Loading...
HomeMy WebLinkAboutSW8080740_COMPLIANCE_20100414STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 !�nD74D DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE 9 COMPLIANCE EVALUATION INSPECTION DOC DATE 2.o l o oe4 YYYYM M D D GREENHORNE & O'MARA CONSULTING ENGINEERS April 14, 2010 NCDENR 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Attn.: Mr. Edward Beck RE: Stormwater Permit Designer's Certification SW8 08 080740 P-828 Field Medical Services School Camp Lejeune, North Carolina Dear Mr. Beck: RECEIVED APR 16 2010 BY: Greenhorne & O'Mara, Inc. (G&O) is submitting this Designer's certification for stonnwater permit SW8 080740, We performed periodic observation of the construction of the stormwater device and have determined to the best of our ability that it has been constructed in accordance with the plans and specifications of the project. Please notify the undersigned if any additional information is required. Sincerely, GREENHORNE & O'MARA, INC. 1 Robert L. Downs, P.E. (919-532-2315) Department Head — Infrastructure & Design Services Enclosures 5565 Centerview Drive, Suite 107 . Raleigh, NC 27606 Phone 919.851.1919 . Fax 919.851.tia9:S www.G-and-O.com -• 1 State Stormwater Management Systems Permit No. SW8 080740 P-828 Field Medical Services School Stormwater Permit No. SW8 080740 Onslow County Designer's Certification 1, l-ISMT L•­D9WNs ., as a duly registered E•..4.. cm in the State of North Carolina, having been authorized to obsery periodical) weekly/ full time) the construction of the project, (Project) for U.. .taa sees mA Lg 4r Cups -(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: ZLrv�4�arS ikS AJpa uk* SJ Gin Faze*,, NcnF-R, CNIt99 IW-eti `0kTEi) l'0L,,LB_6r,'t (112009 Signature Registration Number, o2-g%& Date _-ghtto. - - --- — --- •�,Jl fgjlll kA 'fed 3b/0 �•�•!• SEALfir; d SEAL. 29481 e � GINIE ''"i i 1110 Page 7 of 8 State Stormwater Management Systems Permit No. SW8 080740 Certification Requirements: 1-14 1. The drainage area to the system contains approximately the permitted acreage. J:.�2. The drainage area to the system contains no more than the permitted amount of built -upon area. �-� 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. �wI 5. The outletibypass structure elevations are per the approved plan. P_-o 6. The outlet structure is located per the approved plans. t" 7. Trash rack is provided on the outlet/bypass structure. R-,o 8. All slopes are grassed with permanent vegetation. a-V? 9. Vegetated slopes are no steeper than 3:1. ti'_W 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. t—! 11. The permitted amounts of surface area and/or volume have been provided. t-,-o 12. Required drawdown devices are correctly sized per the approved plans. 2 %,Q 13. All required design depths are provided. a ,,o 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 8 of 8 �K�KW�KP. 01W :WIC TRANSACTION REPORT DEC-11-2009 FRI 12:49 PM 910 S50 2004 FOR: NCDENR SEND M`4 DP 9 DATE START RECEIVER TX TIME PAGES TYPE NOTE �.�.—_M_________ � DEC--11 12,48 PM 919104512927 26" 2 FAX TX _OK223 TOTAL 26S PAGES: 2 TAW• State, of North Carolina Deparlmaint of Environment and Natural Resources Wilmington Regional Office BL-verly Eames Perdue, Governor FAX COVER SHEET Dee. Freeman, Secretary Date: To: Co: Gi�t�Q Fax: No, Pages (excl. cover): From: Saj�Y-Rus_ Phone: 910 796-7265 Fax; (9l0 350__-_2004 __—_______,..._. 127 Cardinal Drivc Extension, Wilmington, T`.0 28405 0 (910) 796-7215 • An Equal Oppori.uni'sy Affirc-n4t;ive Action Urnplcyer State Stormwater Management Systems Permit No. SW8 080740 P-828 Field Medical Services School Stormwater Permit No. SW8 080740 Onslow County Designer's Certification as a duly registered in the State of North Carolina, having been authorized to obsery periodicall weekly/ full time) the construction of the project, ?-828 4CLD p1V*-L4t- SL.wkr% 5;r41,,... - (Project) for Uw ao Sines MAat-•,� -(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and Intent of the approved plans and specifications. The checklist of items on page 2 of this form Is -included in the Certification. Noted deviations from approved plans and specification: AS AIN"Ogo '[S� C�*Ert Ft M Ncns�Rr c Hn� �1aKen •`{A- E 9QELBw(i Il�2ooq• �1i1V1�filf/(/ SEAL 5�:AL; 29481 • a Signature 4, r %p �' GloHE �°cboe: o24'ta� / Registration Number L �! , Date Athillo EGERV `;i SEP 14 2020 BY: Page 7 of 8 •' ' '� I .-+ .. GREENHORNS & O'MARA CONSULTING ENGINEERS April 14, 2010 NCDENR 127 Cardinal'Drive Extension Wilmington, North Carolina 28405 Attn.: Mr. Edward Beck RE: Stormwater Permit Designer's Certification SW8 08 080740 P-828 Field Medical Services School Camp Lejeune, North Carolina Dear Mr. Beck: Greenhorne & O'Mara, Inc. (G&O) is submitting this Designer's certification for stormwater permit SW8 080740. We performed periodic observation of the construction of the stormwater device and have determined to the best of our ability that it has been constructed in accordance with the plans and specifications of the project. Please notify the undersigned if any additional information is required. Sincerely, GREENHORNE & O'MARA, INC. Robert L. Downs, P.E, (919-532-2315) Department Head — Infrastructure & Design Services Enclosures SE 1 P 4 2020 BY. 5565 Centerview Drive, Suite 107 . Raleigh, NC 27606 Phone 919.851.1919 . Fax 919-851.8393 www.G•and•O.com State Stormwater Management Systems Permit No. SW8 080740 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. WW2. The drainage area to the system contains no more than the permitted amount of built -upon area. (-+? 3, All the built -upon area associated with the project is graded such that the runoff drains to the system. (11--Q 4. - All roof drains are located such that the runoff is directed into the system. 0-w1 5. The outlet/bypass structure elevations are per the approved plan. F-,4 6. The cutlet structure is located per the approved plans. 7. Trash rack Is provided on the outlet/bypass structure. r 8. All slopes are grassed with permanent vegetation, I?V' 9, Vegetated slopes are no steeper than 3:1. #'W 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. _ A4 11. The permitted amounts of surface area and/or volume have been provided. 7-w 12. Required drawdown devices are correctly sized per the approved plans, 13. All required design depths are provided. rr,,n 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections SEP f zo20 BY` Page 8 of 8 SWP 151 W P�1'5 J M508 Legend CLJ N. CL. I mpoundment_Stormwater ^e � terU ilitySegment t 44 M20 N BY: EXIMAN i� ..n � SCALE 7:2,444 0 O.D10.02 0.04 Kilometers 0 0.D7 D02 0.04 Miles ELEVATION IN FEET 20 FOOT CONTOUR INTERVAL This Camp Lejeune map was produced by Michael Taylor at G-F Dept, EC8, 12 Post Lane, michael.c.taylor5@usmc.mil 910-4 51-9657 Feb 2020 Data Credit/Source ©2002 Digital Globe/ (0 2003 Space Imaging Map generated using the Geographic Information System Managed by the InstalTatron Geospallal Information & Services Otfce Regional Geospatial Information & Services Division, GF, Marine Corps Installations East— Marne Corps Base Camp Le}eune FOR REFERENCE ONLY FOR OFFICIAL USE ONLY (FOLIO) NOT TO BE USED FOR TARGETING OR NAVIGATION Disclaimer Although every effort has been made to ensure the accuracy of information, errors and conditions originating from the physical sources used to develop the database may be retleaed in the data supplied. The requester must be aware of data mndibons and ultimately bear responsibility for the appropriate use of the information with respect to passible emxs, onginal map scale, collection methodology, currency of data, and other specific mnditi0n5 tocerain data. This information does not depict a4 passible resources. Field verification of all data is required for site-speofc projects - This information is deemed reliable, but not guaranteed. Camp Lejeune SW Permit Renewal; Number Measure Type Treatment Number Permit Number Expiration Date Inspection Date Status 1 WDP 5WP 152 SW8 060147 12/31/2020 6/30/2020 In Compliance 1 WDP SWP 1S3 SW8060147 12/31/2020 6/30/2020 In Compliance 2 WDP SWP 080 SW8 060832 10/6/2020 6/9/2020 In Compliance 3 SF SWP 386 SW8 080313 3/20/2019 6/4/2020 In Compliance 4 SF SWP429 SW8 080740 9/1/2020 Not Built 4 WOP SWP 430 SW8 080740 9/1/2020 Not Built 4 WOP SWP 431 SW8 080740 9/1/2020 Not Built 4 WDP SWP432 SW8 080740 9/1/2020 Not Built 4 WET SWP151 SW8 080740 9/10/2020 6/9/2020 In Comptiance 5 SF SWP 221 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 5F SWP 222 SW8 080907 7/2/2020 5/6/2020 Not in Compliance S SF SWP 223 SW8 080907 7/2/2020 S/6/2020 Not in Compliance 5 SF SWP 224 SW8 080907 7/2/2020 5/6/2020 Not in Compliance 5 SF SWP 225 SW8 080907 7/2/2020 S/6/2020 Not in Compliance 6 WDP SWP 301 SW8 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 302 SW8 090630 9/8/2020 7/28/2020 In Compliance 6 WDP SWP 303 SW8 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 304 SW8 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 305 SW8 090630 9/8/2020 1/21/2020 In Compliance 6 WDP SWP 306 SW8 090630 9/8/2020 1/21/2020 In Compliance 6WDP SWP307 SW8 090630 9/8/2020 7/28/2020 In Compliance 7 WDP SWP 250 SW8090815 10/22/2020 6/15/2020 In Compliance 7 WDP SWP 360 SW809081S 10/22/2020 6/29/2020 In Compliance 8 WDP SWP 211 SW8 090901 9/21/2020 6/9/2020 In Compliance 8 WDP SWP 212 SW8 090901 9/21/2020 6/9/2020 In Compliance 8 WOP SWP 213 SW8 090901 9/21/2020 5/6/2020 In Compliance 8 WDP SWP 230 SW8 090901 9/21/2020 6/8/2020 In Compliance 9 WDP SWP 214 SWS 100201 6/11/2020 6/29/2020 In Compliance 9 WDP SWP 261 SW8 100201 6/11/2020 7/28/2020 In Compliance 9 WDP SWP 262 SW8 100201 6/11/2020 6/29/2020 In Compliance 9 WDP SWP 263 SW8 100201 6/11/202C 7/28/2020 In Compliance 10 IB SWP 311 SW8 120509 5/30/2020 S/6/2020 Not in Compliance 10 IB 5WP 312 SW8 120509 5/30/2020 S/6/2020 Not in Compliance 11 WDP ISWP 315 SW8 120806 8/1S/2020 6/29/2020 In Compliance 12 WDP JSWP 013 SW8 920705 3/7/2018 6/15/2020 In Compliance $6,060