2 6.5 3.9 5.2 4.6 3.9 3.3 1.410'16 tZ.V 110.0 8.8 8.1 7.3 6.6 5.13 5.1 4.3 3.6 Uft tt1 i4 to pnvbm at bepenwommd Dmk (�, p,Ev15En Cote CTE� U I z coy - En tSrN� -_ =- ___ N w cov��1►vLU Ni, <fA L.c.vt_AT1OQS, j v. Ilt�d:. 5ubcat/ Reach �,on _ , Lihk PondCalcs2 Type Il 24-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 1 HydroCADO 6.00 sln 001707 ©1986-2001 Applied Microcomputer Systems 6/2/2003 Time span=0.10-20.00 hrs, dt=0.01 hrs, 1991 points Runoff by SCS TR-20 method, UH=SCS, Type 11 24-hr Rainfall=4.50" Reach routing by Stor-1nd+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Original Site Design Subcatchment 2S: New Development Subcatchment 3S: Uncollected Yard Areas Tc=5.0 min CN=89 Area=2.200 ac Runoff-- 12.70 cfs 0.566 of Tc=5.0 min CN=89 Area=2.500 ac Runoff= 14.43 cfs 0.643 of Tc=5.0 min CN=61 Area=1.490 ac Runoff-- 2.87 cfs 0.119 of Subcatchment 4S: Proposed Uncollected Flows Tc=5.0 min CN=61 Area=1.180 ac Runoff-- 2.27 cfs 0.094 of Pond 1 P: Stormwater Pond Peak Storage= 11,283 cf Inflow-- 12.70 cfs 0.566 of Primary= 6.68 cfs 0.392 of Outflow-- 6.68 cfs 0.392 of Pond 2P: Revised Pond Peak Storage= 13,530 cf Inflow-- 14.43 cfs 0.643 of Prmary= 6.55 cfs 0.433 of Outflow-- 6.55 cfs 0.433 of Link 1L: Existing Total Flow Inflow-- 9.02 cfs 0.511 of Primary= 9.02 cfs 0.511 of Link 2L: Proposed Combined Flow Inflow-- 8.24 cfs 0.527 of Primary= 8.24 cfs 0.527 of Runoff Area = 7.370 ac Volume =1.422 of Average Depth = 2.32" PondCalcs2 Type 1124-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 2 H droCAM 6.00 sln 001707 © 1986-2001 Applied Microcom uter Systems 6/2/2003 Subcatchment 1S: Original Site Design Runoff = 12.70 cfs @ 11.96 hrs, Volume= 0.566 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=4.50" Area (ac) CN Description 2.200 - 89 Urban commercial, 85% imp, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (fVft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Enry O IL Subcatchment 1S: Original Site Design Hydrograph Plot 4 - - _ - - ' - ---- -- - - ! I 12`70-cfs E.. , 3 . --' - ' i e i i i I I 7 ....... .._.............. ,._. _ ----- i- --- - ---- --- : i i r i ,.—_._._._ _ r I ! i �� i r I I 4 - _ -------- -_-- -- - I , e i i i i i j , 1 i , 3 ' - - - - Time (hours)-- - Runo#f PondCalcs2 Type 11 24-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page HydroCA_D® 6.00 s/n D01707 01 , pMicrocomputer c 1988-2001 Applied Systems 6/2/2003T Subcatchment 3S: Uncollected Yard Areas Runoff = 2.87 cfs @ 11.97 hrs, Volume= 0.119 of Runoff by SCS TR-20 method, UH-SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=4.50" Area (ac) CN Description 1.490 61 >75% Grass cover, Good, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (M) (ft sec) (cfs) _ 5.0 Direct Entry, yard sheet flow Subcatchment 3S: Uncollected Yard Areas Hydrograph Plot 3 7 w y 0 U. 2 8Z<cis.' --- - - - 3 i I I 4 I I I I I I 1 I j I 1 i I E ' i E i i f " .. .. Time (hours) ,� .,. .. ... ... ,. ,., ... �., — RunoH PondCalcs2 Type 1124-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 6 HydroCAD® 6.00 sln 001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003 Pond 1 P. Stormwater Pond Inflow - 12.70 cfs @ 11.96 hrs, Volume= 0.566 of Outflow = 6.68 cfs @ 12.04 hrs, Volume= 0,392 af, Atten= 47%, Lag= 4.8 min Primary = 6.68 cfs @ 12.04 hrs, Volume= 0.392 of Routing by Stor-Ind method, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Peak Elev= 23.95' Storage= 11,283 cf Plug -Flow detention time= 119.9 min calculated for 0.392 of (69% of inflow) Storage and wetted areas determined by Prismatic sections Elevation Surf.Area lnc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 22.50 6,890 0 0 23.50 8,060 7,475 7,475 24.50 8,700 8,380 15,855 25.50 9,980 9,340 25,195 26.50 10,650 10,315 35,510 Primary OutFlow (Free Discharge) L1=Culvert t 2=Orifice/Grate 3=Orifice/Grate # Routing Invert Outlet Devices 1 Primary 22.50' 24.0" x 40.0' long Culvert Ke= 0.500 Outlet Invert-- 22.42' S= 0.0020 T n= 0.013 Cc= 0.900 2 Device 1 23.50' 2.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 3 Device 1 22.50' 1.5" Vert. Orifice/Grate C= 0.600 PondCalcs2 Type 1124-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 7 HydroCAD® 6.00 sin 001707 © 1986-2001 Applied Microcomputer Systems 612I2003 Pond 1 P: Stormwater Pond Hydrograph Plot 12.70 Cf5 r E_ I ' r i 'i i ! ....I i..-.-._.__.._._----- _. i 1 i : ! I ... ` i ! j i j ! 1 '.6'.68.`ct'S i .._.L, i i 7 _._.-. .--- ----- -------- -._...--- ---- --_--- ---'- —'-'-- -'-- E i it i i , r ' I j I i i ! ; _ _.-- j j I -------- ------------------- - 2- i t.'''';'''' i I ; i a-.- i 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time jhoumj — Inflow — Primary PondCalcs2 Type Il 24-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 10 HydroCAD® 6.00 sln 001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003 Link IL: Existing Total Flow Inflow - 9.02 cfs @ 12.00 hrs, Volume= 0.511 of Primary = 9.02 cfs @ 12.00 hrs, Volume= 0.511 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs 1 Link 1L: Existing Total Flow Hydrograph Plot 0 -�i --- I --- -- �I - - — -- "'i=---- - ----�E --- - ---- • j W-0--2 Gfs i s , -- ..---- --- --------- - ; • i i �I :' j i I 7. � I E I I • I y i I i I i j ' i i I I I I E I I ..i I I i E ' � 3- 2 - - I-._..._._. E _ aE I I ! [ I - - - - - � Time (hours) -- .- - '- -- -- �- -- — infiow — Primary PondCalcs2 Type 1124-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 3 HydroCAD® 6,00 sln 001707 O 1986-2001 Applied Microcomputer Systems _ _ 6/2/2003 Subcatchment 2S: New Development Runoff = 14.43 cfs @ 11.96 hrs, Volume= 0.643 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type 1124-hr Rainfall=4.50" Area (ac) CN Description 2.500 89 Urban commercial, 85% imp, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Sheet and Pipe travel time III Subcatchment 2S: New Development Hydrograph Plot 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) _ Runoff PondCalcs2 Type 1124-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C, Page 5 HydroCAD® 6.00 sln 001707 ® 1986-2001 Applied Microcomputer Systems 6/2/2003 Subcatchment 4S: Proposed Uncollected Flows Runoff = 2.27 cfs @ 11.97 hrs, Volume= 0.094 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=4.50" Area (ac) CN Description 1.180 61 >75% Grass cover, Good, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ftfft) (ftlsec) (cfs) _ 5.0 Direct Entry, Sheet Flow Runoff Subcatchment 4S: Proposed Uncollected Flows Hydrograph Plot — Runaff 1 L J Y J O ! V A IV 11 lL IJ IY IJ IV I IV lM LV Time (hours) PondCalcs2 Type 1124-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 8 HydroCADO6.00 s/n 001707 © 1986-2001 ARplied Microcomputer_ Systems 6/2/2003 Pond 2P: Revised Pond Inflow - 14.43 cfs @ 11.96 hrs, Volume= 0.643 of Outflow = 6.55 cfs @ 12.05 hrs, Volume= 0.433 af, Men= 55%, Lag= 5.4 min Primary = 6.55 cfs @ 12.05 hrs, Volume= 0.433 of Routing by Stor-Ind method, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Peak Elev= 23.94' Storage= 13,530 cf Plug -Flow detention time= 125.8 min calculated for 0.433 of (67% of inflow) Storage and wetted areas determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 22.50 8,388 0 0 23.50 9,652 9,020 9,020 24.50 10,972 10,312 19,332 25.50 12,349 11,661 30,993 26.50 13,783 13,066 44,059 Primary Outflow (Free Discharge) t1=Culvert I 2=Orifice/Grate 3=Orifice/Grate # Routing invert Outlet Devices 1 Primary 22.59 24.T x 40.0' long Culvert Ke= 0.500 Outlet Invert= 22.42' S= 0.0020 7 n= 0.013 Cc= 0.900 2 Device 1 23.50' 3.00' x 2.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 3 Device 1 22.50' 1.6" Vert. Orifice/Grate C= 0.600 PondCalcs2 Type It 24-hrRainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 9 hlydroCAD® 6.00-sin 001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003 1 1 1 i 1 1 3 0 Pond 2P: Revised Pond Hydrograph Plot B- --- - _ E- - - -- -- ---- - -------- -i- -- - -- - ; 4- — —1... -- _-- --- - -- : -- -- - - - - - - -- - - - -;— — j ........... . i 1: ........................_..._...,._...._._... ,.._-._._._:... -_......._:_._._._...;......._....,._._._....... - .._._._._._........ '.._:_._._._;_...._._._._!.............. ...._._. .. ------------------ -- - - — 9- ---'- - - -- ' -- — - ---- - - -- - - -- ---- -- - - -- — _ i I ' <.6`.55`cis" 7: — - -- - - --- ---- ---- --'--- --- -- - - -- =----- --- ---' - i i j : 1 i i 5 : - _ ....... ---- - ---------- ... .............. ' ... _ ._ _I ........... ..... ...'....-._._._ i i E: j 2- -- --- -- ' j i i- � — - - - � 0=._ .. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) -- Infiow - Primary PondCa11cs2 Type 1124-hr Rainfall=4.50" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 11 HydroCAD® 6.00 s/n 001707 © 1986-2001 Applied Microcomputer Systems 612l2003 Link 2L: Proposed Combined Flow Inflow — 8.24 cfs @ 12.00 hrs, Volume= 0.527 of Primary = 8.24 cfs @ 12.00 hrs, Volume= 0.527 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs 7- 6- 5- FL 4- 1-I Link 2L: Proposed Combined Flow Hydrograph Plot Time (hours) —L Inflow —� Primary F- C, -AL ED � S Cot P,) e- o L �F-CTFA 'cc 3 I S rt NCR�P-0i"As 1JEW POST PondCaicO Type li 24-hr Rainfall= 7. 00" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 1 HydroCADO) 6.00 sin 001707 01986-2001 Applied Microcomputer Systems 6IM003 Time span=0.10-20.00 hrs, dt=0.01 hrs, 1991 points Runoff by SCS TR-20 method, UH=SCS, Type II 24-hr Rainfall=7.00" Reach routing by Stor-Ind+Trans method - Pond routing by Stor-ind method Subcatchment 1S: Original Site Design Subcatchment 2S: New Deveidpm6ni Subcatchment 3S: Uncollected Yard Areas Tc=5.0 min CN=89 Area=2.200 ac Runoff-- 21.20 cfs 0.935 of Tc=5.0 min CN=89 Area=2.500 ac Runoff-- 24.09 cfs 1.120 of Tc=5.0 min CN=61 Area=1.490 ac Runoff- 7.50 cfs 0.305 of Subcatchment 4S: Proposed Uncollected Flows Tc=5.0 min CN=61 Area=1.160 ac Runoff-- 5.94 cfs 0.242 of Pond 1 P: Stormwater Pond Peak Storage= 16,325 rf Inflow-- 21.20 efs 0.985 of Primary= 11.66 cfs 0.809 of Outflow-- 11.66 cfs 0.809 of Pond 2P: Revised Pond Peak Storage= 20,181 cf Inflow-- 24.09 efs 1.120 of Primary= 11.84 cfs 0.906 of Outflow-- 11.84 cfs 0.906 of Link 1L: Existing Total Flow Inflow-- 18.09 cfs 1.114 of Primary= 18.09 cfs 1.114 of Link 2L: Proposed Combined Flow Inflow= 16.68 cfs 1.148 of Primary= 16.68 cfs 1.148 of Runoff Area = 7.370 ac Volume = 2.652 of Average Depth = 4.32" PondCalcs2 Type 1124-hr Rainfall=7.00" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 2 HydroCADO 6.00 sln 001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003. Subcatchment 1S: Original Site Design Runoff = 21.20 cfs @ 11.96 hrs, Volume= 0.985 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, tit= 0.01 hrs Type 1124hr Rainfall=7.00" Area ac CN Description 2.200 89 Urban commercial, 85% imp, HSG A Tc Length Slope Velocity Capacity Description (min) -(feet) (ftfft) ^ (ftlsec) (cfs) _ 5.0 Direct Entry, Direct Enry Subcatchment 1S: Original Site Design Hydrograph Plot 22, ;-_-----_._._._._.!.___...._. __._._................ _ ---- ...._'-----.- -._._ ._.__...__._..._......_._.__l.._._._._...;............. ............. i 'i':24 c'f , f i 16- --- - ! -- - - -I— -- -- ---' -- — -- —'— -- -- — i _ L_...._._._. E : i I c I j i _. ._.l... y r i ! : 6 - -- -- -- i f 't '. i I i I ' , 1 2 3 4 5 6 7 8 9 14 11 12 13 14 15 16 17 18 19 20 Time (hours) — Runoff mom PondCalcs2 Type 1124-hr Rainfall= 7. 00 " Prepared by Wrightsville Engineering Services, P.L.L.C. Page HydroCAD® 6.00 sln 001707 OO 1986-2001 Applied Microcomputer Systems 6/2/2003 Subcatchment 3S: Uncollected Yard Areas Runoff = 7.50 cfs @ 11.97 hrs, Volume= 0.305 of Runoff by SCS TR-20 method, UH =SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=7.00" Area (ac) C_N Description 1.490 61 >75% Grass cover, Good, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, yard sheet flow w U O LL M O Subcatchment 3S: Uncollected Yard Areas Hydrograph Plot I L J Y J V ! V 3 IV i I I L 10 1 1 I J IV 1/ 1 V 19 L V Time (hours) — Runoff PondCa1cs2 Type 11 24-hr Rainfaii=7.00" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 6 H droCADO 6.00 s/n 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Pond 1 P: Stormwater Pond Inflow - 21.20 cfs @ 11.96 hrs, Volume= 0.985 of Outflow = 11.66 cfs @ 12.03 hrs, Volume= 0.809 af, Atten= 45%, Lag= 4.7 min Primary = 11.66 cfs @ 12.03 hrs, Volume= 0.809 of Routing by Stor-Ind method, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Peak Elev= 24.55' Storage= 16,325 cf Plug -Plow detention time= 96.0 min calculated for 0.809 of (82% of inflow) Storage and wetted areas determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 22.50 6,890 0 0 23.50 8,060 7,475 7,475 24.50 8,700 8,380 15,855 25.50 9,980 9,340 25,195 26.50 10,650 10,315 35,510 Primary OutFlow (Free Discharge) t1=Culvert I2=0rifice/Grate 3=Orifice/Grate _ # Routing _ Invert Outlet Devices 1 Primary 22.50' 24.0" x 40.0' long Culvert Ke= 0.500 T^� Outlet Invert-- 22.42' S= 0.0020 7 n= 0.013 Cc= 0.900 2 Device 1 23.50' 2.00' x 3.00' Horiz. Orif ce/Grate Limited to weir flow C= 0.600 3 Device 1 22.50' 1.5" Vert. Orifice/Grate C= 0.600 PondCafcs2 Type 1124-hr Rainfall= 7. 00" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 7 H droCAD® 6.00 sln 001707 01986-2001 A2plied Microcom uter Systems 6/2/2003 22 Pond 1P: Stormwater Pond Hydrograph Plot Time (hours) — knflow — Primary PondCalcs2 Type I! 24-hr Rainfall= 7. 00 " Prepared by Wrightsville Engineering Services, P.L.L.C. Page 10 HydroCAD® 6.00 sln 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Link 1L: Existing Total Flow Inflow = 18.09 ds @ 11.99 hrs, Volume= 1.114 of Primary = 18.09 ds @ 11.99 hrs, Volume= 1.114 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs 3 kL Link 1L: Existing Total Flow Hydrograph Plot �------------- i i ! 16 ...... . ...... ' — i 15" --- ----- -- 14 -._._. .......... .t _. ........ I_.__._._._i- ,_._.�._._._._ i.._._._._._r_ -. .._._._-_._ _._.,�.__._._- ------._.�._.----- 13- I f i I i i t i —.— i , i i 2 -'— - -- -I ._._._._._l . ----- -- E I I Time (hours) L.—Inflow Primary PondlCalcs2 Type It 24-hr Rainfall=7.00" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 3 HydroCAM 6.00 s/n 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Subcatchment 2S: New Development Runoff = 24.09 cfs @ 11.96 hrs, Volume= 1.120 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=7.00" Area (ac)_CN Description 2.500 89 Urban commercial, 85°% imp, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ftfft) (ft/sec) (cfs) 5.0 Direct Entry, Sheet and Pipe travel time Subcatchment 2S: New Development Hydrograph Plot 26 _._._. _._._._._._._._._.._._._...._'._.-........_._.-......_._.__..._..._ -.-.- !__--._ • � i � E i i i I i I , I I 24' D9`ivfs ; j i 18- I i i 1 I I ---- ------ --- ----- a.- ----- ._l. i i i j f I 31 E i i i j n _. 1__._.___.__._—_— i i i� 'i ------------- I j e i 4. i 2---1------- ---- - ._. .. - --- - - - -' -- -' = - 0 �' 1 2 3 4 5 5 7 S 9 10 11 12 13 14 15 16 17 18 -19 20 Time (hours). - Runoff PondCalcs2 Type lI 24-hr Rainfall= 7. 00 " Prepared by Wrightsville Engineering Services, P.L.L.C. Page 5 HydroCADO 6.00 sin 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Subcatchment 4S: Proposed Uncollected Flows Runoff = 5.94 cfs @ 11.97 hrs, Volume= 0.242 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=7.00" Area (acl CN Description 1.180 61 >75% Grass cover, Good, HSG B Tc Length Slope Velocity Capacity Description (min) (feed___ (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Sheet Flow Runoff Subcatchment 4S: Proposed Uncollected Flows Hydrograph Plot — RunoSf 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PondCalcs2 Type 1124-hr Rainfall= 7. 00 " Prepared by Wrightsville Engineering Services, P.L.L.C. Page 8 HydroCADO 6.00 s/n 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Pond 2P: Revised Pond Inflow = 24.09 cfs @ 11.96 hrs, Volume= 1.120 of Outflow = 11.84 cfs @ 12.04 hrs, Volume= 0.906 af, Atten= 51 %, Lag= 5.1 min Primary = 11.84 cfs @ 12.04 hrs, Volume= 0.906 of Routing by Stor-Ind method, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Peak Elev= 24.57' Storage= 20,181 cf Plug -Flow detention time= 101.0 min calculated for 0.906 of (81 % of inflow) Storage and wetted areas determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store feet s -ft cubic-feet cubic -feet 22.50 8,388 0 0 23.50 9,652 9,020 9,020 24.50 10,972 10,312 19,332 25.50 12,349 11,661 30,993 26.50 13,783 13,066 44,059 Primary OutFlow (Free Discharge) L1=Culvert L 2=Orifice/Grate 3=Orifice/Grate # Routing Invert Outlet Devices _ 1 Primary 22,50' 24.0" x 40.0' long Culvert Ke= 0.500 Outlet Invert-- 22.42' S= 0.0020 7 n= 0.013 Cc= 0.900 2 Device 1 23,50' 3.00' x 2.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 3 Device 1 22,50' 1.6" Vert. Orifice/Grate C= 0.600 PondCalcs2 Type Il 24-hr Rainfall= 7. 00" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 9 HydroCAD® 6.00 s1r1001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003 Pond 2P: Revised Pond Hydrograph Plot 26- - - - 24- --- - --- — - -- - --- ; -- -- - - - - - - - — - --- - -- --- ---------- -- -- -- --- , r 22 -- !.._._._._._' r i I , i i i _... . r I I I I --- - - - _ - - .'. i _! _ i I i 14- ---- ----- ---- -... - - .. - - - - - - - 1 li84cfs 1 ! 10 r ._.------- ------- --- ' r r ! r e - __._..._... 1.....__.._.I—.-----._._:._.__._._i i i. I i i i I 1 i I 1 ;............ .__--------- ------- __._r._._._.__,.._._._ i f r f a 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) - Inflow - Primary PondCalcs2 Type 11 24-hr Rainfall=7.00`' Prepared by Wrightsville Engineering Services, P.L.L.C. Page 11 Hy_droCAD® 6.00 sh 001707 01986-2001 Applied Microcomputer Systems _ 6I212003 Link 2L: Proposed Combined Flow Inflow = 16.68 cfs @ 11.99 hrs, Volume= 1.148 of Primary = 16.68 cfs @ 11.99 hrs, Volume= 1.148 af, Men= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Link 2L: Proposed Combined Flow Hydrograph Plot — inflow — Primary w 10: l� --' g_ ___--- 8: - — 7-- — I 5- ... -' 4-._._._..T- i 3.--- --- -- i 2= i 0" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) a 4S - 2S �1S ti.4Ka �cSr , � nE�Ew�ENr 'Pl2�d�VELol��N7- � �5—�EAP2 Ct�t-Cvu4Tioi.J�S Drainage Diagram for PondCalcs2 5� .-ubcat) Reach on` ink Prepared by Wrightsville Engineering Services, P.L.L.C. 6/2/2003 .� 2 HydroCAD9) 6.00 sln 001707 0 1986-2001 Applied Microcomputer Systems PondCalcs2 Type 1124-hr Rainfall=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 1 HydroCADO 6.00 s/n 001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003 Time span=0.10-20.00 hrs, dt=0.01 hrs, 1991 points Runoff by SCS TR-20 method, UH=SCS, Type II 24-hr Rainfall=8.05" Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Original Site Design Subcatchment 2S: New Development Subcatchment 3S: Uncollected Yard Areas Tc=5.0 min CN=89 Area=2.200 ac Runoff-- 24.73 cfs 1.164 of Tc=5.0 min CN=89 Area=2.500 ac Runoff-- 28.11 cfs 1.323 of Tc=5.0 rein CN=61 Area=1.490 ac Runoff= 9.67 cfs 0.395 of Subcatchment 4S: Proposed Uncollected Flows Tc=5.0 min CN=61 Area=1.180 ac Runoff` 7.65 cfs 0.313 of Pond 1 P: Stormwater Pond Peak Storage= 18,211 of Inflow-- 24.73 cfs 1.164 of Primary= 13.27 cfs 0.987 of Outflow-- 13.27 cfs 0.987 of Pond 2P: Revised Pond Peak Storage= 22,654 cf Inflow-- 28.11 cfs 1.323 of Primary-- 13.51 cfs 1,108 of Outflow= 13.51 Us 1.108 of Link 1 L: Existing Total Flow Inflow-- 21.68 cfs 1.382 of Primary= 21.68 cfs 1,382 of Link 2L: Proposed Combined Flow Inflow-- 19.86 cfs 1.421 of Primary= 19.86 cfs 1.421 of Runoff Area = 7.370 ac Volume = 3.195 of Average Depth = 5.20" PondCalcs2 Type Il 24-hr Rainfall=8. 05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 2 HydroCADO 6.00 s!n 001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003 Subcatchment IS: Original Site Design Runoff = 24.73 cfs @ 11.96 hrs, Volume= 1.164 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0,10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=8.05" Area ac CN Description 2.200 89 Urban commercial, 85% imp, HSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (fUsec) (cfs) 5.0 Direct Entry, Direct Enry ?6' ?4= 16 14 Subcatchment 1S: Original Site Design Hydrograph Plot 1 L J Y J V ! Q 0 14 I 16 IJ Ins IJ IV I! 10 10 LV Time (hours) Runoff PondCalcs2 Type 1l 24-hr Rainfall=8.05" Prepares! by Wrightsville Engineering Services, P.L.L.C. Page 3 HydroCAD® 6.00 s/n 001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003 Subcatchment 2S: New Development Runoff = 28.11 cfs @ 11.96 hrs, Volume= 1.323 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=8.05" Area ac CN Description 2.500 89 Urban commercial, 85% imp, MSG A Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ft/sec) (cfs) 5.0 Direct Entry, Sheet and Pipe travel time Subcatchment 2S: New Development Hydrograph Plot I i I i 28.11:;cfs ! I i I I I I i ii �, I I E E 24^ I i -- - -- - - -- - - -'------ -.--- '- _ - - - 22: _-- i 18= ._....- ----- ? - - r -- -` ! ; I------- -' I 10 8 i i � ! i I I ! ! I ; : i i I 2- ; ............................ I 4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PondCalcs2 Type I/ 24-hr Rainfa11=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 4 HydroCAD® 6.00 sln 001707 O 1986-2001 Applied Microcomputer Systems 6/2/2003 Subcatchment 3S: Uncollected Yard Areas Runoff = 9.67 cfs @ 11.96 hrs, Volume= 0.395 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type 1124-hr Rainfall=8.05" Area (ac) CN Description 1.490 61 >75% Grass cover, Good, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ftfft) Sft/sec) (cfs) 5.0 Direct Entry, yard sheet flow Subcatchment 3S: Uncollected Yard Areas Hydrograph Plot -- Runoif i i i 3 i i r r I!i it 7 _ _ _ -._ _ _ _._._._.t__._.—.._ __ _E_ _-_ _..__.___ _._-__ _ -_ _w _ - _ _-__3 _ __.-._..._._._ I � j. i.. I I I I i f 1 o- .. , ., � ., .. .. Time {hours} .� :., :. ... ... .: .., ._ .... PondICalcs2 Type 1124-hr Rainfall=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 5 HydroCAD® 6.00 s!n 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Subcatchment 4S: Proposed Uncollected Flows Runoff = 7.65 cfs @ 11.96 hrs, Volume= 0.313 of Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Type II 24-hr Rainfall=8.05" Area ac CN Description 1.180 61 >75% Grass cover, Good, HSG B Tc Length Slope Velocity Capacity Description (min) (feet) (ftt t) (ft/sec) (cfs) _ 5.0 Direct Entry, Sheet Flow Runoff w O LL Subcatchment 4S: Proposed Uncollected Flows Hydrograph Plot ! 1 ! I --- i ------ ::7.65. Cf5 -...-.... ..... ._ r: —T -' ' '-_ ' ' ' -'I'....... ..... i 7- --_._. - ---' - - -'a-'- - ------ -'- �.4. --'-'- - - - -' ' -- } i. ; E i. ,. : i 11 i i i i it : : E ; ! i � ._...�. ..._._.__i.. I 1 i k i : i i j i I j li i i I I i j : ! i : I i i 1 -------- II i I ._._._._...;._.... 'I' -._._._ i ..--'-' .........._._ 1._._._._._.._._._..- -- ---- 1 -.i 0-,. 1 i 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) — Runoff PondCallcs2 Type 1124-hr Rainfall=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 6 HydroCAD® 6.00 s/n 001707 © 1986-2001 Applied Microcomputer Systems 6/2/2003 Pond 1P: Stormwater Pond Inflow = 24.73 cfs @ 11.96 hrs, Volume= 1.164 of Outflow - 13.27 cfs @ 12.04 hrs, Volume= 0.987 af, Aften= 46%, Lag= 4.8 min Primary = 13.27 cfs @ 12.04 hrs, Volume= 0.987 of Routing by Stor-Ind method, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Peak Elev= 24.75' Storage= 18,211 cf Plug -Flow detention time= 90.5 min calculated for 0.987 of (85% of inflow) Storage and wetted areas determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) cubic -feet) (cubic -feet) 22.50 6,890 0 0 23.50 8,060 7,475 7,475 24.50 8,700 8,380 15,855 25.50 9,980 9,340 25,195 26.50 10,650 10,315 35,510 Primary OutFlow (Free Discharge) L1=Culvert I2=Orifice/Grate 3=Orifice/Grate # Routing Invert Outlet Devices 1 Primary 22.50' 24.0" x 40.0' long Culvert Ke= 0.500 Outlet Invert= 22.42' S= 0.0020 T n= 0.013 Cc= 0.900 2 Device 1 23.50' 2.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 3 Device 1 22.50' 1.5" Vert Orifice/Grate C= 0.600 PondCalcs2 Type it 24-hr Rainfall=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 7 H droCAD® 6.00 s/n 001707 O 1986-2001 Applied Microcomputer Systems 6/2/2003 w 3 0 U. Pond 1 P: Stormwater Pond Hydrograph Plot , t ---...._.... i 3 2473� .._ ; _._._. I26- 24 ' ... ............ _... ............. - I I j } I f 1 ; r ----- . ._._. r ,._. . 20,:i i I i , , ; 13'.2Tcfs` - _ -- - -- - --- ---- - - ---- — ---- 12- i i ; 10 i 1 r Y r ' i, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) lRfi0N1 Pnmary PondCa1cs2 Type 1! 24-hr Rainfaii=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 8 HydroCADO6.00 _sln 001707 © 1.986-2001 Applied Microcomputer Systems 6/2/2003 Pond 2P: Revised Pond Inflow - 28.11 cfs @ 11.96 hrs, Volume= 1.323 of Outflow = 13.51 cfs @ 12.04 hrs, Volume= 1.108 af, Atten= 52%, Lag= 5.2 min Primary = 13.51 cfs @ 12.04 hrs, Volume= 1.108 of Routing by Stor-Ind method, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Peak Elev= 24.78' Storage= 22,654 cf Plug -Flow detention time= 95.7 min calculated for 1,108 of (84% of inflow) Storage and wetted areas determined by Prismatic sections Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 22.50 8,388 0 0 23.50 9,652 9,020 9,020 24.50 10,972 10,312 19,332 25.50 12,349 11,661 30,993 26.50 13,783 13,066 44,059 Primary OutFlow (Free Discharge) t1=Culvert t 2=Orifice/Grate 3=OrificelGrate # Routing Invert Outlet Devices 1 Primary 22.50' 24.0" x 40.0' long Culvert Ke= 0.500 Outlet Invert-- 22.42' S= 0.0020 7 n= 0.013 Cc= 0.900 2 Device 1 23.50' 3.00' x 2.00' Horiz. OrificelGrate Limited to weir flow C= 0.600 3 Device 1 22.50' 1.6" Vert. Orifice/Grate C= 0.600 PondCalcs2 Type 1124-hr Rainfail=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 9 HydroCAD® 6.00 sin 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 7 0 LL Pond 2P: Revised Pond Hydrograph Plot y , ; i i i 26= - --- - -- - -- -- -f - --- ! f ! i f 22 - - - ---- - - --- --- _ - -- 20�^- !_....__....; r f.......... I! '...,....._....._--- ------ ... _...... 16 _ - - - - k -------- - - --- - - - - -- -- - ----- 14 ------ 13 5licfs: ! - -- ------- --- - -k ------ --- I 10 r 4... ..... - -- -' - -- L- - --- - - -- -- - - ! - - - - ----i - - ' -- - -- -- ---- e � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) -- lnfiow - Primary PondCalcs2 Type 1124-hr Rainfall=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 10 HydroCAD® 6.00 sin 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Link 1L: Existing Total Flow Inflow = 21.68 cfs @ 11.98 hrs, Volume= 1.382 of Primary = 21.68 cfs @ 11.98 hrs, Volume= 1.382 af, Atien= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Z4- Z2 18=1. Link 1L: Existing Total Flow Hydrograph Plot Time (hours) F1 n ow — Primary PondCalcs2 Type 1124-hr Rainfall=&05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 11 HydroCAD® 6.00 sln 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Link 2L: Proposed Combined Flow Inflow = 19.86 cfs @ 11.99 hrs, Volume= 1.421 of Primary = 19.86 cfs @ 11.99 hrs, Volume= 1.421 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Link 2L: Proposed Combined Flow Hydrograph Plot Inflow 11 Primary Time (hours} PondCalcs2 Type II 24-hrRainfall=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 1 HydroCAD® 6.00 sin 001707 01986-2001 Applied Microcomputer Systems 6/2/2003 Time span=0.10-20.00 hrs, dt=0.01 hrs, 1991 points Runoff by SCS TR-20 method, UH=SCS, Type II 24-hr Rainfall=8.05" Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Intl method Link 1 L: Existing Total Flow Inflow= 21.68 cfs 1.382 of Primary= 21.68 cfs 1.382 of r PondCa1cs2 Type I! 24-hr Rainfall=8.05" Prepared by Wrightsville Engineering Services, P.L.L.C. Page 2 H droCAD® 6.00 sin 001707 O 1986-2001 Applied Microcomputer Systems 6i212003 Link 1 L: Existing Total Flow Inflow = 21.68 cfs @ 11.98 hrs, Volume= 1.382 of Primary - 21.68 cfs @ 11.98 hrs, Volume= 1.382 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.10-20.00 hrs, dt= 0.01 hrs Link 1 L: Existing Total Flow Hydrograph Plot Time (hours) 0 w- Inflow — Primary DESIGN NARRATIVE, STORM. DRAINAGE CALCULATIONS, EROSION CONTROL TECHNICAL SPECIFICATION AND STORMWATER MANAGEMENT OPERATION & MAINTENANCE PLAN SATELLITE OFFICE, NEW HANOVER MEDICAL GROUP SOUTH COLLEGE ROAD Monkey Junction. New Hanover County, North Carolina PREPARED FOR Primary Care Associates 1960 South l 6th Street WILM]NGTON, NC 28401 (910) 343-9991 File Number: 97019 Date: January 1998 ���,as�ce�aaao�oe .. �`te C,AP A aye e i mF • 14109 ` ire, r k� Prepared by Klein Engineering and Associates 322 South 4th Street Wilmington, North Carolina 28401 (910)763-7900 `KLEIN*EIJGINEERING AND ASSOCIATES PROJECT: New Hanover Medical, Monkey Jct. PROJECT NO.: 97019 CLIENT: NH Medical Group DATE: November 1997 LOCATION: New Hanover County, NC PREPARED BY: JKK SUBJECT: Stormwater Calculations GIVEN: Design for single collection pond. Runoff Coefficients used for Design: Postconstruction = 0.80 Turf (developed) = 0.20 TOTAL PROJECT AREA = 160612 SF = 3.69 Ac Area draining to pond = 95925 SF = 2.20 Ac Areas not draining to pond = 64687 SF = 1.49 Ac Design Storm Event = 10-year, 5 minute duration Rainfall Intensity = 7.23 inches/hour SOLUTION: 1. Summary of Drainage Areas AREAS DRAINING TO POND AREA AREA TYPE (SF) (AC) BLDG 19170 0.440 SIDEW 3180 0.073 PVMNT 52320 1.201 TOTAL 1MPERV. 74670 1.714 TURF 21255 0,488 TOTALS 95925 2.20 Pond Design Criteria: Percent Built -Upon: = 1.714 Ac 1 2.202 Ac = 77.8 % use: 80 % 2. STORM DRAINAGE DESIGN: 10-Year, 5-Minute Storm, i = 723 In/hr DRAIN CUMUL REQ'D DESIGN PIPE AREA RUNOFF RUNOFF DIA SLOPE SLOPE LENGTH UPPER LOWER NO. C (ac) (CFS) (CFS) (IN) (%) (%} (LF) INVERT INVERT 5 0.80 0.44 2.5 2.5 15 0,15 0.20 64 23.03 22.90 4 0.80 0.50 2.9 5A 18 0.27 0,30 132 22.90 22.51 3 0.80 0.27 1.6 7.0 18 0.44 0.45 124 22.51 21.95 2 0.80 0.22 1.3 8.3 18 0.62 0.65 144 21,95 21.01 NH Medical DEM Stormwaler Calculations -KLEINO'EIJGINEERING AND ASSOCIATES 1 0.80 0.46 2.7 10.9 24 Note: Pipes based on RCP with n = 0.013. 3. DETENTION POND DESIGN: Design to store the first 1-inch of runoff from project area Imperv. 1.00 x 74670 SF x 1'I12" = Turf 0.20 x 21255 SF x V/12" = 0.23 0.25 6223 354 6577 CF Based on state requirements for ponds without vegetative filter and using the design impervious percent o'; 80 with a depth of feet, the ratio of surface area (SF) to drainage area to drainage area (DA) _ Therefore, required pond surface area (SA) is: 5.86 x 2.20 / 100 = 0.13 Acres 5621 SF Use: Pond Width at Design Surface: see plan Pond Length at Design Surface: see plan AVE. CUMUL. AREA AREA VOLUME VOLUME ELEV. (SF) (SF) (CF) (CF) 17.5 (Pond Design Bottom) 0 22.5 57-tV 0 (Design Area) 6885 6885 23.5 8060 6885 8380 838.0 24.5 8700 15265 9340 9340 25.5 9980 24605 10315 10315 26.5 10650 34920 Depth where storage requirement met: 23.46 Depth of Required Storage: 0.96 VF or Elevation of Top of Riser: 23.50 Depth of Storage Provided: 1.00 VF or 4. Restrictive Orifice Design: Design orifice for discharge allowed using the following equation Q= C x A x (2gh)"0.5 where: Q= CFS C = orifice coefficient A = orifice diameter (SF) g = 32.2 ft/sec2 h = pressure head (ft) Rearranging the above equation to solve for hole diameter A = Q / C x (2gh)^0.5 5.86 5710 SF 64 21.01 20.85 Lt', 11.5 Inches 12.0 Inches NH Medical DEM Stormwater Calculations =KLEIN ENGINEERING AND ASSOCIATES For our type of discharge, C = 0.60 Pond Outlet Invert = 99.50 Max. Reqd Storage Level = 23.46 Ave Reqd Storage Level = 22.98 Trial Orifice Diameter = 1.50 inches Orifice centerline = 22.56 Ave. Pressure Head (h) = 0.42 Allowable discharge rate: Design discharge so that ponds drain between two (2) day and five (5) days. Pond Volume: 6577 CF Pond Volume: 6577 CF Time to drain: 2 days Time to drain: 5 days or 172800 sec or 432000 sec Therefore, release rate = Therefore, release rate = 6577 CFS 1 172800 sec 6577 CFS 1 432000 sec or 0.038 CFS or 0.015 CFS A = 0.0123 SF A = 0.0049 SF 1.5 inches 0.9 inches Use: 1.50 " 5. Forebay Design Requirements: Design forebay for 20 % of the required storage volume. Required Storage Volume = 6577 CF (see above) Required Forebay volume = 1315 CF Refer to Drawings for Cross-section of forebay for volume estimates. Forebay Cross-section = 60.6 CF/Ft Length Required Length of Forebay = 21.7 LF Design Length of Forebay = 35 LF Therefore, design forebay volume = 2121 CF which is greater than required volume. 6. Pond Outlet Design Design pond outlet pipe to convey runoff in excess of 1-inch generated from a 10-year storm event. Tc Rate Depth (min) (inlhr) (in) Comments 5 7.23 0.6 less than pond storage 10 6.3 1.1 approx. pond storage 15 5.45 1.4 exceeds storage use Q = C x i x A C= 0.80 i = 5.45 inlhr A = 2.20 Ac Q = 9.6 CFS REQ'D DESIGN RUNOFF DIA SLOPE SLOPE (CFS) (IN) (%) (%) LENGTH UPPER LOWER (LF) INVERT INVERT Comments NH Medical DEM Stormwater Calculations °'KL.EIN'ENGINEERING AND ASSOCIATES 9.6 18 0.84 1.00 24 0.18 0.20 40 22.50 22.10 40 22.50 22.42 Use 7. Overflow Weir Design for Forebay and Pond Emergency Spillway Design Overflow Weir based on 25-year, 10-minutes storm which produce a volume in excess of one (1) inch. Q = C x i x A C= 0.80 i = 7.13 in/hr A = 2.20 Ac Q = 12.6 CFS Design weir to convey entire flow. Set weir invert above storage level. weir equation: Q = C x H13/2 x (L - 0.2H) where: Q=CFS C = weir coefficient = 3.33 L = weir lenfth (FT) = 2 x H (min) H = head (FT) rearranging and solving for weir length yields the following: L=(Q/CXH"3/2)+0.2H Design weir capacity = 12.56 CFS Design weir depth = 6 Therefore, required weir length = 8. Summary: Required Volume = Pond Volume Provided = Pond Outlet Invert = Required Storage Elev. _ Design Storage Elevation = Pond Invert Outlet Orifice Diameter = Ave Discharge Rate = Anticipated drawdown time = 10.77 FT USE 6577 CF 6885 22.50 23.46 Depth = 23.50 Depth = 17.50 1.50 " 0.038 CFS 48.0 Hours 0.5 FT 12 FT 0.96 VF 1.00 VF 2.0 Days NH Medical DEM Stormwater Calculations State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality April 17, 1998 Dr. J. William Eakins, President Primary Care Associates 1960 South 16th Street Wilmington, NC 28401 Subject: Permit No. SW8 961209 Modification New Hanover Medical Group Satellite Office #2 High Density Commercial Stormwater Project New Hanover County Dear Dr. Eakins: The Wilmington Regional Office received the Stormwater Management Permit Application for New Hanover Medical Group Satellite Office #2 on December 2, 1997, with final information on March 4, 1998. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 961209 Modification dated April 17, 1998, for the construction of New Hanover Medical Group Satellite Office #2. This permit shall be effective from the date of issuance until April 17, 2008, and shall be subject to the conditions -and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or Iimitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written. petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the M Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, (26 �' Y�' �, Rick Shiver, P.G. Acting Regional Water Quality Supervisor RSS/arl: S:IWQSISTORMWATIPERMIT1961209.APR ;cc: John Klein, P.E. Tony Roberts, New Hanover County Inspections Beth Easley, New Hanover County Engineering Linda Lewis Wilmington Regional Office Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled11011/o post -consumer paper State Stormwater Management Systems Permit No. W STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY �,I I i .L�J1* K Id ru `J5[" ua�' 7l� M_�l HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules; and Regulations PERMISSION IS HEREBY GRANTED TO Primary Care Associates New Hanover Medical Group Satellite Office #2 New Hanover County FOR THE construction, operation and maintenance of a detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on fife with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 17, 2008 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 74,670 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be Iimited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 2 State Stormwater Management Systems Permit No. SW8 961209i DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: New Hanover Medical Group Satellite Office #2 Permit Number: SW8 961209 Modification Location: New Hanover County Applicant: Dr. J. William Eakins, President Mailing Address: Primary Care Associates 1960 South 16th Street Wilmington, NC 28401 Application Date: December 2, 1997 Water Body Receiving Stormwater Runoff: Classification of Water Body: If Class SA, chloride sampling results: Pond Depth, feet: Permanent Pool Elevation, FMSL: Total Impervious Surfaces, ftz: Future, ftz Offsite Area entering Pond, ftz: Required Surface Area, ftz: Provided Surface Area, ftz: Required Storage Volume, ft3: Provided Storage Volume, ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: Mott Creek "C Sw" n/a 5 22.5 74,670 19,359 (Future building and parking) None, per Engineer 5,323 6,890 6,000 7,475 23.5 1.5"4 pipe C State Stormwater Management Systems Permit No. 3W8 961204 Mod'ficatio S. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built - upon area. 6. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. H. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's interided use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. Decorative spray fountains will not be allowed in the ponds. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. A copy of the approved plans and specifications shaII be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. id State Stormwater Management Systems Permit No. SW$ 261209 Modificatignn 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 8. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. 9. The connection into the stormwater control system from all future impervious areas shall be made such that short- circuiting of the system does not occur. 10. All built -upon area on the site must be directed into the permitted stormwater control system. III. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143- 215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. . The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 17th day of April, 1998. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION (2b 4VI A. Preston Howard, 7r., .E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 961209 Modification 5 State Stormwater Management Systems Permit No. SW8 961209 Modification New Hanover Medical Group Satellite Office #2 Stormwater Permit No. SW8 961209 Modification New Hanover County Engineer's Certification 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation,of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL no DIVISION OF ENVIRONMENTAL MANAGEMENT NORTH CAROLINA STORM WATER MANAGEMENT PERMIT APPLICATION 1. GENERAL INFORMATION 1. Project Name Satellite Office - New Hanover Medical Group 2. Location, directions to project (include County, Address, State Road) Attach map New Hanover Coun__ty_ _ South College Road (NC Highway 132). apprx. 500' south of intersection of NC 132 and SR 1698 (Greenbriar Rd) 3. Owner's Name Primary Care Associates Phone 910 343-9991 4. Owner's Mailing Address 1960 South 16th Street City Wilmington State NC Zip 28401 5. Nearest Receiving Stream Tributa to Mott Creek Class C-Sw 6. Project description Construction of medical facility and parking lot to service the facility II. PERMIT INFORMATION 1. Permit No. (To be Gllcd in by DWQ) 15w 3 q & 1 Z09 2. Application Date November 26, 1997 Fee enclosed $385 3. Permit Type X New — Renewal _X_ Modification (excluding; Permit No.) SWO Q Col ZOO( 4. Project Type:_ Low Density X Detention _ Infiltration _ Redevelop_ General _ Alter Offsite 5. Other State/Federal Permits/Approvals Required (Check appropriate blanks) CAMA Major Sedimentation/Erosion Control X 404 Permit III. BUILT UPON AREA (please see NCAC 2H 1005 thru 1007 for applicable density limits) Classification Existing; Built -upon Area Proposed Built -upon Area Total Project Area % Built -upon Area Drainage Drainaae Basin Basin C-Sw 0 1.71 Ac 3.69 Ac 46.3 % Breakdown of Impervious Area (Please: indicate below the drainage inipenlous am) Buildings 0.44 Ac Streets Parking/SW 1.27 Ac Other Totals 1.71 Ac IV. STORMWATER TREATMENT (Describe how the runoff will be treated) Collection into DEM stormwater_pond V. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the covenant cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. OWNER'S CERTIFICATION 1, J. William Eakins , certify that the information included on this permit (Please print or type name clearly) application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 214.1000. I authorize the =s:=mit stormwater plans on my behalf. s Jent O er/Authorized Agent Signature and Title Date VI1. AGE THORIZATION ((Please fti3 in the name of the enginecrlsurveyor authorized to submit plans on the owncrs hehalt) Person or firm name Klein_ Engineering and Associates Mailing Address 322 South 4th Street City Wilmington „ _ _ State NC Zip 28401 Phone (910) 763-7900 Please submit application, fee, plans and calculations to the appropriate Regional Office. CC'. Applicant/WiRO//Central Files Office use only iORMWATE E C E I V E DEC 0 21997 a >E M PROJ #5W-5q 1'-09 i STORMWATER NE OE�Ea z,997 r' SATELLITE OFFICE -NEW HANOVER MEDICAL GRd" # P f oIZbQ M 0 0 South College Road (N.C. Highway 132) STORM WATER MANAGEMENT OPERATION AND MAINTENANCE PLAN L GENERAL The project area will contain improvements which will require perpetual maintenance and include a storm water management system which relies on the treatment of surface runoff through the use of a detention pond facility. 2. OPERATION OF DETENTION POND SYSTEM The detention pond is intended to provide some measure of sediment and nutrient filtration within the vegetation along the pond perimeter as well as promoting infiltration of runoff into the subsurface groundwater, The use of a ponds allows a more intensive built -upon area to be developed and is a permitted method for stormwater treatment in compliance with the State of North Carolina Administrative code Section 15 NCAC 2H.1000, Stormwater Runoff Disposal. 3. MAINTENANCE RESPONSIBILITIES Routine maintenance as detailed below is required for the detention pond. To provide for this, the OWNER shall be responsible for all required maintenance. In lieu of performing the direct maintenance, the OWNER may contract this service to an independent maintenance entity; however, all responsibilities for enforcing these restrictive covenants shall reside with the actual owner. 4. DETENTION POND SYSTEM MAINTENANCE As a minimum, the following maintenance procedures shall be followed for the pond: (1) General: Side slopes shall be kept mowed and clear of debris. Vegetation shall be kept to a maximum height of eight (8) inches and mowing shall be scheduled accordingly. (2) Upon Completion of Construction: (a) Any sediment deposited in detention pond shall be removed to obtain design depth, slopes and specifications. Page Two Operation and Maintenance Plan Satellite Office -New Hanover Medical Group South College Road (b) The wetted perimeter shall be planted with water resilient vegetation appropriate to soil and site characteristics; the remaining pond slopes shall also be vegetated and planted with vegetation appropriate to soil and site characteristics. All slopes shall be maintained to ensure growth of such vegetations. C All drainage features shall be inspected and cleaned of sand, silt or foreign materials. These features include, but not limited to, the pond outlet structure trash screen, outlet orifice and site drop inlet and catch basin grates. (d) Any component which is determined to be not performing satisfactory in its intended usage shall be repaired or replaced to original design specifications. (3) After Each Runoff Producing Rain: (a) Any sloughing, erosion or vegetative wash -out of the pond slopes shall be repaired immediately. (b) All drainage features shall be inspected and cleaned of trash or foreign materials. These features include the pond side slopes, pond outlet structure trash screen, outlet orifice and site drop inlet and catch basin grates. C Any component which is determined to be not performing satisfactory in its intended usage shall be repaired or replaced to original design specifications. (4) Semi -Annually: (a) The detention pond shall be checked for siltation and filling. Should the bottom elevation exceed the design bottom elevation, the pond shall be excavated six (b) inches below the design elevation to allow solids accumulation due to siltation and filling. Page Three Operation and Maintenance Plan Satellite Office -New Hanover Medical Group South College Road OWNER: Primary Care Associates 4960 South 16th Street Wilmington, NC 28401 Phone: (910) 343-9991 STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER C / (Signature) (Title) (Date) I, . +Lr V, A A L. , a Notary Public of the State of North Carolina, County of M4, Hanover, Hereby certify that J. William Eakins personally appeared before me this day and executed the above certification. Witness my hand and notarial seal, this ( day of OCAE be r , 1997. (j tary Public) My Commission expires') - 14 - Z -- 62 o 1 - n 4 1 . KLEIN ENGINEERING AND ASSOCIATES February 27, 1998 Ms. Linda Lewis NC DEHNR, DWQ 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Satellite Office for New Hanover Medical Group Monkey Junction, New Hanover County Stormwater Project No.: SW8 961209 Modification Additional Information Dear Ms. Lewis: 322 South 4th Street Wilmington, NC 28401 (910) 763-7900 File No.: 97019 STORMWATER D E C E i E MAR 04p U 598 PRpJ E M # _ As requested in letter dated February 4, 1998, please find enclosed revised submittal items for the above referenced project. Enclosed are the following: three (3) copies of the revised Drawing three (3) copies of the revised Calculations Regarding the request for additional information, the following is provided: 1. J.W. Eakins signed as the President of the Associates. This is shown on the signed O&M Agreement. 2. The future building area is accounted for in the Calculations. This has been clarified on the new Layout Plan provided. 3. An entire Layout Plan designated SD2A has been provided for your use. Within the General Notes you will find that all dimensions are to the face of curb or face of building unless otherwise noted. 4. No wetlands are currently on the project site. A note has been added to Sheet SD2. 5. No offsite drainage is planned. Current finished grades on the Drawings are to elevate the building and parking areas. With existing drainage ditches to the north, east and west, the majority of the grassed areas will be drained to these features. 6. The forebay has been reduced to 20 percent of the total storage volume. 7. The orifice calculations have changed since the original submittal due to the reconfiguring of the vegetative shelf. Although the orifice size has not changed, the pond volume has increased which brings the diameter within the desired range for drawdown. 8. The vegetative shelf has been relocated as requested. Page Two Ms. Linda Lewis February 27, 1998 We hope'the enclosed information is found satisfactory. As the applicant is anxious to get underway with the project, should there be any questions concerning the enclosed items or additional copies desired, please contact our office by phone to expedite the process. Sincerely, KLEIN ENGINEERING AND ASSOCIATES r 3HN K. KLEIN, PE enclosures cc: Mr. Michael R. McLeod, AlA Neill H. Musselwhite, MD •; 1 STORM DRAINAGE CALCULATIONS (REVISED) SATELLITE OFFICE, NEW HANOVER MEDICAL GROUP SOUTH COLLEGE ROAD Monkey !unction New Hanover County, North Carolina PREPARED FOR Primary Care Associates 1960 South 16th Street WILMINGTON, NC 28401 (910) 343-9991 File Number: 97019 Date: February 1998 FS�'3'1"Ref. a ZEAL 141Q� Prepared by Klein Engineering and Associates 322 South 4th Street Wilmington, North Carolina 28401 (910) 763-7900 �"ORMWATER E C E I V E MAR 0 4 1998 PRQ,1 # `�Cv 209 KLEIN ENGINEERING AND ASSOCIATES PROJECT: New Hanover Medical, Monkey Jct. PROJECT NO.: 97019 CLIENT: NH Medical Group DATE: November 1997 LOCATION: 'New Hanover County, NC PREPARED BY: JKK SUBJECT: Stormwater Calculations GIVEN: Design for single collection pond Runoff Coefficients used for Design: Postconstruction = 0.80 Turf (developed) = 0.20 TOTAL PROJECT AREA = 160612 SF = 3.69 Ac Area draining to pond = 95925 SF = 2.20 Ac Areas not draining to pond = 64687 SF = 1.49 Ac Design Storm Event = 10-year, Rainfall Intensity = SOLUTION: 5 minute duration 7.23 inches/hour 1. Summary of Drainage Areas AREAS DRAINING TO POND AREA AREA TYPE (SF) (AC) BLDG 19170 0.440 SIDEW 3180 0.073 PVMNT 52320 1.201 TOTAL IMPERV. 74670 1.714 TURF 21255 0.488 TOTALS 95925 2.20 Pond Design Criteria: Percent Built -Upon: = 1.714 Ac 1 2.202 Ac 77.8 % use: 80 % 2. STORM DRAINAGE DESIGN: 10-Year, 5-Minute Storm, i = 7.23 Inlhr DRAIN CUMUL REQ'D DESIGN PIPE AREA RUNOFF RUNOFF DIA SLOPE SLOPE LENGTH UPPER LOWER NO. C (ac) (CFS) (CFS) (IN) (%) (%) (LF) INVERT INVERT 5 0.80 0.44 2.5 2.5 15 0.15 0.20 64 23.03 22.90 4 0.80 0.50 2.9 5.4 18 0.27 0.30 132 22.90 22.51 3 0.80 0.27 1.6 7.0 18 0.44 0.45 124 22.51 21.95 2 0.80 0.22 1.3 8.3 18 0.62 0.65 144 21.95 21.01 1 0.80 0.46 2.7 10.9 24 0.23 0.25 64 21.01 20.85 NH Medical DWQ Stormwater Calculations (Rev 2-23-98) 1 KLEIN ENGINEERING AND ASSOCIATES Note: Pipes based on RCP with n = 0.013. 3. DETENTION POND DESIGN: Design to store the first 1-inch of runoff from project area Imperv. 1.00 x 74670 SF x 1712" = 6223 Turf 0.20 x 21255 SF x V/12" = 354 6577 CF Based on state requirements for ponds without vegetative filter and using the design impervious percent o 80 with a depth of feet, the ratio of surface area (SF) to drainage area to drainage area (DA) = Therefore, required pond surface area (SA) is: 7.00 x 2.20 / 100 = 0.15 Acres 6715 SF Use. Pond Width at Design Surface: see plan Pond Length at Design Surface: see plan AVE. CUMUL. AREA AREA VOLUME VOLUME ELEV. (SF) (SF) (CF) (CF) 18.5 (Pond Design Bottom) 0 22.5 6890 0 (Design Area) 7475 7475 23.5 8060 7475 8380 8380 24.5 8700 15855 9340 9340 25.5 9980 25195 10315 10315 26.5 10650 35510 Depth where storage requirement met: 23.38 Depth of Required Storage: 0.88 VF or Elevation of Top of Riser: 23.50 Depth of Storage Provided: 1.00 VF or Volume of Storage Provided: 7475 CF 4. Restrictive Orifice Design: Design orifice for discharge allowed using the following equation Q= C x A x (2gh)^0.5 where: Q= CFS C = orifice coefficient A = orifice diameter (SF) g = 32.2 ft/sec2 h = pressure head (ft) Rearranging the above equation to solve for hole diameter A= Q I C x (2gh)10.5 4.0 7.00 10.6 Inches 12.0 Inches • 1)b99 NH Medical DWQ Stormwater Calculations (Rev 2-23-98) . KLEIN ENGINEERING AND ASSOCIATES For our type of discharge, C = 0.60 Pond Outlet Invert = 22.50 Design Storage Level = 23.50 Ave Reqd Storage Level = 23.00 Trial Orifice Diameter = 1.50 inches Orifice centerline = 22.56 Ave. Pressure Head (h) = 0.44 Allowable discharge rate: Design discharge so that ponds drain between two (2) day and five (5) days, Pond Volume: 7475 CF Pond Volume: 7475 CF Time to drain: 2 days Time to drain: 5 days or 172800 sec or 432000 sec Therefore, release rate = Therefore, release rate = 7475 CFS / 172800 sec 7475 CFS 1 432000 sec or 0.043 CFS or 0.017 CFS A = 0.0136 SF A = 0.0054 SF 1.6 inches 1.0 inches Use: 1.50 " 5. Forebay Design Requirements: Design forebay for 20 % of the storage volume. Design Storage Volume = 7475 CF (see above) Required Forebay volume = 1495 CF AVE. CUMUL. AREA AREA VOLUME VOLUME ELEV. (SF) (SF) (CF) (CF) 19.5 50 0 113 113 20.5 175 113 268 380 21.5 360 493 0 630 1010 22.5 900 1503 Therefore, design forebay volume = 1503 CF or 20 % or Storage Volume 6. Pond Outlet Design Design pond outlet pipe to convey runoff in excess of 1-inch generated from a 10-year storm event. Tc Rate Depth (min) (inlhr) (in) Comments 5 7.23 0.6 less than pond storage 10 6.3 1.1 approx, pond storage 15 5.45 1.4 exceeds storage use NH Medical DWQ Stormwater Calculations (Rev 2-23-98) KLEIN ENGINEERING AND ASSOCIATES Q=CXiXA C= i= A= Q = 9.6 CFS REQ'D DESIGN RUNOFF DIA SLOPE SLOPE (CFS) (IN) N M 9.6 18 0.84 1.00 24 0.18 0.20 0.80 5.45 in/hr 2.20 Ac LENGTH UPPER LOWER (LF) INVERT INVERT Comments 40 22.50 22.10 40 22.50 22.42 use 7. Overflow Weir Design for Forebay and Pond Emergency Spillway Design Overflow Weir based on 25-year, 10-minutes storm which produce a volume in excess of one (1) inch. Q = C x i x A C= 0.80 i = 7.13 in/hr A = 2.20 Ac Q = 12.6 CFS Design weir to convey entire flow. Set weir invert above storage level. weir equation: Q = C x HA3/2 x (L - 0.2H) where: Q=CFS C = weir coefficient = 3.33 L = weir lenfth (FT) = 2 x H (min) H = head (FT) rearranging and solving for weir length yields the following: L=(Q/CxHA312)+0.2H Design weir capacity = 12.56 CFS Design weir depth = 6 " = 0.5 FT Therefore, required weir length = 10.77 FT USE 12 FT 8. Summary: Required Pond Surface Area = 6715 SF Design Pond Surface Area = 6890 SF Required Storage Volume = 6577 CF Design Storage Volume = 7475 CF Pond Outlet Invert = 22.50 Required Storage Elev. = 23.38 Depth = 0.88 VF Design Storage Elevation = 23.50 Depth = 1.00 VF Pond Invert = 18.50 Outlet Orifice Diameter = 1.50 " Ave Discharge Rate = 0.039 CFS Anticipated drawdown time = 46.7 Hours = 1.9 Days NH Medical DWQ Stormwater Calculations (Rev 2-23-98) State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality February 4, 1998 Mr. John Klein, P.E. Klein Engineering and Associates 322 South Fourth Street Wilmington, NC 28401 Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 961209 Modification New Hanover Medical Group Satellite Office #2 New Hanover County Dear Mr. Klein: The Wilmington Regional Office received a Stormwater Management Permit Application for New Hanover Medical Group Satellite Office #2 on December 2, 1997. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: A. What is the title of J. W. Eakins? Please be sure to add the titles of the applicants on the application form. The future parking area is noted as accounted for in the talcs, but the future building expansion is not noted as accounted for. Is it? 3. Please provide the dimensions of the building, parking and walks. Please note the dimensions as FC-FC or BC -BC. ✓4. Delineate all wetlands on site, or note on the plans that none exist. 15. Is there any offsite drainage?. ✓6. Try not to oversize the forebay. Since the forebay counts as part of the required surface area, unnecessarily large forebays cut down on the available surface area at the required design depth, resulting in inadequate TSS removal. ✓7. The 1.5" orifice is barely on the edge of providing a 2 day drawdown. Will you consider decreasing the size to ensure a 2 day minimum detention time? 127 Cardinal Dr. Ext-, Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr. Klein February 4, 1998 Stormwater Project No SW8 961209 Modification 8. Please relocate the vegetated shelf below the permanent pool. I know in the past I have requested it to be above the permanent pool, but the Central Office has provided new information that it should be located below the permanent pool. The shelf should end at the permanent pool elevation and extend below it at a 6:1 slope. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to March 4, 1998, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. RSS/arl cc If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer S:1W QSISTORMWATIADDINF01961209.FEB Linda Lewis Central Files 127 Cardinal Dr. Ext.., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/I0% post -consumer paper KLEIN ENGINEERING 322 South 4th,Strcet.:.v: AND ASSOCIATES w�� (910) 763 900401 w November 26, 1997 File No.: 97019 Ms. Linda Lewis NC DEHNR, DWQ 127 Cardinal Drive Extension 7DEC ��!EI Wilmington, NC 28405-3845 0 2 97g7Re: Satellite Office for New Hanover Medical Group9ColZC Monkey Junction, New Hanover County Engineered Submittal jvv v 1� Dear Ms. Lewis: Please find enclosed submittal for the above referenced project. The project will involve the construction of approximately 1.71 acres of built -upon area. Included for your review are the following items: completed application form application fee in the amount of $385 three (3) copies of the Drawing three (3) copies of the Narrative which includes Calculations and 0&M Agreement Should there be any questions concerning the enclosed items or additional copies desired, please feel free to contact our office. Sincerely, KLEIN ENGINEERING AND ASSOCIATES eM ��KKLEIN, PE enclosures cc: Mr. Michael R. McLeod, AIA Neill H. Musselwhite, MD ti ,; •tea. State of North Carolina Department of Environment, Health and Natural Resources 7� Division of Water Quality ±Aff James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director January 9, 1997 Dr. William J. Eakins Primary Care Associates 1960 S. 16th Street Wilmington, North Carolina 28401 Subject: Permit No. SW8 961209 New Hanover Medical Group - Satellite Office #2 General Permit Stormwater New Hanover County Dear Dr. Eakins: The Wilmington Regional Office received the Stormwater Management Permit Application for New Hanover Medical Group - Satellite Office #2 on December 9, 1996, with final information on January 9, 1997. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H .1000. We are forwarding Permit No. SW8 961209 dated January 9, 1997 , for the construction of New Hanover Medical Group - Satellite Office #2. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office_of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact either me or Greg Stutts at (910) 395-3900. Si lgl on al Zater Quality Supervisor KElges: S:IWQSISTORMWATIPERMIT1961209.JAN cc: John K. Klein, P.E.. Klein Engineering & Associates Tony Roberts, New Hanover County Inspections Beth Easley, New Hanover County Engineering Greg Stutts Wilmington Regional Office Central Files P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer State Stormwater Management Systems Permit No.SW8 961209 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT ["B1 1"61 O 081401�11 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Primary Care Associates New Hanover Medical Group - Satellite Office #2 New Hanover County FOR THE construction of site clearing and grading in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules °) and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for New Hanover Medical Group - Satellite Office #2. - The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS 1. This permit covers the construction of 0 square feet of built -upon area. 2. The approved Erosion Control plan will be followed. 3. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. -2- State Stormwater Management Systems Permit No.5W8 961209 4. No stormwater piping in addition to the existing piping shall be allowed except: a. That minimum amount necessary to direct runoff beneath an impervious surface such as a road. b. That minimum amount needed under driveways to provide access to lots. 5. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction for the following items: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign of, addition to or deletion of the approved amount of built -upon area, regardless of size. e. Further subdivision of the project area. f. Alteration of the proposed drainage. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COiMTLIANCE 1. The permittee shall at all times comply with the following schedule for construction and maintenance of the project: 2. The permittee shall at all times provide adequate erosion control measures in conformance with the approved Erosion Control Plan. 3. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. III. GENERAL CONDITIONS 1. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. 2. The permit issued shall continue in force and effect until revoked or terminated. 3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. -3- State Stormwater Management Systems Permit No.SW8 961209 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. at. 5. The permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. A formal permit request must be submitted to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. 6. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. 7. The permittee grants permission to DEHNR Staff to enter the property for the purpose of inspecting the project. Permit issued this the 9th day of January, 1997 NORTH CAWUNA/ENVTRONMENTAL MANAGEMENT COMMISSION 1 rPresln ----�------------f ---------------------�-_--- ward, Jr., rector Division of Water Quality By Authority of the Environmental Management Commission Permit Number SWS 961209 _Z r DIVISION OF ENVIRONMENTAL MANAGEMENT NORTH CAROLINA STORM WATER MANAGEMENT PERMIT APPLICATION 1. GENERAL INFORMATION 1. Project Name Satellite Office #2 for the New Hanover Medical Group on South College Road. 2. Location, directions'to project (include County, Address, State Road) Attach map East side Qf SQuth College Road, NC HWY 132, 200+ feet south of Greenbriar Road. 3, Owner's Name pri mFarru Cart- AGGnr.i atas Phone i 91 0 }.343-g991 4. Owner's Mailing Address 1960 S. 16th Street, Wilmington_, NC_ 28401 City Wilmington. State NC Zip 28401 5. Nearest Receiving Stream Motts Creek Class 6. Project description _ Grading of site and existing Swale. -No_proposed built -upon.. H. PERMIT INFORMATION 1. Permit No. ('ro be filled in by pwQ) 2. Application Date 6 December 1 9 9 6 Fee enclosed $ 5 0. 0 0 3. Permit Type x New — Renewal Modification (excluding Permit No.) 4. Project Type:_ Low Density— Detention _ _ Infiltration .___ Redevelop--! General _ Alter— Offsite 5. Other State/Federal Permits/Approvals Required (cheek appropriate blanks) CAMA Major Sedimentation/Erosion Control X 404 Permit 111. BUILT UPON AREA (please see NCAC 2H 1005 thru 1007 for applicable density limits) Drainaae Drainage Bmakdom_-of .lwpervigus Area Basin bm n (Pimse indicate below the drainage in�ous area) Classification 3.69 ac Buildings Existing Built -upon Area 0 Streets Proposed Built -upon Area 0 Parkmg/SW Total Project Area 3-69 ac Other % Built -upon Area 0 % Totals IV. STORMWATER TREATMENT (Describe how the runoff will be treated) Draina e to existing swales V. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project .shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the covenant cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. OWNER'S CERTIFICATION I, /V I / C. /I certify that the information included on this permit (Please print cw'type name clearly) a plication form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 2H.1000, I authorize the below named person or firth to submit stormwater plans on my behalf. Authorized Agent Signature and Title Date V11. AGENT AUTHORIZATION ((Please rill in the name of the engineer/arwyor authorized to submit plans on the owners behalf) Person or firm name -Klein Engv_ecring and Associates Mailing Address 322 Soutb 41h Street City —Wilmington on _ _ State " NC _ Zip 28401 Phone (910) 763-7900 Please submit application, fee, plans and calculations to the appropriate Regional Office. cc: Applicant/WiRO//Central Files Office use only [1[ 0 9 1 ��6 KLEIN ENGINEERING G 0 19961322 South 4th Street AND ASSOCIATES S o5'�1Z ° "--`•- Wilmington, NC 28401 (910) 763-7900 December 6, 1996 Mr. Greg Stutts NC DEHNR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: General Permit Application Future Site of New Hanover Medical Group South College Road (NC 132), New Hanover County Dear Mr. Stutts: File No.: 96025 Please find enclose application for General Water Quality Permit for the above project area. The project involves site preparation only and no built -upon areas are proposed at this time. Included are the following: completed application and application fee of $50 two (2) copies of the Drawings which include both onsite work as well as the ditch modifications Should there be any questions concerning the enclosed items or additional copies desired, please ` contact our office. Under separate cover, we are submitting information to Ms. Beth Easley for Erosion and Sedimentation Control consideration. 1. Sincerely, KLEIN ENGINEERING AND ASSOCIATES rHNKLEIN, PE enclosures cc: Mr. Michael R. McLeod