Loading...
HomeMy WebLinkAboutSW8070509_APPROVED PLANS_20201012STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 07v5&-' DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 'Zd ZD 10 ( Z YYYYMMDD - NORTH CAROLINA Department of the Secretary of State CERTIFICATE OF AUTHORIZATION I, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby certify that GENERAL ELECTRIC COMPANY a corporation organized under the laws of New York was authorized to transact business in the State of North Carolina by issuance of a certificate of authority on the l 6th day of October, 1913. I FURTHER certify that the said corporation's certificate of authority is not suspended for failure to comply with the Revenue Act of the State of North Carolina; that the said corporation's certificate of authority is not revoked for failure to comply with the provisions of the North Carolina Business Corporation Act; that its most recent annual report required by G.S. 55-16-22 has not been delivered to the Secretary of State; and that a certificate of withdrawal has not been issued in the name of the said corporation as of the date of this certificate. k7— 9 d :, ocI 0 6 2020 IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 16th day of September, 2020. T .i Scan to verify online. Certification# 108193600-1 Reference# 16521561- Page: 1 of 1 Secretary of State Verify this certificate online at httpsVtwww.sosne.gov/verification �•NORTH CAROLINA Department of the Secretary of State CERTIFICATE OF AUTHORIZATION (Long Form) 1, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby certify that GENERAL ELECTRIC COMPANY a corporation organized under the laws of New York was authorized to transact business in the State of North Carolina by issuance of a certificate of authority on the 16th day of October, 19I3, with its period of duration being Perpetual, under the name General Electric Company and the following documents have been filed since that date: Date Event 10/16/1913 Creation Filing 1/12/1956 Survivor 6/7/1984 Survivor 7/17/1987 Amendment 7/31 / 1987 Amendment 12/31/1987 Survivor 2/26/1988 Survivor 5/31/1988 Amendment 4/2/1990 Survivor 7/2/1990 Amendment 1/2/1992 Annual Report 1/5/1993 Annual Report 1/12/1994 Annual Report 1/4/1995 Annual Report 1 /8/ 1996 Annual Report 1 / 17/ 1997 Annual Report Scan to verify online. Filed Document Application for Certificate of Authority Articles of merger Articles of merger Change of Address of Registered Office/Agent Articles of Amendment Articles of merger Articles of Merger Articles of Amendment Articles of merger Change of Address of Registered Office/Agent Annual Report Annual Report - �f Annual Report Annual Report OCT 4 6 2020 Annual Report Annual Report BY. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seat at the City of Raleigh, this l6th day of September, 2020. Certification# 108193601-1 Referenced 16521561- Page: 1 of Secretary of State Verify this certificate online at https://www.sosne.govlverification / r GENERAL ELECTRIC COMPANY ATTESTING SECRETARY'S CERTIFICATE COW40r knilit s lieu* Lie" bvvnn, llas+ulwvtl�arlltl tAk The undersigned, an Attesting Secretary of GENERAL ELECTRIC COMPANY, a New York Corporation (the "Corporation"), does hereby certify that: 1) 1 am duly elected and qualified to act as Attesting Secretary of the Corporation and as such have access to the minute books and records of the Corporation; 2) the following, extract is a true and correct copy of the resolutions adopted at the meeting of the Board of Directors of the Corporation held on April 26,1988 and are in full force and effect: (A) Any contract, lease, license, assignment, bond or other obligation, conveyance, power of attamey, guarantee, proxy, court pleading, release, tax return and related documents, or other instruments may be executed an behalf of this Company by the Chairman of the Board, a Vice Chairman of the Board, an Executive Vice President, a Senior Vice President a Vice President reporting directly to the Chairman or a Vice Chairman of the Board, the Comptroller, the Treasurer, the Secretary or any Vice President who is a corporate staff f officer of the Company, all of the above -named individuals tieing hereinafter called "Authorized Persons'. In addition to the foregoing, any Operational Officer may sign any instrument of the type described in this Paragraph (A) which relates to the component or function to which such Operational Officer is assigned, and any Iv1anager, or formally designated Acting Wriager, of any Division or Department level organization component may sign any such instrument which relates to that component. Each Operational Officer and each such Manager or Acting Manager is authorized to delegate to others, authority to execute on behalf of the Company, the types of contracts or other instruments which relate to the function or component to which such Operational Officer, Manager or Acting Manager is assigned which are of the some types as the contracts and other instruments listed in Paragraph (C) below. c BY; 0 NORTH CAROLINA Department of the Secretary of State CERTIFICATE OF AUTHORIZATION 1, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby certify that GENERAL ELECTRIC COMPANY a corporation organized under the laws of New York was authorized to transact business in the State of North Carolina by issuance of a certificate of authority on the 16th day of October, 1913. I FURTHER certify that the said corporation's certificate of authority is not suspended for failure to comply with the Revenue Act of the State of North Carolina; that the said corporation's certificate of authority is not revoked for failure to comply with the provisions of the North Carolina Business Corporation Act; that its most recent annual report required by G.S. 55-16-22 has not been delivered to the Secretary of State; and that a certificate of withdrawal has not been issued in the name of the said corporation as of the date of this certificate. 11� 'l�ri' i OCT 0 6 2020 i IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 16th day of September, 2020. Scan to verify online. Certification# 108193600-1 Reference#! 16521561- Page: 1 of I Secretary of State Verify this certificale online at httpsJlwww.sosnc.govlverificalion 0 HITACHI September 30, 2020 North Carolina Department of Environment, and Natural Resources Division of Energy Mineral & Land Resources 127 Cardinal Drive Extension Wilmington, NC 28405-3845 GE Hitachi Nuclear Energy Drew Holbrook Facility Engineering Specialist 3901 Castle Hayne Road P.D. Boa 780 Wilmington, NC 28402 USA T 910 292.8019 Andrew.holbrookfgn( com Subject: Stormwater Management Permit Renewal Application Permit #SW 8070509 — SCM Inspection To Whom It May Concern: This letter is to certify that the SCM's applicable to Stormwater Management Permit #SW 9070509 have been inspected, and that they have been built and maintained in accordance with the permit. If you have any questions regarding the permit renewal application, please contact me at (910) 232-8019. Sincerely, Andrew L. Holbrook, P.E. Facility Engineering Specialist t P. E . `=�PoFE;ssRo ��;y-r a SEAL 023973 ?� yO FWGiH. O, 2Z L. N 2)P cc: Original plus one copy File 0rn D 6 t�lf: @1 HITACHI October 5, 2020 North Carolina Department of Environment, and Natural Resources Division of Energy Mineral & Land Resources Attn: Christine Hall 127 Cardinal Drive Extension Wilmington, NC 28405-3845 GE Hitachi Nuclear. Energy Karen Williams EH5 Specialist 3901 Castle Hayne Road, M/C A55 P.O. Box 780 Wilmington, NC 29402 USA T 910 547.2758 Karen.williams@ge.com Subject: Stormwater Management Permit Renewal Application Permit #SW 8070509 Dear Ms. Hall: ECEIVE 0CT0620M BY: Enclosed please find the Stormwater management permit renewal application for GE Hitachi Nuclear Permit # SW 8070509. Please note the check for associated permit fees is currently being held at the NC DEQ office. The associated documentation required for the permit renewal that is attached includes: • Permit Renewal Application Form, signed and notarized; • NC Dept of Secretary of State Certificate of Authorization; • SCM Inspection Verification — signed/sealed; If you have any questions regarding the permit renewal application, please contact me at (910) S47-2758. Sincerely, 4 �� wi 10-52a Karen Williams EHS Specialist cc: Original plus one copy File 0 H ITACH October 5, 2020 North Carolina Department of Environment, and Natural Resources Division of Energy Mineral & Land Resources Attn: Christine Hall 127 Cardinal Drive Extension Wilmington, NC 28405-3845 GE Hitachi Nuclear Energy Karen Williams EHS Specialist 3901 Castle Hayne Road, M/C ASS P.O. Box 780 Wilmington, PIC 28402 USA T M 547-2758 Ka ren.wi Iliam s@ ge.COm Subject: Stormwater Management Permit Renewal Application Permit #SW 8070509 Dear Ms. Hall: Enclosed please find the Stormwater management permit renewal application for GE Hitachi Nuclear Permit # SW 8070509. Please note the check for associated permit fees is currently being held at the NC DEQ office. The associated documentation required for the permit renewal that is attached includes: • Permit Renewal Application Form, signed and notarized; • NC Dept of Secretary of State Certificate of Authorization; • SCM Inspection Verification — signed/sealed; If you have any questions regarding the permit renewal application, please contact me at (910) 547-2758. Sincerely, Karen Williams EHS Specialist CC' Original plus one copy File RECEIVED OCT 0 S 2020 NCDEQ WILMINGTON RO ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director October 12, 2020 NORTH CAROLINA Environmental Quality General Electric Company Mr. Russell Stokes, SVP, President and CEO, GE Power P.O. Box 780 M/C A55 Wilmington, NC 28401 Subject: Permit Renewal Stormwater Permit No. SW8 070509 GE FCO Cafeteria High Density Project New Hanover County Dear Mr. Stokcs: The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on. The Division is hereby notifying you that permit SW8 070509 has been renewed on October 12, 2020, and shall be effective until May 23, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on May 23, 2007, will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit, You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Daniel Sams in the Wilmington Regional Office, at (910) 796-7215 or dan.sams@ncdenr.gov. Sincerely, Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Renewal Application Documents DES/dan:IllStormwaterlPermits &c Proiects120071070509 HD12020 10 permit 070509 cc: Wilmington Regional Office Stormwater File ME �-. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 auNA NORTH anR 0-. " a �+�� 910,796,7215 State Stormwater Management Systems Permit No. SW8 070509 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO General Electric Company GE CFO Cafeteria Castle Hayne Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of an underground infiltration trench in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until May 23, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 9,232 square feet of impervious area. The infiltration trench must be operated with a 30 foot vegetated filter. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. This permit makes no allocation for any future built -upon area. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 1 of 6 State Stormwater Management Systems Permit No. SW8 070509 N. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. The following design criteria have been provided in the infiltration trench and must be maintained at design condition: a b. C. d. e. f. 9- h. i. 1• k. I. m n. o. Drainage Area, acres: Onsite, ft2: Offsite, ft2: Total Impervious Surfaces, ft2: Design Storm, inches: Trench Dimensions, L x W x H, ft: Perforated Pipe Diameter/Length- Bottom Elevation, FMSL: Bypass Weir Elevation, FMSL: Permitted Storage Volume, ft3: Type of Soil: Expected Infiltration Rate, inlhr: Seasonal High Water Table, FMSL Time to Draw Down, hours: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE 0.28 12,226 0 9,232 1.0 133.5 x 9.5 x 1.0 15"01390 feet 38.1 39.1 747 Onslow 10 36.1 1.5 NE Cape Fear River/ CPF23 18-74-(52.5) "C SW" The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: 4 a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Page 2 of 6 State Stormwater Management Systems Permit No. SW8 070509 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 0 This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; Page 3 of 6 State Stormwater Management Systems Permit No. SW8 070509 b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08, c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121. 3. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 4. Any individual or entity found to be in noncompliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 6. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 9. Permittee grants permission to staff of the Division to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 10. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit reissued this the 12th day of October 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Management Systems Permit No. SW8 070509 GE FCO Cafeteria Stormwater Permit No. SW8 070509 New Hanover County Designer's Certification I, as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Management Systems Permit No. SW8 070509 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure elevations are per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. .9. Vegetated slopes are no steeper than 3:1. _10. The inlets are located per the approved plans and do not cause short- circuiting of the system. _11. The permitted amounts of surface area and/or volume have been provided. _12. All required design depths are provided. .13. All required parts of the system are provided. _14. The required system dimensions are provided per the approved plans. CC' NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 6 of 6 r- NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SSW 807Q§Q4 2. Project name: ECO-Cafeteria 3. Project street address: 3901 Castle Havne Rd. City: Wilmington County: New Hanover ZIP: 28401 4. What, if any, changes have been made to the project as permitted? None If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: h_tips:Hdeg.nc.gov/about/divisions/energy- mineral-land-resources/energy-mineraHand- rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: htts://de .nc. ov/about/divisions/ener -mineral-land- re$urces/energy-mineral-land-rules/stormwater-program/posl-construction. State Stormwater Permits do not automatically transfer with the sale of the property. - 1. Current Permit Holder's Company Name/Organization: General Electric Company 2. Signing Official's Name: Russell Stokes 3. Signing Official's Title: SVP. President and CEO. GE Power 4. Mailing Address: General Electric, P.O. Box 780 M/C A55. City: Wilmington State: NC ZIP, 28402 5. Street Address: 3901 Castle Havne Rd City: Wilmington -,,,,-_State: NC ZIP: 28402 6. Phone: 678 844- 400 Email: russell.stokes®ge.com Stormwater Permit Renewal Form I Page 1 of 3 ECEIVkt:` OCT 0 6 2020 BY: May 11, 2018 C: SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQ W/ORK9. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each Item below to Indicate that the required information is provided in the application package: 'fS 1. A permit application processing fee of $505.00 payable to NCDEQ. 0(5 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined In G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. NIA 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. Of5 4, O&M Agreements, Please select one: ® 1 have a copy of the current recorded O&M Agreement for all SCMs, and 1 will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ® A copy of the certifications) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. OT5 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit i�'- r5 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httgs:/lwww.sosnc.gov/online services/search/by title/ Business Registration ECE E "r OCT 0 6 2020 BY: Stormwater Permit Renewal Application Form page 2 of 3 May 11, 2018 I D: PERMITTEE'S CERTIFICATION I,,S'�SEu-SToS the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature; / _ Date: �Z3�Z�7o NOTARIZATION: i, that /ols5Cll -r Vyk-eS a Notary Public for the State of County of WG74dYr— , do hereby certify personally appeared before me this the zi P-W day of 7Gf?�LirY7 , 20_� and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: My commission e7 BETH GRIFFITH NOTARY PUBLIC STATE OF OHIO Recorded in Warren County My Comm. Exp. 11/13/2022 r OCT 0 6 2020 � BY: Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Central Files.. APS _ SWP _ 10/9/2020 Permit Number SW8070509 Program Category State SW Permit Type State Stormwater Primary Reviewer dan.sams Coastal SWRule Permitted Flow Facility Permit Tracking Slip Status Project Type Active Renewal with major mod Version Permit Classification 2.00 Individual Permit Contact Affiliation Facility Name Major/Minor Region Wilmington -Castle Hayne CFO Cafeteria Minor Wilmington Location Address County 3901 Castle Hayne Rd New Hanover Facility Contact Affiliation Wilmington NC 28401 Owner OName �P`I4,��° Owner Type —Qt Zrar uclear Fuel —Americas. C Non -Government Owner Affiliation Brad Beard 3901 Castle Hayne Rd Dates/Events Wilmington NC 28402 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 5/23/2007 10/6/2020 10/8/2020 10/8/2020 5/23/2029 Regulated Activities Requested /Received Events State Stormwater - Infiltration System Outfall Waterbody Name Streamindex Number Current Class Subbasin IDS T 1s o� T T 7 ci- or 7-f C514A)A loci %2v55tLL ��oKES"s TiTi-c QUAGr Fics �AT-r ON CA) to �k 0ame. or does~ 1,1o1- nab Rh 6010S lzs a Valid 6oine-r/ ►-„c,- a+6 d�1 Burd, Tina J From: Burd, Tina J Sent: Thursday, October 8, 2020 8:17 AM To: russell.stokes@ge.com Subject: SW8 070509 - Wilmington/Castle Hayne CFO Cafeteria The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on October 6, 2020. The project has been assigned to Dan Sams and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Ernail correspondence to and From this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Application Completeness Review Checklist (Non -Transfers) - Short Version Project Name: ±-A g,-�}At. p4lACara—C�STLt; %�A`�1J� CFc7 � ,���DateDeliveredtoWlRO: �p/(p 2C,2-0 Project County/Location: 4 5tb A/)rl� BWS Received/Accepted Date: Rule(s): F�2017 Coastal �2008 Coastal F�1995 Coastal RIMS Acknowledged Date': ElPhase II Universal El1988 Coastal Permit Action: New New Permit #z: �� ,�M??a--jor Mod / Minor Mod newal ® Existing Permit #: Str�� Qy5d� Permit Type: Cam'/ LD / LD Overall / HD &LD Combo Expriation Date3: rJ Z3 �p z General Permit / Offsite / Exempt / Rescission Development Type: Commercial / Residential / Other Subdivided?: Subdivision or Single Lot Permittee Type & Documents Needed: moffsite to SW8: Lot is in Master Permit? E3PE Cert on File? 'Property Owner(s) Purchaser Lessee 1_1HOA El Developer Viable? Viable? OViabie? Viable? Viable? Deed Purchase Agmt ElLease F lection Minutes Not Subdivided: Deed Subdivision: Common Area Deed Paperwork Ei Application ©Fee: 12$505 (within 5mo) Check#(s): 0z1,0 El No Fee F]Supplementz (1 new form or for older forrns: 1 original per SCM) EIO&Mz E]Soiis Report (lnfil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative F-1USGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N Plans (2 Sets) FTE Certification Electronic Copies Easements, Recorded (2017 Rules) NOTES: 'Enter BUS Acknowledged Date on this Sheet ZFor New Projects -Enter New Permit # on Supplements & Deed Restiction Templates. 3If w/in 5 months and they are requesting a mod, STOP. Needs a renewal first. EMAILED ENGINEER DATE: REVIEWER NAME: Comments: G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist_2020 01 31