Loading...
HomeMy WebLinkAboutSW8001125_COMPLIANCE_20010216STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE WYYMMDD i I DETENTION POND ANALYSIS FILE NAME: S:1WQSIPOND1001125.WK1 PROJECT #: SW8 001125 PROJECT NAME: Pier 1 Imports REVIEWER: Lewis DATE: 16-Feb-2001 Receiving Stream: Newport River Class: SA Chlorides: 37 mgll Drainage Basin: WHO Index No. 21-17 Site Area 1.86 acres Drainage Area 727:16 OO square feet Area in Acre 1.67 IMPERVIOUS AREAS Rational C Builidng 15460.00 square feet 1.00 Parking 43720.00 square feet 1.00 SW 1660.00 square feet 1.00 square feet square feet square feet TOTAL I 6084Q 001square feet Rational Cc= 0.87 SURFACE AREA CALCULATION % IMPERVIOUS 83.67% Des. Depth 5 TSS: 90 SA/DA Ratio 5.99% Req. SA 4358 sf Prov. SA 4887'jsf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* 1 Des. Storm 1 00' inches Rv= 0.80 Bottom 11 msl Perm. Pool 16 00'jmsl Design Pool .. 17.16 msl Design SA 6041 sf Req. Volume 4$66 cf Prov. Volume 6338 cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter or Weir Dimensions FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= SA @ _ Elevation= Q2 Area = 1.13 in Q5 Area = 0.45 in Orifice Area 0.79 in Q= 0.020 cfs Drawdown �:' 2.9jdays COMMENTS Surface Area , Volume and Orifice are within Design Guidelines. 12313 2462.6 2598.00