Loading...
HomeMy WebLinkAboutSW8060147_HISTORICAL FILE_20100713STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Q O 1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS JR HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zp I Q 0-7 13 YYYYMMDD 44 + =J - VYA 4 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Caleen H. Sullins Governor Director July 13, 2010 Carl Baker, Deputy Public Works Officer USMCB Camp Le eune Building 1005 Michael Road Camp Lejeune, NC 28542 Subject„ State Stormwater Management Permit No. SW8 060147 Midway Park Child Development Center High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for Midway Park Child Development Center on July 9, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 060147 dated July 13, 2010, for the construction of the subject project. This permit shall be effective from the date of issuance until July 13, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any pails, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to .Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sincerely, eorgette rco tf Stormwater Supervisor Division of Water Quality GDSlcsb: S:IWQSISTORMWATERIPERMIT1060147.jul10 CC' Phil Gambrell, P. E., Luckett & Farley Wilmington Regional Office Stormwater File Wilmington Regional Office One 127 Cardinal Orive Extension, Wilmington, North Carolina 28405 NorthCarolina Phone: 9,0-796-72151 FAX: 910-35(-20041 Customer Service: 1-677-623-6748 f/ I Internet: Ymw,rncwaterquai!9 .org Jl �atura!!i State Stormwater Management Systems Permit No. SW8 060147 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Midway Park Child Development Center 4t'' Street, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules) the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 13, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The East pond has been designed to handle the runoff from 69,235 square feet of impervious area and the West pond has been designed to handle the runoff from 39,427 square feet of impervious area. 3. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured landward from the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean or normal high water line of tidal waters. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 060147 6. The runoff from all built -upon area within the permitted drainage area($) of this project must be. directed into the permitted stormwater control system. 7. The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: East Pond # West Pond a. Drainage Area, acres: Onsite, ft2: Offsite, ft2 2.69 117,091 None 1.45 63,198 None b. Total Impervious Surfaces, ft : Onsite, ft2: Offsite, ft2 69,235 69,235 None 39,427 39,427 None C. Design Storm, inches: 1.5 1.5 d. Average Pond Design Depth, feet: 3.5 3.0 e. TSS removal efficiency: 90% 90% f. Permanent Pool Elevation, FMSL: 30 27.5 g. Permanent Pool Surface Area, ft : 8,890 5,408 h. Permitted Storage Volume, ft : 9,303 5,132 i. Temporary Storage Elevation, FMSL: 30.9 28.3 j. Pre-dev. 1 r-24 hr. discharge rate, cfs: 0.06 0.03 k. Controlling Orifice, in: 1.75 1.25 1. Orifice flowrate, cfs: 0.04 0.02 M. Permitted Forebay Volume, ft : 3,904 2,049 n. Fountain Horsepower NIA NIA o. Receiving Stream/River Basin: Mott Creek 1 WOK02 Stream Index Number: 19-16-3 Classification of Water Body: QNSW II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance,of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken, Page 3 of 7 State Stormwater Management Systems Permit No. SW8 060147 5. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in substantial intent and conformance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. B. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. ' Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. ' f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 060147 III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General .Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re - issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 13th day of July, 2010. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION A/'-5' V4./ r &'-� or oleen K Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5of7 MEMORY TRANSMISSION REPORT • TIME :07-14-'10 11:26 J' FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 653 DATE 07.14 11:25 TO : R 915025870488 DOCUMENT PAGES 7 START TIME 07,14 11:25 END TIME 07.14 11:26 PAGES SENT 7 STATUS OK *** SUCCESSFUL TX NOTICE ** North Carolina Oepartmant of Environment and Natural Resources Division of Wnter Clualily pov@fly E9Vos Pardue Coloon H. Sullins 00.0 Froaman Gova rn or Di motor Socmtery July 1 3. 2010 Curl 8ziker, IDoputy P bllc Works Officer USMCB Camp l_ateruna Building9C1006 Mlcff llaol Rgad Camp ejauna, 144-- 28542 3ubj4*4-t7 State Stormwatar Managsrrtont Parrr•It Mee- 15W8 660'147 Mldway Park 4--h11A dovslapment Canter High Momnmity Cor*tmorclsl Wet t7etsntlon Pond Projact Onrlow County Qear Mr. Baker: -1-he Wilmington Reglonnl OHica received a complete Storr"wator Management Permit Application for Midway Par Child evalopmant Center on July @, 2010- Staff review of the plena and apacificatlona has d®terrnlnad that the prwjoct, cas �ropgsBd, will comply with th4 Stormwoter Regulation$ eat forth In Title 15A IVCAC 2H.100 and Session aw 200B-211 . e aro forwarding Permit Na. SW8 0�0147 cletad July 13, 201 O, for the conatruCtion of the subject project. TI-lis ppermit shall ba affactivQ from tho date of issuance until July 13, 2U20, and shall be subject to the, conditions and limitations as specified therein. Faleaaep pay apecial attention to the dporation and Mralntananca requirements In this permit. F sallurn to establlah an adequate system for operation and maintenance of the stormwator managQmont syntam will r4sult in future compliance problemla. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the rigght to reqpuest an ndjudicatory hoar;ngg upon written request within thirty (30) days following receipt of this. perrmit_ -Fhls request must bo in the form of a written petition, conforming to Chapter 1 SOB of the North Carolina Genarat Statuteo and filed with the Office of Adminlntrntiva Hoanngn. P.O, priawer 27447, Raleigh, NC 27811-7447f. Unless such demands are made thin permit shall be final and binding. If you have uny questions, or need additional information concerning this matter, pieaae contact Chris ,Ciakesr, or ma at (B10) 7913-7215_ Slncorely, oorge3tta co�•-tt �� 3torrrlwater %uperviaor 131vis5On of Woter Quality GOS/cob: S:\WQS\S"rOF2MWATER\PERMI7:OB0147.jullO cc: Phll C3ombrall, P_ E_, L_uckatt 8. Farley Wilmington Reglonal Office Storrnwntar File, WHmIrQO n Ragbr ( 127 Gnrelnal 0r Wliml,ytu,- North C.r ne 2MOS Ph-- 0107] -72" 1 F^.; 91-,1 -2p04 \ CUEtnme. Bnmaa: "7 r-623ar48 �memel. v,,.�.,.no_.r4,v..envorQ r ]XA`1 t.hCarc> a atut�rz17 J Beverly Eaves Perdue, Governor State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office FAX COVER SHEET Date: To: Co: �p Fax: Dee Freeman, Secretary No. Pages (excl. cover): -2 From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 Re: ILI 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 e An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT FILE NO. 332 DATE 07.14 13:31 TO R 913174236300 DOCUMENT PAGES 8 START TIME 07.14 13:32 END TIME 07.14 13:35 PAGES SENT 8 STATUS 03 TIME :07-14-'10 13:35 FAX NO.1 :910-350-2018 NAME :DENR Wilmington *i* SUCCESSFUL TX NOTICE *** Statb o£North Carolina L]epurtmont of E"viranment and TJatural Ral:oau-cBa Wilraingtc rn Ragional O£ficb FJpvprly ,waves Ycrdub, Governor i7aa Frccman. Sc ctu y • FA_X COVER SH��'x' riutet Iqp. UP Yages: (cxclaadlnQ cwver) -IV": . N M1 s k'�#-i-�� Ir rom: S CC?: �^ CU: 1%7C, 110E1kFR FAX #: 31'7ZA 3-[v.3O6 T'AX#: 910-350-2004 5I9 C�rdlnel �rlv� Csrrn Nsn. WH-9.6 ew. N_[". 20405-31045 TN�f hens [V!6) •F4�?]LS i�r (910) ]30-700A .�R a.�.. el onPo.aanlar Arnr...en�e wreiee 6..,paoyer MEMORY TRANSMISSION REPORT FILE NO. 333 DATE 07.14 13:33 TO : 8919104512976 DOCUMENT PAGES 8 START TIME 07.14 13:35 END TIME 07.14 13:36 PAGES SENT 8 STATUS I OK *** SUCCESSFUL TX NOTICE TIME :07-14-10 13:36 FAX NO.1 : 910-350-2018 NAME :DENR Wilmington +s.coydu.� ru)rav'.•�I+.+w+i1�v Ka)u n4.odap 1—ba .•v ► X-P v m[6) --d aML-96L (0[6) ... 'I— 1—)O.-.a Lie (.avwas au)pn�ax�) :sa+`Kd 3C� `�ri eo7gQ �Lsv7 osa�g 'Laew�as3 oaQ socr»nor,) •onpt�d 6ona3 i€p�nnag _ - - �ot13Q f�tiaO4fl�g volF�ciewli� cvotno�a� less)svH pvv �vauaaosinu�3o 7v�urJlvd�C7 avelosn� tYyoH3o eav7S - 1 Permit Number SW8060147 Program Category State SW Permit Type State Stormwater Primary Reviewer linda.lewis Coastal SW Rule Coastal Stormwater - 2008 Permitted Flow Facility Name Midway Park Child Development Center Location Address Building Lch4007 4th St Midway Park NC 28544 Owner Central Files: APS SWP 07113/10 Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Major/Minor Region Minor Wilmington County Onslow Facility Contact Affiliation Owner Name Owner Type Commanding Officer US Marine Corps - Camp Lejeune Government - Federal Owner Affiliation Carl H. Baker Psc Box 20004 Camp Lejeune NC 285420004 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 07/13/10 06/14/10 07/13/10 07/13/10 07/13/20 Regulated Activities Requested/Received Events State Stormwater - Other Deed restriction requested Deed restriction received Additional information received Additional information received Additional information requested 06/16/10 Additional information requested 07/06/10 Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin STATE OF NORM CAROL&A Depaem=t Df Ez 7 menjal and gatural p asomccs . 127 Card491 Dxiv�; Brenszon wS-a:mgtou? Nolt� Carolina 28405 {910}196-7215 LILE A t'sS RECORD wroN _rn�l Wol f Pozm �un,e 23 , ZD 17 MMffi 'vac s GLHeimes r ocess: ` o stiff omim Re i Office is dAcated to makiagpa* reca4 ia . oar c��adyieadt�pa�afZable to tie p�.�Irc for �e�iew and cop"Y� �e a€so l��e dZc res�c�tsibllity � �xs purizc fo sa eg and these records and toy o�t m r day to -day program Agadoes. Plme read carefaily 11E foffnw ngg iddl= sig=gtdc fir.: Doe in to .%.tge pgblie d=wd for 15 acoess, wf, p,,V%ttl atyou call. ai l asta dad' �1 ad.V'aucc to scbeddee an appaiufm atto xyimrt.c Mos. -A' oN menfs wi11 be scheduled �een �.Q4am ad I Od m. ir45pm crie arrf�in2 �ifb��� � gmop�yle ,f%�I�c � the.aimt ftf ire and Laffs� 7. kau must apaoify 2105 pat giant to �e�Fe�u b faci�t . ztar� The And or of AW fiat you my'xavi*atMz-tbawill beIWW-b eve . - • _ �. � You i�matce cs�pies c�a. ale �hsn the aalazer zs not irr use by#1xe staffarrd �t�e pe�rk;tts. Cost per cagy is $.05 oents. Pwgenfoaf b6 made knr check, m ouey cider, or cash at the reccpiao d Crpjg tyfalp tg $S. Dd or ]Rare ca& be b rolped mr caa enc� •. M MTIS°C );E n-FT IN Q.jDER YOU VQMD TM, -Has my itotbe fft fr= the efte;. To rejcvey afa, depaaey uid s, Cr" do,% oy materw is cme afbest Rles is a 2wmkeaaorforw1doh you earl be glad up to MOM, No �fCases lame Cafes e�. ate . emlittetl in. ire 10 ` OW area. �. ba wow Genaral St the 25 3--S M a winbo cha t and oolraded.fcr diecics ca wll o rpaymmthat bmx6fased J�A=Y C4 3_ f X m ofatIlMusiaosa I Time in e out - h a bless wd to this form MA -DP, PAID NVOICE North Carolina Department of Environmental Quality Pat McCrory Governor September 28, 2015 Mr. Neal Paul, Deputy Public Works Officer MCB Campp Lejeune Buildin 1Q05 ichael Road Camp Neune, NC 28547 Subject: USMC Stormwater Permit Extensions (75 Permits — See Attachment A) Onslow County Dear Mr. Paul: Donald R. van der Vaart Secretary On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Energy, Mineral and Land Resources under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that was set to expire during this time frame up to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for an extension of up to four (4) years. As a result, 120 USMC Camp Lejeune permits are impacted. Of the 120 permits, 45 permits have previously been issued extensions and 75 permits have been extended effective today. This is summarized in Attachment A. If you have any questions, need additional copies of the permit or approved plans, please contact Kelly Johnson with DEMLR in the Wilmington Regional Office at (910) 796-7331. Sincerely,, 57m Tracy Davis, P.E., Director' 1 Division of Energy, Mineral and Land Resources GDSlkpj: %StormwaterlPermits & Pro'ectsl Each permit file cc Michael I ay or, I ay or via emai only, michael.c.taylor5@usmc.mil) Wilmington Regional 0 Ice Stormwater File Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 29405 (910) 796-72151 Fax: (910) 350-2004 • Internet: hftp:llportal.ncdenr.org/web/ir/ An Eoual Opportunity 1 Aifirmaliye Acbon Employer — Made in part by recycled paper Attarhmpnt A - IISMC Prnierts - Permit Extensions - 9129115 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Permit Number Permit . Version Original Issued Date tssued Date Expiration Date New Expiration Date Comments SW8000401 2 05-16-2000 10-13-2009 05-16-2020 05-16-2024 Extended 9/29/15 SW8010420 1.4 07-03-2001 11-07-2005 11-07-2015 11-07-2019 Extended 9/29115 SW8011222 2 06-06-2002 12-28-2011 06-06-2022 06-06-2026 Extended 9129/15 SW8030406 1 06-26-2003 06-26-2003 06-26-2013 06-26-2017 Extended 9/29/15 SW8030913 1.3 11-18-2003 06-24-2010 09-21-2019 09-21-2023 Extended 9129/15 SW8040912 1 01-23-2006 01-23-2006 01-23-2016 01-23-2020 Extended 9/29/15 SW8050817 1.1 09-29-2005 12-18-2008 09-29-2015 09-29-2019 Extended 9/29/15 SW8050830 1.1 05-04-2006 06-02-2011 05-04-2016 05-04-2020 Extended 9129/15 SW8050925 1 03-13-2006 03-13-2006 03-13-2016 03-13-2020 Extended 9/29/15. SW8051018 1,2 12-13-2005 07-30-2009 12-13-2015 12-13-2019 Extended 9/29/15 SW8051065 1 03-14-2006 03-14-2006 03-14-2016 03-14-2020 Extended 9/29/15 SW8060110 1 02-02-2006 02-02-2006 02-02-2016 02-02-2020 Extended 9/29/15 SW8060137 1 03-03-2006 03-03-2006 03-03-2016 03-03-2020 Extended 9/29/15 SW8060147 1 07-13-2010 07-13-2010 07-13-2020 12-31-2021 Extended 9/29/15 SW8060309 1 05-01-2006 05-01-2006 05-01-2016 05-01-2020 Extended 9/29/15 SW8060323 1.2 04-10-2006 10-18-2010 04-10-2016 04-10-2020 Extended 9/29/15 SW8070108 1.2 03-21-2007 01-04-2011 08-19-2019 08-19-2023 Extended 9/29/16 SW8070239 1 03-28-2008 03-28-2008 03-28-2018 12-30-2021 Extended 9/29/15 SW8070708 1 07-16-2007 07-16-2007 07-16-2017 07-16-2021 Extended 9/29/15 SW8070831 1 07-11-2008 07-11-2008 07-11-2018 12-30-2021 Extended 9/29/15 SW8070925 1 10-10-2007 10-10-2007 10-10-2017 10-10-2021 Extended 9/29/15 SW8071034 1.1 12-13-2008 09-23-2010 12-13-2017 03-22-2019 Extended 9/29/15 SW8080126 1 02-06-2008 02-06-2008 02-06-2018 12-31-2021 Extended 9/29/15 SW8080510 1 05-30-2008 05-30-2008 05-30-2018 12-30-2021 Extended 9/29/15 SW8080521 1 06-03-2008 06-03-2008 06-03-2018 12-30-2021 Extended 9/29/15 SW8080522 1.1 06-17-2008 08-11-2011 06-17-2018 11-06-2018 Extended 9/29/15- SW8080649 1 07-23-2008 07-23-2008 07-23-2018 12-30-2021 Extended 9/29/15 SW8080653 1 11-19-2008 11-19-2008 11-19-2018 12-30-2021 Extended 9/29/15 1 of 5 Attachment A - USMC Proiects - Permit Extensions - 9/29/15 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 Permit Number Permit Version Original. Issued Date I Issued Date I Expiration Date New Expiration Date Comments SW8080714 1 07-21-2008 07-21-2008 07-21-2018 12-30-2021 Extended 9/29/15 SW8080715 1 08-01-2008 08-01-2008 08-01-2018 12-30-2021 Extended 9/29/15 SW8080728 1 07-28-2008 07-28-2008 07-28-2018 12-30-2021 Extended 9129115 SW8080734 1 08-15-2008 09-15-2008 09-15-2018 12-30-2021 Extended 9/29/15 SW8080927 1 10-21-2008 10-21-2008 10-21-2018 12-30-2021 Extended 9/29/15 SW8080931 1.1 10-09-2008 09-27-2011 10-09-2018 01-12-2019 Extended 9/29/15 SW8080932 1 10-17-2008 10-17-2008 10-17-2018 12-30-2021 Extended 9/29115 SW8080933 1 10-20-2008 10-20-2008 10-20-2018 12-30-2021 Extended 9/29115 SW8080936 1 11-03-2008 11-03-2008 11-03-2018 12-30-2021 Extended 9/29/15 SW8080944 1 11-21-2008 11-21-2008 11-24-2018 01-02-2022 Extended 9/29/15 SW8080945 1.1 11-06-2008 11-17-2011 11-06-2018 12-20-2018 Extended 9/29/15 SW8080950 1 12-03-2008 12-03-2008 12-03-2010 12-30-2021 Extended 9/29/15 SW8081016 1.1 12-03-2008 02-16-2011 12-03-2018 10-17-2019 Extended 9129/15 SW8081113 1 04-08-2009 04-08-2009 04-08-2019 12-30-2021 Extended 9/29/15 SW8090108 1 04-20-2009 04-20-2009 04-20-2019 12-30-2021 Extended 9/29/15 SW8090116 1 03-18-2009 03-18-2009 03-18-2019 12-30-2021 Extended 9/29115 SW8090117 1 03-13-2009 03-13-2009 03-13-2019 12-30-2021 Extended 9/29/15 SW8090330 1 04-23-2009 04-23-2009 04-23-2019 12-30-2021 Extended 9/29/15 SW8090407 1 05-12-2009 05-12-2009 05-12-2019 12-30-2021 Extended 9/29/15 SW8090412 1 07-07-2009 07-07-2009 07-07-2019 12-30-2021 Extended 9/29/15 SW8090517 1.1 08-31-2009 08-28-2011 08-31-2019 01-05-2020 Extended 9/29/15 SW8090625 1 07-28-2009 07-28-2009 07-28-2019 12-30-2021 Extended 9/29/15 SW8090632 1 07-02-2009 07-02-2009 07-02-2019 12-30-2021 Extended 9/29/15 SW8090710 1 11-16-2009 11-16-2009 11-16-2019 12-30-2021 Extended 9/29/15 SW8090714 1 09-15-2009 09-15-2009 09-15-2019 12-30-2021 Extended 9/29/15 SW8090810 1 09-04-2009 09-04-2009 09-04-2019 12-30-2021 Extended 9/29115 SW8090814 1 10-26-2009 10-26-2009 10-28-2019 12-30-2021 Extended 9/29/15 SW8090912 1 1 10-06-2009 10-06-2009 10-06-2019 12-30-2021 Extended 9/29/15 2 of 5 Attachment A - USMC Proiects - Permit Extensions - 9/29/15 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 1 2 3 4 5 6 7 8 9 Permit Number Permit Version Original Issued Date Issued Date Expiration . Date New Expiration Date Comments SW8090913 1 10-01-2009 10-01-2009 10-02-2019 12-31-2021 Extended 9/29/15 SW8090918 1 12-01-2009 12-01-2009 12-01-2019 12-30-2021 Extended 9/29/15 SW8091109 1 01-15-2010 01-15-2010 01-15-2020 12-30-2021 Extended 9/29/15 SW809111 1 1 A 05-07-2010 03-17-2011 05-07-2020 02-20-2021 Extended 9/29/15 SW8100214 1 05-07-2010 05-07-2010 05-04-2020 12-28-2021 Extended 9/29/15 SW8101106 1 12-09-2010 12-09-2010 12-09-2020 12-31-2021 Extended 9/29/15 SW8921101 1.1 12-16-1992 01-17-2007 01-17-2017 01-17-2021 Extended 9/29/15 SW8950708 2 01-08-1996 02-18-2008 02-18-2018 02-18-2022 Extended 9/29/15 SW8950710 2 10-19-1995 02-19-2008 02-19-2018 02-19-2022 Extended 9/29/15 SW8960103 2 03-07-1996 07-08-2008 07-08-2018 07-08-2022 Extended 9/29/15 SW8960509 2 11-04-1996 06-03-2008 06-03-2018 06-03-2022 Extended 9/29/15 SW8970205 2 09-02-1997 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8970219 2 10-23-1997 04-14-2010 10-23-2017 10-23-2021 Extended 9/29/15 SW8970408 2 05-15-1997 03-12-2008 03-12-2018 03-12-2022 Extended 9/29/15 SW8970618 1.2 01-28-1998 06-17-2010 09-15-2019 09-15-2023 Extended 9/29/15 SW8970847 2 01-28-1998 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8970927 2 06-25-1998 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8990624 2 10-22-1999 10-09-2009 10-22-2019 10-22-2023 Extended 9/29/15 SW8990848 2 11-01-1999 10-09-2009 11-01-2019 11-01-2023 Extended 9/29/15 SW8010431 1.1 08-08-2001 01-10-2005 01-10-2015 01-10-2019 Previously Extended SW8010640 2 09-18-2001 02-02-2011 09-18-2025 09-18-2029 Previously, Extended SW8010817 1.1 03-21-2002 12-16-2002 12-16-2012 12-16-2016 Previously Extended 8W8011202 1 06-17-2002 06-17-2002. 06-17-2012 06-17-2016 Previously Extended SW8020113 1.1 06-28-2002 08-20-2009 06-28-2012 06-28-2016 Previously Extended SW8020319 1.1 07-26-2002 11-18-2011 11-18-2021 11-18-2025 Previously Extended SW8020320 1 06-28-2002 06-28-2002 06-28-2012 06-28-2016 Previously Extended SW8020504 1 08-12-2002 08-12-2002 08-12-2012 08-12-2016 Previously Extended SW8020611 1 08-16-2002 08-16-2002 08-16-2012 08-16-2016 Previously Extended 3of5 Attachment A - USMC Proiects - Permit Extensions - 9/29/15 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8020612 1 08-16-2002 08-16-2002 08-16-2012 08-16-2016 Previously Extended SW8020725 1 11-05-2002 11-05-2002 11-05-2012 11-05-2016 Previously Extended 5W8020911 1 12-13-2002 12-13-2002 12-13-2012 12-13-2016 Previously Extended SW8030720 1.3 12-12-2003 12-20-2010 01-26-2015 01-26-2019 Previously Extended SW8060832 1.1 10-06-2006 02-16-2007 10-06-2016 10-06-2020 Previously Extended SW8070847 2.1 01-24-2008 12-16-2011 07-11-2018 07-26-2018 Previously Extended SW8070926 1.4 11-16-2007 12-22-2011 11-16-2017 11-16-2021 Previously Extended SW8071213 1 01-28-2008 01-28-2008 01-28-2018 12-31-2021 Previously Extended SW8080206 1 03-13-2008 03-13-2008 03-13-2018 12-30-2021 Previously Extended SW8080301 1.1 04-29-2008 12-11-2008 04-29-2019 05-18-2022 Previously Extended SW8080313 1 04-29-2008 04-29-2008 04-29-2018 12-30-2021 Previously Extended SW8080740 1.1 08-22-2008 12-11-2009 08-22-2018 09-10-2020 Previously Extended SW8080813 1.1 09-25-2008 07-08-2011 09-25-2018 03-20-2019 Previously Extended SW8080907 1.1 10-08-2008 04-07-2010 10-08-2018 07-02-2020 Previously Extended SW8081007 1 12-12-2008 _ 12-12-2008 12-12-2018 12-30-2021 Previously Extended SW8081015 1.2 01-21-2009 04-01-2011 01-20-2019 10-21-2019 Previously Extended SW8081202 1.1 03-06-2009 08-04-2011 03-06-2019 08-02-2019 Previously Extended SW8090630 1.3 02-08-2010 06-01-2011 02-08-2020 09-08-2020 Previously Extended SW8090815 1,1 02-01-2010 04-11-2011 02-01-2020 10-22-2020 Previously Extended SW8090901 1.1 12-14-2009 03-24-2011 12-14-2019 09-21-2020 Previously Extended SW8090925 1.1 10-16-2009 02-01-2011 02-01-2021 12-31-2021 Previously Extended SW8091108 1.1 08-27-2010 10-04-2011 08-27-2020 11-23-2020 Previously Extended SW8091113 1 04-13-2010 04-13-2010 04-14-2020 01-01-2022 Previously Extended SW8100406 1 06-28-2010 06-28-2010 06-28-2020 12-31-2021 Previously Extended SW8100502 1 09-27-2010 09-27-2010 09-27-2020 12-31-2021 Previously Extended SW8100701 1 09-30-2010 09-30-2010 09-30-2020 12-31-2021 Previously Extended SW8960117 2 08-06-1996 02-19-2008 02-19-2018 02-19-2022 Previously. Extended SW8960329 2.1 07-09-1996 07-09-2010 02-20-2018 02-20-2022 Previously Extended 4of5 Attachment A - USMC Projects - Permit Extensions - 9/29/15 38 39 40 41 42 43 44 45 Permit Number Permit Version Original Issued Date Issued Date 1, Expiration 1 Date New Expiration Date Comments SW8960501 1.1 09-18-1996 12-08-2004 12-08-2014 12-08-2018 Previously Extended SW8960815 2 10-29-1996 07-14-2008 07-14-2018 07-14-2022 Previously Extended SW8961204 2 06-30-1997 06-20-2008 06-20-2018 06-20-2022 Previously Extended SW8970136 2 02-10-1997 07-08-2008 07-08-2018 07-08-2022 Previously Extended SW8980204 1.1 10-02-1998 07-06-2005 07 06 2015 07-06-2019 Previously Extended SW8980401 2 10-28-1998 06-03-2008 06-03-2018 06-03-2022 Previously Extended SW8990850 2.1 02-03-2000 12-09-2011 02-03-2020 02-03-2024 Previously Extended SW8991135 2 08-09-2000 10-28-2009 08-09-2023 08-09-2027 Previously Extended 5of5 Lucketk&TFariey Celebrating 150 Years o: NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 N: Chris Baker We Are Sending You: ❑ Specifications ■ Plans ❑ Copy of Letter Master Planning Architecture Engineering Interior Design Design Build Date: 7/8/2010 737 South Third Street Louisville, KY 40202-2100 502-585-4181 Phone 502-587-0488 Fax www.luckett-farley.com Project Name: Camp Lejeune - Midway Park CDC Commission No. 2009.149 Reference: Stormwater Revisions ❑ Bulletin ❑ Shop Drawings ❑ Addendum ❑ Permits ❑ Change Order ■ Calculations Copies Date No. Description 3 717110 CG-402-M Midway Grading and Drainage (Revised Orifice Diameter) 1 717110 Page 3 of the Stormwater Application with Revised Areas 1 718110 East Pond Supplement Form with Revised Orifice Diameter and drawdown time 1 717110 West Pond Supplement Form with Revised Orifice Diameter and drawdown time 1 718110 West Pond - Orifice Calculation with revised diameter and drawdown time These Are Transmitted as Checked Below: ■ For Approval ❑ Reviewed With No Exception ❑ Resubmit Copies for Review ( ) ❑ For Your Use ❑ Reviewed wlExceptions As Notec ❑ Submit Copies for Distribution ( ) ❑ As Requested ❑ Rejected - Revise & Resubmit ❑ Return Corrected Copies ( ) ❑ For Review and Comment ❑ Prints Returned After Loan to Us ❑ For Bids Due , 20 Remarks: Chris: I am sending you revised dwgs and calcs. Regarding the application, I have revised page 3 with the new quantities shown. You can just replace that page in the existing application. Thanks for your help. Please call if you have any quuestionsor need anything else. _ cc: File Phil Gambrell Nick Eckhart Dave Shuey, PE, LEEDAP Civil Engineering Group 3.4F1.1 Rev. 2 Date: 05108r20G3 MEMORY TRANSMISSION REPORT TIME : 07-07-10 10:20 FAX N0.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 590 DATE 07.07 10:19 TO S 919104512976 DOCUMENT PAGES 3 START TIME 07.07 10:19 END TIME 07.07 10:20 PAGES SENT 3 STATUS OK * * * SUCCESSFUL TX NOTICE *** Dapurtmcut ni 8tri-lrvosncut uod Natural R®ourew wum�ss�oo R�{on�1 Ot17,cc Sarwr/Y � ue.: nrdrw, !` vcroor FAX CQVl!:A B��F:'I' Ia�e l'lne�wl..na�. Secrrfary Na_ Pagoa o%/ �'o �✓ .�-G i r. � � i.�s � .ter i�•� �• �r c�i 127 �ardirial Orivo Hxicnsi[�n, Wllmin�Tor�• N� 2.MU3 � (A 10) 796«72ka a Ar 6goa1 OpyorcuniTy AfYfrnf alive Action Employer ;w State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: ! �� To: Fax: Re:1-7 No. pages (excl. cover): From: Jo Casmer Phone: (,910) 796-7336 Fax: (910) 350-2004 "� G'--� -/- 127 Cardinal Drive Extension, Wilmington, NC 29405 q (910) 796-7215 e An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :07-07-'10 10:19 FAX NO.1 : 910-350-2004 NAME :DERR Wilmington FILE NO. 589 DATE 07.07 10:19 TO R 915025870488 DOCUMENT PAGES 3 START TIME 07.07 10:19 END TIME 07.07 10.19 PAGES SENT 3 STATUS OK *** SUCCESSFUL TX NOTICE' Ssmibo Of T:oi.-e6 ca.a��aa riwpartm�nt of lcmvfw"Meat aad Naa—fta Rcaourcaa - Wllm�w`teo RO�Ioew� ORloe _ '_ Aw—& .p A'wr leMuc, CC.�ova— IFAI L !„ "Nrvlwt MumET LL F� )p [9701 350-2004 �i l.��O� � �i raffia AY � 'r� �P' �ysy /�.S- �►4 �' �� � �� r t�!' 127 c`ardlnai D"wft L'aa sign. W11mi3�won. Nc 2R401 • (910) TVhS-7215 . A^ Pqa ] Oppo nliy AYlirtralivd Aa 6[ llmpl—ye s State of North Carolina Department of Environment and Natural Resources Wilmington RegionalOMce Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: / /,/,;, Co: /_ z/G Fax: No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: 910 350-2004 lO� /y •ram'/ 127 Cardinal Drive Extension, Wilmin�gon, NC 28405 0 (910) 796-7215 o An Equal Opportunity Affirmative Action Employer NC®ENR North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Cirector July 6, 2010 Carl Baker, Deputy Public Works Officer USMCB Camp Lejeune Building 1005 Michael Road Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 060147 Midway Park Child Development Center Onslow County Dear Mr. Baker: Resources Dee Freeman Secretary The Wilmington Regional Office received and accepted corrections to a State Stormwater Management Permit Application for Midway Park Child Development Center on June 29, 2010. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: The east pond (pond #1) supplemental form was changed showing an increase in the drainage area and the built -upon -area however these changes were not transferred to the permit application, please correct. 2. Pond #1 (east pond) calls for a 1.75" orifice on the plans and in the calculations but is reported as 2" on the supplemental form, please correct. Note: The 2" drawdown time is less than the required 2 days. 3. The pond #2 (west pond) orifice of 1.5" does not meet the required drawdown time of between 2 and 5 days. The drawdown time was calculated to be 1.91 days, below the required 2 day minimum, please correct. Note: Be sure to revise the plans, supplemental form and calculations when making this correction. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to July-13, 2010,) or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The. Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Wilmington Regional Office One 127 Cardinal Drive Exlensio+r, Wilmington, North Carolina 28405 NorthCarol I na Phone: 910-796-72151 FAXE 910-350-M l Customer Service: t-877-623-6748 Internet: www.ncwa1ergoality.0r9 N�7 i / j tur'a l) Carl Baker, Deputy Public Works Officer July 6, 2010 Stormwater Application No. SW8060147 Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at chris.baker@ncdenr.gov. Sincerely, C: Chris Baker Environmental Engineer II GDS/csb: S:IWQSISTORMWATERIADDINFO120101060147.ju110 cc: Phil Gambrell, P. E., Luckett & Farley Wilmington Regional Office Stormwater File Page 2 of 2 l " L-- -ickett& r1ey Celebrating 150 Years Master Planning 737 South Third Street Architecture Louisville, KY 40202-2100 Engineering 502-585-4181 Phone Interior Design 502-587-0488 Fax Design Build www,luckett-farley.com LETTER OF TRANSMITTAL To: NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 Chris Baker We Are Sending You: ❑ Specifications ■ Plans ❑ Copy of Letter Date: 6/28/2010 Project Name: Camp Lejeune - Midway Park CDC Commission No. 2009.149 Reference: Stormwater Revisions ❑ Bulletin ❑ Shop Drawings ❑ Addendum ❑ Permits ❑ Change Order ■ Calculations Copies Date No. Description 3 6128/10 CP-103-M Midway Paving and Utilities Plan 3 6128/10 CG-105-M Midway Grading and Drainage 3 6/28/10 CG-106-M Midway Grading and Drainage 3 6/28/10 CG-107-M Midway EPSC Measures 3 6/28/10 CG-402-M Midway Grading and Drainage 1 6/28/10 Revised Stormwater Calculation Sheets These Are Transmitted as Checked Below: ■ For Approval ❑ Reviewed With No Exception ❑ Resubmit Copies for Review ( ) ❑ For Your Use ❑ Reviewed wlExceptions As Notec ❑ Submit Copies for Distribution { } ❑ As Requested ❑ Rejected - Revise & Resubmit ❑ Return Corrected Copies ( ) ❑ For Review and Comment ❑ Prints Returned After Loan to Us ❑ For Bids Due 20 Remarks: Chris: I am sending you plans and talcs, revised per our phone conversation last week. Please call if you have any questions. Thanks. cc: File Phil Gambrell Nick Eckhart JUN 2 9 2010 s Dave Shuey, PE, LEEDAp Civil Engineering Group 3AF1.1 Rev. 2 Date: 05108l203 i KWENR North Carolina Department of Environment and Natural Resources Division of Land Resources Land Quality Section James D. Simons, PG, PE Beverly Eaves Perdue, Governor Director and State Geologist Dee Freeman, Secretary .tune 17, 2010 LETTER OF APPROVAL WITH MODIFICATIONS AND-PERFOR-AIANCE RESERVATIONS . MCB-Camp Lejeune ATTN: Carl H. Baker 1005 Michael Road Camp Lejeune, NC 28547 RE: Project: Name: Midway Park Child Development Center - EXPRESS Project ID: ONSLO-2010-130 Acres Approved: 5.09 County: Onslow, LCY14007 Fourth St, Midway Park, Camp Lejeune River Basin: White Oak . Stream Classification:, Other Submitted By: Phillip Gambrell, Luckett & Farley Date Received by LQS: June 14, 2010 Plan Type: New Dear Mr. Baker: This office has reviewed the subjecterosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. I I 3A-54. 1)(b). Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 11.3A-51 thru 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 213405 Phone:(910) 796-7215 I Fax (910) 350-2004 V Letter of Approval with Modifications and Performance Reservations Project :- Midway Park Child Development Center June 17, 2010 Page 2 of4 Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing, activity. This approval does not supersede any other permit or approval. Please be aware that your project will be covered by the enclosed Nrl'DES General Stormwater . 11'ennit NCG010000 (Construction Activities). You should first become familiar with all of tlse requirements for compliance with the enclosed- general permit. Please note that this approval is leased in part on the accuracy of the infonnation provided in the Financial Responsibility Form, which you have provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. - Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, ]Uionda ball Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications and Performance Reservations NPDES Permit . cc: Phillip Gambrell, PE, Luckett & Farley Letter of Approval with Modifications and Performance Reservations Project :- Midway Park Child Development Center June 17, 2010 Page 3 of 4 1•IODIFICA,riONS AND PERFORMANCE RESERVATIONS Project Name: Midway Park Child Development Center Project ID: ONSLO-2010-130 County: 'Oh slow 1. This, plan approval shall expire on December 31, 2013, if no land disturbing activity has been undertaken, as is required by Title 1'5A NCAC 4B.0029. 2. The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site.. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete. 3. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed development unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less steep. Bank slopes may be mowed, but stripping of vegetation is considered new earth work and is subject to the same erosion control requirements as new ditches. 4.. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity, This could include agencies such as the Division of Water Quality's stormwater regulations, their enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval; however, in the case of a Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All highland would still have to be in compliance with the N.C. Sedimentation Pollution Control Act. 5. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act, the developer is responsible for compliance with the requirements of the Division of Water Quality, the Corps of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to installation. The Land Quality Section must be notified of a relocation of the measures in question to the transition point between the wetlands and the uplands to assure that the migration of sediment will not occur. If that relocation presents a problem or contradicts any requirements of either DWQ, the Corps, or the EPA, it is the responsibility of the developer to inform the Land Quality Section regional office so that an adequate contingency plan can be made to assure sufficient erosion control remains on site. Failure to do so will be considered a violation of this approval. Letter of Approval with Modifications and Performance Reservations Project :- Midway Park Child Development Center June 17, 2010 Page 4 of 4 Any borrow material brought onto this site must be from a legally operated mine or other approved source. Any soil waste that leaves this site can be transported to a permitted mine or separately permitted construction sites without additional permits. Disposal at any other location would have to be included as a permit revision for this approval. 7. This permit allows for a land disturbance, as called for on the application plan, not to exceed 5.09 acres. Exceeding.that acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and stormwater retention measures. The construction detail for the proposed silt fence requires reinforcing wire and steel posts a maximum of eight (8) feet apart. Omission of the reinforcing wire is a construction change that necessitates more posts for support, i.e., the spacing distance needs to be reduced to no greater than six (6) feet apart. Because the sediment traps and basins are shown on the plan as the'primary sedimentation and erosion control devices on this project, it is necessary that the traps and basins and their collection systems be installed before any other grading takes place on site. If that proves to be impractical, a revised plan must be submitted and approved that addresses erosion and sediment control needs during the interim period until the traps and basins are fully functioning. Each trap and basin must stay in place until the area that drains into that trap or basin, is completely developed and is permanently stabilized and vegetated. 10. A graveled construction entrance must be located at each point of access and egress ' available to construction vehicles during the grading and construction phases of this project. Access and egress from the project site at a point without a graveled entrance will be considered a violation of this approval. Routine maintenance of the entrances is critical, 11. The North Carolina Sedimentation Pollution Control Act mandates a shortened time frame in which to re-establish vegetative groundcover. Slopes (including cuts, fills, and ditch banks) left exposed will, within 21 calendar days after completion of any phase of grading, be planted or otherwise provided with groundcover sufficient to permanently restrain erosion. MIDWAY PARK CHILD DEVELOPMENT CENTER LCH 4007, 4' Street Camp Lejeune, NC Stormwater Management Permit Application Package Submitted to State of North Carolina Department of Environmental and Natural Resources Division of Water Quality June 7, 2010 by LUCKETT & FARLEY ARCHITECTS AND ENGINEERS 737 S. Third St. Louisville, KY 502-585-4181 _� f � ��i�� �i a� ` � 1 '� �� � �� js J =;.' �' • 1I • , OrieStep° OffAM Index Templates at cardinalhrands.com 1472278 Application Forms and Agreements Design Narrative 1 Supplements Maps, Tables and Reference Documents Soils Report 1 Seasonal High Water Table Drainage Area Figures and Calculations Drainage Area 1 (East Pond): Calculations and Figures Drainage Area 2 (West Pond): Calculations and Figures Additional Copies North Carolina Department of Environment and Natural Resources Request for Express Permit Review Midway Park Child Development Center RECEIVED JUN 14 2010 Project Information BY: Located at Marine Corps Base Camp LeJeune, we are requesting an Express Permit Review for the Midway Park Child Development Center. Thestreet address is Building LCH4007, Fourth St., Midway Park, NC 28544. In addition to the area of proposed development, we are including an adjacent site in the requested permit. Just west of the proposed CDC building, there is an existing CDC, with associated parking, that was not permitted at the time it was constructed. This existing built -upon area is to be treated and permitted along with our proposed project. The total limits of disturbance, including the disturbed area on the adjacent site, is 221,556 sf, or 5.09 acres. `Phis area will serve as the Project Boundary. There have not been any wetlands identified in the project. The project will consist of the construction of a 31,665 SF Child Development Center and 125-space parking lot. The development will include two wet detention pond BMI's for stormwater management and treatment of stormwater runoff on the site. The existing CDC roof drains are to be rerouted to the proposed "West Pond" via underground pipe. The West Pond will also treat stormwater from the adjacent site parking lot. Within the proposed development area, existing paved recreational courts and existing sidewalks and structures are to be removed, and the area regraded to allow for proper drainage. Stormwater from the proposed built -upon areas iswill be conveyed via catch basins and underground piping to the "East Pond". A portion of the proposed CDC building roof drainage will be piped to the West Pond, with the remainder going to the East Pond. There is an existing 24" pipe taking stormwater runoff from and through the site. This pipe system is to be rerouted around the proposed construction to the existing catch basin just south of Butler Drive. Wastewater from the proposed facility will be conveyed to the public sanitary sewer system via gravity piping to the existing 12" sanitary sewer main located south of the proposed site. There will be a new domestic water service from the existing water main located just north of Butler Drive North.The Child Development Center at Midway Park, Camp LeJeune Marine Corps Base is being funded through MCON (Military Construction, Navy) appropriations. Stormwater Information The Midway Park Child Development Center is located in the White Oak River Basin, and drains to C waters classified as NSW, with Index # 19-16-3. The Stormwater Design is High Density, a commercial development, and falls under the Coastal State Stormwater Program. The Proposed Total % Impervious Surface is 40.4%. There are no buffer requirements for this project location. A geotechnical analysis has been performed by RFTS on December 7, 2009. Infiltration rates for the Midway Park site were less than 0.1 inches per hour. The seasonal high water table ranges from 13 to 29 inches below grade. There are no turn lane or road widening requirements by the North Carolina Department of Transportation associated with this project. Additionally, there is no road construction across another property that is necessary to access the project. There will be two proposed wet detention basin BMPs (achieving 90% TSS pollutant removal) for water quality treatment of the built -upon areas. Stormwater runoff from offsite and from open grassed areas are not to be routed to the wet detention basins, but will be conveyed to the existing catch basin south of Butler Drive via a separate storm drain system. All roof drainage and runoff from the parking areas is routed to the basin forebays, via catch basins, pipes and swales. 'The existing CDC roof drains currently daylight to the surface grade where the runoff is not treated. As part of this project these roof drain leaders are to be connected to a new roof drain pipe system draining to the West Pond forebay. r ,ii 1{ eY In •M Yw• Ii1OR1 RO AYYVhe P iYMN.. P•V L1M 1,11y1gIO0Y)1 PlrlOio Yg141• . 1161 Ol{Ih1RDlOMY wxl �.m prlwp W u.P/ .• 1.•. a�W [! ifi VNIOrh limm volG 00YY010]'wmNla'ALYYN Tr:NwO /N / arm NN Wil v1•ul SS ewn wl{,•'uY wy ewyu id•trnN a'nNm• nw nY¢,erl x,N e>r1A4 Mr fwl -wat,tim fW �++w� wWw we•/{Y wow wil nl •pnYp.N .�.. p inn •�.� •Nwn M'�.'1• �NMM .MYn M.Ign I •1e� •n a 3'N3N[131dWY3 ` y�faeu,xnsYn)a-IIII.ro•eno•all.vl••ex+,ulo ,+, a,l•.,:'�:•N•el.e yt{,"lo Ynleo wMILMN NSIZO1E 1.01" 133!'i 1YAtl3lNl tlf10LN0� alrtq nn5 +olall 5 � __ .,. ........... a•r,Yuwun .. —w,.w _ .., N^ill!`1 !'"Ti'T:R: '°"" .]•Karl i - i.l_><Y �. • „,TFTNW! 4,uwe,1 q� Nglr,>fJ15Sr,71rioY ,.I • `f— , l� o0o re I rnA 17 ,1 :4.Yf A- _ _ ♦r'/, url,w eMM wtnl 6 _ _ -, q, \uQ - { `i� �� i_ �' ,:ems ✓`— —,� � �- � '������ � b , �� , �:> ]I ..i.._-.•. ,_ _ .....''�`_ - ���l����� l - f �� � •:}_fit I / I / cLu 171Hd Y!lOOd01] 93I839 3.11WIN G Z 03 lAMRNO.-YNFFOe V7 H.LMON 3lONVNQVf10 3Nf1313-1 dWV3 A3Adns ZL 30030 0" ,j5Y0D 301Mi JIMOD 30 LN3W1tlYd30 831V18 0311Nn P••NY) el•'1 i•V , N wu•w,•'Vl it{I w•n •W IP.IW4 •w• I +Wa; intlna•d +uN MaAY4• n{wM w uwww •ww..•y '.•,� i a • m0-H 1 uYlw nwlPlooa .urya•� VimN uo PNR9 PUA I�1'OW 01 uMup urx.•u,r V3)iH Id&1 opl•Iw0 nw'slwd FF5! F)•1•P 14+1N 57YJ511 '1'a4 /yi•APIMM ZSfi [ MaeV1 Vlw J Ly{! Pu• i S4 i •wM a110Ad �N 5 n G,Y 57Y.75r1'w,.xw non •I,•N W 1„a•�m•1 ZSyi nu• 61b1 r� iV0.10101A IFwe u,0,1 Pn'illm i+•{ u YNIN9 M ertprt0 } IN) NSn"'1W J*%A l�I Sp7DSn 4y P L-o FF A—S 1►NSNDO IM41 b peVi,lghd pu{ o.,IV3 e11 11109WD 415103 $ n WI k Wddi. ✓� 14 .iI..AO yl� bF.U.11 11C1F.TE u � Cr.eF J3n231i8 •7Va100'�030 801831N1 3H.1 AO .LN3W.LNVd3❑ 931Y18 a311Nf1 r' 0 0 0 • A C K S 0 N V U -T Park w` L � L � b' � � • ;Ta v � •. • \1 ram--. •.� . t�ORTSEAS z5 ��.,�•• 'tif, '�, _ rr 21 �• a- i TruesdaIt (C) REVA C1j===ae tt �+ , eREwsrJ= 1 P 7eum Y • 35 • !a y!= • — - • r. x 1' 0 23 ._ Tr Park • �,36Q �% •o •� • _ it •t fj r sa _ f J J (\ i r 'i i 9��• r to 1LIU a Trailer 1• • �''•' i Park on @ 3 _ J9 u nqy 1 0 • Mfl •F o / n• R lack � a• 7' 3S 1 -Ar t ZS MIDtr.L4`( P"-W- CDC CAMP LEJEL04 E, f4c QVA beAWG LE Sca.LrE = 1:24,000 • . • O c0-� 9 0 0 law GN. `r1F' 9lMIt5 1.19' 23 MILS TM GRID AND 1971 MAGNETIC NORTH DECLINATION AT CENTER OF SHEET RECEZZ010 JUN 14 BY: 5553 rrr SE SrvE ADS FERRY 13 Mr. 1 SCALE L24000 1 0 1 MILE 1000 0 1000 2000 30M 4000 5000 6000 700D fEET 1 5 0 1 KILOMETER CONTOUR INTERVAL 5 FEET NATIONAL GEODETIC VERTICAL DATUM OF 1929 DEPTH CURVES AND SOUNDINGS IN FEET —DATUM IS MEAN LOW WATER SHORELINE SHOWN REPRESENTS THE APPROXIMATE LINE OF MEAN HIGH WATER THE MEAN RANGE OF TIDE IS 2 FEET THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS SALE BY U. S. GEOLOGICAL SURVEY, DENVER, COLORADO 80225, OR RESTON, VIRGINIA 22092 A FOLDER DESCRIBING TOPOGRAPHIC MAPS AND SYMBOLS IS AVAILABLE ON REQUEST a!r�� N C �J ♦J OLIADRANGLE LOCATION To place on the predicted North American D move the projection lines 13 meters South a 27 meters west as shown by dashed corner I DATASHEETS Page 1 of 2 JUN 4 z� �o BY. The NGS Data Sheet See file dsdata.txt for more information about the datasheet. DATABASE = ,PROGRAM = datasheet, VERSION = 7.73 1 National Geodetic Survey, Retrieval Date = OCTOBER 14, 2009 EA2267**++******++******+***++++++******+**+*+*******+***************++***** EA2267 DESIGNATION - MIDWAY EA2267 PID - EA2267 EA2267 STATE/COUNTY- NC/ONSLOW EA2267 USGS QUAD - CAMP LEJEUNE (1971) EA2267 EA2267 *CURRENT SURVEY CONTROL EA2267 4 EA2267* NAD 83(2001)- 34 43 48.19157(N) 077 20 50.01511(W) ADJUSTED EA2267* NAVD 88 - 8.7 (meters) 29. (feet) VERTCON EA2267 EA2267 LAPLACE CCRR- -0.19 (seconds) USDV2009 EA2267 GEOID HEIGHT- -37.05 (meters) GEOID09 EA2267 HORZ ORDER - SECOND EA2267 EA2267.The horizontal coordinates were established by classical geodetic methods EA2267.and adjusted by the National Geodetic Survey in August 2005. EA2267 EA2267.The NAVD 88 height was computed by applying the VERTCON shift value to EA2267.the NGVD 29 height (displayed under SUPERSEDED SURVEY CONTROL.) EA2267 EA2267.The Laplace correction was computed from DEFLEC99 derived deflections. EA2267 EA2267.The geoid height was determined by GEOID09. EA2267 EA2267; North East Units Scale Factor Converg. EA2267;SPC NC - 109,978.343 760,953,677 MT 0.99991377 +0 57 14.2 EA2267;SPC NC - 360,820.61 2,496,562.19 sFT 0.99991377 +0 57 14.2 EA2267;UTM 18 - 3,845,616.416 285,089.399 MT 1.00016930 -1 20 15.9 EA2267 EA2267! - Elev Factor x Scale Factor Combined Factor EA2267!SPC NC - 1.00000445 x 0.99991377 = 0.99991822 EA2267!UTM 18 - 1.00000445 x 1.00016930 = 1.00017376 EA2267 EA2267: Primary Azimuth Mark Grid Az EA2267:SPC NC - MARINE 155 42 51.2 EA2267:UTM 18 - MARINE 158 00 21.3 EA2267 EA22671--------------------------------------------------------------------- I EA22671 PID Reference Object Distance Geod. Az I EA22671 dddmmss.s I EA22671 EA2266 MARINE APPROX. 0.7 EMI 1564005.4 1 EA22671--------------------------------------------------------------------- I EA2267 EA2267 SUPERSEDED SURVEY CONTROL EA2267 EA2267 NAD 83(1986)- 34 43 48.20323(N) 077 20 50.03003(W) AD( ) 2 EA2267 NAD 27 - 34 43 47.61941(N) 077 20 51.17862(W) AD( ) 2 •EA2267 NGVD 29 (07/19/86) 9.0 (m) 30. (f) VERT ANG EA2267 EA2267.Superseded values are not recommended for survey control. http://www.ngs.noaa.gov/cgl-bin/ds_quads.prl 10/14/2009 DATASHEETS Page 2 of 2 EA2267.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums. EA2267.See file dsdata.txt to determine how the superseded data were derived. EA2267 EA2267 U.S. NATIONAL GRID SPATIAL ADDRESS: 18STD8508945616(NAD 83) EA2267 MARKER: DE = TRAVERSE STATION DISK EA2267 SETTING: 7 = SET IN TOP OF CONCRETE MONUMENT EA2267_SP_SET: SET IN TOP OF CONCRETE MONUMENT EA2267_ STAMPING: MIDWAY 1968 EA2267 MARK LOGO: NCGS EA2267 MAGNETIC: N r NO MAGNETIC MATERIAL EA2267 STABILITY: C = MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO EA2267+STABILITY: SURFACE MOTION EA2267 EA2267 HISTORY - Date Condition Report By EA2267 HISTORY - 1968 MONUMENTED NCGS EA2267 HISTORY - 19820101 SEE DESCRIPTION NCGS EA2267 EA2267 STATION DESCRIPTION EA2267 EA2267'DESCRIBED BY NORTH CAROLINA GEODETIC SURVEY 1968 (CBM) EA22671MIDWAY IS A N. C. GEODETIC SURVEY TRAVERSE STATION ESTABLISHED EA22671IN THE VICINITY OF JACKSONVILLE, NORTH CAROLINA. EA2267' EA2267'MIDWAY IS LOCATED APPROXIMATELY 5.0 MILES SOUTHEAST OF THE EA2267'CENTER OF JACKSONVILLE, TO REACH STATION PROCEED FROM THE EA22671INTERSECTION OF SR 1470 (WESTERN BLVD.) WITH NC 24, GO EAST ON EA2267'NC 24 FOR 2.15 MILES TO STATION. WHICH IS IN MEDIAN ACROSS FROM EA2267'MIDWAY HOUSING AREA, AND JUST BEFORE NC 24 E BOUND LANE CURVES EA2267'TOWARD CAMP LEJEUNE MAIN GATE. EA2267' . EA2267'STATION MARK IS A STANDARD N. C. BRASS TRAVERSE DISK, STAMPED EA2267'MIDWAY 1968, SET IN THE TOP OF A CONCRETE CYLINDER, THE TOP OF EA2267'WHICH IS 2 INCHES BELOW THE SURFACE OF THE GROUND. EA2267' EA2267'MARK IS 8.3 FT SSW OF SW CURB OF NC 24 W BOUND LANE. EA2267' EA2267'6.4 FT NNE OF NE CURB OF NC 24 E BOUND LANE. EA2267' EA2267'10,8 FT W OF 4X4 CAUTION POST ON SW CURB OF NC 24, AND WITH EA22671ALUMINUM REF. TAG. EA2267' EA2267'67.0 FT WNW OF 4X4 CAUTION POST ON SW CURB OF NC 24, AND WITH EA2267'ALUMINUM REF. TAG. EA2267' EA2267'78.3 FT WNW OF 4X4 POST WITH SPEED LIMIT 45 SIGN, AND WITH EA2267'ALUMINUM REF. TAG. EA2267' EA2267176.7 FT NW OF C/L OF SE END OF CURB IN MEDIAN EA2267 EA2267 STATION RECOVERY (1982) EA2267 EA22671RECOVERY NOTE BY NORTH CAROLINA GEODETIC SURVEY 1982 (LFS) EA2267'MARK WAS SEARCHED FOR, BUT NEW HIGHWAY CONSTRUCTION PROBABLY DESTROYED EA2267'STATION. *** retrieval complete, • Elapsed Time = 00:00:00 http://www.ngs,noaa.gov/cgi-binds quads.prl 10/14/2009 Print Page - NC Areas Subject to Phase II Post -Construction & Other Stormwater Progra... Page I of I NC Areas Subject to Phase Yi Post -Construction & Other Stormwater Program Requirements Page 1 of 1 *I MAPQUE'ST Map of 650 Butler Dr Jacksonville, NC 28544-1302 Notes MA4011fST. o New Bern 0 14km I Deep Run O 8mi .... Trent Wood• Korneg ay fl 0 tlTrenton fir Warsaw PollOckfvit!• Kenansville Richlands oMayaville Havelock a Chinquapin a ` I 0 1Ilace Pendel10 lI I\. O t • nurgaw 0 4)locky Point Fo1111 Half Moon Jacksonville C•] 40iney Green Verona o 0 Cape Carteret Camp Li}e me Manne Corps Base O Holly Ridge 0Surf City 0Newport Otwey 0 U Morehead City Emerald isle O 14t7 A 2009 MapQuest Inc. Map Data 0 2009 MapQuest Inc_ or AND All rights reserved. Use subject tQ Lio*nse/Copyright I Map Legend Directions and maps are informational only We make no warranties on the accuracy of their content, road conditions or route usability or expeditiousness. You assume all risk of use MapQuest and its suppliers shall not be liable to you for any loss or delay resulting from your use of MapQuest Your use of MapQuest means you agree to our Tgt"f Uwe littp://www.mapquest.cotn/print 1/13/2010 Page 1 of 1 0 MAPQUEST. Notes Map of 650 Butler Dr Jacksonville, NC 28544-1302 12 MAPQNIST. t7 m tztm ft C 8a4r J�9�r 79 Northeast i �? Creek eroC4 a 24 Midway Park a 1 •. rp G 2 � p `Y r o d � 2DO9 MapQuest Inc. Sr9N' Ste r t31v Map Data 0 2009 NAV TEQ or Tple.Atlas All nghts reserved. Use subject to LirzenselCopynght Map Legend Directions and maps are informational only We make no warranties on the accuracy of their content, road conditions or route usability or expeditiousness. You assume all risk of use MapQuest and its suppliers shall not be liable to you for any loss or delay resulting from your use of MapQuest Your use of MapQuest means you agree to our Tt m-t of Use http://www.mapquest.com/print 1/13/2010 Hydraulics Unit Page 3 of 5 equation, with the limitations on maximum pipe capacity presented in Appendix. I.,. sheet. f most systems by this procedure is generally sufficient. While a check of the system by development of a hydraulic grade line requires minimum design time when utilizing an automated design process such as GEOPAK Drainage, a r procedure can be very time consuming. Therefore, the engineer must evaluate and justif hydraulic grade line check of a system on a case by case basis. Conditions that may H undertaking this additional design analysis are: • Systems with outlets that are subject to high tailwater conditions. • Systems that transition from a steep to flat gradient. • Systems on flat gradient that have substantial junction and/or bend losses. Pipe System Design procedure as Reference Appendix I, sheet 2� , for initial system design documentation. Items 1 - 2. These are inlet numbers corresponding to inlet computation sheet. Item 3. Total drainage area served by the section of pipe. Item 4. Sum of the incremental portions of the drainage area and corresponding runoff coefficier Item 5. Length of the pipe run between study points. Item 6. Time of concentration for portion of drainage area in -flowing at beginning end of pipe. Item 7. Flow time for first pipe equals inlet time. Subsequent sections are a sum of the time of cc previous reach (min. t� = 10 minutes) plus time of flow in subject pipe. µo �G Item 8. Larger value from Items 6 and 7. Use o minutes as minimum valu For times greater tt hydrograph or other routing procedures is recomm e . so piPE�� Item 9. Design storm rainfall intensity for duration equal to design time. lir"S 00 oei Item 10. Design discharge for pipe reach. Item 11. Invert elevation of pipe inlet. Item 12. Invert elevation of pipe outlet. Item 13. Invert slope of pipe. Item 14. Diameter of pipe. This size is to be selected u (So Q 5) A nomograph solution for this equation is provided in Appendix 1, sheet 3 J equatii The capacity utilized for design cannot exceed the values contained in the table - Appendix I, st • Item 15. Velocity based on design discharge and selected pipe size (can use charts Appendix 1). http://www.ncdot.org/doh/PRECONSTRUCT/HIGH WAY/hydro/g]0399web/[X_stormdrainage.ht... 5/28/2010 • Table 8.05a Maximum Allowable Design Velocities' for Vegetated Channels Typical Soil Grass Lining Permissible Velocity' Channel Slope Characteristics2 for Established Grass Application Lining (ftlsec) Easily Erodible Bermudagrass 5.0 Non -plastic Tall fescue 4.5 (Sands & Silts) Bahiagrass 4.5�� entuc y uegra Grass -legume mixture 3.5 Erosion Resistant Bermudagrass 6.0 Plastic Tall fescue 5.5 (Clay mixes) Bahiagrass 5.5 Kentucky bluegrass 5.5 Grass -legume mixture 4.5 5-10% Easily Erodible Bermudagrass 4.5 Non -plastic Tall fescue 4.0 (Sands & Silts) Bahiagrass 4.0 Kentucky bluegrass 4.0 Grass -legume mixture 3.0 Erosion Resistant Bermudagrass 5.5 Plastic (Clay mixes) Tall fescue Bahiagrass 5.0 5.0 Kentucky bluegrass 5.0 Grass -legume mixture 3.5 >10% Easily Erodible Bermudagrass 3.5 Non -plastic Tall fescue 2.5 (Sands & Silts) Bahiagrass 2.5 Kentucky bluegrass 2.5 Erosion Resistant Bermudagrass 4.5 Plastic Tall fescue 3.5 (Clay mixes) Bahiagrass 3.5 Kentucky bluegrass 3.5 Source: USDA-SCS Modified NOTE: 'Permissible Velocity based on 10-year storm peak runoff 2Soil erodibility based on resistance to soil movement from concentrated flowing water. 'Before grass is established, permissible velocity is determined by the type of temporary liner used. Selecting Channel To calculate the required size of an open channel, assume the design flow is uniform and does not vary with time. Since actual flow conditions change Cross -Section throughout the length of a channel, subdivide the channel into design reaches, Geometry and design cacti reach to carry the appropriate capacity. The three most commonly used channel cross -sections are "V"-shaped, . parabolic, and trapezoidal. Figure 8.05b gives mathematical fonnulas for the area, hydraulic radius and top width of each of these shapes. 8.05.4 6.17 RECP Practice Standards and Specifications Definition Rolled erosion control products are manufactured or fabricated into rolls designed to reduce soil erosion and assist in the growth, establishment and protection of vegetation. Examples of RECP's are blankets, nets, and matting. Purpose Erosion control mats and blankets are intended to protect soil and hold seed and mulch in place on slopes and in channels so that vegetation can become well established. Turf reinforcement mats can be used to permanently reinforce grass in drainage ways during high flows. Nets are made of high tensile material woven into an open net which overlays mulch materials. Blankets are made of interlocking fibers, typically held together by a biodegradable or photodegradable netting (for example, excelsior or straw blankets). They generally have lower tensile strength than nets, but cover the ground more completely. Coir (coconut fiber) fabric comes as both nets and blankets. Conditions Where Rolled Erosion Control Products (RECP's) should be used to aid permanent Practice Applies vegetated stabilization of slopes 2:1 or greater and with more than 10 feet of vertical relief. RECP's should also be used when mulch cannot be adequately tacked and where immediate ground cover is required to prevent erosion damage. R.ECP's should he used to aid in permanent stabilization of vegetated channels when runoff velocity will exceed 2 ft/sec on bare earth during the 2-year rainfall event that produces peak runoff. The product selected must have a permissible shear stress that exceeds the shear stress of the design runoff event. 0 ('14LOW.. F#3 16WA V Planning Good ground contact is critical to the effectiveness of these products. If 0 • • Table 8.03a Time of Concentration Solving for Time of Concentration (overland flow) Kinematic Wave Theory Length of overland flow: 100 feet Manning's "n" surface: Average watershed slope: 0.030 foot per foot Rational Coefficient: 0.33 Appendices Surface Manning's "n" Fog 54ULZ (;A lltStrAT1+4 Smooth Surface: 0.011 Bare Earth: 0.020 Fallow: 0.050 Cultivated, < 20% residue: 0.060 Cultivated, > 20% residue: 0.170 Grass, sho 50 Grass, dense: 0.240 Grass, Bermuda: 0.410 Woods, light: 0.400 Woods, dense: 0.800 Trial Time of Rainfall Calculated Time Duration Intensity of Concentration Tr (minutes) i (inches/hour) T. (minutes) 5 7.08 2.90 10 5.66 3.17 15 4.78 3.39 30 3,46 3.86 60 (1 hour) 2.25 4.58 Enter the Rainfall Intensity Values for the Corresponding Times of Duration from the Table 8.03c, Intensity Duration Frequency, or the NOAA Precipitation Frequency Data Server, http:llhdsc.nws.noaa.gov/hdsc/pfds/orbinc_pfds.html. Select the Trial Time of Duration that is equal to or less than the calculated Time of Concentration, or the Calculated Time of Concentration if less than 5 minutes. This is the overland flow component of the Time of Concentration. In this example, there is no Trial Time of Duration that is less than corresponding Calculated Time of Concentration. In this case, select a Rainfall Intensity of 7.08 inchesftur and a Time of Concentration for Overland Flow of 2.90 minutes. Rev. 5108 8.03.3 • JUN 14 2010 I `fit. 24 gL. PericiPmAnotJ 1-13-10 of Stream Description Carr. Class Date Basin Stream Index # r 4W RIVER From a line extending SA;HQW across New River from Grey Point to a point of land approximately 22 2200 yards downstream from mouth of Duck Creek to Atlantic Ocean; including all unnamed bays, creeks, and other waters except restricted areas # 1 and # 2 described below. NEW RIVER From Blue Creek to U. SB;NSW $. Hwy. 17 bridge Chainey Creek From source to New SC;NSW River Sandy Run Branch From source to Chainey SC;NSW Creek Burnt House From source to Chainey SC;NSW Branch Creek Brinson Creek From source to New SC;NSW River Edwards Creek From source to New SC;HQW,NSW River Strawhorn Creek From source to Edwards SC;HQW,NSW Creek on Bay Entire Bay SC;HQW,NSW k Creek From source to New SC;HQW,NSW River Northeast Creek From source to N. C. SC;NSW TAwARA Hwy. 24 Northeast Creek -' From N. C. Hwy.24 to SC;HQW,NSW downstream side of mouth of Scales Creek Northeast Creek From the downstream SC;NSW side of mouth of Scales Creek to New River Wolf Swamp From source to C;NSW Northeast Creek Little Northeast From source t0 C;NSW Creek Northeast Creek Horse Swamp From source to Little C;NSW Northeast Creek Rocky Run From source to Little C;NSW Northeast Creek Poplar Creek From source to Little C;NSW Northeast Creek Mott Creek From source to C;NSW Northeast Creek From source to SC;HQW,NSW WesCreek Northeast Creek Southwest Creek From source to Mill Run C;NSW 06/01/60 White Oak 19-(27) 08/01/91 White Oak 19-(7) 08/01/91 White Oak 19-10 08/01/91 White Oak 19--10-1 08/01/91 White Oak 19-10-2 08/01/91 white Oak 19-12 08/01/91 white Oak 19-13 08/01/91 White Oak 19-13-1 08/01/91 White Oak 19-14 08/01/91 White Oak 19-15 08/01/91 white Oak 19-16-(0.5) 08/01/91 white Oak .19-16-(3.5) 08/01/91 white Oak 19-16-(4.5) 08/01/91 White Oak 19-16-1 08/01/91 white Oak 19-16-2 08/01/91 white Oak 19-16-2-1 08/01/91 White Oak 19-16-2-2 OB/01/91 white Oak 19-16-2-3 08/01/91 white Oak 19-16-3 08/01/91 white Oak 19-16-4 ` `1 08/01/91 White Oak 19-17-(0.5) Page 3 of II 2009- i 0- l 0 07: l 2:27 0 Frecipitatlon Frequency Data Server Page 1 of 1 POINTPRECIPITATION FREQUENCY ESTIMATES ' PROM NOAA ATLAS ICI �.,..� North Carolina 34.738 IN77.373 W 29 feet from "PmcipilatiomFuquency Atlas of the United States" NOAA Atlas 14, Volume?, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Psmyho, M,Ycl mid D. Riley NOAA, Nattonal Weather Service, Silva Spring, Maryland, 2004 L'xtr-led: Mon Mar 15 2010 Gdnfiderice Limits SeasorialitLo`cation'iNa s I Other Ififo: GIS data Mta s bocs Retum to State'Map Precipitation Intensity Estimates (inlhr) ARIA (years) mm l0 ❑ min 15 min 30 min b0 min l20 min 3 hr 6 hr l2 hr 24 hr 48 hr. 4 day 7 10 20 30 day day 11 day1Lday 45 day, b0 day 1� 5.89 4.70 3.92 2.69 1.68 1.02 0.73 0.45 D.26 D.IS 09 OAS 0.03 0.03 OA2 0.01 0.01 0.01 1�6.94 5.54 4.65 3.2I 2.01 1.23 0.89 0.E4 4.32 O.18 O.l l 0.06 0.04 0.03 0.02 0.02 0.01 0.0] L 18.00 6.41 5.41 3.84 2.46 1.5E 1.11 0.68 6.46 0.24 O.14 0.08 0.05 0.04 D.o2 0.06 0.04 tl.tl3 0.02 0.02 0.42 0.02 D.01 0.02 10 9.01 7.20 6.07 4.40 2.87 1.84 1.33 0.82 0.48 0.28 O.16 0.09 25 10.16 8.10 6.84 SA7 3.38 2.22 1.64 1.00 6.60 0.35 0.20 0.11 0.07 0.05 0.03 0.03 0.02 0.02 50 I I.10 8.64 7.46 5.62 3.81 2.56 1.91 I. ! 8 0.7 i 0.4 3 0.24 0.13 0.08 OFO-61 0.04 0.03 0.02 0.02 104 12.01 9.54 8.04 G.16 4.24 2.92 2.20 1.36 0.82 0.48 0.28 4.14 0.09 0.07 OF047 0.03 0.03 0.02 200 12.92 l0.24 6.61 6.70 4.70 3.31 2.52 1.56 0.95 0.56 0.32 0.16 O.10 0.08 0.05 0.04 0.03 0.02 500 14.08 ll.l4 9.34 7.43 5.33 3.R6 2.99 1.87 I.15 0.67 0.38 0.20 0.12 0.09 OF057 0.04 OA3 0.03 1000 15.10 ! 1.89 9.94 8.05 5.88 4.35 3.42 2.14 1.32 0.77 0.44 0.22 0.13 O.10 0.06 0.04 O.D4 0.03 • These precipitation frequency estimates are based on a p duril series ARf is the Average Recurrence lnmrval, Please refer to NOAA All 14, Document for atom information. NOTE: Formal forces estimates near zero to appear m zero. * Upper bound of the 90% confidence interval Precipitation Intensity Estimates (inlhr) ARI*" 10 15 3D 60 l20 ❑3 ❑6 12 24 48 ❑4 ❑7 10 20 -- 4S 60 ( cars) m1n min min min utln min hr hr hr hr hr day day day dny day dayJ1 day 1r- 5.11 4,26 2,92 1.82 1.1I 0.80 0.49 0.29 0.17 0.10 0.05 0.04 0A3 0.02 O.OI 0.0] 0.01 �16.40 6.01 5.04 3.48 2.18 1.35 0.97 0.60 0.35 0.20 D.12 0.07 0.04 0.03 0.02 0.02 0.01 0.01 �- -f- �17,51 1 18.65 t0 6.94 5.65 4.16 2.67 1.b9 ].22 0.75 0.45 0.26 0.15 0.08 0,05 0.04 0.03 0.02 0.02 0.02 0.02 0.02 9.74 7.79 6.57 4.76 3,l0 2.00 1,46 0.9D 0.54 0.31 O,1R O.10 0.06 0.05 0.03 0.02 25 s o-1 100 I 1D9 l 1.99 13.00 8,75 9.55 10.32 7.40 8.06 8.70 5.48 6.07 6.66 3.65 4.1 ] 4.59 2.42 1.79 Ej 0.67 0.39 0.22 O.12 0.08 0.06 0.04 0.03 0.02 0.02 0.03 0.02 2.T9 2,09 1.3D 0.78 0.45 0.2b 114 0.09 0.07 0.04 0.03 3.1B Efl 1,50 0.91 0.53 Q30 0.16 0.10 1 0.07 0.05 0.03 0.03 0,02 200 13.99 1l.09 12.09 9.33 170.14 1 7.26 8.07 5.09 5.79 3.6-0 2.75 1.72 1,o5 O.bl Efl 0.18 Ejj 0.08 I EJ Eil 0.43 0. 33 500 rl 1-2 97 4.21 3.28 2.65 1,27 0.74 0.43 0.22 0.13 0.f0 0.06 0.04 0.04 0.03 1000 1b.43 ]2.94 10.63 8.77 6.40 4.Tb 3.75 2,36 1.A7 0.86 0.50 0.25 0.15 0.11 0.06 0.05 0.04 0.03 • The upper bound ofthe confidence interval at 90% Confidence level is the value which 5% of the simulated quantila values for a given frequency ate greater than. •• These precipitation frequency estimates are based on a partial dyUjijgn feria ART is the Average Recurrence Interval. Please refer to NOAA-Atlas 14 Document for more inforrrmlon. NOTE: Formatting preventss eslimates near zero to appear as zero. Lower bound of the 90% confidence interval Precipitation Intensity Estimates (inlhr) AR1a• � i0 IS 30 60 124 �� 12 24 48 [Q[ 10 20 30 45 60 (years) min min min min min min hr hr hr hr hr des day day 11 day 11 day 11 day 11 day !� 5.45 4.35 3.63 E9j ;L55 0.94 0.67 0.41 0.24 0.14 D.OB CFO 57 0.03 070 2-1 0.02 0.01 0.01 0.01 I s_ J 6.42 5.14 4.30 2.97 1.86 1.14 0.81 0.49 0.29 0.17 O.IO 0.05 0-04 0.03 D.02 0.02 DAl 0.01 0 7.39 5.92 4.99 Ej 2. 77 1.42 1.02 0.62 (-)3 61 0.22 0.12 0.07 0.05 OA4 E2] EK OA2 0.01 10 8.29 6.64 5.60 4.05 `2.fi4 1.68 1.22 0.74 0.44 0.26 0.15 0.08 0.05 0.04 0.03 4.02 0.02 0.02 25 9.31 E2j 6.27 4.64 3.09 2.02 1.49 0.9l 0.53 1 0.32 1 EE 0.30 0.06 OAS 0.03 0.02 0.02 0.02 50 16.13 8.06 6.81 S.13 3.47 2.32 L72 1,05 0.62 0.37 0.21 E]Efl 0.05 D.03 0.03 0.02 0.02 t00 ]0.91 8.66 7,30 5.59 3.85 2.63 1.97 1.21 0.72 0.43 6.24 0.13 OAS 0.06 0.04 0.03 0.02 0.02 200 SDo ] ].65 12.58 13.37 9.23 9.95 10.52 7.77 8.34 8.80 6.05 6.64 7.13 4.24 2.9E 2.24 Efl 0.83 Efl D-28 0.14 OA9 0.07 0.04 0.03 0.03 0. 22 4,76 3.42 2.62 I.b2 tl.98 0.58 0.33 6.i7 D.11 0.08 D.OS OA4 0.03 0.02 IUDD 5.20 3.82 2.96 i.83 ].il 0.65 0.37 0.19 O.i2 0.09 0.05 0.04 0.03 0. 33 • The lower bound of the confidence inlcrval at 50%confidence level is the value which 55: of the simulated quantile valua for a given frcqucncy are less than. •• these precipitation Frequency estimates are based on ill duration _meaima stria ART is the Average Recurrence Imerval. Please refer to N066Atl4j j4-Document for mac information, NOTE: Formatting prevents estimates near zero to appear as zero. ' Tezf version `of tabies +"'': http:llhdse.nws.noaa.gov/cgi-binlhdsclbuildout.perl?type=idf&units=us&series=pd&staten... 3/15/2010 �ecipitation frequency Data Server Page] of 4 POINT PRECIPITATION` . FREQUENCY ESTIMATES FROM NOAA ATLAS 14 North Carolina 34.73 N 77.34 W 22 feet from "Precipitation -Frequency Atlas of the United Slates" NOAA Atlas 14, Volume 2, Version 3 C.M. Bonnin, 1). Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Fxtracted: Thu May 20 20I0 Confidence Limits --� - WSeasonality -Location Maps- ;., Other.Info. GIS data , :Maps„ 17ocs , r _Retu� Precipitation Frequency Estimates (inches) ARI 5 10 35 30 GU 3 hr 6_hr 12 hr (years) min min min min min min - _ 0.49 0.79 0.98 1.35 1.68 2.04 2.20 2.68 3.16 24 hr -- 48 hr - RRZF-20- d.ay 30 day. 45 day 60 d.ay. 3.63 .23 4.73 5.50 6.1b 8.22 10.07 12.61 15.25 0 0.58 a.93T,16 1.61 2.02 2.47 2.67 3.24 3.83 0.67 1.07 1.35 1.92 2.47 3.]0 3.36 4.10 4.86 4. 2 5.71 5.12 5.72 6.63 7.38 9.78 11.96 14.93 17.98 6.58 7.27 8.34 9.15 11.90 14.38 17.79 21.16 10 0.75 L20 1.52 2.20 2.87 3.6$ 4.02 4.91 5.85 6.82 7.83 8.57 9.76 10.62 13.65 16.32 20.12 23.70 25 0.$5 1.35 1.71 2.54 3.38 4.46 4.93 6.04 7.85 8.49 9.74 ]0.47 11.80 12.73 16.13 19.01 23.39 27.16 9.95 50 0.93 L48 l.87 2.81 3.81 S.14 5.75 7.06 8.53 11.40 12.10 l3.52 14.49 18.17 21.16 26.03 29.86 ]00 17007 II.59 2.01 3.08 4.25 5.86 6.fi3 8.17 9.94 11,58 13.2b 13.$7 15.37 16.38 20.32 23.37 28.75 32.59 200 1.08 I.7 ] 2. ] 6 LEE] 6.64 7.60 9.40 11.51 13.40 15.36 15.81 17.38 18.41 22.59 25.64 31.58 35.35 500 I.18 1.86 2.34 E73]K34]E7fl 9.02 11.21 13.85 16.17 18.54 18.85 20.30 21.33 25.80 28.76 35.49 39.06 18.57 2 ] .3 ] 21.46 22.74 23.75 28.41 31.22 3$.59 41.92 1000 1.2b 1.99 2.49 4.04 5.89 8.73 ] 0.30 12.8fi ] 6.00 *These precipitation frequency estimates are based on a partial duralL n series. A R I is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formalting forces estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Precipitation Freauenev Estimates (inches) ARl** 5 10 1 15 11 30 11 60 1 =1�O 3 6 12 L;24�]LZ48 47 10 20 30 45 60 (years) min min min min min hr hr hr day day day day day day day [_ 0 0.53 0.85 1.07 1.46 1.82 2.23 2.42 2.97 3.53 4.01 4.67 5.20 6.01 6.72 8.87 10.80 13.55 16.26 0 0.63 1.00 1.26 1.74 2.18, 2.70 2.93 3.59 4.27 4.88 5.66 6.29 7.24 8.05 10.57 12.83 16.03 19.19 0 0.72 1.16 Efl 2.08 2.67 3.38 3.69 4.53 5.42 6.29 7.27 798 9.10 19.97 12.86 15.42 19.10 22.58 10 0.81 l .30 1.65 2.38 3. ] 0 4.01" 4.41 5.43 6.53 7.5E 8.65 9.40 10.64 11.56 14.73 I7.5a 2l .62 25.27 25 0.92 1.46 1.85 2.74 3.65 4.85 5.39 6.66 8.06 9.33 10.73 11.47 12.85 13.85 17.39 20.38 25.14 28.96 50 I.Oa 1.59 2.02 3.04 4.12 5.59 6.28 7.79 9.4b 10.92 12.58 13.26 14.74 15.74 19.6I 2- 28.00 31.87 100 1.08 1.72 2.18 3.34 4.59 7.24 8.99 11.0E 12.71 14.65 15.24 16.80 ] 7.87 21.99 25.13 30.98 34.85 200 1.17 1.85 2.34 3.64 5.10 7.22 8.30 10.34 12.74 14.73 17.02 17.42 I9.03 20.15 24.52 27.66 34.10 37.92 500 1.28 2.02 2.54 4.04 5.80 8.44 9.87 12.35 15.35 17.86 20.66 20.87 22.39 23.50 28.17 31.18 38.51 42.13 1000 1.37 2.16 2.71 4.39 6.41 9.54 11.30 14.20 E7fl 20.62 23.91 EE 25.24 EE 31. 00 34.01 42.12 45.45 * The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values fora Given frequency are treater than "These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ** 10 15 30 60 120 �j 12 24 48 F-4�10 20 30 45 ti0 mm min min mm mm hr hr hr hr hr ay day day day day day da! http:llhdsc.nws.noaa.gov/cgi-biiVhdsc/buildout.perl?type=pf&units=us&series=pd&statename=N... 5/20/2010 w WEST 'Ply O GRAwO GafWXr SVk,JT6 `Z7 UNK:, faWL-, s rrs SST 1449&&l f--B-8 HA -Li 191-1 " EAST r040 r,'777116-4� r g CiftOWD SO"ACL B-2 �"H mst., ITA63 FE �w 1 -2 NIF B-4 t-- —1; -H L B-5 7 1� A�6 114 -5 SEAS&o4AL W414 WATK Legend I (9 APPROXIMATE SOIL -BORING LOCATION 4 APPROXIMATE HAND AUGER BORING LOCATION M tbv%a%f TiNzy'.. (9 APPROXIMATE INFILTRATION/SHVVf ESTIMATE LOCATION SOIL BORING LAYOUT FIGURE 2 CHILD DEVELOPMENT CENTER DRAWING NOT TO SCALE RIFTS, PLLC F MI , DWAY PARK DATE: 121SLog 1305 3A Carolina Beach Ave N CAMP LEJEUNE MARINE CORPS BASE Carolina Beach, North Carolina 28428 Soils Engineering and JACKSONVILLE, NORTH CAROLINA SKETCH: DLW Office. 910-458-1377 Testing Services. JOB NO. 507-09 REVIEW: SDK Fax: 910-458-5261 e 7RF r-S* December 7, 2009 Soils Engineering and Testing Services Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, North Carolina 28451 Attention: Mr. Kevin'McBride Reference: Report of Subsurface=Exploration Proposed.Chi I d. Development Cehters Midway Park and Tarawa Terrace MCB Camp Lejeune, North Carolina, RFTS Job No. 507-09 Dear Mr. McBride: Pursuant to the scope of our Proposal No. 1,010c=09, dated .November 24, 2009, RHTS has recently completed ail exploration of subsurface conditions within .the areas of two proposed child development centers within the Tarawa Terrace and Midway Park areas of the Camp. Lejeune Marine Corps Base located near Jacksohville, North Carolina. This letter serves as the :report of our work. We present herein our understanding of the relevant project information, a description of our field activities, our findings, and conclusions -and recommendations relating to earth support of the proposed buildings and appurtenant .pavements. PROJECT INFORMATION Our -understanding of the relevant project information is based on our conversations with -you and our review of the following documents: • A Request for -Services Proposal, Exhibit B, prepared by Shiel Sexton Co., Inc., and dated September 29, 2009 (2 pages), "I-wo 8%`xl t`' site drawings •prepared by Cape Fear Engineering, showing. the coriiigurations of the proposed buildings, pavements, and infiltration features for the facilities. • "Report of Subsurface Investigation and Geotechnical Engineering Services'.'., dated June 9, 2008, prepared by GET Solutions, Inc. for the site -of the proposed Tarawa Terrace child development center. O Tarawa Terrace and Midway Park -are family housing areas within the Camp Lejeune Marine Corps Base located near Jacksonville, North Carolina. The site of the proposed RFTS, Pllc Committed to�Respanihx Sttwice Ofte: 910-456.1377 1305'3A Carolina Beach Ave N tc it,ur r'ft�plic Fax: 9i0-458-52b1 Carolina Beach Norlh Carolina 28428 Cape Fear Engineering, Inc, December 7, 2009 RFTS .lob No_ 507-09 Page Two Tarawa Terrace child development center is located adjacent to and north of Saipan Drive at its intersection with Iwo Jima Boulevard, with the building for the facility on the west side of Iwo Jima Boulevard and the parking area on the east side of Two Jima. The site of the proposed Midway Park child development center is located adjacent to and northwest of 41h Street between Butler Drive North and Butler Drive South. Site sketches showing the configurations of the proposed buildings, pavement areas, and stormwater infiltration areas for the two sites are included with this report as Figures 1 and 2. As we understand, the buildings for both facilities will be single -story structures, each with a footprint of somewhat more than 32,000 square feet. Wall and column loads are expected to be on the order 4 kips per lineal foot and 35 kips, respectively. The floor will be a cast -in -place concrete slab -on -grade. If a shallow foundation is found to be feasible based on discovered subsurface conditions, it will consist either of separately formed footings bearing in the upper two or three feet of the present site grade or of thickened elements formed monolithically within the floor slab. The facilities will have appurtenant bituminous pavement parking and drive areas, comprising approximately 140 spaces for the Tarawa Terrace facility and approximately 220 spaces for the Midway Park facility. We understand that these pavements will be designed for the use typical of such facilities; that is to say, personal vehicle parking with occasional heavy -axle loads from delivery and utility vehicles. Stormwater infiltration areas have been identified for both facilities in the preliminary design. No depths for these features have as yet been identified pending the characterization of the soils and groundwater conditions within the areas. DESCRIPTION OF FIELD EXPLORATION ACTIVITIES In order to obtain subsurface data to forrn the basis for our conclusions and recommendations herein, we have advanced 4 soil borings to a depth of 30 feet below site grade and one boring to a depth of refusal in rock within the area of the building at each facility. These borings are designated for each site as Borings B-1 through B-5. At the Tarawa Terrace site, three borings were also advanced, each to a depth of 15 feet below site grade, within areas proposed for infiltration structures. These borings are designated as Borings B-5 through B-8. At the Midway Park site, borings were advanced to a depth of 15 feet within proposed areas of infiltration structures at five locations. These are designated as Borings B-b through B-10. A trailer -mounted rotary drilling rig was used to advance all of the borings. Soil samples were recovered and Standard Penetration (SPT) Testing was conducted at routine depth intervals in general accordance with the procedures set forth in A5TM D1586. The locations of the borings were determined• in the field by reference to the existing buildings and site features abutting the proposed . construction. The approximate locations of the borings are shown in the site sketches included with this report as Figures 1 and 2. Cape Fear Engineering, Inc. December 7, 2009 RFTS Job No. 507-09 Page Three In addition to the soil borings advanced with a rotary drilling rig, we advanced a total of four hand auger borings at the Tarawa Terrace site (HA-1 through HA-4) and seven hand auger borings (HA -I through HA-7) at the Midway Park site. These borings were advanced to a depth of 5 feet below site grade within the areas of proposed bituminous pavements. At each location, the encountered soils were visually classified and logged by depth, the depth to any encountered standing water was recorded, and dynamic cone penetrometer (DCP) testing was conducted at routine depth intervals to determine the relative in-silu density/consistency of the soils. In the DCP test, a conical steel point is driven into the soil to be tested by means of a 15-pound sliding weight which free falls a vertical distance of 20 inches the number of blows required to drive the point through each of three I'/4-inch increments is recorded as the DCP driving resistance. At the completion of drilling, standing water levels in the boreholes were determined and recorded. The use of drilling fluid in the wash -boring techniques used for our exploration can result in standing water levels in the boreholes which are at variance with and less accurate than watertable levels obtained by other methods, such as the installation and reading of peizometers. The soil samples obtained in the field were delivered by the drillers to the undersigned authors of this report who classified them in general accordance with the Unified Soil Classification System (USCS) as set forth in ASTM D2487 using the visual/manual methods set forth in ASTM 2488. The soil boring and hand auger boring logs included with this report were then prepared based on those classifications and the drillers' field logs. Within areas designated for proposed stormwater infiltration ponds, our personnel conducted infiltration testing at various depths within the upper one foot below site grade using a Model 2800 Guelph Permeameter. This is a constant -head device which operates on the Mariotte siphon principle as referenced in ASTM D-5126. The permeameter is used to determine field saturated hydraulic conductivity in centimeters per second for soil at a specified depth. This testing involves advancing a borehole to the desired infiltration depth and introducing water at a constant head to determine the steady state flow rate from which the hydraulic conductivity can be calculated. Since no specific depth of infiltration has as yet been determined in the site design, testing was performed within the upper one foot below site grade to determine infiltration rates within the near -surface profile. Three infiltration tests were conducted on the Tarawa Terrace site (INF-1 through INF-3), and five tests were conducted on the Midway Park site (INF-1 through INF-5). The approximate locations of the infiltration tests are shown for the respective sites in Figures I and 2. In order to estimate seasonal high groundwater levels for purposes of infiltration structure (& design, our personnel advanced hand auger borings near the locations of each of the field Cape Fear Engineering, Inc. December 7, 2009 RFTS Job No. 507-09 Page Four infiltration tests, logged and classified the soils by depth, and compared their coloration to a Munseil Soil Color Chart. FINDINGS The findings of our subsurface exploration are based on the conditions discovered in our soil borings as detailed in the boring logs, on our familiarity with local subsurface conditions, and on our observations of the respective sites. We summarize them as follows: Site Descriptions Tarawa Terrace Facility The site of the proposed building for the Tarawa Terrace child development center is presently developed with bituminous pavement parking lots, lawned areas, and a complex of connected modular office units. The topography across the building site is relatively flat, with no more than two or three feet of relief across the property. The site of the appurtenant parking is heavily wooded. The exposed concrete foundations of an abandoned tower also occur within this area of the site. It is not known whether this is a deep (pile) or shallow (spread footing) foundation. This wooded area is • poorly drained. At the time of our field exploration, approximately one third of it was inundated. Midway Park Facility The site of the building and appurtenant parking areas for the Midway Park child development center is presently a ]awned area with a few scattered pine trees, a bituminous -surfaced tennis court, and some playground equipment. It is relatively flat, with no more than two or three feet of relief across the site. Subsurface Conditions Tarawa Terrace Facility With some variations in the thickness and depth of layering, our borings at the Tarawa Terrace site encountered the following generalized soil profile: (a) a sunccial layer of topsoil and organics less than a foot in thickness, (b) interbedded clean sands and sands with varying amounts of silt or clay (USCS Soil Groups `Sp', `SM', and `SC') occurring in a medium dense in silu condition extending to a depth of approximately 8 feet, (c) clays or clayey sands (`CL', `CH', and `SC') occurring in a very soft/very loose condition, extending from approximately a depth of 8 feet to 12 feet, and (d) relatively clean sands (`SP', `SP-SC' and `SP-SM') in a medium dense condition extending from a depth of l2 feet to the completed boring depth of 30 feet. In Boring 13- 4, which was advanced to a depth of 60 feet, the subsurface soils between a depth of 30 feet and 58 feet consisted of clean sands (`SP') occurring in a medium dense to very dense in -situ state. This boring terminated in the top of a layer of loose clayey sand • Cape Fear Engineering, Inc. December 7, 2009 RFTS Job No. 507-09 Page Five Subsurface conditions encountered in the hand -auger borings were generally consistent with those encountered in the soil borings. Topsoil thickness measurements, which could be determined with greater accuracy in the hand auger borings, were found to range between 4 and 8 inches. Midway Park Facility With some variations in the thickness and depth of layering, our borings at the Midway Park site encountered the following generalized soil profile: (a) a surficial layer of topsoil and organics less than a foot in thickness, (b) interbedded clean sands, silty sands, and clayey sands (USCS Soil Groups `SP', `SM', and `SC') occurring in in -situ conditions ranging from very loose to medium dense extending to a depth of 8 feet, (c) sandy clays and clays (`SC', `CU) ranging from very loose/soft to loose/firm extending from a depth of 8 feet to a depth of about 25 feet, and (d) loose to medium dense clean sands extending from 25 feet to the completed boring depths of 30 feet. In Boring B-2, which was advanced to a depth of 100 feet, the materials encountered from a depth of 30 feet to the completed boring depth of 100 feet consisted of clean and clayey sands interbedded with partially weathered rock occurring in a medium dense to very dense in -situ state. Groundwater Tarawa Terrace Facility Standing water levels observed 24 hours after drilling in the boreholes at the Tarawa Terrace building site ranged from one to three feet below site grade. In the hand auger borings advanced within the proposed pavement area on the opposite side of Iwo Jima Boulevard, standing water levels ranged from 3 inches to 18 inches below grade. Midway Park Facility Standing water levels observed 24 hours after drilling in the boreholes at the Midway Park site ranged from 6 inches to 3 feet below grade with the level in most cases being one foot or less below grade. In the hand auger borings, the standing water levels ranged from 2 inches to 34 inches below grade with the levels again being less than a foot below grade in most instances. Infiltration Rates and Seasonal High Water Table Levels The logs of the hand auger borings advanced within the areas of proposed infiltration ponds for the purpose of determining the seasonal high water table levels are shown in "fables 3 and 4 for the Tarawa Terrace site and the Midway Park site, respectively. The aresults of field infiltration tests conducted at these locations are shown in Table 5. Cape Fear Engineering, Inc. December 7, 2009 RFTS Job No. 507-09 Page Six Tarawa Terrace Facility Seasonal high water table levels on the Tarawa Terrace site ranged from 15 to 22 inches below grade. Corresponding field infiltration rates ranged from 0.6 to 1.6 inches'per hour. Midway Park Facility Seasonal high water table levels on the Midway Park site ranged from 13 to 29 inches below grade. Corresponding field infiltration rates were all less than 0.1 inches per hour. CONCLUSIONS AND RECOMMENDATIONS Our analysis and recommendations herein have been developed in accordance with standards of practice generally accepted within geotechnical engineering practice in this region and at the time of preparation of this report. No other warranty, express or implied, is made. Inasmuch as subsurface conditions can and do vary significantly between the locations of borings, it is entirely possible that conditions not contemplated within our analysis and recommendations may be discovered during the course of construction. In this event, we will be pleased to revisit our recommendations and expand or modify them. Our recommendations are predicated upon our understanding of the proposed construction as set forth under the heading "Project Information" in this report. Any features of the actual design or construction of the project which may be at variance with the assumptions set forth therein should be brought to our attention so that we may revise or expand upon our recommendations as appropriate. Site Preparation and Earthwork Considerations General to .Both Sites Areas of proposed buildings and areas receiving bituminous or rigid pavements in the new construction should be stripped of topsoil and surface vegetation and grubbed to remove root systems. Existing bituminous pavements, slabs -on -grade, foundation elements, and their underlying base courses, should be demolished and removed from these areas. Utility lines running beneath the building foundations of the new construction should be rerouted outside the construction areas. After the above work has been completed, any resulting excavations, where they exceed a few inches in depth, should be backfilled with a relatively clean sand (USCS Soil Group `SP', `SP-SM', or `SP-SC') placed in lifts not exceeding 8 inches in loose thickness and compacted to at least 98 percent of the maximum dry density as determined by the Standard Proctor Method (ASTM D698). This specification of soil type, placement, and method of compaction will be referred to hereafter in this report as "controlled structural fill". The leveled construction area should then be proofrolled with a heavy vibratory roller to identify areas of yielding soils and to densify loose surficial materials. Areas exhibiting Cape Fear Engineering, Inc. December 7, 2009 RFTS rob No. 507-09 Page Seven pumping, excessive tutting, or other unacceptable displacement should be undercut to firm material and backfilled with controlled structural fill. Where fill is required to attain subgrade elevations for pavements, slabs -on -grade, or backfill adjacent to earth retaining walls, it should consist of controlled structural fill as defined above. Both sites exhibit shallow groundwater conditions. The presence of shallow groundwater will have a detrimental effect on site grading operations unless special care is exercised during site stripping, fill placement, and fill compaction. To avoid pumping water to the surface and destabilizing the exposed subgrade, grading and transportation of soils should be accomplished to the greatest extent possible using track -type equipment. Pneumatic - tired vehicles, such as dump trucks delivering fill to the site, should not traverse the pavement or building areas until a sufficiently thick "bridge lift" has been placed to provide some vertical separation between the groundwater levels and the working surface of the site. Consideration should be given to ditching the site several weeks in advance of grading operations, especially if site work is to take place during the wet season of the year. As will be discussed below in our recommendations for bituminous pavements, at least some of these subgrade drainage measures will need to be permanent in any event. Re -use of Excavated Soils Due to the existing shallow groundwater conditions on both sites, soils excavated from depths ofmore than two or three feet below site grade will have to be processed to lower their moisture content before they can be effectively compacted in place as controlled structural fill. When considered as to their classifications (`SP', `SC', and `SM'), most of the soils occurring in the upper eight feet of site grade on both sites could be re -used as structural fill; however, the amount of silt and/or clay in many of the soil layers would require measures more aggressive than mere stockpiling or spreading in order to drain them. The costs of disking and aerating individual lifts of these soils should be weighed against the cost of importing fill when deciding whether they might be of economical use in structural areas. Foundation Support Considerations General to Both Buildings The subsurface conditions on both of the subject sites are generally suitable for the support of the proposed buildings on shallow spread footings. The specific recommendations given below for each facility are predicated on the understanding that column and wall footings will be sized for an aallowable soil contact pressure of 2000 pounds per square foot (psf) and that the loading Cape Fear Engineering, Inc. December 7, 2009 RFTS Job No. 507-09 Page Eight conditions are as set forth above (viz, 4 kips/lineal foot for walls and 35 kips for individual columns). If actual design loads are at variance with those we have assumed for the purpose of this analysis, we should be notified so that we may revise our recommendations as necessary. For both sites, we recommend that the exposed soils be probed and tested with a dynamic cone penetrometer (DCP) in the upper three feet of the footing subgrade after the footing excavations have been opened so that isolated regions of yielding, soft, or degraded soils can be identified and repaired as necessary. This testing should be conducted by a qualified soils technician and the results should be provided to us for our review. Areas which, in our opinion, are in need of repair should be undercut to firm material and backfilled to the design footing subgrade elevation with washed stone (457 or W). Footings should be placed as soon is practicable after they have been opened and inspected so that the subgrade will not be degraded by rainfall or traffic. Footings should bear at a depth of at least two feet below the adjacent grade to provide frost protection and to develop the bearing capacity indicated above without shearing failure. In the specific recommendations provided below, a range of anticipated bearing elevations is.provided for each facility based on our understanding of the foundation type (monolithic or separately formed shallow footings) and the assumption that a modest ® building pad will be constructed to provide surface drainage away from the building. If the design bearing elevations should fall outside the indicated range of elevations, we should be consulted so that we may. revise or confirm our estimates of the expected total and differential settlements. Foundation Recommendations Tarawa Terrace Facility Subsurface conditions are generally suitable for the support of the Tarawa Terrace child development center on shallow spread footings bearing at elevations ranging from 4-22.0 feet MSL to +25.0 feet MSL. Subject to implementation of our general recommendations as to the preparation of the footing subgrade, the foundation should experience total settlements no greater than one inch and differential settlements no greater than one half inch. Foundation Recommendations —Midway Park Facility Subsurface conditions are generally suitable for the support of the Midway Park child development center on shallow spread footings bearing at elevations ranging from +27.0 feet MSL to +30.0 feet MSL. Based on the variety of conditions encountered in the upper five to six feet in our borings across the site, it will be particularly important that the general recommendations as to probing and testing the exposed soils in the footing excavations be implemented. There will almost certainly be some regions of the footing subgrade which will require ® two or three feet of undercutting and stone replacement based on identification of very Cape Fear Engineering, Inc. December 7, 2009 RFTS Job No. 507-09 Page Nine soft clays or very loose clayey sands. If it is not practical to provide field evaluation of the footing subgrade during construction, then we would recommend that all footing excavations be undercut to a depth of three feet and backfilled with washed stone. Preparation of the footing subgrade in the manner recommended above should Iimit total foundation settlements to less than one inch and differential foundation settlements to less than one half inch. Seismic Site Class (Both Sites) Based on our analysis of the soil stratigraphy encountered in our deep borings and our general knowledge of the characteristics of the underlying geological formations, we recommend that both sites be regarded as a Seismic Site Class D for purposes of seismic design under the terms of Section 1613.5.5 of the 2006 International Building Code. Soil Parameters for Use in Design of Retaining Walls (Both Sites) For the near -surface soils on both sites and the soil types we have recommended as fill and backfill materials, we recommend that the following soil parameters be used in designing earth retaining structures: Coefficient of Earth Pressure at Rest 0.5 Coefficient of Active Earth Pressure 0.333 Coefficient of Passive Earth Pressure 3.0 Friction Angle Against Sliding 200 Coefficient of Cohesion Cohesionless Slabs -on -Grade (Both Sites) Slabs -on -grade for floors and loading dock pavements should be designed for a subgrade modulus (k) of 150 per where they will bear upon a properly prepared subgrade consisting of the clean or silty sands our exploration encountered in the upper 3 feet on site or upon a clean sand or crushed stone drainage course placed upon those soils. We recommend that floor slabs be furnished with a drainage or capillary cut-off layer consisting of at least 4 inches of washed stone or of clean sand with no clay and no more than 12 percent silt by weight (USCS Soil Group `SP' or `SP-SM'). DI Cape Fear Engineering, Inc. December 7, 2009 RFTS Job No. 507-09 Page Ten Bituminous Pavements (Both Sites) We have not conducted a laboratory CBR (California Bearing Ratio) or other strength test for the near -surface soils encountered on site; however, for the clean and silty sands (Groups `SP' and `SM') encountered in the upper three feet on both sites, it is our experience that a CBR value of 12 to 14 percent is typical for properly prepared and drained soils. Where the native soils have been undercut and replaced with controlled fill of the type we have indicated above, the same range of CBR values would also be appropriate for design purposes. In the absence of specific design information as to traffic and loading conditions, we recommend that the pavement section on both sites consist of 2 inches of NCDOT SF9.5A bituminous concrete surface course over 8 inches of NCDOT Aggregate Base Course. This recommendation is predicated on the assumption that the pavement will accommodate traffic typical of the use contemplated for these facilities; that is to say, several hundred daily axle -passes by cars and light pickup trucks with occasional heavy axle loads from garbage trucks and delivery trucks. The presumptive design provided above is based on a 20-year service life. Materials, placement, and compaction procedures for aggregate base course and wearing course should be in accordance with the applicable sections of the North Carolina Department of Transportation Standard Specification for Roads and Structures (July 2006). It has been noted above that both sites have a potential for the occurrence of shallow perched water during periods of seasonally wet weather. It will therefore be necessary to furnish the bituminous pavements at both sites with some provision for the control of perched water beneath the pavement section. This should consist of sub -drains or permanent swales surrounding the perimeter of paved areas, routed to a sufficiently deep outfall, and graded so as to maintain a vertical separation of at least three feet between the level of any groundwater or perched water and the bottom of the pavement section. Without effective permanent provisions for maintaining the level of perched water and/or groundwater at a sufficient depth below the pavement section, the bituminous pavement recommended above will not perform adequately. Stormwater Infiltration Considerations In our opinion, all of the areas on both sites evaluated for the near -surface soil infiltration rate and depth to seasonal high watertable will need to be modified in some fashion due either to a shallow seasonal high watertable level or a slow infiltration rate or both, Improving the infiltration rate of the in -place soils and providing some storage for infiltrated water can be achieved by removing the soils to the depth of the seasonal high watertable level and replacing them with a free -draining sand, such as a sand meeting the grading requirements of ASTM C-33 (Concrete Sand). While replacement with such Cape Fear Engineering, Inc. December 7, 2009 RFTS Job No. 507-09 Page Eleven sands will provide an initial infiltration rate in the range of 4 to 6 inches per hour, the long term rate will of course be controlled by the slower rates exhibited in our tests. CLOSURE RFTS appreciates the opportunity to provide you with services. If you have any questions after reviewing this letter, please do not hesitate to contact us at your convenience. Sincerely, RFTS, PLLC David L. Winstead Field Operations Manager DLW;SDKJdl%v Attachments 0 Steven D. KellyI E. Senior Engineer • SOIL BORING LOGS AND BORING LAYOUT TARAWA TERRACE (9 El e o • F n 171 flI I INF-11 r! -f B B-3 B -4 B-5 4". Legend 0 APPROXIMATE SOIL BORING LOCATION (4 APPROXIMATE HAND AUGER BORING LOCATION :0- APPROXIMATE INFILTRATION/SHWT ESTIMATE LOCATION IT! 11) H ������ _fir = - -- -HA .7 "Z=7 IN �-2 INF-A -8 SOIL BORING LAY - OUT FIGURE I RF rS CHILD DEVELOPMENT CENTER DRAWING NOT TO SCALE ISKETCk: RFTS, PLLC TARAWATERRACE DATE: .12/§109 1305 3A Carolina Beach Ave N CAMP LEJEUNE MARINE CORPS BASE DLW Carolina Beach, North Carolina 28428 Soils Engineering and JACKSONVILLE, NORTH CAROLINA REVIEW SDK Me: 910-458-1377 F ' ax: 9110-458-5261 Testing S6rvi6es JOB NO. 507rO9 ®R P A Fog SOIL BORING PROFILES FIGURE 3 I R CHILD DEVELOPMENT CENTER I DRAWING NOT TO SCALE I RIFTS, PLLC F17s TARAWA TERRACE DATE., 1216/09 I 1305 3A Carolina Beach Ave N CAMP LEJEUNE MARINE CORPS BASE SKETCH: DLW - Carolina Beach, North Carolina 28428 Soils Engineering and JACKSONVILLE, NORTH CAROLINA REVIEW: SDK Office: 910-458-1377 F= 9 10-458-5261 Testing Services JOB NO. 507-09 PROJECT: JOB NO. BORING 8-1 PROPOSED CHILD DEVELOPMENT CENTER 507-09 TARAWA TERRACE — CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA U w r a MATERIAL DESCRIPTION a -' STANDARD PENETRATION TEST DATA IL -' a a g (btows/foot) 7 o 3 10 20 30 6080 z Medium Dense Brown and Orange Clayey SAND (SC) 11 5 Medium Dense to Loose Light Brown fine to 27 i. medium SAND (SP) 6 10 Soft Grayish Brown CLAY, trace of SAND (CL) 4 Medium Dense Light Gray fine to medium 15 SAND with Clay (SC) 22 Loose Green fine to medium SAND with 20 6 Clay (SC) 25 30 :::: Medium Dense Grayish Brown fine to medium SAND (SP) ::: Medium Dense Dark Gray fine to medium 30 .=: SAND (SP) 15 Boring terminated at 30 feet. 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Tarawa Terrace CDC Building Footprint DATE DRILLED: 12/04/09 DRILLER: Carolina Drilling, George Bridger NG METHOD: Wash Boring/Split Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. GROUND ELEVATION: 24.26' MSL BORING DEPTH: 30 FEET INITIAL WATER LEVEL: 3 FEET 24-HOUR WATER LEVEL: 2 FEET DRILL RIG: 45D ff Soils Engineering and FTSM Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: JOB NO. BORING B-2 PROPOSED CHILD DEVELOPMENT CENTER TARAWA TERRACE — CAMP LEJEUNE MARINE CORPS BASE 507-09 JACKSONVILLE, NORTH CAROLINA o z a L9 MATERIAL. DESCRIPTION a a STANDARD PENETRATION TEST DATA (blows/fool) N 10 20 30 60$0 z Medium Dense Brown Clayey SAND (SC) 15 — 5 Loose Black Silty SAND (SM) 7 :'. Loose Brown tine to medium SAND (SP) Sot; Light Gray CLAY (CH) 10 4 Medium Dense Light Gray fine to medium SAND (SP) 15 15 20 11 Medium Dense Gray fine to medium SAND (SP) Medium Dense to Loose Dark Gray fine 10 medium SAND (SP) 25 13 6 Boring terminated at 30 feet. 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586, 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Tarawa Terrace CDC Building Footprint DATE DRILLED: 12/05/09 I GROUND ELEVATION, 26.25' MSL DRILLER: Carolina Drilling, George Bridger I BORING DEPTH: 30 FEET BORING METHOD: Wash Boring/Split Spoon INITIAL WATER LEVEL: 3 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL: 2 FEET CLIENT: Cape Fear Engineering, Inc. DRILL. RIG: 451) Soils Engineering and RF S Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: JOB NO. BORING B-3 PROPOSED CHILD DEVELOPMENT CENTER TARAWA TERRACE —CAMP LEJEUNE MARINE CORPS BASE 507-�� JACKSONVILLE, NORTH CAROLINA LU W = a MATERIAL DESCRIPTION Q STANDARD PENETRATION TEST DATA a W (blows/foot) o 0 U) 10 2. 30 6080 z Medium Dense Brown tine to medium SAND, trace of Sitt (SP-SM) Z10 5 Medium Dense to Loose Light Brown fine to 20 medium SAND (SP) 6 1l} 3 Soft Light Gray CLAY (CH) Medium Dense Light Gray fine to medium 15 SAND (SP) 22 or 20 11 Medium Dense Gray fine to medium SAND :.. (SP) 25 19 30 20 Boring terminated at 30 feet. 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2_ Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of hummer. BORING LOCATION: Tarawa Terrace CDC Building Footprint DATE DRILLED: 12/05/09 1 GROUND ELEVATION: 25.09' MSL I DRILLER: Carolina Drifting, George Bridger I BORING DEPTH: 30 FEET j 18ORING METHOD: Wash SodnglSplit Spoon INITIAL WATER LEVEL: 3 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL: 2 FEET CLIENT: Cape Fear Engineering, Inc. DRILL RIG: 45D Soils Engineering and R Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: JOB NO. BORING B-4 PROPOSED CHILD DEVELOPMENT CENTER TARAWATERRACE —CAMP LEJEUNE MARINE CORPS BASE 507-09 JACKSONVILLE, NORTH CAROLINA o o O MATERIAL DESCRIPTION a STANDARD PENETRATION TEST DATA (blows/foot) 1D 2D 30 6080 Z Medium Dense Brown and Gray fine to mediurr 5 -" SAND, some Clay (SC) 1D 36 Dense Light Brown fine to medium SAND (SP) 3 10 Soft Gray CLAY (CH) 4 15 18 Medium Dense Gray fine to medium SAND, trace of Clay (SP-SC) 20 4 Very Loose Dark Gray Clayey SAND (SC) 25 21 •`:: Medium Dense Dark Brown fine to medium SAND, trace of Silt (SP-SM) 30 ; Loose to Dense Dark Gray fine to medium SAND (SP) 6 3 35. 34 40 5516" 45 =: ::: Very Dense Dark Gray fine to medium SAND (SP) 65 63 55 := 75 5 .- Loose Dark Gray Clayey SAND (SC) Boring terminated @ feet 60. BORING LOCATION: Tarawa Terrace CDC Building Footprint DATE DRILLED. 12/04/09 1 GROUND ELEVATION: 25.29' MSL DRILLER: Carolina Drilling, Gerald Eisler I BORING DEPTH: 61) FEET I ,PORING METHOD: Wash Boring/Split Spoon I INITIAL WATER LEVEL: 5 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL: 4 CLIENT- Cape Fear Engineering, Inc. DRILL RIG: ATV Soils Engineering and ff Frs Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: JOB NO. BORING B-5 PROPOSED CHILD DEVELOPMENT CENTER 507-09 TARAWATERRACE — CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA _ -j MATERIAL DESCRIPTION —' STANDARD PENETRATION TEST DATA a 2 (blows/fool) j a 10 20 30 6080 Z Medium Dense Black fine SAND, trace of Silt (SP-SM)) 16 = Medium Dense Light Brown fine to 5 medium SAND (SP) 13 Medium Dense Light Gray fine to medium SAND (PP) 28 10 Firm Greenish Gray CLAY with SAND (CL) 5 15 3 Very Loose to Loose Greenish Gray Clayey SAND(SC) 20 5 25 Medium Dense to Loose Dark Gray fine to 11 medium SAND (SP) 8 Boring terminated at 30 feet. 1, Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Tarawa Terrace CDC Building Footprint DATE DRILLED: 12/04/09 DRILLER: Carolina Drilling, George Bridger METHOD: Wash Boring/Split Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. GROUND ELEVATION: 24.75' MSL BORING DEPTH: 30 FEET INITIAL WATER LEVEL_ 3 FEET 24-HOUR WATER LEVEL: 3 FEET DRILL RIG: 45D Soils Engineering and Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: RIFTS JOB NO. BORING B-B PROPOSED CHILD DEVELOPMENT CENTER 507-09 TARAWA TERRACE —CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA MATERIAL DESCRIPTION W J a STANDARD PENETRATION TEST DATA W 0-0 J (blows/foot) j W o to 10 20 30 6080 z Z Loose to Medium Dense Dark Brown fine to 7 medium SAND, trace of Silt (SP-SM) 5 11 Medium Dense Brown fine to medium SAND 2 (SP) 14 10 Soft Light Gray CLAY (CH) 4 4 Medium Dense Light Gray fine to medium SAND (SP) 15 := 17 Boring terminated at 15 feet. 2a 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Tarawa Terrace CDC Infiltration Basin DATE DRILLED: 12/05/09 1 GROUND ELEVATION: 25.01' MSL DRILLER: Carolina Drilling, Gerald Eister METHOD: Wash Boring/Split Spoon LOGGED BY; David Winstead CLIENT: Cape Fear Engineering, Inc. BORING DEPTH: 15 FEET INITIAL WATER LEVEL: 2 FEET 24-HOUR WATER LEVEL: 15 INCHES DRILL RIG: 45D � Soils Engineering and —' iSM Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: RFTS JOB NO. BORING B»7 PROPOSED CHILD DEVELOPMENT CENTER 507-09 TARAWA TERRACE —CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA U ns o MATERIAL DESCRIPTION W W a STANDARD PENETRATION TEST DATA W CL � g (blows/foot) j W n 3 U)j 10 20 30 6080 Z Topsoil Loose Dark Brown fine to medium SAND, 5 trace of Sill SP-SM Medium Dense Light Gray and Brown fine to 5 medium SAND (SP) 12 2 Soft Light Gray CLAY with Sand (CL) 4 10 .4 Soft Greenish Gray CLAY, some Sand (CL) 4 Loose Greenish Gray Clayey SAND (SC) 15 5 Boring terminated at 15 feet. 6 20 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Tarawa Terrace CDC Infiltration Basin DATE DRILLED: 12/04109 DRILLER: Carolina Drilling, Gerald Eisler NG METHOD: Wash Boring/Split Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. GROUND ELEVATION: 23.37' MSL BORING DEPTH: 15 FEET INITIAL WATER LEVEL: 2 FEET 24-HOUR WATER LEVEL: 18 INCHES DRILL RIG: ATV Soils Engineering and Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT; RFTS JOB NO. BORING 0-8 PROPOSED CHILD DEVELOPMENT CENTER 507-09 TARAWA TERRACE — CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE. NORTH CAROLINA U s MATERIAL DESCRIPTION J W a STANDARD PENETRATION TEST DATA UJ 0- (blows/foot) 7 0 0 3 cn 10 20 30 6080 z Topsoil Very Loose Black fine to medium SAND, trace of Sift SP-SM 4 Loose Dark Brawn Silty SAND (SM) 7 2Loose Dark Gray Clayey SAND (SC) 6 10 3 Soft Light Gray Sandy CLAY (CL) 4 Loose Greenish Gray fine to medium SAND 151with Clay(SC) 10 Boring terminated at 15 feet. 6 20 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586, 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Tarawa Terrace CDC Infiltration Basin DATE DRILLED: 12/04/09 DRILLER: Carolina Drilling, Gerald Eister NG METHOD: Wash Boring/Split Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. GROUND ELEVATION: 24,17' MSL BORING DEPTH: 15 FEET INITIAL WATER LEVEL: 2 FEET 24-HOUR WATER LEVEL: 15 INCHES DRILL RIG: ATV Soils Engineering and RF S Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 SOIL CLASSIFICATION AND SYMBOLS LEGEND RELATIVE DENSITY OF COHESION LESS SOILS STD PENETRATION RESISTANCE RELATIVE DENSITY BLOWS/FOOT Very Loose 0 to 4 Loose 5 to10 Medium Dense 11 to 30 Dense 31 to 50 Very Dense over 50 SAMPLER TYPES ® Shelby Tube ® Split Spoon IRock Core CONSISTENCY OF COHESIVE SOILS STD PENETRATION RESISTANCE CONSISTENCY BLOWSIFOOT Very Soft 0 to 2 Soft 3 to 4 Firm 5 to 8 Stiff 9 to 15 Very Stiff 16 to 30 Hard 31 to50 Very Hard Over 50 No Recovery Measured depth to water at boring completion. Asphalt, Base Course, Concrete CH, CL SP. SP-SM, 5P-SC Partially Weathered Rock SC Organic MH, ML SM Office: 910-458-1377 RF ��rS Soils Engineering RFTS, PLLC Fax:910-458-5261 and Testing Services 1305 3A Carolina Beach Ave N www.RFTSPLLC.com Carolina Beach, North Carolina 28428 SOIL BORING LOGS AND BORING LAYOUT MIDWAY PARK 0 �l I 8-6 413-7 HA NNF-4' HA- B-2 ti I a- I `•:. �, l i`. 'V t 1 RA-3 [�:�:r�r INF=1 �H I '' rrs6111 I ?s B-3 L - .I -4 B i a r P&M lul Legend IB APPROXIMATE SOIL BORING LOCATION �- APPROXIMATE -HAND AUGER BORING LOCATION APPROXIMATE INFILTRATION/SHWT ESTIMATE LOCATION ��rS SOIL BORING LAYOUT FIGURE 2 R 'CHILD DEVELOPMENT CENTER DRAWING NOT TO SCALE RFTS, PLLC MIDWAY PARK DATE: 12 5109. 1305 3A Carolina Beach Ave N CAMP LEJEUNE MARINE CORPS BASE SKETCN: DLW Carolina Beach, North Carolina 28428 Soils Engineering and JACKSONVII_I_E, NORTHCAFtOLINA REVIEW: SDK office: 910-458-137'7 Fax: 910 458-5261 Testing Services JOB N6..5b7-09 roo 'PAP 'PAP Avg OAF ;oAi NO 01 SOIL BORING PROFILES FIGURE 3 CHILD DEVELOPMENT CENTER DRAWING NOT TO SCALE RFTS, PLLC R MIDWAY PARK DATE: 12/6/09 1305 3A Carolina Beach Ave N CAMP LEJEUNE MARINE CORPS BASE SKETCH: DLW Carolina Beach, North Carolina 28428 Soils Engineedng and JACKSONVILLE, NORTH CAROLINA REVIEW: SDK Office: 910-458-1377 Fax: 910458-5261 Testing Services JOB NO, 507-09 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER JOB NO. BORING 8-1 MIDWAY PARK — CAMP LEJEUNE MARINE CORPS BASE JACKSONV€LLE, NORTH CAROLINA 507-09 o U o MATERIAL DESCRIPTION a -j STANDARD PENETRATION TEST DATA 0. 2 (biewslfoot) 10 20 30 6080 z Very Loose Dark Brown Silty SAND (SM) Z 3 Very Loose Brown and Orange Clayey SAND 5 .:::; (SC) 3 12 Medium Dense Light Gray fine to medium SAND with Clay (SC) .' Very Loose Dark Gray Clayey SAND (SC) 10 3 15 4 Soft Dark Gray CLAY (CH) 20 3 K. 25 11 Medium Dense to Loose Gray fine to medium SAND (SP) 8 Baring terminated at 30 feet. 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Building Footprint DATE DRILLED: 12f03109 I GROUND ELEVATION; 30.02' MSL DRILLER; Carolina Drilling, George Bridge( I BORING DEPTH: 30 FEET BORING METHOD: Wash Baring/Split Spoon INITIAL WATER LEVEL: 5 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL: 3 FEET CLIENT: Cape Fear Engineering, Inc. DRILL RIG: 45D Soils Engineering and R Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER JOB NO. BORING B-2 MIDWAY PARK - CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA 507-09 W W 3:0 0 MATERIAL DESCRIPTION -J &A. STANDARD PENETRATION TEST DATA (WWS111`00t) Lu a< 2P 30 6080 Z DDrk Med ium ense aBrown fine to me rum ff— SAND, trace of Slit (SP-SM) 17 Loose Light Brown fine to medium SAND 10 5 with Clay (SC) 8 Loose Grayish Brown fine to medium SAND with Clay (SQ- 3 Very Loose Dark Gray Clayey SAND (SC) 1 11 'ago 1 11 Firm to Very Stiff Dark Gray CLAY with SAN Ohl 30 Loose Greenish Gray fine to medium SAND iA I I I 1 11 9 with Clay (SC) 35— 33 40:-,-- 28 Dense to Medium Dense to Very Dense Partially Weathered Rock 45 �5015" 54 55 60 70__ 5516- 50/3" 57/6" 50/2" Very Dense Light Brown fine to medium SAND (SP) Very Dense Greenish Gray fine to medium SAND (SP) Boring log continued on next page. BORING LOCATION. Midway Park CDC Building Footprint Soils Engineering and WS Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Ca'rolina 28428' Phone (910) 458-1377 Fax (910) 458-5261 DATE DRILLED: 12/01109 GROUND ELEVATION: 30.66'MSL DRILLER: Carolina Drilling, Gerald Eister BORING DEPTH: 100 FEET RING METHOD: Wash Boring/Split Spoon INITIAL WATER LEVEL: 3 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL- I FOOT 1 CLIENT: Cape Fear Engineering, Inc. DRILL RIG: 45-08 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER JOB NO. BORING B-2 MIDWAY PARK -- CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA 507-09 continued 2 LU W a MATERIAL DESCRIPTION ora STANDARD PENETRATIONTEST DATA �� ootON ) o 10 20 30 6080 z 75 42 Dense to Medium Dense Greenish Gray fine 80 to medium SAND (SP) 27 85 41 — Dense Light Brown fine to medium SAND with Clay (SC) 46 90 95 5012" Very Dense Partially Weathered Rock 1 no 5716" Boring terminated at 100 feet. 1, Boring, sampling and penetration test data In general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3, Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer, BORING LOCATION: Midway Park CDC Building Footprint DATE DRILLED: 12101l09 1 GROUND ELEVATION: 30.66' MSL LORILLER: Carolina Drilling, Gerald Eister I BORING DEPTH: 100 FEET i PORING METHOD: Wash Boring/Split Spoon INITIAL WATER LEVEL: 3 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL. 1 FOOT CLIENT: Cape Fear Engineering, Inc. DRILL RIG: 45-08 Sails Engineering and WS Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER JOB NO. BORING B-3 MIDWAY PARK — CAMP LEJEUNE MARINE CORPS BASE JACKSONVILLE, NORTH CAROLINA 507-09 J MATERIAL DESCRIPTION x a ii STANDARD PENETRATION "PEST DATA (blows/foot) r¢n 10 20 30 60$0 � a z Loose Brownish Gray fine SAND with Clay (SC) - 8 5 := Medium Dense Gray fine to medium SAND 12 (SP) 20 10 8 Firm Dark Gray Sandy CLAY (CH) 15 6 Firm Dark Gray CLAY (CH) 20 5 Medium Dense Dark Gray fine SAND with 25 Clay (SC) 19 Loose Greenish Gray fine to medium SAND with Clay (SC) 7 Boring terminated at 30 feet. 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Building Footprint DATE DRILLED: 12/04/09 DRILLER: Carolina Drilling, George Bridger NG METHOD: Wash Boring/Split Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. GROUND ELEVATION: 29.25' M5L BORING DEPTH: 30 FEET INITIAL WATER LEVEL: 2 FEET 24-HOUR WATER LEVEL: 1$ INCHES DRILL RIG: 45D Soils Engineering and RFIS Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER JOB NO. BORING B-4' MIDWAY PARK — CAMP LEJEUNE MARINE CORPS BASE 507-09 JACKSONVILLE, NORTH CAROLINA o MATERIAL DESCRIPTION -' STANDARD PENETRATION TEST DATA IL-j (blows/foot) j 0 Lu U)) 10 20 30 6080 z Very Loose Orange Clayey SAND (SC) 4 — Medium Dense Brownish Gray fine to medium SAND(SP) 11 Medium Dense Dark Gray fine to medium SAND with Clay (SC) 11 1a 2 Very Loose to Loose Dark Gray Clayey SAND (SC) 15 9 20 5 Firm Dark Gray CLAY (CH) 25 20 :- Medium Dense to Loose Dark Gray fine to :-' medium SAND (SP) 9 Boring terminated at 30 teat. 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Building Footprint DATE DRILLED: 12/03/09 1 GROUND ELEVATION: 29.26' MSL DRILLER: Carolina Drilling, George Bridger I BORING DEPTH: 30 FEET i IFORING METHOD: Wash Boring/Split Spoon INITIAL WATER LEVEL: 4 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL: 2 FEET CLIENT: Cape Fear Engineering, Inc. DRILL RIG: 45D Soils Engineering and UP Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 .Fax (910) 458-5261 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER JOB NO. BORING B-5 MIDWAY PARK —CAMP LEJEUNE MARINE CORPS BAST` JACKSONVILLE, NORTH CAROLINA 507-09 o a o J MATERIAL DESCRIPTION W a STANDARD PENETRATION TEST DATA (blows/foot) 10 20 30 6080 W z Very Soft Dark Brown CLAY with SAND (CH) 2 Very Loose Brown and Orange Clayey SAND 5 .:. (SC) 2 13 Medium Dense Dark Brown Clayey SAND (SC) 10 2 Very Loose to Loose Dark Gray Clayey SAND (SC) 15 5 Firm Dark Gray CLAY (CH) 20 5 25 5 '. Loose Dark Brown Clayey SAND (SC) Very Loose Gray fine to medium SAND (SP) 4 Boring terminated at 30 feet. 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Building Footprint DATE DRILLED: 12/03/09 DRILLER, Carolina Drilling, George Bridger METHOD: Wash Boring/Split Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. GROUND ELEVATION: 30.12' MSL BORING DEPTH: 30 FEET INITIAL WATER LEVEL: 4 FEET 24-HOUR WATER LEVEL: 1 FOOT DRILL RIG: 45D Soils Engineering and RF S Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER RFTS JOB NO. BORING B-6 MIDWAY PARK —CAMP LEJEUNE MARINE CORPS BASE 51}7-09 JACKSONVILLE, NORTH CAROLINA U a O MATERIAL DESCRIPTION w —' a STANDARD PENETRATION TEST DATA g O 2 (blows/fool) a U)i 10 20 30 6080 z 4 Very Loose to Medium Dense Light Brown fine to medium SAND, trace of Silt (SP-SM) 5 11 2 1 Loose Dark Brown fine to medium SAND, ::: trace of Silt (SP-SM) 10 2 Very Soft to Firm Dark Gray CLAY some Sand (CH) 4 15 6 Boring terminated at 15 feet, 6 A20 1-1 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Infiltration Basin DATE DRILLED: 12/04109 DRILLER: Carolina Drilling, George Bridger NG METHOD: Wash Boring/Split Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. GROUND ELEVATION: 30.05' MSL BORING DEPTH: 15 FEET INITIAL WATER LEVEL: 2 FEET 24-HOUR WATER LEVEL: 6 INCHES DRILL RIG: 45D Soils Engineering and R� Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER RFTS JOB NO. BORING B-7 MIDWAY PARK — CAMP LEJEUNE MARINE CORPS BASE 507-09 JACKSONVILLE, NORTH CAROLINA ca nz MATERIAL DESCRIPTION w w a STANDARD PENETRATION TEST DATA w a F (blowsifoot) 0 0 ¢ U) 10 20 30 6080 z Loose Dark Brown fine to medium SAND, trace of Silt (SP-SM) 12 5 Medium Dense Light Gray fine to medium 16 SAND(SP) 2 14 1 ; Loose Light Brown fine to medium SAND (SP) 8 4 Very Soft Dark Gray CLAY some Sand (CH) 15 2 Boring terminated at 15 feet. 6 20 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. I Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Infiltration Basin DATE DRILLED: 12/04/09 1 GROUND ELEVATION: 31.24' MSL DRILLER: Carolina Drilling, George Bridger METHOD: Wash Boring/Split Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. BORING DEPTH: 15 FEET INITIAL WATER LEVEL: 2 FEET 24-HOUR WATER LEVEL: 6 INCHES DRILL RIG: 45D Soils Engineering and RF S Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER RFTS JOB NO. BORING B-8 MIDWAY PARK — CAMP LEJEUNE MARINE CORPS BASE 507-09 JACKSONVILLE, NORTH CAROLINA z Y O P DESCR MATERIAL DESCRIPTION J W a STANDARD PENETRATION TEST DATA EL o (blows/foot) j 0 o c� cis 10 20 30 6080 z Loose Dark Brown fine to medium SAND, trace of Sill (SP-SM) — 6 Medium Dense Grayish Brown SAND some 5 : Silt (SM) 15 2 21 Medium Dense Light Gray fine to medium SAND (SP) 10 19 4 Very Soft Dark Gray CLAY with Sand (CH) 15 3 Boring terminated at 16 feet. 6 20 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Infiltration Basin DATE DRILLED: 121D4/09 DRILLER: Carolina Drilling, George Bridger NG METHOD: Wash BoringlSplit Spoon LOGGED BY: David Winstead CLIENT: Cape Fear Engineering, Inc. GROUND ELEVATION: 31,60' MSL BORING DEPTH: 15 FEET INITIAL WATER LEVEL: 3 FEET 24-HOUR WATER LEVEL: 2FEET DRILL RIG: 45D Soils Engineering and ors Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT; PROPOSED CHILD DEVELOPMENT CENTER RFTS JOB NO. BORING B-8 MIDWAY PARK — CAMP LEJEUNE MARINE CORPS BASE 507-09 JACKSONVILLE, NORTH CAROLINA E MATERIAL DESCRIPTION J STANDARD PENETRATION TEST DATA a (blows/foot) j 0 0 0 W 10 20 30 60$0 Z Loose Black Silty SAND (SM) — B Loose Brownish Gray fine to medium SAND some Silt SM 9 2 Medium Dense Gray fine to medium SAND (SP) 22 10 $ Loose Brown fine to medium SAND (SP) 4 Very Soft Dark Gray CLAY with Sand (CH) 15 2 Boring terminated at 15 feet. 6 20 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of exploration and will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Infiltration Basin DATE DRILLED: 12/04/09 1 GROUND ELEVATION: 31.60' MSL DRILLER: Carolina Drilling, George Bridger I BORING DEPTH: 15 FEET MWRING METHOD: Wash Boring/Split Spoon I INITIAL WATER LEVEL: 3 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL: 2FEET CLIENT: Cape Fear Engineering, Inc. DRILL RIG: 45D Soils Engineering and R� Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 Phone (910) 458-1377 Fax (910) 458-5261 PROJECT: PROPOSED CHILD DEVELOPMENT CENTER RFTS JOB NO. BORING B-10 MIDWAY PARK —CAMP LEJEUNE MARINE CORPS BASE 507-09 JACKSONVILLE, NORTH CAROLINA J V _ MATERIAL DESCRIPTION a W ii STANDARD PENETRATION TEST DATA W 0 o F (blows/foot) 0 o t9 v! 10 20 30 6080 Z Soft Black CLAY with SAND (CFI) 4 Very Loose Brown Clayey SAND (SC) 5 4 2 : '' Loose Gray Clayey SAND (SC) 6 10 ?: Medium Dense Gray fine to medium SAND I I Hill11 :== (Sp) 4 Loose Gray SAND with Clay (SC) 15 9 Boring terminated at 15 feet. 6 20 1. Boring, sampling and penetration test data in general accordance with ASTM D-1586. 2. Water level is at time of explorationand will vary. 3. Stratification and groundwater depth are not exact. 4. WOH = Weight Of Hammer. BORING LOCATION: Midway Park CDC Infiltration Basin DATE DRILLED: 12/03/09 1 GROUND ELEVATION: 31.04' MSL I DRILLER: Carolina Drilling, George Bridger . i BORING DEPTH: 15 FEET RING METHOD; Wash BoringlSplit Spoon INITIAL WATER LEVEL: 3 FEET LOGGED BY: David Winstead 24-HOUR WATER LEVEL: 1FOOT CLIENT: Cape Fear Engineering, Inc. DRILL RIG: 450 Soils Engineering and Mrs Testing Services 1305 3A Carolina Beach Ave N Carolina Beach, North Carolina 28428 'hone (910) 458-1377 Fax (910) 458-5261 • DYNAMIC CONE PENETROMETER TEST RESULTS TARAWA TERRACE AND MIDWAY PARK E 0 0 L� Table 1 Dynamic Cone Penetrometer Test Results Child Development Center Midway Park --- Camp Lejeune Marine Corps Base Jacksonville, North Carolina RIFTS Job No. 507-09 LOCI Depth Blow Count Depth Below Depth ELEV Soil Description (inches) per I % Inch Ground to Surface Water Topsoil 0-6 Gray fine to medium SAND 6-8 6-19-20+ 1' H2O HA-1 Light Brown Fine to medium SAND 8-12 6-8-8 3' @3" 31.72' Dark Brown fine to medium SAND, trace of Silt 12-27 4-10-10 5' Gray fine to medium SAND. trace of Silt 27-45 GM.fine to medium SAND, some Silt 45-60 —_--Light Topsoil 0-7 Black fine SAND, trace of Silt 7-12 5-7-7 1' H2O HA-2 Dark Brown fine to medium SAND, trace of Silt 12-20 2-3-5 3' @7" 31.55' Orange fine to medium SAND, trace of Clay 20-34 6-11-10 5' Graz SAND some Silt' 34-60 Topsoil 0-8 Black Silty SAND 8-16 5-8-9 1' H2O HA-3 Dark Brown fine to medium SAND, trace of Silt 16-34 5-6-6 3' @2" 31.45' Brown/Orange SAND, some Clay 34-38 5-10-11 5' Gray SAND some Silt 38-60 Topsoil 0-8 HA-4 Black fine SAND, trace of Silt 8-18 7-11-15 1' H2O 31.34' Dark Gray Silty SAND 18-48 2-3-7 3' @3" Obstruction encountered boring.terminated 48" - - - 5' Topsoil 0-8 EIA-5 Black fine SAND, trace of Silt 8-13 7-9-8 1' H2O 31.47' Dark Gray SAND with Silt 13-48 4-4-5 3' @12" Gra SAND some Silt 48-60 4-7-8 5' Topsoil 0-6 Dark Brown fine to medium SAND, trace of Silt 6-12 7-7-7 1' H2O HA-6 Tan/Orange SAND with Clay 12-30 4-4-4 3' @34" 31.32' Gray/Orange SAND with Clay 30-49 4-6-9 5' Gra SAND with Silt 49-60 Topsoil 0-] 0 HA-7 Brownish Gray Silty SAND 10-28 4-4-4 1' H2O 30.86' Brown/Orange Clayey SAND 28-48 3-4-3 3' @4" Gra Claxex SAND 48-60 5-6-6 5'' �11 Table 2 Dynamic Cone Penetrometer Test Results Child Development Center Tarawa Terrace — Camp Lejeune Marine Corps Base Jacksonville, North Carolina RFTS Job No. 507-09 LOCI Depth Blow Count Depth Below Depth ELEV Soil Description (inches) per l -/+ Inch Ground to Surface Water Topsoil 0-4 HA-1 Black Silty SAND 4-14 6-10-1 1 1' H2O 24.58' Light Gray Silty SAND 14-60 4-4-6 3' @4" 5-7-10 5' Topsoil with Gravel 0-8 Black Silty SAND 8-19 5-6-8 1' H2O HA-2 Light Gray Silty SAND 19-60 4-5-4 3' @2" 24.91 6-8-9 5' Topsoil 0-4 HA-3 Black Silty SAND 4-18 6-10-9 1' HZO 24.59' Dark Brown SAND with Silt 1845 4-3-4 3' @ l 8" Tan/Oran e SAND with Silt 45-60 6-11-12 5' Topsoil 0-8 HA-4 L24.51' Black Silty SAND 8-31 4-4-3 1' H2O Dark Gray Silty SAND 31-47 3-5-6 3' @12" Light GraX Sil SAND 47-60 6-8-10 5' 0 LJ MUNSELL SOIL COLORATION LOGS TARAWA TERRACE AND MIDWAY PARK El 0 Table 3 Munsell Soil Classifications Child Development Center Midway Park - Camp Lejeune Marine Corps Base Jacksonville, North Carolina RFTS Job No. 507-08 Loc. Soil Description Hue Value Chroma Depth in.) Comments IN F-1 Topsoil - - - 0-4 - Dark Gray fine to medium SAND 7.5YR 4 1 4-7 - Very Dark Brown fine to medium SAND, trace of Silt 1 OYR 2 2 7-13 - Olive Brown fine to medium SAND 2.5Y 4 4 13-20 - Pale Brown fine to medium SAND I OYR 6 3 20-34 SHWTI112O a 21" Gray fine to medium SAND 7.5YR 6 1 34-40 - 1NF-2 Topsoil - - - 0-6 - Black fine SAND, some Silt . IOYR 2 l 6-14 - Very Dark Grayish Brown fine to medium SAND 10YR 3 2 14-21 - Very Dark Grayish Brown tine to medium SAND 1 OYR 3 2 21-30 SHWTIH2O 21" Brown fine SAND with Clay 10YR 4 3 30-43 - lNF-3 Topsoil - - - 0-8 - Black fine to medium SAND, some Silt IOYR 2 1 8-12 Dark Gray fine to medium SAND 7.5YR 4 1 12-15 SHWT/H20 13" Very Dark Brown Fine to medium SAND, trace of Silt IOYR 2 2 15-31 - Brown fine to medium SAND, trace of Silt IOYR 4 3 31-43 - WF-4 Topsoil - - - 0-6 - Very Dark Brown fine to medium SAND, trace of Silt 7.5YR 2.5 2 6-12 - Dark Yellowish drown fine to medium SAND I OYR 4 6 12-21 - Yellowish Brown fine to medium SAND 1 OYR 5 4 21-26 SHWT/H20 21" Light Gray fine to medium SAND 10YR 7 1 26-31 Gray fine to medium SAND some Clay 10YR 6 1 31-38 s 0 • Table 3 Munsell Soil Classifications Child Development Center Midway Park - Camp Lejeune Marine Corps Base Jacksonville, North Carolina RFTS Job No. 507-08 Loc Soil Description Hue Value Chroma Depth in. Comments LNF-5 Topsoil - - - 0-3 - Brownish Yellow Clayey SAND 10YR 6 6 3-11 - Very Dark Gray Silty SAND 10YR 3 1 11-25 - Dark Grayish Brown Silty SAND l OYR 4 2 25-29 - Light Olive Brown Clayey SAND 2.5Y 5 3 29-45 SHWT 29" Dark Gray and Light Olive Brown CIney SAND I OYR/ 2.5Y 4/5 1/3 45-50 - Dark Gray fine to medium SAND with Cla 1 OYR 4 1 50-60 H2O@52" M Table 4 Munsell Soil Classifications Child Development Center Tarawa Terrace - Camp Lejeune Marine Corps Base Jacksonville, North Carolina RFTS Job No. 507-08 Loc. Soil Description Hue Value Chroma Depth Comments in. INF-1 To soil/Black Silty SAND - - - 0-9 - Very Dark Grayish Brown fine to I OYR 3 2 9-13 - medium SAND, trace of Silt Black fine to medium SAND, 5YR 2.5 1 13-20 - trace of Silt Dark Yellowish Brown fine I OYR 3 4 20-23 SHWT/H20 SAND 22" Grayish Brown fine SAND with IOYR 5 2 23-36 - Cla Grayish and Yellowish Brown IOYR 5/5 2/6 36-42 - fine to medium SAND, trace of Silt Dark Yellowish Brown fine to 1 OYR 3 4 42-44 - medium SAND, trace of Silt INF-2 To soil - - - 0-8 - Very Dark Grayish Brown fine to 1 OYR 3 2 8-11 - medium SAND, trace of Silt Very Dark Brown fine to medium I OYR 2 2 ] 1-0 - SAND, trace of Silt Dark Brown fine to medium IOYR 3 3 17-22 SHWT/H20 SAND, trace of Silt 17" Brown fine to medium SAND, 1 OYR 5 3 22-36 - trace of Cla Yellowish Brown fine to medium 1 OYR 5 4 36-48 - SAND, trace of Clay INF-3 To soil - - - 04 - Dark Gray and Yellow Clayey I OYR 4 1 4-11 - SAND Black Silty SAND IOYR 2 1 11-17 SfYWT/H20 15„ Very Dark Gray fine to medium 1 OYR 3 1 17-31 - SAND with Silt Very Dark Grayish Brown fine to 10YR 3 2 31-36-j - medium SAND, trace of Cla 0 STORMWATER INFILTRATION TEST RESULTS TARAWA TERRACE AND MIDWAY PARK O Table 5 Guelph Permeameter Test Results Child Development Centers Midway Park and Tarawa Terrace Camp Lejeune Marine Corps Base Jacksonville, North Carolina RFTS Job No. 507-09 Site Tarawa Tarawa Tarawa Midway Midway Midway Midway Midway Location INF-1 INF-2 INF-3 INF-1 INF-2 1NF-3 CNF-4 INF-5 Elevation 24.98' MSL 23.64' MSL 23.81' MSL 31.91' MSL 31.81' MSL 31.35' MSL 30.34' MSL 30.90' MSL Depth (in.) 1035 W) 835 813 8" 811 8" 8" H3 (cm) 5 5 5 5 5 5 5 5 R, (cm/min) 1.15 0.383 0.36 0.10 0.15 0.10 0.02 0.15 Ris (cm/sec) 0.191 6.38x10" 6.Ox1O" 1.6x10" 2.5x 10-3 1.6x1O" 3.3x10 2.5x10" H2 (cm) . 10 10 10 10 10 10 10 10 R2 (cm/min) 2.00 0.733 0,66 - - - - - R2s (cm/sec) 0.033 0.012 1. l x 10" - - - - - KrS (cm/sec) 1.17x 10" 5.19x 10 4.47x 10 - - - - - Kr, (in/hr) 1.6 0.7 0.6 <0.1 <0.1 <0.1 <0.1 <0.1 (D. (cm/sec) 1.07x 10" 0.0118 2.91 x 10" - - - - - a (cm") 0.68 0.043 0.154 - - - - - Definition of Terms RI,2 — Established 3 or more constant rate of water level change (cm/min) RIS, 2s — Calculated steady state flow rates (cm/sec) H 1,2 — Maintained Head of H2O (cm) K f, — Calculated field saturated hydraulic conductivity (cm/sec) (D,, — Matric flux potential (cm/sec) a — Alpha parameter Depth — Depth of well hole (in.) Location — Test location identification number Note: Diameter of well is 3.0 cm. is j 17F rS February 15. 2009 Soils Engineering and Testing Services Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville_ North. Carolina 28451 Attention: Mr. Kevin McBride Reference: Seasonal high Watertable Estimate Existing Stormwater Pond Existing Child Development Center Midway Park MCB Camp Ujeune, North Carolina RFTS Job No. 507--09 Dear Mr, McBride: As requested, ou.r staff visited the site on February 12, 2010 to estimate the seasonal high watertable at one location near the existing stgrmwater pond located on the west side of the existing child development center near the intersection of Sutler Drive North and 3' Streets. 5easQnal HJ�Lh Watertable Estimate A hand auger bong was advanced to a depth of aplrroxirnately 40 inches below the ground surface south of the existing pond approximately 15 feet outside of the fenced area. The encountered soils were logged and visually classified by depth and a Munsell Soil Color Chart was used to determine the hue, value, and chrorna of the visually distinct soil layers. CW soil logs are presented in Table. 1 _ Soils encountered in our boring location consisted of fine sand with clay (USCS Soil Group `SC') in the upper 10 inches and was underlain by Bue sand with a trace of clay (USCS Soil Group `SP-SC') from 10 inches to 16 inches below the ground surface_ From 16 to 22 inches fine sand with clay (USCS Soil Group `SC') was encountered, and from 22 to 28 inches silty sand (USCS Sail Group `SM') was encountered. Clayey sand (USCS Soil Group `SC') was encountered from 28 inches to the boring tetatination. depth of 40 inches. Comparison of the soils to the Munsell Chart suggests the presence of a zone of aerated sons indicative of their occurring alcove the seasonal high water table extenditrrg to a depth approximately 22 inches below the existing ground surface. A measurement made 30 minutes after augaing indicated a depths to standing water in the borehole of 27 inches below the existing ground surface_ RFrS, PLLC Committed to Ae*onsive Service OMOW 910-458-1377 1305 3A [:WWAa 15M" Ave N C8(09" O"Ch. North Carolina 29128 WWW rft*HC.cwnt Fmc: Q10-4BM261 E L" 4) Cape Fear Enginming, Inc_ RFTS Job No. 507-09 February 15, 2010 Page Two Based on the location the hand auger boring was advanced and review of an existing conditions site plan drawing of the area, we estimate the approximate grou�nd,sbrlaq a elevation, to' be 7+30: MSR. CLOSURE This seasonal high water estimate should be reviewed by appropriate regulatory authorities before fioalizing the details of any civil design, Please find attached our field data. If you have any questions after reviewuig this letter, please do not hesitate to contact us at your convenience. Sincerely, 'S, PLLC David L, Winstead Field Operations Manager DLW/dlw Altt dunents Fax Copy_ Mr_ Jay Hosteft, spiel SeNtm Co., Inc. Table 1 Mwisell Soil Classifications Existing Stormwater Pond Existing Child Development Center Midway Park MCB Camp L*uve, North Carolina Rl~TS Job No. 507-09 Loc Soil DeScAption Hue Value Chroma TJepth Comments 1 TOPsDil - - _ 04 Very Dark Gray 6ne SAND xvith 2.5Y 3 l 4-10 - C Very Dark Gray and sight Gray 2.5Y 3/7 'l2 10-16 - fim SAND, trace of Slay Light Yellowish Brown and Dark 2.5Y +6/3 3/1 16-22 - Gray fine SAND some Clay Black fine S±X SAND 2,5Y 2.5 1 22-23 rsE[WT/lr�,,( 27".` U& Brownish Gray Clayey 2.5Y b 2 28 4U SAND 3C�.0 — 21 — 2 7.1 A 0 IV, 10 -'DRAINAGE--AREN �AL AREA:-66,381,SF-(1.52 A E R v 10 u 6 -A R EA.--�3 0 -,0 8 9 -S F COMPOSITE _-R� U IN 0 F F� COEFFICIENT "C": 0.56m V LF-0 I —we a Ww w ?,UNOFF L w TOTAL AREA: -59 XIIVIPERVIbu'sl� compj osil O'E' 116. I'E SITE FRqM_TWS_CATCH_BASIN_ w w "RCP I ------------- T rl SF -37 AC) 17,166 SF RUNOFF C": 0.44 4� RX�644 �rl7v 11--DRAINAGE AREA - C .� '\1 TOTAL AREA: 201,494 SF (4.63 AC) PERVIOUS AREA: 39,137 SF COMPOSITE'RUNOFF COEFFICIENT "C": 0.37 &Y C2 w ?,UNOFF L w TOTAL AREA: -59 XIIVIPERVIbu'sl� compj osil O'E' 116. I'E SITE FRqM_TWS_CATCH_BASIN_ w w "RCP I ------------- T rl SF -37 AC) 17,166 SF RUNOFF C": 0.44 4� RX�644 �rl7v 11--DRAINAGE AREA - C .� '\1 TOTAL AREA: 201,494 SF (4.63 AC) PERVIOUS AREA: 39,137 SF COMPOSITE'RUNOFF COEFFICIENT "C": 0.37 &Y C2 T 2R-0. I I PRE -CONSTRUCTION DRAINAGE AREAS I J_ $ w f w 1 I'l ER DRIV_ a 13 -All fit/7 OFFSITE RUNOFF COMING TO THIS CATCH BASIN IS ASSUMED TO BE EQUAL TO OR LESS THAN THE FULL -FLOW CAPACITY OF THE STRUCTURE'S EXISTING OUTLET PIPE (24" RCP @ 030" SLOPE = 11 5 f�ccz o If VV0 pro MIDWAY PARK - CDC STORMWATER CALCULATIONS 5-26-10 DRAINAGE AREA - 3 TOTAL AREA: 7,495 SF (0.17 AC) �11 /$\� RUNOFF LEAVES SITE FROM THIS CATCH BASIN IMPERVIOUS AREA: 3,711 SFbaA f / �,<$ a' VIA EXISTING 36" RCP ACROSS BUTLER DR: NORTH RUNOFF COEFFICIENT 0.59- r % RN�'r• r a no,Vr prn��rrr iJ�RI�= �• `-�.^ice_ �. /�-rrr--�.il� �� �•.� �_� �`r �_�_^-��" cw�sT:�:r �^_ri�i�i! ii-�. -.::..ilk .'•.�n.1lJrT•'7.:-L'4� // / /i �J//>%/. �J��%i%�%`J"/�i�����i�/J����,fJ�/����1 /�///i q \•r `�� �° � ; , 111 �••,� `���I�-'�,/I , 3uN 2 g nit —F �:=_ DRAINAGE AREA r ` `zs 75t .� 5� TOTAL AREA: 15,724 SF (0,36 AC) -� IMAGE ARIMPERVIOUS AREA: 3,768 SF TOTAL AREA: 17,485C) OMPOSlTE RUNOFF COEFFICIENT IMPERVIOUS AREACOMPOSITE RUNOFF NT i "C":0.40 / 'Y' � ti I I 1� � l � , ;! • ,PAR IMAGE AREA - 2 WEST POND ; /i' ) � • ' . / ,!•`' `L — —'— — — �,. ARE TOTAL AREA: 63,197 SF (1.45AC) IMPERVIOUS AREA: 39,427 SF I ' f,,, sy/ ,DRAINAGE :OMPOSITE RUNOFF COEFFICIENT, as��kiTOTAL AREA: 7,100 S r , •.I ff C f�yD��68� a�•; ��/� ,�I (0.16 AC) i V%�//0//J�'Ill , i ti IMPERVIOUS AREA: COMPOSITE RUNOFF /,COEFFICIENT "C": 0.21 7-0 '•"� r� ti � e' c•wvrw. r[�� j in DRAINAG AREA-7 TOTAL AREA: 30,328 SF, (0.70 AC) % PERVIOUS AREA: 8,662 SF - COMPOSITE RUNOFF 's COEFFICIENT, "C"' 0.44 DRAINAGE AREA -13 TOTAL AREA: 8,4615 SF (0.19 AC); IMPERVIOUS AREA: 4,080 SF^ COMPOSITE_ RUNOFF, COEFFICIENT "C": 0'58 r ... �..� -� 1. i. 11 DRAINAGE AREA - 8_ �� ` b �i"N TOTAL AREA: 24,187 SF (0,56 AC) IMPERVIOUS AREA: 5,601 SF OMPOSITE RUNOFF COEFFICIENT ,. C" 0.40 •"" 6RAINAGE /J AREA - 9 Sr I TOTAL AREA: / �• I A 1 ST � DRAINAGE AR { �'� � sr 7,362 SF , (DA-1 INCLUDES AREAS 9,10,11) (0.17 AC) TOTAL AREA: 117,091 SF (2.69 AC) IMPERVIOUS AREA: 263 5F y IMPERVIOUS AREA: 69,235 5F .r � COMPOSITE RUNOFF COEFFIGIENT/ COMPOSITE / ,, RUNOFF 6 �� // �J • "COEFFICIENT��// J PART OF.'DRAINAGE AREA -�1 / //% 0 / REA i I / r ,/ •.I n : iriri a o .r .- c ri a ri /n r :/ /ir,.. n •./� � r /// r �% DRAiN I I, A EAR A - 10 r 'ir TOTAL AREA: 16,008 SF (0.37 AC) X r,` ��/// I h I �� IMPERVIOUS AREA: 1,517 SF IM1 COMPOSITE RUNOFF COEFFICIENT "C" 0.30 f/ii ,. /// iiirn✓.. iii//f ifri/i,i i/i %%/�'%':' %/% �; DRAINAGE AREA - 14 DRAINAG AREA -11 ' Y. �• ' �. ; / % j //r. TOTAL AREA: 6,545 SF (0.15 AC) TOTAL AREA: 9,2$8 , / ' ' / / / / / I IMPERVIOUS AREA: 2,660 SF I' SF (0.21 AC) 1000MPOSITE RUNOFF IMPERVIOUS AREA: ; j i';' y; ///f-/ i � COEFFICIENT "C": 0.52 COMPOSITE � '� • OFFSITE RUNOFF RUNOFF COEFF. r,,s �' /• / / / / `� / %/,/ � � � "'' / r ' - / COMING TO THIS CATCH "C 0.32 �'j/,syl ��; rr ' • !' _ /�% s % BASIN IS ASSUMED TO BE EQUAL TO OR LESS THAN THE FULL -FLOW CAPA- /CITYOF"THE STRUCTURE'S EXISTING FOUTLET'PIPE''(24" RCP 0 0.30 SLOPE) = 13.5 CFS DRAINAGE AREA -12 TOTAL AREA: 23,560 SF (0.54 AC) IMPERVIOUS AREA. 10,411 SF .OMPOSITE RUNOFF COEFF,ICCIEN' jil .cQ •a �j / r /f /f/%y'i y� �,� /.� +� 1 yam• tL i pU" ,�2':.- PROPOSED DRAINAGE AREAS 57 32 d ;,! 1 DRAINAGE AREA - 15 TOTAL AREA: 10,463 SF (0.24 AC) IMPERVIOUS AREA: 2,429 SF COMPOSITE RUNOFF COEFFICIENT "C": 0.40 'v e 1 s � MIDWAY PARK - CDC STORMWATER CALCULATIONS REVISED 5-28-10 Midway Park - CDC 5tormwater Calculations Proposed Drainage Areas 6/112010 REVISED 6-28-10 Drainage Area Total Area (sf) Impervious Area (sf) Total Area, A (Acres) Comp. Runoff Coeff., C 2 yr. Precipitation Intensity, I (inlhr) * 2 yr. Peak Runoff, a (cfs) Q = C*I*A 10 yr. Precipitation Intensity, I (inlhr) * 10 yr. Peak Runoff, q (cfs) Q = C*I*A 1 includes 9,10,11 117,091 69,235 2.69 0.66 5,54 9,76 7.20 12.69 1 A 29,881 29,881 0.69 0.95 5.54 3.61 7.20 4.69 1 B 9,857 9,857 0.23 0.95 5.54 1,19 7.20 1,55 1 C 8,194 8.194 0.19 0.95 5.54 0.99 7.20 1.29 2 63,197 39.427 1.45 0.68 5.54 5.46 7.20 7.09 3 7,495 3,711 0,17 0,59 5.54 0.56 7.20 0.73 4 15.724 3,768 0.36 0.40 5.54 0.80 7.20 1.05 5 17,485 3,286 0.40 0.37 5.54 0.81 7.20 1.06 6 7,100 436 0.16 0.27 5.54 0.25 7.20 0.32 7 30,328 8,662 0.70 0.44 5.54 1.68 7.20 2.18 8 24,187 5,601 0.56 0.40 5.54 1.22 7.20 1.59 9 7,362 263 0.17 0.26 5.54 0.24 7.20 0.31 10 16,008 1,517 0.37 0.30 5.54 0.61 7.20 0,79 11 9,288 1,125 0.21 0.32 5.54 0.37 7.20 0.49 12 23,560 10.411 0.54 0.55 5.54 1.64 7.20 2,13 13 8,461 4,080 0.19 0.58 5.54 0.62 7.20 0.81 14 6,545 2,660 0.15 0.52 5.54 0.44 7.20 1 0.57 15 10,463 1 2,429 0.24 0.40 5.54 0.53 7.20 0.69 Midway Park - CDC 5tormwater Calculations Pre -Construction Drainage Areas 6/1/2010 Drainage Area Total Area (sf) Impervious Area (sf) Total Area, A (Acres) Comp. Runoff Coeff., C 2 yr. Precipitation Intensity, I (inlhr) * 2 yr. Peak Runoff, Q (cfs) Q = C*1*A 10 yr. Precipitation Intensity, I (inlhr) * 10 yr. Peak Runoff, Q (cfs) Q = C*1*A A 66,381 30,089 1.52 0.56 5.54 4.70 7.20 6.10 B 59,871 17,166 1.37 0.44 5.54 3.32 7.20 4.32 C 201,494 39,137 1 4.63 0.37 5.54 9.48 7.20 12.32 * NCDOT Storm Drainage design criteria calls for minimum time of concentration to be 10 minutes, for Rational Method calculations. Intensities are based on Tc = 10 minutes, for small drainage areas (<2 acres). JUN 2 9 2010 ' r u7eni /'bRAINAGE - l ZE AREA .3 z9I. I Lrl / J1 A a 1 li l k�\ i RUNOFF LEAVES SITE FROM THIS CATCH BASIN ,�f �rasti \ -~ VIA EXISTING 36" RCP ACROSS BUTLER DR; NORTH a I au:.3:sv � n:• fS. r:.�.s � !.lirlO�l'l'1�� lFra.11w._/�1.� �/ / / rbr ti�i/�p,.L"-•��/h�' •,� "i ;;Y / . /w'-=;,�/�/�..�./��f ����,///%I/ �EPE i 1.1 —.xa. —' ,/.. /i.,,.r r, i' /i ... . / ', r, AREA - 13✓`\ ti m n�s f r'r /!//iT//%I rs` c 71_•l_LiiY�r �-...L •.Ili iIi 7/i r../i _i-i, ri./ I3i IP 914cs. :SWALE 91 z9- ��T- PIPEs r\� r t 3° 2 DRAINAGE ln��� 1 ` 5 DRAINAGE 1PE#g ST ARES� A - 5 `. �. DRAINAGE,%/ AREA - 8 'I �' .�•.� i I , I I I �T IPF�# / "AT OF D/ /DRAINAGERAINAG 9 / / , j AREA - 2 AREA - 9 DRAINAGE AREA - 2 (WEST POND) e \ � / .�'s,�',��,�� �� I I , � �I/ . , /1', / • / / / / � r /, / � Q f /PART OF DRAINAGE AREA ./�. j',,, Y� ; /%/�� ./// lT = �Q tc► '1If ''/; �, Y ' ,may///I/.f• DRAINAGE AREA - 6 �/.�./ ,..< . , „ ,.., .r > � •/ . / .%% ."� _ DRAINAGE / . �a���'`,:r,. ,_x.F� � . �- h..�^u:: � ., \ �k\ • :���° � AREA • 10 � • %///% • �/ � _ IT dt``� % l'` -�. % I////G �I �I DRAINAGExo�, AREA-7 /.,�# DRAT AGE � Q[ , / � • �� I ARE -11 77 ,77 7,/ WRKSF P ',�DRA[NAGE AREA -1� i�/l (EAST POND) `� VIA pxj 1 � i/♦ / a /, � / /.f. _/, lam. �,,///� // / /� 1 rU7 No CAT, 94a, 7�/r DRAI AGE AREA -12 A �I' ;,, � ? �✓ ra<>j' fir. ,� I %� .�,r%3 ♦-:`�"— `ry , �,r(' /6.0 t'�" ' j.�_'.�y.,,6.� �. I [.,;3'� D,� i < ,V C!V / ` -!/✓12 1 DRAINA 5 %� i �/� ��9 I rr j / sr :-r/,;.—a AREA -15 1 I I'/i'/ '//'/ % 1 I ��tl� v4'�'c ice,• � /> � �'"j'`.. ,s'�• �� ,I�.,l I6Y: MIDWAY PARK - CDC PROPOSED STORM DRAIN SYSTEM STORMWATER CALCULATIONS REVISED 6-28-10 A el et A C F. Z 0 KEYNOTES - MIDWAY) ❑ a w L. PRECAST CW_RETE HEADWALL. SEE DETAIL 27/C-503. L[AIti5 CF C15i�1RBANICF SEE PEERAUT _ _ - .^w�-w�• 2. PRATE. MODEL ND. STQ7ODDb j-T3,STRulcTDRE-CLNS INLEI. PWIDEROWS AND OR INSTATE ERNE AND 90UNDAF Y PLAti Tn� SHEET _ 4 �^, w - �_ w -�: * : r >E ___ - - - - GRATE. MODEL ND. IALt lI-T3. BY EAST ACCORDANCE IRON w NC l APPROVED EQUIVALENT. QQ I w • . - . - 4 -- \ - MATERIALS AND IHSTALEA7LpN TO BE IN ACCORDANCE wl iH NCO07 5[AlIDARbS AND - - •_� _ .-*-r-_ter-w��e �* r---w�- llldd::'•• SPECIFIGTIONS- ,y _ _ __ - r ^M - r•. - _ "_'IS-- = --•-+^ 1. 3. PRECAST CONCRETE STOW STRLICTLHE - CATCH BASIN INLET. PROVIDE AM INSTALL ERNE 'l ,7- w -' - '� . .. - - - _ AND FRAME. MWEL NO. SWD-MI. BY EAST JORDAN IRON WOWS. OR APPROLED "TO, II TJGRATEtl0.50. • "� -4 EQUIVALENT_ uATERIALS AND INSTALLATION 10 BE 4N ACCORDANCE WITH NLDOT RI ,i ' -•-_ _ -,-- 3914/- ! _ �' __ _ _ '�'_- _Y. IVON)-27.40'-. •._L _ ••- �% STANOARi3S AND SPECIFICATIONS- . -'ate _ _wp.•1 - - _ _ - _ _ _" _ 39.60 -`i - _ - _ .- _ _ - .�L - «« _ - _ - MJV: 15'fOUi}27d0 _ �'' _ -. ..n �� 4 % 4. STOW DRAIN PIPE (RC'). SEE DETAIL S/C-5p1. SEE PLAN FOR SI7E, SLOPE AND INVERT -' ELEVAi,ars, 4 �,• .._i3 _ ;� -- - a 1,= "«r.--•sue--•,---F•. --r -ti- - - 157-: 19 �`�. �` LLI _- " y �i5 ROOF DRAIN PIPE (HOPE. N-72 kATER-TIGHT PIPE BY A05. OR APPRWED EW IVALENT). -' LU - T I.E. T11Dp28.50 � 'ram - _ _ E--� '', s1 /"' `�; ���__ !-l�� • 1'� �r Jir SEE DETAIL 9/C-507, PROVIDE ClEANOUT AT ALL BENDS, TEES AND INTERSECTI DNS. SEE �L I g _ „' :may- ♦ ` s `e V _ 1 •J�J� DETAIL 7/C-501. 11.8% 9LF�-�i T1B7RlICTw!l,BO I 1 S ))-j{I 0 J 6. PRECAST CONCRETE POND OUTLET STRUCTURE. SEE SHEET C[ 4pp-M FCI? ADDITIONAL I I TLC _ WV, 1r w)-28.a6 E .��['St'� /J i e � r �4� ' ' >a _. 1�r' ,.;�, J' J %, rNFDFAfArICN. 33� _ _ _ _ _ _ _ _ NV. 24"IW).25.55 �11,.•4, r 37. 30 77 lam. �m `, ����, - ' 7. DOWISPOUT COLLECTOR. SEE DETAIL 72/C-501. COORDINATE SIZE AND LOCATION OF • INV. 30'(OVT)=25.55 �YY''�� 'ILl I y •. j �,J+' DOMSPOUTS WITH ARCHITECTURAL DRAWINGS, TN ST ~sT A �0�4x11• 1 Y Ji ' 4 �./J• 8. CONCRETE MITERED HEADWALL. SEE DETAIL 20/C-502. 329 Lc ST ► } -'� / •5 i 9. CLEANOUT. SEE DETAIL 7/C-501. A. �I T -sr 10. PRECAST CONCRETE STORM STRUCTURE - CATCH BASIN INLET. PROVIDE AND INSTALL FRAME AND GRATE, MODEL NO. 6610 "DITCH GRATE". BY EAST JORDAN IRON WORKS, OR APPROVED � I.E. IRD'7.3040 "' EQUIVALENT. MATERIALS AND INSTALLATION TO BE IN ACCORDANCE WITH NC110T �1 E. {AD}SI.00 I.E.(R0�3190 S 1 �IsT -Sl ISTI s®Q''-sY - `� -,. 4 I.E. �p29,95 STANDAfmS AND SPECIFICATIONS. 7 + I A 1 9 L;l0lMTE�220 I. TNGRATE., { L ' 11. PRECAST STORM STRIICTLFIE TO BE 5 Fr. DIAlEIER, MIN. I17V15'0 . i1%T�79.33 MV. l5i7NP28bO-o- -r, VVET OErcNr7E3N BASIN EMP'EAS r PONEY. SEE 17. PRECAST CONCRETE STOW STRL1CTl1RE -DOUBLE CATCH BASIN INLET. PROVIDE AND WV, iS{OUT)=28-80 a SHEET CC-402-M FOR ADDITIONAL INSTALL FRAME AND GRATE. MODEL NO. 5235, BY EAST "DAN IRON WORKS. OR APPROVED II4Ff7RMATION. SEE EAST POND DRAINAGE EQUIVALENT. MAIERIALS AND INSTALLATION 20 BE IN ACCORDANCE WITH NCODT /`' - \ -s i '%'" t a AREA PLAN, SHEET CG-106-M. STANDAIAiS AND SPECIFICATIONS - L N 13. PRECAST Op1a7tETE STpPBe STRUCTURE - JIMCTION BOK. PFi0VI0C AND 1-1-L FRAML -I IR. IIIL E16. i000 - 7YPE A. BY EAST JORBAN IRON eGRNS, DR APPROVED 33.x� ' I I. ) N-P- EQUIVALENT. MA7ERlALS ND INS7µlAT lO F4 BE IN ACCORDANCE FTH NCDOT T ! II � - � 4 ' SIANDAROi ANQ SPEC IFl CFT IONS 32.90 �� \ f♦♦ jI1 1L1 �F\` YPARK ,Tss v.m \� � } !T ! ror.AAaw0FwvN.wsmpyAlFuarMraITSOF09TFdIAN* CHILD DEVELOPMENT CENTER �.�-AL Z i'- seEUN�YAe�a3eLowr�ne�rus+c6�wuuaT.,rs. rrGRArE IR1NIp3o.70 u5� FFE = 34,4() \ F I s;.6o = r ! r. -__ W -; +-_ * - _W- 7 INVfS'TINp25A0 INN oc.z4•fDtlTpn.l.N- � � @ � �� \ � 1 , uL 1, :. \ LJ !•� � ! *,� �. _ _ = .4•_ si-� a�-�=C-�rs: � :;�.- _-_ .tit• jt_ •� 10 J2.9p � ' 7 Sir• •..r �} � ... __lL ��' bf�--Si- � '�: ��_ � 6iAAL g' \ 1 .'j :'ti+ _ �I 7'+ V : ✓'r'�P' e' "''=a"' _- -- -+ a` I� �' �_.` E- -r�'Q j St• t S1� i 9 ar f F I I{_ t l j of [\ \\mm \\\\\\\\\\\\\\\\ \\ .\\\\\\\\ \\\\\\ _' ` I� C r7GRAT> az.7 I _ m r, •; ^ _ ` - 1 F[ L� yyAd 1 INV. 16 INIV. 1Sf Wp28.13._ h ,S k� r' 1 1 • 17 - I I-ti3r-- I _ - h-•r- j I 4 BI\ •, \-12'-17 17- - aY tF 4 \ i� T'J WV. 18"(OUTkwn.00_ I.E. 0 29.4aLl m r ALL g•-RCP{ 1P'A sl �1 EADWALLI,6")v�f 1_1� E p�I` 31.05 \ L•R` 5 / k°# sly `��S} Doi LF 1 , NV..2r,66 f •1, ^r-_ 1 •�i ,- -'ll6- QI /WKL \ LL _. _ - -- �3 6 n r r `'``l�1 �.s• 1:_, j I� Y f'��, ING PT 2 S' �'' r • `l•r,53 p{� ' )�.y 7',i _L I. } �ti ��� �s`�I ..T. ri INV. 24 28.1 P�2pi •'t t1y�7 `� r'. I { -taf ASRATE00 t J1 6N. ,8'=28.77 W I I2S LF !_;E INN. 7 S- OJ 29.20 1 l E 11 2I2 fi ✓��. .R�- t .-�.' �7 INV. 18"(DUrp29i I' B/YALL \ 4ra�3A 1 41 ��'j EE 3a.as I _ 7 .I. •1 Txv u... �37s J1 ,` ter- t _ ;TNBRATEM,7! E i ` 1!' .\ • + .. / N ¢ si} "¢T _ i `N '�, ` PTV. is fDL7IpQ656�.•IIi .,IIY 1. 7"I. \ - . -�• , . .,J=� �ti--r�r:.-+--ry--��-'"r-- ,,.� _ _ - I .`' I _ �-_ -7- ' .�✓�'� 4 r--27�OOJ + \ \I 3400 33.SS 33.15 7 1 0 I 3 .6 IN 911Arwm 7Tp27.67 TIGPATTE KM).29.90 �_�_+I�/ Ihv. 15'pN]•28.80 't3_40 �.l`"", :IL_ � - '� YC{OV!�%•2926.87 wf'M 50-TIGR5TE-32.55 I1 In I - ` r `%�.. % , INV. 15JOUTr309A-``�,• EAMALL1,6'jSs.10 NV..i8.7S .. HEAOWALUl "Ifr JJ }{ f�!J•J;J -1-INV.=29 E111 j �I E _ ' ' � - -' :-=` ?� 31-a 51.39 � � • Lu4rrS OF DISTURBANCE. SEE PLRMYr 3.1.55 34.40 - L BOUNDARY PLAN. THIS SHEET F : ` , ." I j^ ,° ["� • IMTS OF DISTURIi+VJCE'{- % SMPFiAUTBOLINIXOM,- • I ` t r w'n' ' . �i' ... •PLAx. TFE44 St1EE?�� . _ . � - � •- 34.09 I I + . . PRl13N:W rRUI= MIDWAY GRADING & DRAINAGE JUN 2 9 2010 NORTH NDHIH GRAPHIC SCALE SUPERCEDES NL4.IERIC SCALH 0 15' 30' 60' JJ �j y. SCALE: 1' = 30' � 7 ,4;,,n i Jµ--" �..A.i- �a':lT. -I' . �__-ESS'-' 6-.7�F.•_a 171078CT TRUE PERMIT BOUNDARY PLAN NORTH NORTH GRAPHIC SCALE SUPERCEDES NUMERIC SCALE 100' 200' SCALE: 1" = 100' U,. T.W. Ulna LonV pirecllon L, 27.753 S21' 56' 24.56'w L2 30.265 304- 46- 19.487E L3 22.774 S22' 01' 02.57E L4 40,792 $47' 22' t19 79'E L5 10.745 S37 1S' 40.98'W 2 101560 $53, IV so-O8"E L7 10.640 N36, 55' 4i.95"E L8 =232 Syr 47, 34.401E L9 10.50 N38. 2W 2249-E !10 7t097 N3V 07 4L22'W L11 M...NIT lY 53.97E L12 1 47.312 97Y IN 38 OVE L13 131.890 SW 46. 51.25'E 1­14 $1.321 ser 17 37.88'w L15 79.642 1450- 39' 23, 22-W L16 121.538 S39- 15 16L64'' L77 1.060 550' 30' 01.31 -E LID 120.297 N39' 1S- 42.98-E L19 76.043 550' 3T 2A.52-E L20 1J4.028 539' 21' 08.35"w L21 69.233 HBO' 37' 41.37'W the %bl. LA.. A Lmpth Dk tko L22 1.467 S40' 51' 29, 50'w L23 70565 SW 40' 37.41"E L24 136.122 N39' 24' 52.34'E L25 91.535 N54- 45' 32, 66'E L26 82.406 gyp' I1' 28-74 E L27 35236 S2Y 0V 09,30`w L28 4.43T SW Dr 11.39"W L29 2D5.p63 Sop- 58' 11) 42"W t.30 19 Mi N61. _W 22.00'W L31 17.631 547 5,' 33.27-W L32 5>_588 S51- DY 4R27'L L33 34.771 S6r 57- 07.20"C L34 26.661 SW 227 59.94'E L35 30.581 N70' 24 36.40'£ Lib 13,493 N39' 24' 46AYt L37 155.968 NIS- 16' 31.66'E UM 39.336 N17' 32' UA VE L39 44.629 N09' t5' 25.41'E t40 57.144 585't2' W�85'W Lel 16529647:50`w L42 41-691 N2]' 11' 4D.94'w Lino 7*61. un. / Lmgth DW' tion L43 37,140 N27' 15' 10.19"E L44 11.446 N12. 56' 11.16-E L45 50.044 N31' 2D' 40.E4"£ L46 28.7Q N21' 20' 00.70'w L47 1C.709 N4V 34' 10.68-E L40 S9.924 NSp' 21' 27.91'w L49 21,834 N36' 40, 22191E EDO 22.057 1450' 22' S368'w 1Sl 22.041 S39' S3' 18-82-w L32 16.575 S82- 22- 1079-W L33 82.604 H47- 3w 03.34-w L54 5.485 H36- vV 04341E L35 61.053 NOS' 47' 19.65W L58 91,654 N45' 23' 1511'W L37 23.967 S75 28' 04, 48-W L38 116.200 549- 23- DS 30'W L59 t5.595 561' 2T' 31 A2'W LDO 72.179 S36' S6' 32.21'w LOt 94,200 54D' 36' S3.o2'w 762 09.543 S68 28' 18-91'w L63 69.216 S46' 54' 47.85'w FN ID DOCUMENTS s = E w Z J_ € z EU) n Q Y L1! LLT pow ?y aF- �z 0 a Uj U c+� 7 roo p ll l Q z am Q U) a w I I O_ t7 Z SS W L.i Z O 4 5 �� U Q �..T� ❑_ 4 �¢ ca.3 g¢g U 9Zf 5 1wW.(.l.O: vtpppeNll tJ N40085-09-G3222 12571982 e 0 Midway Park - CDC Stormwater Calculations Proposed Drainage Areas 6/1/2010 Drainage Area Total Area (sf) Impervious Area (sf) Total Area, A (Acres) Comp. Runoff Coeff., C 2 yr. Precipitation Intensity, I (inlhr) " 2 yr. Peak Runoff, Q (cfs) Q = C*I*A 10 yr. Precipitation Intensity, I (inlhr) * 10 yr. Peak Runoff, Q (cfs) Q 1 84,053 66,233 1.93 0.80 5.54 8.52 7,20 11.08 1 A 29,881 29,881 0.69 0.95 5.54 3,61 7.20 4.69 1 B 9,857 9,857 0.23 0,95 5.54 1.19 7.20 1,55 1 C 8,194 8,194 0.19 0.95 5.54 0.99 7.20 1.29 2 63,197 39,427 1.45 0,68 5,54 5.46 7.20 7.09 3 7,495 3,711 0.17 0.59 5.54 0.56 7,20 0.73 4 15,724 3,768 0.36 0.40 5.54 0.80 7,20 1.05 5 17,485 3,286 0.40 0.37 5.54 0.81 7.20 1.06 6 7,100 436 0.16 0.27 5.54 0.25 7.20 0.32 7 30,328 8,662 0.70 0.44 5.54 1.68 7.20 2.18 8 24,187 5,601 0.56 0.40 5.54 1.22 7.20 1.59 9 7,362 263 0.17 0.26 5.54 0.24 7.20 0.31 10 16,008 1,517 0.37 0.30 5.54 0.61 7.20 0.79 11 9.288 1,125 0.21 0.32 5.54 0.37 7.20 0.49 12 23,560 10,411 0.54 0.55 5.54 1.64 7.20 2.13 13 8,461 4,080 0.19 0.58 5.54 0.62 7.20 0.81 14 6,545 2,660 0.15 0.52 5.54 0.44 7.20 0.57 15 1 10,463 1 2,429 1 0,24 1 0.40 5.54 0.53 1 7.20 0.69 Midway Park - CDC Stormwater Calculations Pre -Construction Drainage Areas 611 /2010 Drainage Area Total Area (sf) Impervious Area (sf) Total Area, A (Acres) Comp. Runoff Coeff., C Inten 2 yr. EF� , Q (cfs) Q = C*I*A 10 yr. Precipitation Intensity, I (inthr) ` 10yr.Peak Runoff,Q (cfs) Q = C*I*A A 66,381 30,089 1.52 0,56 5.54 4.70 7.20 6.10 B 59.871 17,166 1.37 0.44 5.54 3.32 7.20 4.32 C 201,494 39,137 4.63 0,37 5.54 9.48 7.20 12.32 * NCDOT Storm Drainage design criteria calls for minimum time of concentration to be 10 minutes, for Rational Method calculations. Intensities are based on Tc = 10 minutes, for small drainage areas (<2 acres). Camp Lejeune — Midway CDC Stormwater Pond Calculations — East Pond 0 5-20-10 TREATMENT VOLUME Calculate the Required Treatment (Temporary) Storage Volume: (V=3630 x Rd x R, x A) from gage 3-3, NCDENR BMA Manual Rd = 1.5 in. (Design Storm Rainfall Depth — Coastal Region) R, = 0.05 + 0.9IA, where IA = Impervious Area/Drainage Area A = Drainage Area in Acres For East Pond, Drainage Area = 84,053 sf = 1.93 ac. Impervious Area = 66,233 sf = 1.52 ac. IA = 66,233/84,053 = 0.79 R, = 0.05 + 0.9(0.79) = 0.76 —i V = 3630 x (1.5in.) x (0.76) x (1.93ac.) = 7986 W - required treatment volume Check volume available between elevations 30.00 Permanent Pool and 30.80: Contour Area rr 30.00: 2,128 sf (Forebay) + 6,762 sf (Main Pond) = 8,890 sf Contour Area G?a 30.80: 2,715 sf (Forebay) + 8,887 sf (Main Pond) = 11,602 sf • —> Volume available = (11,602 + 8,890 sf)/2 x 0.8 ft. = 8,196 ft' > 7986 (req'd) OK SURFACE AREA Calculate the Required Surface Area at the Permanent Pool_ Elevation: From Table 10-4, Chapter 10, BMP Manual (For 90% TSS Pollutant Removal Efficiency) Assuming average depth of 3 fl., with a percent impervious cover of 80% (76% rounded Grp): Required surface area is 9.4% of the total drainage area —+ 9.4% of 84,053 sf = 7,900 sf < 8,890 sf provided OK AVERAGE DEPTH Calculate the Average Depth of the Wet Detention Basin (East Pond): From Page 10-5, Chapter 10, BMP Manual: Average Depth (d cv) _ /0.25(1+Arw,j,,r�At-c,mP�aril + (Arur wf +Aivp.,,d1/2 x (Depth/Aeis�,er�] where: Surface area at the bottom of shelf (includes Main Pond and Forebay) ft' APcrmroo[ = Surface area at the permanent pool elevation -(includes Main Pond and Forebay) ft' �A,3,p,,d = Surface area at the bottom of pond excluding sediment storage (Main Pond only) R2 Depth = Vert. distance between the bottom of shelf and bottom of pond (excluding sediment storage) ft -- d,,V = [0.25(I + 7,041 /8,890)] + [(7,041 +402)/2 x (5.5/7,041)] = [0.45] + [2.90] = 3.35 ft. > 3 OK Midway CDC — East Pond Calculations Page 2 of 2 VOLUME OF FOREBAY ® Check the Permanent Pool Volume of the Forebay compared to the Total: Forebay permanent pool volume should be between 18-22% of the total permanent pool volume Permanent Pool Volume in Forebay = 3,904 ft3 Pennanent Pool Volume in Main Pond = 14,599 1.13 — Total volume = 18,503 ft3 Forebay is 3,904/18,503 = 21% of Total Volume OK • 0 ----------- RD Ix" RD F-- rAl SF SF -SF 31 1�6 30 77 POOP V6 8 25 Zb+S .2 5 9 CiLmi 0 g�.e tOS"/70 (1*4?, S /rA (N (C) CO zr, (&/sEbimwr sTiu4rr.) Z(V -/I W. A ,52 C') I "7 2 1 Z 7.9 5 (PVM - fw) lb-S 2449.28 (T/Smf) 34 z6Q.-Il (TEMP. skbe� mlvWA%( - Cvc - STI<nt�¢. EAST Po*40 DeSVW RD F-- rAl SF SF -SF 31 1�6 30 77 POOP V6 8 25 Zb+S .2 5 9 CiLmi 0 g�.e tOS"/70 (1*4?, S /rA (N (C) CO zr, (&/sEbimwr sTiu4rr.) Z(V -/I W. A ,52 C') I "7 2 1 Z 7.9 5 (PVM - fw) lb-S 2449.28 (T/Smf) 34 z6Q.-Il (TEMP. skbe� mlvWA%( - Cvc - STI<nt�¢. EAST Po*40 DeSVW Pond Report Hydraflow Hydrographs Extension for AuloCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Wednesday, May 19, 2010 Pond No. 2 - East Pond - Forebay Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 26.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incl. Storage (tuft) Total storage (cult) 0.00 26.00 166 0 0 1.00 27.00 461 301 301 2.00 28.00 878 658 959 3.00 29.00 1,451 1,153 2,112 3.50 29.50 1,801 811 2,923 4.00 30.00 2,128 981 3,904 4. 1,148 5,05 5,00 31.00 2,863 1,332 6.384 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [S] [Cl [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 0.00 0.00 0,00 0.00 Invert Ell. (ft) = 0.00 0.00 0.00 0.00 Weir Type = - - - Length (ft) = 0.00 0.00 0-00 0.00 Multi -Stage = No No No No Slope [%) = 0.00 0-00 0.00 nfa N-Value = ,000 .000 .000 nla Orifice Coeff. = 0.00 0.00 0.00 0.00 E01.0nlhr) = 0.000 (by Contour) Multi -Stage = nla No No No TW Elev. (ft) = 0.00 Note'. CulverUOrifice outflows are analyzed under inlet (ic) and outlet (oc) cortrol. Weir risers checked for orifice conditions (ic) and submergence {s). Stage 1 Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Cfv C PrfRsr Wr A Wr B Wr C Wr 0 Wit User Total ft tuft ft cfs cfs cfs cfs cfs cfs efs cfs cfs cfs cfs 0.00 0 26.00 --- --- --- --- --- - --- --- 0.000 1.00 301 27,00 --- --- --- --- - 0.000 2.00 959 28.00 --- --- --- -.- 0.000 3,00 2,112 29.00 -- --- --- --- --- --- --- 0.000 3.50 2,923 29.50 --- --- --- --- - --- 0.000 4.00 3,904 30.00 --- --- --- --- --- --- 0.000 4.50 5,052 30.50 --- --- --- --- --- 0.000 5,00 6,384 31.00 -- - -- - --- --- - -- 0.000 V TOIIAL Ct-acA'&C L*-0 a 709)4. ?b%L EILWI = 3904- t 14599 = [ 5,503 eF Fo¢IESA-1 V01,a PVXA,%, %5- bS ! - °Zo = Z ° o AF fit- �J HAW 0 1[otwqlr A ml.Ake '�Cnwesl RV. 3b.6b � 3�.oa = C 1VAr - 391,�) +(ZZ,-777 - l4F-M� Z4 80 + 6 112> Pond Report • 0 Hydraflow Hydrographs Extension for AutOCAD® Civil 3D® 2008 by Autodesk, Inc. v6.052 Wednesday, May 19, 2010 Pond No. 1 - East Pond - Main Pond Data Contours - User -defined contour areas. Conic method used for volume calculation, Begining Elevation = 24.00 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 24.00 402 0 0 1-00 25.00 839 607 607 2.00 26.00 1,403 1,109 1,716 3.00 27.00 2,045 1,714 3.429 4.00 28.00 2,789 2,407 5,836 5.00 29.00 4,125 3.435 9,271 5.50 29.50 5,241 2,336 11,607 6.00 30.00 6,762 2L992 14,599 _ 6.50 30.50 8.441 3,793 18,391 7.00 31.00 9,106 4,385 22,777 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [g] [C] [Dj Rise (in) = 0.00 0.00 0.00 0,00 Crest Len (ft) = 0.00 • 0,00 0.00 0.00 Span (in) 2 0.00 0.00 0.00 0.00 Crest El. (ft) = 0-00 0.00 0.00 0,00 No. Barrels = 0 0 0 0 Weir Coeff. = 0.00 0,00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type - -- _ Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0,00 nta N-Value = .000 .000 .000 nla Orifice Coeff. = 0.00 0.00 0.00 0.00 EAL(inthr) = 0.000 (by Contour) Multi -Stage = nfa No No No TW Elev. (ft) = 0,00 Note: Culvert)Orifice outflow$ are analyzed under inlet (ic) and outlet (0c) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage 1 Storage ! Discharge Table Stage Storage Elevation CIv A Clv B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total It tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 24.00 _._ . -- -- - - 0.000 I.00 607 25.00 --- -- _ ... •-- ... --- --- .•. --- 0.000 2.00 1,716 26.00 .._ ... __- --- 0.000 3,00 3,429 27.00 ._ ... --_ -_- _.- 0.000 4.00 5,836 28.00 -• - - -- --- -- 0.000 5.00 9,271 29.00 --- - --- 0.000 5.50 11,607 29.50 ..- -- --- --- --- 0.000 6.00 14.599 30.00 --- -- --- --- 0.000 6.50 18.391 30.50 --- --- --- --- 0.000 7.00 22.777 31.00 --- -- --- - -- - --- --- --- 0.000 • Average Depth Calculation - Wet Detention Basin Figure 10-2b - NCDENR Stormwater BMP Manual 511912 010 East Pond West Pond A (Bot_Shelf) (sf) 7041.3 A (Bot_Shelf) (sf) 3990.76 A (Bot_Pond) (sf) 401.68 A (Bot_Pond) (sf) 312.6 A (Perm —Pool) (sf) 8890.03 A (Perm_Pool) (sf) 5407.65 Depth (ft) 5.5 Depth (ft) 5 Average Depth (ft) 3.35 Average Depth (ft) 3.13 Camp Lejeune — Midway CDC Stormwater Pond Calculations — East Pond 6-28-10 TREATMENT VOLUME Calculate the Required Treatment (Temporary) Storage Volume: (V=3630 x Rd x R,, x A) from Page 3-3, NCDENR BMP Manua] Rd = 1.5 in. (Design Storm Rainfall Depth — Coastal Region) Rv = 0,05 + 0.91,,, where I„ = Impervious Area/Drainage Area A = Drainage Area in Acres For East Pond, Drainage Area = 1 ] 7,091 sf = 2.69 ac. Impervious Area = 69,235 sf = 1.59 ac. I„ = 69,235/117091 = 0.59 R, = 0.05 + 0.9(0.59) = 0.58 --> V = 3630 x (I.5in.) x (0.58) x (2.69ac.) = 8,521 ft' - required treatment volume Check volume available between elevations 30.00 (Permanent Pool) and 30.80: Contour Area @ 30.00: 2,128 sf (Forebay) + 6,762 sf (Main Pond) = 8,890 sf Contour Area @ 30.90: 2,789 sf (Forebay) + 8,996 sf (Main Pond) = 11,785 sf —> Volume available = (11,785 + 8,890 so/2 x 0.9 ft. = 9,303 fe > 8,521 (req'd) OK SURFACE AREA Calculate the Required Surface Area at the Permanent Pool Elevation: From Table 10-4, Chapter 10, BMP Manual (For 90% TSS Pollutant Removal Efficiency) Assuming average depth of 3 ft., with a percent impervious corer of 60% (59% rounded up): Required surface area is 7.0% of the total drainage area — 7.0% of 117,091 sf = 8,196 sf < 8,890 sf provided OK AVERAGE DEPTH Calculate the Average Depth of the Wet Detention Basin East Pond): From Page 10-5, Chapter 10, BMP Manual: 7JUN 2 9 2010 Average Depth (d,,,,) = J0.25(1+ARAner1AP,,.Pnnd1 + J (ABAh,rf+ AR/rn„d)/2 x (Depth/A jv j7e,�J BY. where: A13,s,,v,te = Surface area at the bottom of shelf (includes Main Pond and Forebay) ft' ApeYmpoo, = Surface area at the permanent pool elevation (includes Main Pond and Forebay) ft' A,jrpond = Surface area at the bottom of pond excluding sediment storage (Main Pond only) ft' Depth = Vert. distance between the bottom of shelf and bottom of pond (excluding sediment storage) ft —> dAV = [0.25(I + 7,041 /8,890)] + [(7,041 +402)12 x (5.517,041)] = [0.45] + [2.90] = 3.35 ft. > 3 OK Midway CDC — East Pond Calculations Page 2 of 2 VOLUME OF FOREBAY Check the Permanent Pool Volume of the Forebay compared to the Total: Forebay permanent pool volume should be between 18-22% of the total permanent pool volume Permanent Pool Volume in Forebay = 3,904 ft3 Permanent Pool Volume in Main Pond = 14,599 ft3 —> Total volume = 18,503 ft3 Forebay is 3,904/18,503 = 21 % of Total Volume OK JUN 2 9 2010 BY: Camp Lejeune Midway CDC Stormwater Calulations - East Pond Orifice Flow 1 Treatment Time Calc. 6/2812010 Temporary Storage Volume (cf) = 8196.00 Total Mead (Temp Storage - Inv. Orifice) (ft.) = 0.90 Orifice Diameter (inches) = 1.75 Coefficient of Discharge = 0.59 Cross -Sectional Area of Orifice (so = 0.02 Acceleration of gravity (ftlsecz) = 3220 0 = C a *A'(2gH) o.s (Pg. 3.5.2, BMP Manual) (H is assumed to be Total Head13) Resultant Flow, Q (cfs) = 0.04 Time to Discharge (Days) = 2.19 JUN 2 9 2010 Y. Midway Park - CDC Stormwater Calculations Proposed Storm Drain System - Pipes 6/1/2010 -- REVISED 6-28-10 Pipe No. Pipe Size Pipe Slope % Contributing Drainage Areas Total yr. Peak Flow, Q (cfs) 10 yr. Velocity (fps) Pipe Full -Flow Capacity (cfs) 1 18" RCP 2.0 1 (Includes 9, 10 & 11) 12.69 10.03 16.09 2 24" RCP 0.4 *Offsite, 14,15 14,76 5.60 15.50 3 15" RCP 0.5 1 C, 9 1.60 3.57 4.94 4 15" RCP 1,0 14 0.57 3.43 7.00 5 15" RCP 0.6 1A 4.69 4.95 5.42 6 15" RCP 0.5 9 0.31 2.10 4.94 7 15" RCP 0.5 11 0.49 2.49 4.94 8 15" RCP 0.5 12 2.13 3.81 4.94 9 30" RCP 0.4 -Offsite, 13, 14, 15, East Pond Discharge 15.61 5.81 28.10 10 15" RCP 1.0 West Pond Discharge 0.03 1.36 7.00 11 15" RCP 0.8 8 1.59 4.24 6.26 12 15" RCP 0.6 7, 12 4.31 4.85 5.42 13 15" RCP 1.0 1-13, East Pond Discharge 0.85 3.74 7.00 14 15" RCP 3.0 1 East Pond Discharge 0.04 1.81 12.12 JUN 99 2010 } 3, 130 ^� 2� - - --t"1AO1 P64P . z l '19•'l Z �S ti Sta2ac �� Z 3iZ•(ao CSC � 24 r"_ 10 t -n ' 2.(o 2Zi1.8lo z7.5 4083,1.1 (Peet I o v LL i N 1t� rr l �8 LC)j I ; Z8.7 .Tr fP (TLMP (/} I y i • l L ' S s 1 CN I I �1 .r L vlP ` 0 �fr tAtr cWPI - CXW, wp,s,r pomo test A S- t9-t.D 'Fa•R�PS�►Y I I 27.5 1 SZ4, 04 za -- i 59 i. ►2 (r/swetr-) Y� .A 5� RD RD RD Pond Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 300 2008 by Autodesk, inc. v6.052 Wednesday, May 19, 2010 Pond No. 5 - West Pond - Forebay 40 Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 24.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 24,00 87 0 0 1.00 25.00 289 179 179 2.00 26,00 616 442 621 3.00 27.00 1,067 831 1,452 3.50 27,50 1,324 597 2.049 4.00 28.00 1,591 728 2,776 4.50 28.50 1,869 864 3,640 Culvert/ Orifice Structures Weir Structures [A] [Bl [Cl [PrfRsr] [A] [Bl [C] [Q] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0,00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El, (ft) = 0.00 0.00 0.00 0.00 Weir Type = -- - - --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) ' = 0.00 0.00 0.00 nla N-Value = .000 .000 .000 n!a Orifice Coeff. = 0.00 0.00 0.00 0.00 Exfil.(inlhr) = 0.000 (by Contour) Multi -Stage = nla No No No TW Elev. (ft) = 0.00 Note: CulvertlOrifice outflows are analyzed under Inlet (ic) and outlet (oc) control, Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr 8 Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cis cfs 0.00 0 24.00 --- - - - 0.000 1.00 179 25.00 - --- --- --- --- --- -- -- --- 0.000 2.00 621 26.00 - - - --- --- --- ... - -• - 0.000 3.00 1,452 27.00 - --- -__ - . - --- 0.000 3.50 2,049 27.50 - - - --- --- - -- 0.000 4.00 2,776 28.00 -- --- - --- --- - --- --- --- - 0,000 4.50 3,640 28.50 --- --- --- --- _-_ --- --- 0.000 o Toy. S-n4E . (2'?.5fl� 2j * 87�1 l o, 8z4 cF 101620 =ffD* ze49�+ 6 31% + 5 ti 9 = tot 10 0 f Pond Report Hydraflow Hydrographs Extension for AutOCAD& Civil 3D® 2008 by Autodesk, Inc. v6.052 Wednesday, May 19, 2010 No. 4 - West Pond - Main .Pond Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 22.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (tuft) 0.00 22.00 313 0 0 1.00 23.00 625 460 460 2.00 24.00 1,041 824 1,284 3.00 25.00 1,577 1,300 2,584 4.00 26.00 2,212 1,885 4,469 5.00 27.00 2,924 2,559 7,028 5.50 27.50 4,084 1,744 8,771 6.00 28.00 5.416 2,367 11,138 6.50 28.50 5,835 2,812 13,950 Culvert / Orifice Structures Weir Structures [A] [Bl [C] [PrfRsr) [A] [g) [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0,00 0,00 Span (in) = 0.00 0.00 MID D.00 Crest El. (ft) = 0.00 MID 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = O.00 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = -- -- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 OM 0.00 n/a N-Value = .000 .000 .000 nla Orifice Coeff. = 0.00 0.00 0.00 0.00 Exfil.(inthr) = 0,000 (by Contour) Multi -Stage = nla No No No TW Elev. (ft) = 0.00 Nole: CulverVOrfiice outflows are analyzed under inlet (ic) and outlet (oc) controi. Weir risers checked for orifice condition$ (ic) $nd submergerce (s). Stage ! Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Wit User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs ofs cfs cis 0.00 0 22.00 - - - - - - -- -- --- - --- 0.000 1.00 460 23.00 -- - - - -- - -- 0.000 2.00 1,284 24.00 -- - - - - - - - --• -- 0.000 3.00 2,584 25.00 -- --- - -•- -- -- -- - - 0.000 4.00 4,469 26.00 --- --- --- --- --- --- - 0.000 5.00 7,028 27.00 --- -- --- --- --- -- --- 0,000 5.50 8,771 27.50 --- --- --- --- --- --- --- --- --- -- 0.000 6.00 11,138 28.00 --- --- ... - --- --- --- --- 0.000 ;. 6.50 13,950 28.50 --- --- --- -- - - --- 0.000 0 Camp Lejeune Midway CDC Stormwater Calulations - West Pond Orifice Flow 1 Treatment Time Ca1c. 7/812010 Temporary Storage Volume (cf) = 5132.00 Total Head (Temp Storage - Inv. Orifice) (ft.) = 0.80 Orifice Diameter (inches) = 1.25 Coefficient of Discharge = 0.59 Cross -Sectional Area of Orifice (sf) = 0.01 Acceleration of gravity (ft/sec2) = 32.20 Q = Ca *A;(2gH) °'S (Pg. 3.5.2, BMP Manual) (H is assumed to be 'Total Head/3) Resultant Flow, Q (cfs) = 0.02 Time to Discharge (Days) = 2.85 ,JUL 0 9 2010 IV'a�� �!�.. 09 2010 3Y Average Depth Calculation - Wet Detention Basin Figure 10-2b - NCDBNR Stormwater BMP Manual V19l2010 East Pond A (Bot_Shelo (so A (Bot_Pond) (sf) A (Perm —Pool) (sf) Depth (ft) Average Depth (ft) West Pont! 7041.3 A (Sot_Shel fl (so 401.68 A (Bot_Pond) (so 8890.03 A (Perm_Pool) (so 5.5 Depth (ft) 3.35 Average Depth (ft) 3990.76 312.6 5407.65 5 3.13 MEMORY TRANSMISSION REPORT TIME : 06-16-10 12: 00 FAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 240 DATE TO ii 9150258704 DOCUMENT PAGES 3 START TIME 06.16 11:5 END TIME 06.16 12:'0 PAGES SENT STATUS OE *" SUCCESSFU'- TX N0710E '+ $iat+e oIr Film YI: Cwroli— Dep.rt.aaat o�1 .wA"nm.al .ad Natural 1i.ao— Wlimlagtvn Raiioo.l ¢Kia-� _ , Bevra�y $�i Peed 1�. Gov.raor FA.7C CQV�R QHIr.E7' �rrrr .Fi+s�swnrn. Secr.[ary 17ata: � i� /P Nc1, Pagn. CoxGl. C[+Vear): Co: G�/r' SIC J� p may+ Phonc: Fax-� / � �P 6 1 177 1,^.rdt..b Urivo F�1..aio i. Wit ... ing.00. 1,4C 78405 . (910) 79b-' 2,13 • AR Cqu.1 On»o1'S1+Wiry A T%—.Ul C Aa11— V-.npinv— 1 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: (;;� /4 /z2 No. Pages (excl. cover): To: J"�/ C e From: Jo Casmer Co: Z Phone: (910) 796-7336 Fax: �`- .� O — -s� "" D Fax: (910) 350-2004 Re: le al 127 Cardinal Drive Extension, Wilmington, NC 28405 o (910) 796-7215 a An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME FAX NO.1 NAME FILE NO. 239 DATE 06.16 11:58 TO R 919104512976 DOCUMENT PAGES 3 START TIME 1b�11: END TIME 06.16 11.,:59 PAGES SENT 3 STATUS �: OK i x"* S;ICCESSFUL TX NOTICE **' state Of North Garo!♦<ot ]D.P imewt OE I�OVIrQpRnllf[ wpd ZYwig TRl Aspp rr s WlIm11s14tpe Regtn" blfR— irevwrSlr IM,aaxa P.rrdww, Gnvwrnnr VAAX or_0pV1P_-1RL sVfwxr.-ir :06-16-110 11:59 .910-350-2018 :DENR Wilmington Ll�rw A+kwti-ywo�. :Jecratwry LNkte: No. Pages <e cl. cover): 1pm : Jo cramcr - Co:Vhane: f9_ 1UI 796-7336 ,-s;r� i !% '�1 /%l dc.J� C✓ .G /yJd Obi -ems o�J . 127C—din.l 1>rive i xaaa.sia.., Wilminaeon, h44-_ 7A405 .(910) 798-7215 - A:+ R—pl.N a 0 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET .lee Freeman, Secretary Date: No. Pages (excl. cover): To: r �" From: do Casmer Co: Phone: S,l l/ � 910 796-7336 .. _.. Fax: _ %�Fax: f 910 350-2004 Re: 1// /�lil%� �/� G-�/ Z`i' zmil%' ze 'z2 ii7 ew 7e- -IV 1;7efIfd� 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 a An Equal Opportunity Affirmative Action Employer NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director June 16, 2010 Carl Baker, Deputy Public Works Officer USMCB Camp Lejeune Building 1005 Michael Road Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 060147 Midway Park Child Development Center Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received and accepted a State Stormwater Management Permit Application for Midway Park Child Development Center on June 14, 2010. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. A few areas of the permit application which are required have been left blank- Example, section 11 item 1, "Specify whether the project is (check one)" is blank. Please review the stormwater application carefully and resubmit a complete application. 2. State stormwater rules require all built -upon -area (BUA) to be collected and treated before releasing from the site. Several areas within the site which contain BUA that bypasses the stormwater pond and goes untreated. Please make the necessary corrections to ensure, collection and treatment of all BUA within the project area. 3. The stormwater ponds have not been evaluated because the BUA and possibly the drainage area will change due to the above comments. Be sure to make the necessary changes to the wet pond supplemental forms and resubmit with the changes to the plans. 4. Please keep in mind that the changes required by the previous comments may, likely will, cause other required changes to the submittal package. An example would be required changes to the calculations if the BUA and/or drainage area changes. Please note that this request for additional information is in response to _a preliminary review. The requested information should be received in this Office prior to�june_23, 2010�or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. Wilmington Regional Office One 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 North Carol i rya Phone: 910-796-72151 FAX: 910-350.24041 Customer Service: 1-877-623€748 Internet: www,ncwaterquabty.org ,/ i7t1l ralfil earl Baker, Deputy Public Works Officer June 16, 2010 Stormwater Application No. SW8060147 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at chris.baker@ncdenr.gov. Sincerely, Chris Baker Environmental Engineer II GDS/csb: S:IWQSISTORMWATERIADDINFO120101060147.jun10 cc: Phil Gambreil, P. E., Luckett & Farley Wilmington Regional Office Stormwater File Page 2 of 2 s - SN' For DEN USe NL Reviewer: Z 4. f—N� North Carolina Department of Environment and submit: A'ri;YA'F Natural Resources NC®ENR Request for Express Permit Review Time: Confirm: � L FILL-IN all the information below and CHECK the Permits) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(Dncmaii.net • Fayetteville or Raleigh Region -David tee 919-791-4203; david.lee ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 orpatrick.grogan(Mrigmail.net • Washington Region -Lyn Hardison 252-946-9215 or! n.hardison ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or ianet.iussellAncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Enter Related SW Permits of request SW SW SW SW SW Project Name: MIDWAY PARK CHILD DEVELOPMENT CENTER County: ONSLOW Applicant: JAY HQSTETTER Company: SHIEL SEXTON Address: 902 NORTH CAPITAL AVE City: INDIANAPOLIS, State: IN Zip: 46204-_ Phone: 317-423-6145, Fax: 317423-6300, Email: 'hose telter@shietsexton.com Physical Location:BUILDWG LCH4007. 4TH STREET, MIDWAY PARK, NC 28544 Project Drains into _Q waters - Water classification NSW (for classification see-hfti):I/h2o.enr.state.nc.us/bims/repLorts/reportsWB.htmi) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N. or within 1 mile and draining to class HOW waters? N Engineer/Consultant: PHILLIP GAMBRELL Company: LUCKETT & FARLEY Address: 737 SOUTH THIRD ST City: LOUISVILLE, State: KY Zip: 40202-2100 �'�' Phone:502.585-4181, Fax: 502-587-0488, Email: apg mbrell@luckett-fartey.com MAY 2 8 2010 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR. ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: Y # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major Genera[ Variance ® State Stormwater ® General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter — # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)j ® High Density-Detenlion Pond 2 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ElHigh Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 51 acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scooina and express meetina reauest Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ® No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process wl US ALOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No DENR useoely«ss*sissy*****s**s*r+«+««««««*«+***tar««««r«««+««s+«++«+++*« Fee Split for multiele permits: ICheck a 1 Total Fee Amount S SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ Lb-, ❑ Gen) $ 401: $ LQS $ Stream Deter— $ NCDENR EXPRESS March 2009 North Carolina Department of Environment and Natural Resources .Request for Express Permit Review Midway Park Child Development Center Project Information Located at Marine Corps Base Camp LeJeune, we are requesting an Express Permit Review for the Midway Park Child Development Center. Thestreet address is Building LCH4007, Fourth St., Midway Park, NC 28544. In addition to the area of proposed development, we are including an adjacent site in the requested permit. Just west of the proposed CDC building, there is an existing CDC, with associated parking, that was not permitted at the time it was constructed. This existing built -upon area is to be treated and permitted along with our proposed project. The total limits of disturbance, including the disturbed area on the adjacent site, is 221,556 sf, or 5.09 acres. This area will serve as the Project Boundary. "There have not been any wetlands identified in the project. The project will consist of the construction of a 31,665 SF Child Development Center and 125-space parking lot. The development will include two wet detention pond BMPs for Stormwater management and treatment of stormwatcr runoff on the site. The existing CDC roof drains are to be rerouted to the proposed "West Pond" via underground pipe. The West Pond will also treat stormwater from the adjacent site parking lot. Within the proposed development area, existing paved recreational courts and existing sidewalks and structures are to be removed, and the area regraded to allow for proper drainage. Stormwater from the proposed built -upon areas will be conveyed via catch basins and underground piping to the "mast Pond". A portion of the proposed CDC building roof drainage will be piped to the West Pond, with the remainder going to the East Pond. "There is an existing 24" pipe taking stormwater runoff from and through the site. This pipe system is to be rerouted around the proposed construction to the existing catch basin just south of Butler Drive. Wastewater from the proposed facility will be conveyed to the public sanitary sewer system via gravity piping to the existing 12" sanitary sewer main located south of the proposed site. There will be a new domestic water service from the existing; water main located just north of Butler Drive North.The Child Development Center at Midway Park, Camp LeJeune Marine Corps Base is being funded through MCON (Military Construction, Navy) appropriations. Stormwater Information The Midway Park Child Development Center is located in the White Oak River Basin, and drains to C waters classified as NSW, with Index 4 19-16-3, The-Stormwater Design is High Density, a commercial development, and falls under the Coastal State Stormwater Program. The Proposed Total % Impervious Surface is 40.4%. "['here are no butter requirements for this project location. A geotcchnical analysis has been performed by RFTS on December 7, 2009. infiltration rates for the Midway Park site were less than 0.1 inches per hour. The seasonal high water table ranges from 13 to 29 inches below grade. There are no turn lane or road widening requirements by the North Carolina Department ofTransportation associated with this project. Additionally, there is no road construction across another property that is necessary to access the project. There will be two proposed wet detention basin BMPs (achieving 90% TSS pollutant removal) for water quality treatment of the built -upon areas. Stormwater runoff' from offsite and from open grassed areas are not to be routed to the wet detention basins, but will be conveyed to the existing catch basin south of Butler Drive via a separate storm drain system. All roof drainage and runoff from the parking; areas is routed to the basin forebays, via catch basins, pipes and swales. The existing CDC roof drains currently daylight to the surface grade where the runoff' is not treated. As part of this project these.roof drain leaders are to be c %ted to a•new;rvof=drain pipe system draining to the West Pond forebay.���� V �'� ' MAY 2 8 2010 2 .1. 3 0 �-�r_w,w�eJ--r"y�-W-«�r-w"-"--r�r _r_w�w--a_r�w-w �.w�r • ��_ p • A+-•,�-•fit Y ,v� cr<Na�+wr 'n" -_.LLP171VE N t1�TN w2.v7s�_Y, / urLEP7 ORfVE, NORTH lurch II rr 7a wte A4N n+rt - r7�+Yrt 7x.e� SS r rrowaTli7ao.sa w. T .r'Atlf 4YM rurl,-S'/-j V r }4 y - -'INV. 1S'fINp27.66 ,*-.-�.,r_-�' .-:.--�-.�+1---�•' INV: 15'IOUf1.7�-56 ��1. as �L, "---�.--- � 1 e I-�re. {eGfza-6s � -� rmlc ru. '"' �•^ t Rcv®165t [taCEl I..(. -" W Emo 660 ,y rx -Jo- �$7W` ss_ss g� RATINO Iq \ sr n, zce�ss.so 6INV. ur`�}2 1 F•�J1 �, �,14 sr , ` � I , iii n I I Cr+. �- f sr srs0-RCaf� l •7 I 1 V' I f I' II J42it �S� LE {RC ODAD I S 11 `S WRATEa 10 \ k _7 iT k \II E 5r ..j=UT} 60 EE LE.(Ro}•31,00 st Sr1 2 1 1 LEI } .w• LE. { }s,�• 1 J TIE-31m s5.sc i r a 1 L---. iIs a - In - Ib6:�10` .16•IWp26.t 32.m t {F 4"� 1� MIDWAY PARK (J / I ' L s CHILD 0 EVELOPMENT CENTER sow s ` FFE = 34.00 10 , 37.90 CROSSING PT. I Y Lj ,•7 =' INV. 3D'•'7A.06 16' RCF 2.0% I 9a lO•ALL \ 1 j :;g I INV. 15'119.17 22 Lr' I �ffiN n � \ \ \ \ I TlGRA7G•5�,7� r'b �y 9 1 f2 3.-12'��7 12'- �•�•�-'iM - I I �N \ pE Igo 085 INV.1m'IOU l.00 .E. IROY•7a.a5 0it LI. I ALL 1 �. 3 6 RATE.32,00 ~'row li' J// 4n [ �y 12.00 r \\ I 9 I .S ��I .t5'INM28.20 �, 2 iy enowALLf19}7 a`1 t ALL 1 l ib I l IN .30'IOUT}28.1 ]S.Se b� 1 I NVl�IEO poll A. LATE l9 _ V / 7 L31 9 I TIGMIn TE `m •I:` s0.13 M ` tE �Q miv.15-M 4 -_ � Y• he•[OUtylO�r I ImV' 151pm35.10 ! n,ss ss.15 ax7Op i 1� I 8 ss.t5 M.10 w 1! l + TlORATff (RRAr29.90 1 \ 3 1 :• I ItINV,IS'sIN}2e.e0 r sl 31.A6 l :. . �;• - L� _ 0.�n - J INV.IE761 UT)-26.F7 INY, 21' Qlli}2fi.77 f l�1 � L fN s1,Do „• ; � `p. I�•s1 -�g17� � .... .,r Ir �.,,� � LrrcRATE�a.s6 I r �r I � I.E.IRO 7s`'7�•m !o :. 1 INvRATE-3i .aa- -• / �fU+�/'urCx 9e5eW ( 32 1I ` ii r S /J7-/ - \ r .•i r I / 7A°R AtaO I � / W 5 .16 �j�✓/ 7r'wt: f1, al! 11py ss.sa 1 lrI�c s mva+w7r xc 57.l0 ss,n I VI , s 0 f . 51,20 TlGRATE•29. t I 'tt � . f sl. A mev.rstoL1TrT7.7 1 • I � sa.an 41 ol 41 1 +•1r AT 1% avr aSn St l PRCUECT 7RUE MIDWAY GRADING & DRAINAGE NORM NC`NM GRAPHIC SCALL 5LIPLRCLDLS NIAERIC SCALC -- * -- - - -- Oo 15• 30• so' "[�Gr.1'�4►•�1 J� 1 2 1 13 BY: -- l 2 i 3 z IZ V- 1� ; [aliov �\ 71GRATE47.6�i��ow INV.lEd24' INSi-1- i �7_ER Yppt1. 30'{sN)vz4212a.2p, I et. 7l.1 INV. SS•{1NS=24.50 ,dy5 la' aav ra' ua ING • 26_jp rry !1�'e11 / \. ��l6i.IL�a3i4 �--- - INV. (E) 36'. (OUT}.24.2•f• C IUTj. 26.87— 4 —� M~! 1 ,. �IVry l t _ —_`—_ i_— — - _ b2v J �= 1 _ zv— _MGsr sx STi w T� S� IT 4r S �• 51 231 1 r (RD)-24.90 t }I CID— { � rl urr! .Twi i I m R �T R a o�A + 1 yY l 4r v�� V I to ' ' l w vrw I I I 4r ¢ Jt la � rm: an zearne, rrrei x.m/\��e•— � - � ��\\����\�1\l �� I _ tti�x_ � � 6• HOPE Q 1.D%.IMIN,) _ J I afc v I'� I RO � Rll -:. RU �� RO R� --+ R� --�.. R� 15• H6P� 1!0 �r'RG � 110.� \,\tl,\�`Bl I.G S72•lY2 j.YS � 4� � l 1 11 1 1 1 R 1 ' oae lelR I ,elo t a maw n•+7 ?p—Il�x�ivitxw a .v !vl/Ul�l � 11 �j un s'NP / I PROJECT TRUE MIDWAY GRADING & DRAINAGE NORTH NORTH GRAPHIC SCALE SUPERCEDES "ERIC SCALE (@ (\--") V 15' ]D' 60' crAi F1" . in' MAY 2 S 2010 2 3 \,\tl,\�`Bl I.G S72•lY2 j.YS � 4� � l 1 11 1 1 1 R 1 ' oae lelR I ,elo t a maw n•+7 ?p—Il�x�ivitxw a .v !vl/Ul�l � 11 �j un s'NP / I PROJECT TRUE MIDWAY GRADING & DRAINAGE NORTH NORTH GRAPHIC SCALE SUPERCEDES "ERIC SCALE (@ (\--") V 15' ]D' 60' crAi F1" . in' MAY 2 S 2010 2 3 oae lelR I ,elo t a maw n•+7 ?p—Il�x�ivitxw a .v !vl/Ul�l � 11 �j un s'NP / I PROJECT TRUE MIDWAY GRADING & DRAINAGE NORTH NORTH GRAPHIC SCALE SUPERCEDES "ERIC SCALE (@ (\--") V 15' ]D' 60' crAi F1" . in' MAY 2 S 2010 2 3 ok CV-74 (-�� For DERR Use ONLY Reviewer. !��� LF"A North Carolina Department of Environment and Reviewer: submit: Natural Resources �, NCDENR Request for Express Permit Review rime: ct Confirm: Z - 11 —1 FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application packag of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296.4698;allson.davidson &,,ncmall.net • Fayetteville or Raleigh Region -David Lee 919.791-4203; david.leeto7.ncmail.net • Mooresville & -Patrick Grogan 704.663-3772 or patrick. cirogan@ncmail.n0t • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(CDncmail.net • Wilmington Region -Janet Russell 910-350-2004 or janet.russellprtcmail.net NOTE: Project application received after 12 noon will be stamped in the following work day, Enter Related SW Permits of request SW SW SW SW SW 2 -26 - It) Gt— t10Z-_ Q C e-'-*1 Project Name: MIDWAY PARK CHILD DEVELOPMENT CENTER County; CNSLOW Applicant: JAY HOSTETTER Company: SWEL SEXTON Address: 902 NORTH CAPITAL AVE City: INDIANAPOLIS, State: IN Zip: 46204-__ Phone: 317-423-6145, Fax: 317-423-6300 Email: 'host tetter@shielsexton.com Physical Location: BUILOING LCH4007, 4T" STREET, MIDWAY PARK, NC 28544 Project Drains into C waters — Water classification NSW (for classification see-http:llh2o,enr.state.nc.usibimsfreports/reportsWB.htm1) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within '/2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: PHILLIP GAMBRELL Company: LUCKETT & FARLEY Address: 737 SOUTH THIRD ST City: LOUISVILLE, State: KY Zip: 40202-21CO .J •t,t p S T �--1 Phone: 502-585-4181, Fax: 502-587-0488, Email: apc mbrell@iuckett-tarlev.com l SECTION ONE: REQUESTING A SLOPING MEETING ONLY l I I Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO; CHECK ONLY THE PROGRAM U YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittentlPerenniai Determination: — # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetfand (_linear ft or Tacres) ❑ Riparian Buffer Authorization ❑ Minor Variance El Major General Variance ® State Stormwater ® General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ® High Density -Detention Pond 3 # Treatment Systems ❑ High Density -Infiltration T #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ElHigh Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide Permit u) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 4_3 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both Scoping and express meeting request Wetlands on Site ❑ Yes ❑ No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ® No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process wl US ACOE: ❑ Yes 2 No Permit Received from US ACOE ❑ Yes ® No *******s****x*********M*****s *For DENfRusl' Fee Split for multiple permits: (Check# 1 Total fee Amount $ SUBMITTAL DATES t Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LQS $ Stream Deter,_ $ � � r. Gti,►1d IN A C J NCDENR EXPRESS March 2009 �� l r�r_ FEB 1 4i 2010 BY: North Carolina Department of Environment and Natural Resources Request for Express Permit Review Midway Park Child Development Center Project Information We are requesting an Express Permit Review for the proposed Midway Park Child Development Center, located at Marine Corps Base Camp Leleune, . The project street address is Building LCH4007, 4"' Street, Midway Park, NC 28544. The project site boundary is approx. 4.40 ac., and approx. 4.26 acres of the project are being disturbed. A wetlands del ineation/determination has not been performed for this site. The project will consist of the construction of a 31,746 sf Child Development Center and 125-space parking lot. The development will include three wet detention pond BMPs for stormwater management and treatment of stormwater runoff on the site. The existing basketball and tennis courts will be removed, and the area graded for the proposed building and parking area. There are no existing permits associated with these development areas; however, there is an existing wet pond at the northwest corner of the site, that accepts the stormwater runoff from the roof of the adjacent child development center. This pond was constructed without a permit and does not appear to function as a wet detention pond BMP in accordance with NCDENR regulations. Part of this project will involve removing the existing pond, and constructing a new, functional, wet detention BMP which will treat the runoff from the adjacent CDC building. The proposed sanitary sewer service will connect to an existing 12" gravity sewer just south of the site. The proposed domestic service and the proposed fire sprinkler supply will be connected to the public water main just north of Butler Drive. The project also involves the replacement of approx. 1,0001f of the existing water main. The Child Development Center at Midway Park, Camp LeJeune Marine Corps Base is being funded through MCON (Military Construction, Navy) appropriations. There are a couple of areas of non-compliance regarding the stormwater management that NCDENR should be aware of. 1. A small portion of the proposed entrance drive (new BUA) to the parking lot will be discharged through a nearby storm system without pre-treatment through the wet detention pond BMP. Site characteristics do not allow for proper conveyance of the drainage area to the BMP. Using good engineering practice, the small drainage area drains to a grassed swale and to the existing storm system via a pipe culvert. 2. There are also two outdoor play areas adjacent to the building which will not be routed through the wet detention pond BMP's. These areas have a very small amount of built upon area, consisting of a 5ft. strip of sidewalk directly adjacent to the building, along with some playground equipment. The remainder of these areas will be vegetated. It is our opinion that the amount of these areas that is built upon, is negligible, considering that the runoff will flow over (and be treated for pollutants by) the vegetated areas prior to entering storm system. FER 1 0 2010 Stormwater Information The Midway Park Child Development Center is located in the White Oak River Basin, and drains to C waters classified as NSW, with Index # 19-16-3. The Stormwater Design is High Density, a commercial development, and falls under the Coastal State Stormwater Program. The Proposed Total % Impervious Surface is 44.7%. There are no buffer requirements for this project location. A geotechnical analysis has been performed by RIFTS on December 7, 2009. Infiltration rates for the Midway Park CDC site were estimated below 0.1 inches per hour. The seasonal high water table ranges from 13 to 29 inches below grade. There are no turn lane or road widening requirements by the North Carolina Department of Transportation associated with this project. Additionally, there is no road construction across other property that is necessary to access the project. There will be three proposed wet detention pond BMPs (achieving 90% removal). As discussed in the non-compliance section, there are two small areas that will not be collected into the wet detention ponds for treatment. Additional measures will be taken to help treat the runoff from these areas before they enter into the existing storm systems. Native vegetation, vegetated protection mats, and other considerations will be taken to preserve water quality and downstream waterway protection. There is off -site runoff from the adjacent streets that drain onto the project site. This runoff has been routed through the site by means of underground piping. During construction, temporary erosion prevention and sediment control measures will be used to limit sediment and other pollutants from entering the storm system or leaving the site. These measures are to be provided and maintained until the site is stabilized. 77 G FER I `0 2010 BY: OS Artp- "e MIDWAY PARK CHILD DEVELOPMENT CENTER FFE = 34.00 411V � JIV cns 27 3 °'�' aL a.s' J I 1 '� 3.5 ro OHL ji M.&�, as > APR 4 Allr ft 6 #W a 0 Olt SITE PLAN GRADING & DRAINAGE 'ARAWA TERRACE & MIDWAY PAF CHILD DEVELOPMENT CENTERS RINE CORPS BASE CAMP LEJEUNE, JACKSONVILL part design]` ick fi&iFariey 737 South Third Street, Laulsville, Kentucky 40202-2100 502-585-4101 502587-0488Fax wwwduckeit-faday.Com Master Planning I Architecture I Engineering I Interior Design Design Build I Building Commissioning I Special Inspections 1853 CONTACT PERSON: PHIL GAMBRELL j . 1• -N1 .. - 1 f,i I, - , f r � - ` f .-.i+-sf ��� ��t + � � r sS '� � � �. x•� j/-'f-` � ti 7� _1 `r� � 1! �. Jackson t30. 4 WiLSON SAY • Af - r I L, ,1 : d. t�l�P•err FdrkiF� 1` � .yy� �_�%` � •1�{., j �%y �• �` "- - 1 'il 1 i� rC �s MIDWAY - PARK N `---,�24�-csi�unePROJ ECT�' r " } SITE TARAWA TERRACE ••, ay P a rk `�- I 'PROJECT 4' SITE • t w' �a'h r-r � �.. - I SITE LOCATION MAP NO SCALE t•- rl FF-q 1 0 2010 E BY: n Russell, Janet From: Russell, Janet Sent: Monday, February 15, 2010 10:43 AM To: pgambrell@luckett-farley.com; 'Jay Hostetter'; 'david.towler@usmc.mil' Subject: Tarawa Terrace & Midway Park Child Care Centers Attachments: Stormwater At Camp Lejeune 2.doc Gentlemen: The Express Scope Meeting for Stormwater and Erosion Control for the 2 projects listed above has been scheduled with Rhonda Hall and Chris Baker on February 25, 2010 at 9:00 AM here in the Wilmington Regional Office, 127 Cardinal Drive Extension, Wilmington, NC 28405. For the Stormwater design, please be sure to reference the State of INC BMP Manual and application checklist for items that are required. The project narratives indicate that not all of the proposed bua is being collected and treated. The narratives fail to specify how much bua (SF) is not being treated under the current design, North Carolina generally requires Stormwater treatment from all bua. David Towler with Camp Lejeune can be a great resource for your design strategies. I have been advised that both the existing Center at Midway Park (unpermitted) and the proposed Midway Park Child Care Center can be permitted under the same Stormwater permit. However, all of the bua from both facilities must be collected and treated. Please respond to this email to confirm and reserve the meeting date/time. Also, do not hesitate to contact me if I can be of any assistance. Thank you, Janet M. RusselI Express Coordinator 910 796-7421 NOTE: change in email address: tanet.russell@ncdenr.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Rli: Child Care Facilities SW8 060146 abd SW8 060147 Subject: RE: Child Care Facilities SW8 060146 abd SW8 060147 From: "Towler CIV David W" <david.towler a usrnc.mil> Date: Mon, 21 Jul 2008 08:46:25 -0400 To: "Linda Lewis" <linda.lewis cr ncmail.nct> Linda, I haven't forgotten about this issue. However, I would like to make sure I have looked into every avenue before I give you a definitive answer. Thanks. V/r, David. ---Original Message ----- From: Linda Lewis hailto:linda.lewi.s@ncmail.net] Sent: Thursday, July 03, 2008 9:52 To: Towler CIV David W Subject: Child Care Facilities SW8 060146 abd SW8 060147 David: On June 24, 2006, I gave you copies of the return letters for the 2 daycare facilities and the Engineer Training Area 2 Expansion that we had received incomplete stormwater permit applications for, Two more have come to light: 1., SW8 060146 >Daycare facility Brewster Blvd. 2. SW8 060147 >Daycare facility Midway Park 3. Engineer Training Area 2 Expansion (no number assigned) 4. SW8 060262 >Rifle Range NCSR 1103 5. SW8 060263 >Rifle Range NCSR 1503 We're looking for information regarding the status of the projects, and getting a complete stormwater permit application in house as soon as possible if the projects are already built. Please advise as to the status of these projects or submit permit applications to obtain permits. Thanks, Linda I of 1 7/21/2008 8:47 AM Child Care Facilities SW8 060146 abd SW8 060147 Subject: Child Care Facilities SW8 060146 abd SW8 060147 From: Linda Lewis <linda.lewis@ncmail.net> Date: Thu, 03 Jul 2008 09:51,34 -0400 To: 'fowler C1V David W <david.towler@usmc.mil> David: On June 24, 2008, I gave you copies of the return letters for the 2 daycare facilities and the Engineer Training Area 2 Expansion that we had received incomplete stormwater permit applications for. Two more have come to light: 1. SW8 060146 >Daycare facility Brewster Blvd. 2. SW8 060147 >Daycare facility Midway Park 3. Engineer Training Area 2 Expansion (no number assigned) 4. SW8 060262 >Rifle Range NCSR 1103 5. SW8 060263 >Rifle Range NCSR 1503 We're looking for information regarding the status complete stormwater permit application in house as are already built. Please advise as to the status permit applications to obtain permits. Thanks, Linda of the projects, and getting a soon as possible if the projects of these projects or submit 1 oi, 1 7/3/2008 9:51 AM \NA Michael F. Easley, Governor 4tQF G William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources 'r Alan W. Klimek, P.E. Director Division of Water Quality December 13, 2005 Carl Baker PE, Director Public Works Design Branch USMC Commanding General PSC Box 20004 ATTN,Public Works Officer (Code 405) Camp Lejeune, NC 28542-0004 Project Name: Midway Park Child Care Facility County: Onslow County Project Number: SW8 not assigned Dear Mr. Baker: Your recent stormwater management permit application and check #44991 for the $420.00 application fee are being returned because the application lacked the necessary basic elements to accept it for review. The plans and any other documentation that were submitted have been discarded or recycled, as appropriate. Please address the following noted deficiencies and provide the requested information: ® Please submit coastal state stormwater permit applications directly to the Division of Water Quality in the appropriate Regional Office. The stormwater permit is a separate permit from the Erosion & Sediment Control permit and will be reviewed and issued by the DWQ. ® The site plan provided is inadequate. Please provide two sets of readable plans that contain the information listed on page 4 of the permit application, including existing and proposed topography, dimensions, scale, drainage features, details, etc. Based on the sketchy information shown on the plan, and pending submittal of a more detailed plan, the project appears to cluster it's built -upon area, therefore, it will be considered a pocket of high density, which will require an engineered control. Since the Base does not contain property lines, it must provide a means to keep track of the project limits it uses to demonstrate low density. ® A completed supplement form, March, 1999 version for an engineered control, such as a wet pond, infiltration basin, bioretention system, constructed wetlands or dry detention basin with a supplemental swale. Sealed design calculations for the engineered control. A signed Operation and Maintenance Plan. A soils report with Seasonal High Water Table elevation, soil type, and expected infiltration rate for all infiltration projects. ® Please report the proposed built -upon area in square feet on the application. Small areas are difficult to verify when reported as acres. ® Please provide the name and classification of the body of water that will ultimately receive the runoff from this site. The piped collection system or natural drainage for this runoff is directing it into a body of water somewhere- perhaps Mott Creek or an unnamed tributary to the New River? ® Normally, Commander Readal signs the stormwater permit applications for the Base. North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service 1-877-623-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: h2o.enr.state.nc.us One NorthCarollina An Equal Opportun4lAffirrrative Action Employer— 50% Recyded/10% Post Consumer Paper vaturallY Mr. Baker December 13. 2005 Please resubmit the permit application package to the address below. Note that the 90-day statutory permit review time begins upon receipt of a complete application. If you have any questions, please do not hesitate to call me at (910) 796-7404. Sincerely, Linda Lewis Environmental Engineer cc: Linda Lewis ENB/arl: S:1WQSNSTORMWATIRETURNimidwaychildcare.dec05 -AA Page 2 of 2 OFFICE USE ONLY Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION r 1. Applicants name (specify the name of the corporation, individual, etc, who owns the project): DEPT OF DEFENSE, USMC, COMMANDING GENERAL 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): CARL BAKER, PE; DIRECTOR PUBLIC WORKS DESIGN BRANCH 3. Mailing Address for person listed in item 2 above: PSC BOX 20004, ATTN PUBLIC WORKS OFFICER (CODE 405) City: MCB, CAMP LEJEUNE State: NC Zip: 28542-0004 Telephone Number: { 910 ) 451-3238 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): INTERIM CHILD DAY CARE FACILITY SITE PREPERATION, MIDWAY PARK 5. Location of Project (street address): MIDWAY PARK City: MCB, CAMP LEJEUNE County: ONSLOW 6. Directions to project (from nearest major intersection): ENTER MIDWAY PARK MAIN GATE FROM HWY 24. PROCEED THROUGH GATE AND STRAIGHT ON BUTLER DR. FOR 0.5 MILES. TURN RIGHT ON THIRD ST. SITE LOCATED ON RIGHT SIDE OF THIRD ST. 7. Latitude: Longitude: 8. Contact person who can answer questions about the project: of project Name: THOMAS BURTON Telephone Number: (910 ) 451-3238-252 II. PERMIT INFORMATION: 1. Specify whether project is (check one) X New Renewal Form SWU-101 Version 3.99 Page I of Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): x Low Density High Density Redevelop General Permit Other 4, Additional Project Requirements (check applicable blanks): _CAMA Major x Sedimentation/Erosion Control 404/401 Permit �NPDIS Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PRO]FCT INFORMATION I. In the space provided below, summarize how Stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project, STORMWATER WILL BE TREATED THROUGH VEGETATED CONVEYANCES AND VEGETATED BUFFERS. Z, Storrwater runoff from this project drains to the _WHITE OAK River basin. 3. Total Project Area: 3.45 acres 4. Project Built Upon Area; 24 % 5, How many drainage areas does the project have?_ 1 6, Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area i Drainage Area 2 . Receiving Stream Name XXXXXXXXXXXXXXXXX Receiving Stream Class XXXXXXXXXXXXXXXXX Drainage Area 3.42 ACRES Existing Impervious* Area 0 ACRES Proposed Impervious*Area 0.89 ACRES Impervious* Area (total) 26% Impervious* Surface Area Draicmge Area 1 Drainage Area 2 On -site Buildings 0,195 ACRES On -site Streets 0 ACRES On -site Parking 0.57 ACRES On -site Sidewalks 0.125 ACRES Other on -site 0 ACRES Off -site 0 ACRES Total: 0.89 ACRES otal: Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 7. How was the off -site impervious area listed above derived?, NO STORMWATER RUNOFF CONTRIBUTION FROM OFF -SITE. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. NIA MCB, CAMP LEJEUNE MILITARY RESERVATION 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 NCUse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Storrnwater Management Permit Application Form In • One copy of the applicable Supplement Form(s) for each BMP `P • Permit application processing fee of $420 (payable to NCDENR) `l�1 • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with earned streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Mailing Add City: Phone: ( VIII. APPLICANT'S CERTIFICATION State: Zip: Fax: I, (print or type name of person listed in General Information, itern 2) CARL BAKER, PE certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective eftants will bee rdedand that the proposed project complies with the requirements of 15A NCAC 2H .1 �J Signatu Fora SWU-101 Version 3.99 Page 4 of 4 Date: /C� r /;z_ 4J Permit No. (to be provided by DPVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form play be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(1$). Low density requirements and density factors can be found in 15A NCAC 2H .1005 through .1007, I. PROJECT INFORMATION Project Name: INTERIM CHILD DAY CARE FACILITY SITE PREPERATION, MIDWAY PARK Contact Person: THOMAS BURTON, PE Phone Number: ( 910 ) 451-3238-252 Number of Lots: 1 Allowable Built Upon Area Per Lot*: C. a'� Rur�c5 *if lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. II. BUILT UPON AREA See the Stormwater Management Permit Application for specific language that must be recorded in the deed restrictions for all subdivisions. NA MCB, CAMP LEJEUNE MILITARY RENOVATION For uniform lot sizes, complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean High Water. Wetlands may be excluded when the development results in high density pockets. • DF Density Factor - the appropriate percent built upon area divided by 100, • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. Lots - the total number of lots in the subdivision. • BUA/Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. Form SWU-104 Rev 3.99 Page 1 of 2 Calculation: (SA x DF) - RA - OA = BUA No. Lots Lot (�up, II1. REQUIRED ITEMS CHECKLIST , S9 'doe s/cam r Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. Applicants Initials Z5 __ _ a. A 30 foot vegetative buffer is provided adjacent to surface waters. Projects in the Neuse River basin may require additional buffers. b. Deed restriction language as required on form SWU-101 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to sale of any lots. NA MCB, CAMP LEJEUNE MILITARY RESERVATION c. Built upon area calculations are provided for the overall project and all lots. d. Project conforms to low density requirements within the ORW AEC (if applicable). [15A NCAC 2H .1007(2)(b)] Form SWU-104 Rev 3.99 Page 2 of 2 Site Location Images Courtesy of United States Geological Survey (USGS) Site Location Images Courtesy of United States Geological Survey (USGS) 30 N 26 �y 30 o �e ) U AMS 0 � m 30 y 4 BASIN I c 3.42 ACRES EXTSTIFIG u� rE►+�ets C"Ts m PROJECT / LIMITS um4m NO WETLANDS ❑N-SITE SITE PLAN ,50 Q ,5000 50 DEMOLITION -__GRADING {IOjES� 1. REMOVE EXISTING BASEBALL DIAMOND FENCING AND BASES, REMOVE (6)-10' TREES. PROVIDE 1000LF SILT FENCING AROUND NORTH AND WEST PROJECT LIMITS, PROVIDE TEMPORARY DRAINAGE SEDIMENT TRAP IN EXISTING DRAINAGE SWALE, PR❑VIDE ROCK CHECK DAMS WHERE INDICATED. FOLLOWING PROJECT COMPLETION REGRADE SEDIMNET TRAP TO FORM GRASS LINED DRAINAGE SWALE. REFER TO THE SECP FOR DETAILS, 2. PROVIDE SELECT FILL -AS NECCESARY TO ACHIEVE DRAINAGE. AVERAGE SITE ELEVATION IS 30'. SPOT ELEVATIONS ARE PROVIDED TO SHOW DRAINAGE INTENT, 3. REMOVE EXISTING CULVERT FROM GRAVEL PARKING LOT ENTRANCE, NOTES KEYFD TO PLAN, S PROVIDE 8,500SF, LEVEL BASE FOR MODULAR UNITS. ELEVATION = 32.0'. ® PROVIDE 900LF, 6' WIDE, 4' THICK CONCRETE SIDEWALK. ® PROVIDE 655LF, 6' TALL, CHAIN LINK FENCE. TO INCLUDE, (2)-3' SWING GATES, (2)-12' DOUBLE SWING GATES. PROVIDE 18,000SF CENTIPEDE SOD. PROVIDE 20,000SF, 43 SPACE C2 HANDICAP), ASPHALT PARKING AND DRIVE. PAVEMENT SHALL INCLUDE COMPACTED 8' ABC BASE, PRIME COAT, AND 2,5' SUPERPAVE SURFACE COURSE MARK AS INDICATED AND PR❑VIDE DIRECTI❑NAL AND STOP MARKINGS AT APPROPRIATE POSITIONS, PROVIDE SIGNAGE WHERE NEEDED. SLOPE PRRKING AREA 0.27 TO DRAIN. PROVIDE (2)— 18' RCP CULVERTS ® PROVIDE DUPLEX PUMP STATION W/ AUDIBLE/VISIBLE ALARMS AND 350LF 4' C900 FORCE: MAIN. ROUTE TO EXISTING MANHOLE AND PROVIDE CONNECTI❑N. PROVIDE SERVICE CONNECTI❑N, 240LF, G' C900 WATER MAIN, 2OLF 2' SCH40 PVC SERVICE LINE W/ VALVES AND BOXES AS REQUIRED. CUT AND PATCH ASPHALT AS NEEDED. PROVIDE 300KVA—SCOAMP PAD MOUNTED TRANSFORMER AND SERVICE LINE. ® PROVIDE 12'X6', 4' THICK CONCRETE PAD. GENERAL N TEES, SITE PLAN IS BASED ON GIS DATA, IN —FIELD CONDITIONS MAY VARY AND ADJUSTMENTS MAY BE REQUIRED. ALL FIELD ADJUSTMENTS SHOULD BE APPROVED BY THE CONTRACTING OFFICER. CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS, EQUIPMENT, AND MATERIALS. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES PRIOR TO COMMENCING WORK. ST❑RMWATER AND SEDIMENT/ER❑SI❑N CONTROL PERMIT PENDING APPROVAL FROM NCDENR. CONTRACTOR SHALL BE NOTIFIED BY CONTRACTING OFFICER UPON PERMIT APPROVAL, THIS NOTFICATION SHALL SERVE AS THE BEGGINING OF CONTRACT PERIOD. SITE PLAN DEMI]LITION - GRADING NOTES, ri 1. REMOVE EXISTING BASEBALL DIAMOND FENCING AND BASES, REMOVE C6)-10' TREES. PROVIDE 1000LF SILT FENCING AROUND NORTH AND WEST PROJECT LIMITS. PROVIDE TEMPORARY DRAINAGE SEDIMENT TRAP IN EXISTING DRAINAGE SWALE. PROVIDE ROCK CHECK DAMS WHERE INDICATED. FOLL❑WING PROJECT COMPLETION REGRADE SEDIMNET TRAP TO FORM GRASS LINED DRAINAGE SWALE. REFER TO THE SECP FOR DETAILS. 2. PR©VIDE SELECT FILL AS NECCESARY TO ACHIEVE DRAINAGE. AVERAGE SITE ELEVATION 1S 30'. SPOT ELEVATIONS ARE PROVIDED TO SHOW DRAINAGE INTENT. 3. REMOVE EXISTING CULVERT FROM GRAVEL PARKING LOT ENTRANCE. NOTES KEYED TU PLAN, ® PROVIDE B,500SF, LEVEL BASE FOR MODULAR UNITS. ELEVATION = 32.0'. ®PROVIDE 90OLF, 6' WIDE, 4' THICK CONCRETE SIDEWALK, PROVIDE 655LF, 6' TALL, CHAIN LINK FENCE. TO INCLUDEi (2)-3' SWING GATES, (2)-12' DOUBLE SWING GATES. ® PROVIDE 18,000SF CENTIPEDE SOD. ® PROVIDE 20,000SF, 43 SPACE (2 HANDICAP), ASPHALT PARKING AND DRIVE. PAVEMENT SHALL INCLUDE COMPACTED 8' ABC BASE, PRIME COAT, AND 2.5' SUPERPAVE SURFACE COURSE MARK AS INDICATED AND PROVIDE DIRECTIONAL AND STOP MARKINGS AT APPROPRIATE POSITIONS, PROVIDE SIGNAGE WHERE NEEDED. SLOPE PRAKING AREA 0.2!. TO DRAIN. PROVIDE (2)- 18' RCP CULVERTS ® PROVIDE DUPLEX PUMP STATION W/ AUDIBLE/VISIBLE ALARMS AND 35OLF 4' C900 FORCE MAIN. ROUTE TO EXISTING MANHOLE AND PROVIDE CONNECTION. ® PROVIDE SERVICE CONNECTION, 240LF, 6' C900 WATER MAIN, 20LF 2' SCH40 PVC SERVICE LINE W/ VALVES AND BOXES AS REQUIRED. CUT AND PATCH ASPHALT AS NEEDED. (B)PROVIDE 300KVA-BOCAMP PAD MOUNTED TRANSFORMER AND SERVICE LINE. PROVIDE 12'X6', 4' THICK CONCRETE PAD. GENERAL NOTESi SITE PLAN IS BASED ON GIS DATA. IN -FIELD CONDITIONS MAY VARY AND ADJUSTMENTS MAY BE REQUIRED. ALL FIELD ADJUSTMENTS SHOULD BE APPROVED BY THE CONTRACTING OFFICER. CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS, EQUIPMENT, AND MATERIALS. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES PRIOR TO COMMENCING WORK. STORMWATER AND SEDIMENT/EROSION CONTROL PERMIT PENDING APPROVAL FROM NCDENR. CONTRACTOR SHALL BE NOTIFIED BY CONTRACTING OFFICER UPON PERMIT APPROVAL. THIS NOTFICATION SHALL SERVE AS THE BEGGINING [IF CONTRACT PERIOD. Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W, Klimek, P.E. Director Division of Water Quality February 16, 2006 US Marine Corps Mr. Carl H. Baker, PE Director Public Works -Design Branch PSC Box 2004 Camp Lejeune, NC 28542 Subject: Request for Stormwater Management Permit Interim Child Day Care Facility -Midway Park Stormwater Project No. SW8060147 Onslow County Dear Mr. Baker: On January 5, 2006. the Wilmington Regional Office received a copy of an Erosion Control Plan for the above subject project. The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality, Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than March 16 2006. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit, which will be signed by the Water'Quality Supervisor. Please reference the Project Number above on all correspondence. If you have any questions, please call me at (910)-796-7215. Sincerely, Linda Lewis Environmental Engineer= ENBlarl: S:IWQSISTORMWATISTORMSUB1060147 cc: Onslow-County Building Inspections Wilmington Regional Office File Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington Regional Office Wilmington, NC 28405-3845 An Equal OpportunilylAffirrnative Action Employer— 50% Recycledf 10%Post Consumer Paper Phone (910) 796-7215 Customer Service 1-877-623.6748 FAX (910) 350 2004 Internot: h2o.enr.state.ne.us One No thCarofin a 1;-1Vdit1ra11Y AkTI-K?FA Ti;la NCDENR visa ' JA N .� 1 North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Land Quality Section Michael F. Easley, Governor Director and State Geologist William G. Ross Jr., Secretary January 4, 2006 LETTER OF RECEIPT OF EROSION CONTROL PLAN US Marine Corps Mr. Carl H. Baker, PE, Dir., Public Works -Design Branch PSC Box 2004, MCB Camp Lejeune, INC 28542 RE: Project Name: Interim Child Day Care Facility - Midway Park Project ID: Onslo-2006-204 County: Onslow River Basin: White Oak Submitted By: USMC Date Received by LQS: December 29, 2005 Plan Type: NEW Dear Mr. Baker: This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)), The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. We have performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted before we can complete the review process. Failure to provide the additional information may result in disapproval of your plan. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, Janet M. Russell Land Quality Section cc: Thomas Burton, (fax) LQS-WiRO; SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 • Phone: 910-796-7215 1 FAX: 910-350-2004 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES LAND QUALITY SECTION EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST d X.J 'Ft� 1�, _ PROJECT NAME '-r- r�{�e v �,.� C�,'.ld S_\r64 `c , DATE: )-00(o PROJECT NO.: ,-200 COUNTY: To expedite the approval process, a cursory review of your submitted Erosion and Sediment Control Plan application has been made and has shown the need for additional information as specified below. To meet our review schedule, any additional information should be received by this office no later than ,err t� C C! . Failure to meet this schedule may result in disapproval of your plan. The following items shall be incorporated with respect to specific site conditions, in an erosion & sediment control plan: LOCATION INFORMATION STORMWATER CALCULATIONS Project location (roads, streets, landmarks) Pre -construction runoff calculations for each outlet North arrow and scale SC�r�-rC� FyAIC� from the site (at peak discharge points) GENERAL SITE FEATURES (Plan elements) Design calculations for peak discharges of runoff Legend: North arrow, scale, etc. (including the construction phase & the final runoff Property lines coefficients of the site) Existing contours (topographic lines) Design calcs of culverts and storm sewers Proposed contours Discharge and velocity calculations for open channel �1.,e Limits of disturbed area (provide acreage total, and ditch flows (easement & right-of•ways) delineate limits, and label) Design talcs of cross sections and method of Planned and existing building locations and elevations stabilization of existing and planned channels (include Planned & existing road locations & elevations temporary linings) Lot andlor building numbers Design calcs and construction details of energy Geologic features: rock outcrops, seeps, springs, dissipators below culvert and storm sewer outlets wetland and their limits, streams, lakes, ponds, dams, (diameters & apron dimensions) etc Design talcs and dimension of sediment basins Easements and drainageways Surface area and settling efficiency information for Profiles of streets, utilities, ditchlines, etc. proposed sediment traps and/or basins �Z Stockpiled topsoil or subsoil locations t.f plil.r t C If the same person conducts the land -disturbing acltvity & any VEGETATIVE STABILIZATION related borrow or waste activity, the related borrow or waste Area & acreage to be vegetatively stabilized activity shag constitute part of the land-dislurbing activity unless the Method of soil preparation borrow or waste actMly is regulated under the Mining Act of 1971, Seed type & rates (temporary & permanent) or is a landfill regulated by the Division of ENaste Management. If Fertilizer type and rates ;he land -disturbing activity and any related borrow or waste activity Mulch type and rates are not conducted by the same person, they shall be considered separate land -disturbing activities and must be permitted either NOTE: Plan should include provisions for groundcover on thru the Sedimentation Pollution Control Act as a one -use borrow exposed slopes within 21 calendar days following site or through the Mining Act. completion of any phase of grading; permanent Required Army Corps 404 permit and "later Quatity 401 groundcover for all disturbed areas within 21 certification (e.g. stream disturbances over 150linear feet) calendar days following completion of EROSION CONTROL MEASURES onplan) construction or development. _Z Legend i/ Location of temporary measures FINANCIAL RESPONSIBILITYIOWNERSHIP FORM Location of permanent measures Completed, signed & notarized FRIO Form ✓ Construction drawings and details for Accurate application fee ($50,00 per acre rounded up temporary and permanent measures the next acre with no ceiling amount) Maintenance requirements of measures Certificate of assumed name, if the owner is a Contact person responsible for maintenance partnership SITE DRAINAGE FEATURES Name of Registered Agent (if applicable) Existing and planned drainage patterns (include off- Copy of the most current Deed for the site site areas that drain through project) Method of determination of and calculations for NOTE: For the Express Permitting Option, inquire at the Acreage of land being disturbed local Regional Office for availability. Size and location of culverts and sewers Soil information: type, special characteristics NARRATIVE AND CONSTRUCTION SEQUENCE Soil information below culvert storm outlets ✓ Name and classification of receiving water a or Narrative describing the nature & purpose of the name of municipal operator ( construction activity Construction sequence related to erosion and Comments: ('+lR\�- CC,,nS sediment control (including installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilized) Bid specifications related only to erosion control