Loading...
HomeMy WebLinkAboutSW8960809_CURRENT PERMIT_19961122STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �p(i�Uq DOC TYPE ZP CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE A YYYYMMDD State of North Carolina Department of Environment, A[4 Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor ®I FE Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director November 22, 1996 0 Mr. J. M. Davis, President J. M. Davis Industries 201 Arendell Street Morehead City, North Carolina 28557 Subject: Permit No. SWS 960809 J.M. Davis Industries Convenience Store High Density Commercial Stormwater Project Carteret County Dear Mr. Davis: The Wilmington Regional Office received the Stormwater Management Permit Application for J.M. Davis Industries Convenience Store on August 14, 1996, with final information on November 22, 1996. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000, We are forwarding Permit No, SW8 960809 dated November 22, 1996, for the construction of J.M. Davis Industries Convenience Store. This permit shall be effective from the date of issuance until November 22, 2006, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an ajudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this 7ple- 395-3900.ase ntact Linda Lewis, or me at (910) Sindrely, / KElarl cc: / Ken EkLesod Regional Water Quality Supervisor S:\WQS\STORMWAT\PERMIT\960809. NOV Dion Viventi, Stroud Engineering Garry Yeomans, Carteret County Inspections Linda Lewis Wilmington Regional Office Central Files P.Q. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919.733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer State Stormwater Management Systems PPTTIIIr Nn 4WR 4hOR09 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF WATER QUALITY 4V HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO J. M. Davis Industries J.M. Davis Industries Convenience Store Carteret County FOR THE construction, operation and maintenance of an Infiltration Basin with bypass in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 22, 2006 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 51,656 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2 t State Stormwater Management Systems Permit No- Project Name: Permit Number: Location: Applicant: Mailing Address: DIVISION OF WATER QUALITY PROJECT DATA SHEET J.M. Davis Industries Convenience Store 960809 SR 1141 Q NC 24 in Carteret County 40 Mr. J. M. Davis, President J. M. Davis Industries 201 Arendell Street Morehead City, North Carolina 28557 Application Date: August 14, 1996 Water Body Receiving Stormwater Runoff: Classification of Water Body: Pond Depth: Bottom Elevation: Total Impervious Surfaces Allowed: Green Area entering Pond: Bottom Surface Area: Design Surface Area: Required Storage Volume: Provided Storage Volume: Temporary Storage Elevation: Type of Soil: Expected Infiltration Rate: Expected DrawdownTtime: Bogue Sound "SA" 1.25 feet 30.5 MSL 51,656 square feet 2,344 square feet 4,727 square feet 5,752 square feet 6,149 cubic feet 6,549 cubic feet 31.75 MSL Onslow 0.6" per hour 30.25 hours 3 State Stormwater Management Systems Permit No SWR 96080 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 6. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. o d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. f. FiIling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. H. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the*stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. C. All connections into the stormwater system from future areasloutparcels shall be made such that short- circuiting of the system does not occur. 2. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 3. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 4. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in it's entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 4 State Stormwater Management Systems PermitNn- SWR q60 M Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. M. GENERAL CONDITIONS 0' This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143- 215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DEHNR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 22nd day of November, 1996. NORT AR 1NA E VI MENTAL MANAGEMENT COMMISSION 7 P estop , Ir., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 960809 5� State Stormwater Management Systems J.M. Davis Industries Convenience Store Stormwater Permit No. SWS 960809 Carteret County Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodicallylwecklylfull time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification. Signature Registration Number Date R