Loading...
HomeMy WebLinkAboutSW8000527_HISTORICAL FILE_20091119STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT N0. SW DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD NC®ENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director November 19, 2009 Mr. George T. Norris, President Oakwood Mobile Homes, Inc. P. 0. Box 958 Morehead City, NC 28557 Subject: Session Law 2009-406 — Permit Extension Stormwater Permit #SW8 000527 High Density -- Oakwood Mobile Homes Carteret County Dear Mr. Norris: Natural Resources Dee Freeman Secretary On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to 3 years from its current expiration date. Accordingly, Stormwater Permit # SW8 000527, which was set to expire on August 7, 2010, is now in effect until August 7, 2013. Please resubmit the renewal application and fee at least 180 days prior to August 7, 2013, which would be February 7, 2013. A copy of the Renewal Application can be obtained from the following website: http:l/h2o_enr.state,nc.us/su/bmp forms.htm. If you have any questions, please contact the Division of Water Quality in the Wilmington Regional Office at 910-796-7215. Sincerely, �D, r1, J4 Georgette Scott Stormwater Supervisor Division of Water Quality S:1WQSlSTORMWATERIRENEWAL1SL2009-4061000527.nov09 cc: Wilmington Regional Office Central Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N, Salisbury St, Raleigh, North Carolina 27604 One Phone: 91 M07-63001 FAX: 919-807-64921 Customer Service: 1.877-623-5748 North Carotin a Internet: www.ncwaterquality org naturally An Equal Opportunity 1 Affirmative Action Empioyer COMMUNICATION RESULT REPORT ( AUG. 7.2000 12:16PM ) P. 1 - - -FILEMODE 768 MEMORY TX OPTION -ADDRESS (GROUP) -----------�--- --------------------- 8-252247409E - REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER TTI ENR WIRO RESULT PAGE - -- ---- --------- OK1/1 i E-2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Department of Environment and Natural Resources Division of Water Quality Wilmington Regional Office James B. Hunt, Governor Bill Holman, Secretary FAX COVER SHEET Date: August 7, 2000 To: Ginger Turner Company: Stroud Engineering FAX #: 252-247-4098 DWQ Stormwater Project #SW8 000527 Project Name: Oakwood Mobile Homes NM, SSAGE: Dear Cringer: No. of Pages: 1 From: Linda Le" Water Quality Section - Stormwater FAX #: 910-350-2004 Phone #: 910-395-3900 1. The supplement form submitted still shows the old (and incorrect) numbers for the drainage 4rea and impervious Area. I have changed the Drainage Area From 77,65E 42 to 74,S35 ft2, and the Impervious Area from 72,573 ft2 to 72,047 fl , as reported in the calculations, I have inade cot-rections to the supplement, but I need your written acceptance of this action in order to write this permit, :r. State of North Carolina ti Department of Environment and Natural Resources Division of Water Quality Wilmington Regional Office James B. I-lunt, Governor Date: August 7, 2000 To: Ginger Turner Company: Stroud Engineering FAX #: 252-247-4098 Bill Holman, Secretary FAX COVER SHEET DWQ Stormwater Project #SW8 000527 Project Name: Oakwood Mobile Homes MESSAGE: Dear Ginger: No. of Pages: 1 From: Linda Lewis Water Quality Section - Stormwater FAX #: 910-350-2004 Phone #: 910-395-3900 The supplement form submitted still shows the old (and incorrect) numbers for the drainage area and impervious area. I have changed the Drainage Area from 77,656 ft2 to 79,835 ft2, and the Impervious Area from 72,573 ft2 to 72,047 ft2, as reported in the calculations. I have made corrections to the supplement, but I need your written acceptance of this action in order to write this permit. S:1WQSISTORM WA I'1LETTERS1000527.AUG 127 Cardinal Drive Blension, Wilmington, NC 28405-3845 Telephone (910) 395-3900 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer STROUD ENGINEERING, P.A. HESTRON PLAZA TWO 151-A HWY. 24 MOREHEAD CITY, NORTH CAROLINA 28557 (252) 247-7479 NCDENR Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 ATTN: Linda Lewis RE: Stormwater Project NO. SW8 000527 Oakwood Mobile Homes Dear Linda, 0 Tor. RECEIVED JUL 0 5 2000 DWQ PRar # SW E&JL0 2'�- This package is being sent per the letter requesting additional information, submitted June 23, 2000. Corrections have been made to both the plans and applications and are included with this submittal. The discharge of our project is not the Newport River as noted on the application; it is actually Hull Swamp (topographic map enclosed), which is Class `C'. I have contacted Jim Bushardt, with NCDENR, and had him confirm the Class C classification of Hull Swamp. The other comments included on your letter have all been addressed and revised. 7479. If you have any more questions or comments please feel free to call at (252)247- Sincerely, Ginger Turner, E.I. 107 COMMERCE ST. 3961 A MARKET ST. HESTRON PLAZA TWO SUITE B SUITE A 151-A HWY. 24 GREENVILLE, NC 27858 WILMINGTON, NC 28403 MOREHEAD CITY, NC 28557 (252) 756-9352 (910) 815-0775 (252) 247.7479 7 STROUD,ENGINEERING, P.A.;. p p an Hestron Plaza Two `'� 151-A Hwy. 24 JUL C 5uu M0REHEAD CITY, NC 28557 BY: N ' i (919) 247-7479 TO NGTj� r— '_ l v% 6 hi 0 1 VVC1 2 05 WE ARE SENDING YOU ❑ Attached • ❑ Under separate cover via ❑ Shop drawings ❑ Prints ❑ Copy of letter ❑ Change order Ej ❑ Plans 'NWTION JOB No" +� if S Da, W n o +rVl SWd 2 ❑ Samples the following items: ❑ Specifications COPIES DATE NO. DESCRIPTION VI `I CG C11�. G SU THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your use ❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: , if enclosures are not as noted, kindly notify us at once. 1 F .. � " � . 't .f � :i rr �-� r i i � ' i 1 `i i , i � � � 1 .- 4 � t k - �.- 'u � �,', `i l `� � � � 't- � � 1 � __ '�.. � 1 � L - e��-..Y �� � , �r �a t - -� }- - .. 1 � I ,� STROUD ENGINEERING, P.A. Hestron Plaza Two l 51 ' A' Hwy. 24 MOREHEAD CITY, NC 28557 (252) - 247-7479 JOB SHEET NO, CALCULATED BY CHECKED BY — SCALE OF_ DATE DATE 12N.1 (Skg4 S+wnS 7DSi IPWWI I 5' to O a rr �111 0 ly l��- 4141 �4"�Ill�ll4 fi �ti P01 \ II ll]l I I l N E 12. a Qs s�f, �O O rri Al h FE 12.0 .�O ALL C*vldus AR 4 W T�HN P--K.TY u Nes DR ►rV S rDETC- )T7D N PbN D. ± M \ E 12.0 0.49% 1 \ si \ Ln F 1.8� y \ / FE 12.0 l 0 { Ffi- 12. 5\ \ FE 11.76 \\ FE 12.0 �, FE 12.0 k FE 11.82 ♦ o AO o \ El? fIP ♦\. `. �� A FE 12.0, ♦ fIP �O \ '6 �S. FE 12.0 �� y- +4 l ♦ oo \ Z FIP JOL3 • STROUD ENGINEERING, P.A. '.:'SHEETNO.. _ OF H@StrOn Plaza Two :cAtcuuTEDOY_�'� oa7E 2 c7 151 A Hwy. 24 MOREHEAD CITY, NC 28557 CHECKED BY DATE (252) 247-7479 SCALE W_. I .. ......_. i ..«........'..»..__..�..._..... ;._.....,.. i � 1 it 79 i � ....j.........._i »...---I ..«.....:.....«.....-.......__' » s..... .... .... ........... .............................:.................._................._.;........._.............................G...._...«_..............._..........................._.... ......... ..... I a........_...........................................«..,......:«:..:..,...........3..........,..............,...................................................E...,.........,.....,.. ...._....«.. ........ f »_�...................:_ . . r........... ............_........... _._.. i I I P ,I I i i..... _-......_ .. 4 ...... r. ._....._.{.............. 1............i......... ._.............. ............ i..... i.......... 1~..........�r::... :: .........1.....5 .............._....... ? .......... a...........1: :.....::::::....:::. I �...._...__...._._......_...__........_.._..............._..._r.}.-..............._........'^fir......:................., ..._:.aiG(...:...fU............._i.__.._ I ._.. ......... L.. —.__...._.............. I I i �.._...._..— ........ ...............__ _......_._I. I _ — _....�.. ».._..._._....... _.... _.._.._....._:........................1._..:..„.1..._..... I ._ .. I f I I f _.».....».......».............E.«....,..,......_.,..,..... ....... L,...,...... ......,.......{......... .........`.. .`.. ..... j....�,�..f..... ..... i....�.�...!p�.........1......._...I,............i-..............._......... L. ..... ...... .........�............' i .. ... .... ........V.J .... ..,.! ! i I ..............�............. i i i I �� j � Y g i } '".CO / I i i I i ..�.... ...._.._..... ............... ._........... ........... ......._. ........... ... ..... _ ...... - - ..... ..... ...... ...... ..... ...... ..._ ..... Il .... ... _.. ........ _ ._.._ .__,._...._.._._..._. 1... ....... ..__................ t..... ._... .........._..._...._!._...... I— .`. __..».»... _..».. I J..........._�............�.........» ...«..i...... _ ..._ _..._ ....._................................_':.... �. _ ..._._.....I_........_. I i 1 �.... j i .......!_......_.. _ ................. .... ...........,................ .......... I I I .... i «... .... ..... ........... .... ........ i.... .... .... ...3.... i ; f�.r. ...L ,�.... �._i ....• �.. ••. _;............. _.._.-_........._..... ...-_ ..... ........... ., ........ �.. :_ i....,..: _... .........-.�........:._�......,.....i .......» .. ........ -- - ....__......_,__._......:....._....... L_�._. ..._... ......... .......... 1...... ..... _...._. _...__ ....._ ..... ........i.....«...l......._.. ».._.......«_... I i ...._.._.i...._.... ' _......._._......... ..._........_.... :-....._I ....�._.._..........._..» .... .... ' I............_ ... r... _...» .._.« ._.._.... At .. .. ....... �.............................. .....i�%'........... ... ......_...................._.........1........_-.,...... ...... ...... G.....I............. i..__...... ..,,................_....-..,_.... ......... .._.,: T....,.............r.........1.... I ...... ' _..... .... _.... i �..._ # i - _ . .............._. _ �... _«__j.«_.......... _._._ _..........._._.. It} i .................»..:...._.... ...... ... :......:..... y r,p jj I ��` , .. ....... . i ' i.... i. ._.»_..._»..._.._........................ ... ._i...__......_...........i...__........._.... I �._.___ _ ..... . ._.... I �...................... 65 .......... .1i_ ._°........ »_ lvfi...._......». ........ ��,. `��.......�._ ....: '3.. -..... __.c.-..........i............i._.....« _ ... .. ► . ....__...._ '. I r I I �__.._......__...��.._..._.._.....---.._ .._............_........._. .... ........... -- I ............. i _ i I �i. _. ...I...�.... i i _ ............_......................-......... ...,.........,.............-...........F.•-.:......Y...",..5.:1...................1,......................... .......... ............. L...............: ..... ..... .........i........ ..... I I .. I I �I ... 14..__._._�'....._........f' ...._.._.�L.._...._...__.�...._..._..._......._.J�. __..- __ . -._ _..__._�`._.�.._'' ....._ ..- .... ...... ..... �. i ......__.._.... I . now. M-i MO SMpilms.i md" STROUD ENGINEERING, P.A. Hestron Plaza Two 151 A Hwy. 24 MOREHEAD CITY, NC 28557 (252) 247-7479 rnUµI Mi lt."1 sj m,j(i ; JOB OAK Rg) A116 S _ SHEET NO. OF V �, CALCULATED BY �4r^ G ` + DATE �Ej{/e eq CHECKED BY DATE Gr.Ai F PROJECT: OAKWOOD MOBILE HOMES, INC. LOCATION: CARTERET COUNTY PROJECT AREA: RUNOFF CALCULATIONS: RATIONAL METHOD: Q=CIA RETURN PERIOD: Tc: INTENSITY: RUNOFF COEFFICIENTS: 143808.52 3.30 AC 10 YEARS 5 MIN. 7.23 INIHR 0.95 GRAVEL AREAS 1 IMPERVIOUS AREAS 0.1 GRASSED AREAS AREA AREA IMPERVIOUS IMPERVIOUS GRASSED Cc Quo DA (SF) (AC) AREA -GRAVEL AREA -OTHER (SF) (CFS) (SF) (SF) 1 19845.00 0.46 17441.00 " 978.00 467.00 0.89 2.92 2 33277.001 0.76 1 16444.00 1 9014.00 6864.00 1 0.76 4.20 3 26713.001 0.61 1 26731.00 1 0.00 0.00 1 0.95 4.21 TOTAL 79835.001 1.83 1 60616.00 1 9992.00 7331.00 1 0.86 11.34 NOTE: These drainage areas are for the drop inlet calculations. The total drainage denoted as TOTAL, is all directed to the detention pond. (TOTAL is the only drainage area for the project.) JOB_ 6/6 V-L _1.2 oa- STROUD ENGINEERING, P.A. i SHEEfNO. OF I� Hestron Plaza Two o Q 0 151 A Hwy. 24 CALCULATED BY DATE MOREHEAD CITY, NC 28557 CHECKED BY k/� : DATE -� (252) 247-7479 SCALE _.......__.«........._.._...............:.._..........«__...._I...... ._... ....... ...... ............. !.......... :..... ...... _ _-.. _ i : f ._....1........_.! _......' __. t -µ. _.._. i._....._ ...^.. - I ! i ».......« ......_..... i'....!-. ..... ......z..ifl....-LT:..... ...... ......I.............._........_.t._._......_.._......_....x._ ... _...... --._....— --- -- i 3 i . �. I.._.._..... — I. i f.... .. I..........,........,.....1..:........,�.........i#.............'........._........................ I 1 I f... ....., i } !I i i! i i.... ........ ...l.... i i 1 I I i i E .. _«.....».......... ..................:.......".......... ..., ,....-._... i.....-.......L......._...! ............._.....'.._..._.... .._ L:...::_,c..J........_."i......__.-.�.«........1» ....._ i « ...... ..... ......_ i-.......... ..... ..._ _ ....._ ...._ .... . «.. I I .L C i — ' .O Q0.J.7.. i i 1..-..�._..Q...L..Q... .. I I ...._. .a... i._ ... I I... ... . I � _..«... _.._._.._ .......... �........_.... ... ..................._......... L.._......,....._...... _... .... _. _ _ ._.. ..........................._. i I i E C �... «....� i :......'. h"T I i li I i......�........................I....................... I I i I I r ._,... ..... :............. ......__..L.............E.. .. .........,......... i.....,..................:..........................I,_...... li .... p_.... ,..... �..................._._.;............�....._.,......._.... _ _«_.... _.__._.........".. .� .......,.._........4�.:...._....�....... �.. _.Il ...... .......................�f...._.........._..................._.............................. �...._,................. _........ ....... ... ...... ..... :......_...._.....:.._«.. �.._.__... _ i ._ :_...." .. } : ....«........ .WL.I....a..l..Qi.... .1."........_:... ' 1..... ! ...... I..... i ....................._.E._..........._..._.!....«....__..._.._ i ' 1. i t I. I............I I. f I i L... t............T:. ....... !.....__..._.._....._......_.....__.L...._._..i........_.L...,..._..._"_...... « ..�......" .� i ' I ...... I.........;_...........i�,..................._..............., �..,.........,............ .:........�............ r i t r .". ............. ; ....i._ I i i I : r e'... ! l ! I I I I j i r I` �........._..I�......... 1 ......... ...r . ..L j I I ; i I I �... I I i , ................. ....U..I�.l._.....1�..�.............� ! . .... ...... _ _......_ _ ..._....._.... ... _..».......««.........:..............1...........,...........................................................................�............ ......,.....,.......«......,............,......«:......... ............. .t.....,...... i __..__......_..._._._..__._...___ .._.............................. ...._._....r.._._.............. r ...__..._._ .._--«_.._.0.:.:...:."_................i.._.._...._L...._....... ! ...... ...._....... ....._...._,...:,._............ Jt...........i....... !........ ........... ......._._._...._.._l.......... L...........»............ ;........_.._..__.-i............ :._......_.i........_..:...... ...... ...... ..... _......-- - - it I! ii II I � ...I ..«................._.............»........... ' 3.... ... _...... ` ...... ........ ..«. i .-. I I t._. _....._... ,........... ,._..........................»................._.L._........:... i _— — _.._......... r....� ....,-....... _..._. a...._ LI T.:....... ...... ...... ,........_t...... : ...... ..._..... _«. ....... ......... .... «... ..... .......................... ..... ...... .. • I I i a I I , a I III I I I! i i j � � � � ..l... I I ..,.._ ....... ..................«...........................,..............:...........;.............,.............._..............,............................... ..._ _......... !............. ................._.�........... i I Ir � � : ....._.........................;.......... _....... j..:...... .._.. ..... .«..._.. «.«_............•-..........i_.....«_.................."«....1._ _... _ STROUD ENGINEERING, P.A. Hestron Plaza Two 151 A Hwy. 24 MOREHEAD CITY, NC 28557 (252) 247-7479 .JOB c.� •_.� 1�12% crime✓ �� licJ /li(G L ' SHEET NO._ OF ! O CALCULATED BY T DATE CHECKED BY �"' DATE 6 I i I i _...._..........__.._ ..................._:.._._............ �` „...._.... ��.. - �......._....;_«_ ;. . _..._ I i ' ...........i............L............L i ............4.1 1 ....................«.............::_ j ..:........... i ._.......•............................................ �............ ... ...... ... 1e ..............................s,.........._F..............�........�...,.......... { >aP i........ L........:...... , 1-t. �..............:............ , �--i L.—.,•.....�... ....................... I.......... ...... ..'' .......... .......... . ....-...-... _.. _........�_.........!.... ....... .' I.a................_......3............i....._...... I I _ i 4..' . ._..........:............. ............ ...........I, ..... ,........... ,...1..,. .. I ..... .-». ..._... _...... ........................... ............. .............. p. .............I r- - .............. i. L.......,... .i..... �q .. ..........._.f..................... ; I .............. :.................... ' V � I I f :.. I -_ - -- ...»__.._ ...._.__ ......»............. -...' .._.........._,_.11......_.^ .._...... .............. .... ....... ............. ............. .........._...,.,..:... i... I f I I I �� I �._._....�... +..A.-- : } # I .. .. ............. 0 ., i ...........» .............._ ......... a............. ...... ,...... .�.............. ,....... .... r ..............� I ..... ....._—_.. ....� .....� �..... ....._ .... .. ...... ... ....... ..... _ .. 1........... ......... .... _ I .............. _..._...... ..... ....... i ...... �::.: ,. ....... ......... .......... D.. ........... .............._......»... _._._ ................_........._...... _ ...._ ..L__._.�:.»._ .................._..... -- ....._ I _�;...... I _.......�....._. i .............__................. l..-__.. C ... _..... ........... ............... . w .......... ..._ . .._...C�. _. ......_- ....... __ _:jI...... o � _ I : STROUD ENGINEERING, P.A. SHEET NO. OF— GD Hestron Plaza Two rJ 1 A Hwy. 24 ;CALCULATED DY DATE � �fl MOREHEAD CITY, NC 28557 :. ;'CHECKED BY — DATE (252) 247-7479 SCALE I I i i I i I I i I i t , I i L... L... I _.._� �.. I .............L........_........................... ...... ._... r r..... L... _.,....' .. L... I I I .......... .Lp....{...........��r � '........ �� i ......i....._.. ' ..._....E..:..................I I_.. I.. f,.. ...._._ I j ' I i ..... ..I � I t I i I , i....j._ .,i.., I ........... ............. �,.........................,, ............ _............ }.. I........... F `,:..: ....,.. L.... �.... ....' .... I I ' ............ ......... .................7............. f I I _........... ............................................. ....... ...... ......a................. r......._..............._!.............J............:. ........... , ..........., I _..._.._.... ...........L............,.......... ._...,...��................... I' . L............!............;............... I I € - F­1­' ...._.;_...».....;._.._,............,.............�......_..... ........ ' IV I ..... _...... .... i € .... I ..... I .... I I I €.... ,.......__.. _._.... .._.._.:..(e .......... ............ _...._._. I .... s I •�3 „... I. f�..P.. Q IE I , .. .. ........... .. ... ........ ......... .. . ...... ... ....... .......... .............�i...•.•.........IIi......... ................. L i...... i... ........ i .'.. .... ............ ...... .. I i LE ...,... .......... _._.....IfIEI ....:..... .i:I ..J..u.1.... vI ...�il..,....+l.�. ....... .... .....r LL_..................... ..................................! rf€ �..I ..«L......_....._...�...�..... L;I ..._ i.. E........ .... I ........ .....'.__........ .._...iI1_,....._........,.!..Li3......., .................' fI ,...... ......:EiI ..... .......j ........... ..._... .. ... .... I_ _.. ......... _... '............I..... ........ .........._ ........ ... r... ....... ye& ....... .. ..[ .......'{............3 . .. . ............ ........I ._.:.... _ ....... ......... ..... .. ....... ...._ . ......... ....,.... .1.1.6 I i .. 1..�....». .... .. i, J I I I.J. .... I I i ,._ --...__.L....__—.._._•I�.._._:._ .__.___...:, _._.__...__._..I__j._ .. LII I 1iI - i ii ' I - ,.........._..._......,........._......................;............I...... F ,........... L. .....L...... I i I: .._..__ ................a ....................... I �rrJJl I Ti i.... I_ ............ ........... _I__ ...... .»................................................i............I..._.......:...... ...... �........................ j..........:.I...........t............. i.. E I t ...._ ........ 1.........i.......I _.._.. I _... ._.. ... ....__1 ...... I ...... I i I t ��. ......_...............1............................ .. i. i i I I i , _I...... ...... »...................... I ...I........i..» I ...................................................._..;..........................,................ .._I ... i f i j �..._........ ..... �._........ nCr�]...........€ I ............L............... ... _ ..... F+T...-......,... ...... ..............,.. ................ i........ .....i.............'.........._. i __. i ...... € en1 h i ... ,.... ,.. '............. .i........ ......' i t 1................�. .. I_ i A I........... I{...........I._......... I...........:........ ... s.... .......... .._..._..,......._............. . I .......... ...... ........ ...... ....... ..............r.. _1 i.. L...... I I I _...._. I I �...._ ' t I i .......L_ i. i......... i , _------- i_.. I I i : I I. _.._._...1.............1. _._.._.I._...i _..._._.............. ............ »........_._..,......... I ............i..._..... € .............. ._. ...........,:............ ............. '........... i... i ......... , I i r................. .._F............,L..,....... ......... _ ..... ......_L_....-.._..._..._..._. .i r ....... _............... . L.......... .................... ...... ............. I.._........#.........._......_..!....._._...L....._._........ ! j (. , I................x..........._........._..............I....................................; .........}............................_....._L........... �_._ ___....I... _... I ................__.......I_».........i...._.__..I..._....._......_.:._.1,.........I.......... I i i I I I ..,....».,..t..__.....L.._......,.{._....._................�.... ............ .........i..............,..... A,............1.......,...`.....,........ ...L....... .. _ _ ..... _...... _...... »..._....c..._..._.. ..... I I i ..._..... _. I i f...._.......i.............i.............a............. ... t................-- .......» i l► I I I� i� l i l (' I' 1 I i i� I I I .._ I i ................. ..... � I I i IIIOmy loi'l;Sko LWO ZW r f►+edN1 . STROUD ENGINEERING, P.A. Hes#ron Plaza Two 151 A Hwy. 24 MOREHEAD CITY, INIC 28557 (252) 247-7479 MUM I?M I j5mg1e5Metsl 2M,I IPjdde ) JOB DQ`t:�- i-a a 0 7 - � ^-7 &- S SHEET NO. ' {/ OF r 0 CALCULATED BY DATE�—O CHECKED BY DATE !� SCAI F ")h � q ) o OAKWOOD HOMES INC. WET DETENTION DRAWDOWN orifice dia.= 1.25 in. orifice area= 0.0085 sf Cd= 0.72 time increment 120 minutes storage volume 7223 ft"3 (required 1") overflow el.= 7.4 perm. pool el.= 6.2 Time Cumulative Cumulative Volume Height Flow Volume Volume Increment Time Time Initial Out Out Remaining (minutes) (minutes) (hours) (ft"3) (feet) (cfs) (cf) (ft"3) 0 0 7223.00' 1.20 0.0539 0.00 7223.00 120 120 2 7223.00 1.20 0.0539 388.17 6834.83 120 240 4 6834.83 1.14 0.0524 377.60 6457.23 120 360 6 6457.23 1.07 0.0510 367.02 6090,21 120 480 8 6090.21 1.01 0.0495 356.44 5733.77 120 600 10 5733.77 0.95 0.0480 345.85 5387.92 120 720 12 5387.92 0.90 0.0466 335.26 5052.66 120 840 14 5052.66 0.84 0.0451 324.66 4728.01 120 960 16 4728.01 0.79 0.0436 314.06 4413.95 120 1080 18 4413.95 0.73 0.0421 303.45 4110.50 120 1200 20 4110.50 0.68 0.0407 292.83 3817.68 120 1320 22 3817.68 0.63 0.0392 282.21 3535.47 120 1440 24 3535.47 0.59 0.0377 271.58 3263.89 120 1560 26 3263.89 0.54 0.0362 260.94 3002.96 120 1680 28 3002.96 0.50 0.0348 250.29 2752.67 120 1800 30 2752.67 0.46 0.0333 239.63 2513.04 120 1920 32 2513.04 0.42 0.0318 228.96 2284.07 120 2040 34 2284.07 0.38 0.0303 218.28 2065.79 120 2160 36 2066.79 0.34 0.0288 207.59 1858.20 120 2280 38 1858.20 0.31 0.0273 196.89 1661.31 120 2400 40 1661.31 0.28 0.0259 186.16 1475.15 120 2520 42 1475.15 0.25 0.0244 175.42 1299.73 120 2640 44 1299.73 0.22 0.0229 164.66 1135.07 120 2760 46 1135.07 0.19 0.0214 153.88 981.19 120 2880 48 961.19 0.16 0.0199 143.07 838.12 120 3000 50 838.12 0.14 0.0184 132.23 705.89 120 3120 52 705.89 0.12 0.0169 121.35 584.54 120 3240 54 584.54 0.10 0.0153 110.43 474.12 120 3360 56 474.12 0.08 0.0138 99.45 374.67 120 3480 58 374.67 0.06 0.0123 88.41 286.26 120 3600 60 286.26 0.05 0.0107 77.28 208.98 120 3720 62 208.98 0.03 0.0092 66.03 142.95 120 3840 64 142.95 0.02 0.0076 54.61 88.35 120 3960 66 88.35 0.01 0.0060 42.93 45.42 Vt GG •1 ( V '0r l .'J `� 120 4080 68 45.42 0.01 0.0043 30.78 14.64 7 2 n LS 120 4200 70 14.64 0.00 0.0024 17.47 -2.84 120 4320 72 -2.84 0.00 #NUM!_ #NUM! #NUM! 120 4440 74 #NUM! #NUM! #NUM! #NUM! #NUM! 120 4560 76 #NUM! #NUM! #NUM! #NUM! #NUM! 120 4680 78 #NUM! #NUM! #NUM! #NUM! #NUM! 120 4800 80 #NUM! #NUM! #NUM! #NUM! #NUM! 120 4920 82 #NUM! #NUM! #NUM! #NUM! #NUM! 120 5040 84 #NUM! #NUM! #NUM! #NUM! #NUM! 120 5160 86 #NUM! #NUM! #NUM! #NUM! #NUM! 120 5280 88 #NUM! #NUM! #NUM! #NUM! #NUM! 120 5400 90 #NUM! #NUM! #NUM! #NUM! #NUM! 120 5520 92 #NUM! #NUM! #NUM! #NUM! #NUM! 120 5640 94 #NUM! #NUM! #NUM! #NUM! #NUM! 120 5760 96 #NUM! #NUM! #NUM! #NUM! #NUM! 120 5880 98 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6000 100 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6120 102 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6240 104 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6360 106 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6480 108 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6600 110 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6720 112 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6840 114 #NUM! #NUM! #NUM! #NUM! #NUM! 120 6960 116 #NUM! #NUM! #NUM! #NUM! #NUM! 120 7080 118 #NUM! #NUM! #NUM! #NUM! #NUM! 120 7200 120 #NUM! #NUM! #NUM! #NUM! #NUM! 04,A I�UJ i rl HANDCX ', A 85% TSS REMOVAL IN COASTAL COUNTIES (30 FOOT VEGETATED FILTER REQUIRED) DEPTH 3' 3.5' 4.0' 4.5' 5.0' 5.5' 6.0' 6.5' 7.0' 7.5' IMP 10% .9 .8 .7 .6 .5 0 0 0 0 0 20% 1.7 1.3 1.2 1.1 "1.0 ..9 .8 .7 .6 .5 30% 2.5 2.2 1.9 1.8 1:6 1:5 1.3 1.2 1.0 .9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4' 1.11 1.0 50% 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 '3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 4.5 4.1 4. 3.7 *3.3 2.9 �2.5 2.1 1.8 80%n 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90% 7.5' 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100% 8.2 7.4 6.8 6.2 5.6 5.0 `, 4.4 3.8 3.2. 2.6 *Revised 10/31197 90% TSS REMOVAL IN COASTAL COUNTIES (NO VEGETATED: FILTER REQUIRED) DEPTH 3' 3.5' 4.0' 4.5' 5.0' 5.5' 6.0' 6.5' 7.0' 7.5'- IMP% 10% 1.3 1.0 .8 .7 .6 .5 .4 .3 .2 .1 20% 2.4 -2.0. 1.8 .1.7 ' 1:5 1.4 1.2 1.0 .9 .6 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 .8 40% 4.5 4.0 3.5 , 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50% 5.6 5.0 i- 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 -2.4 1.9 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90% 10.7 9.0 7.9 7.2 6.5 j 5.9 5.2 4.6 3.9 3.3 100%n 12.0 10.0 8.8 8.I [7-3 6.6 5.8 5.1 4.3 3.6 h L 18-73 DRAINAGE SEWERAGE- HYDRAULIC COMPUTATIONS-5 a = CroSs - secfionat. For pipes Full _ area of w' oterway or hoJf- full p a wefted perimeter ' �` R 4 R { P = Hydraulic radius. SECTION OP AN'4 OPEN CHANr1EL - SECTION OF CIRCULAR PIPE. V=Avercge or neon ve%cify in reef per second. Q = Q V -Discharge of pipe or channel in cubic feet per second Cc. f.s.). n = Coefficient of roughness ofpipe or channel surFace ,see Tob/e A-Py.18-68. 5 = Slope of Hydrae/ic 951'a0'ie17t (wafer surface ir, open chonro/s or pipes not under Pressure, Same as slope of` chonriel or pipe invert only when 4/ow !S uniform .)re con371ont section. FIG. A- HYDRAULIC ELEMENTS OF CHANNEL SECTIONS. too 90 so 0-, 70 w u a 60 v 3 50 0 —1 LL 40 U_ 0 = 30 W 20 to 0 v Iv 4v +v MV Jv .py Iv VV 7y !yV to— orw HYDRAULIC. ELEMENT5 PER CENT OF VALUE FOR FULL SECTION (APPrZOXIMATE) ""'AMPLE: Given: Discharge =12 c i7s. through,ia pipe which has capacify f/owing full C. f s. of Cr vela city of 70 /7 per sec ' Reyewietl fo 7�d V for /2 c. f: s: Pereel7fage o/`fu// discfiorge 60% . Enter Ch,7-1 of 80% of Yo/ue fi'ir'fu/lsec/%n of f/ms, foA//2.5x7�79per sec. i7Y, F16.13-VALUES OF HYDRAULIC ELEMENTS OF CIRCULAR SECTION A--�5 Appendices NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: 'Bank and channel fining procedures", New York Department of Transportation, Division of Design and Construction, 1971.) Note: To use the following chart you must know: (1) Q full capacity (2) Qto (3) V full i (4) Vio where Q discharge in cfs and V Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity Vo at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do=Ao, where A.= cross -sectional area of flow at outlet. For multiple culverts, use Do=1.25xDo of single culvert. Step 3) For apron grades of 10% or -steeper, use recommendations For next higher zone.- (Zones I through 6). 2s 20 - 5- warm wrap�m�aaR+u�a r►asQ+u� f��0a irKx+o�n�oo� 11�uR�l/I�d, �t�w�^w�rrrrm a�rrrr��� Atxx�s. rrarw.vmoov4ans+o�mn w�[atl® mom► �a1�.rQ[u�au -mm��m�r o .1m�mo» m mm�watamatrm era®�w[am Rs�[ruamnr*amr� m�muu[ati�®®a 0' S' 10• 15' 20' 25' DIAMETER (Ft.) Figure 8.06.b.1 Rev. ) 2193 8.06.5 H `t- w Z �1,' R ��t S,] A?WN MA ERK MO ECT GIA.VERT L1 10 PREVENT SCOUR HOLE USE L2 ALWAYS L2 1.- STONE FILLING (FINE) CL. A 3 x .Do 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 x Do 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 4 x Do 8 x Do 4 STONE FILLING (HEAVY) . CL. 1 4 x Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 x Do 10 x Do 6 STONE FILLING (HEAVY) CL. 2 6 x Do 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Fig. 8.06.b.2 Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIXES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1) Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps=20" or 550 lbs. Step 2) Use figure.8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.) `. i Note: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Mannin's Mn. thickness (inches) "n" of fining _ (inches Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0,040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapmors) 8.06.6 ' R".IM3 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Bill Holman, Secretary Division of Water Quality ,tune 23. 2000 Mr. Georooe Norris, General ManaVcler Oakwood Mobile Homes. Inc. PO Box 958 Morehead City, NC 28557 Subject: ACKNOWLEDGMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Proiect No. SW8 000527 Oakwood Mobile Homes Carteret County Dear Mr. Norris: The Wilmington Regional Office received a Stormwater Management Permit Application for Oakwood Mobile Homes on May 11, 2000, A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the storrnwater review: A wet pond is not an acceptable engineered solution for those projects which drain to class SA waters. Please either redesic n to an infiltration basin and treat 1.5" of runoff, or provide the results of a chlorides test taken after 3 days without rain; at a point in the receiving stream that is at least 1/2 mile (as the crow flies) from the proposed discharge point. In order to allow the use of a wet pond, the chlorides level must be less than 500 ppm. Please provide a clear, readable location map. Please provide State Road numbers, label major roads and intersections, and provide distances to the project from the nearest major intersection. The printing on the map is too small to be legible on a blueprint. 3. Please seal the des'.Yn calculations. 4. The rules require that only the president or vice-president of a corporation may sign the application. Others may sign only if a signed authorization from the president or vice president is provided. Please provide a signed authorization. 5. The runoff from all impervious areas on the project must be directed to the pond. -Please relocate the high point of the entrance road to the property line. 6. Please specify the vegetated cover to be planted above the permanent pool on the pond section detail and initial item (1) on supplement. Simply saying `'...other aduatic vegetation" is not acceptable. Please be specific in the type of grass to be planted. Please note that Love Grass is not an acceptable vegetation for use in detention ponds due to its clumpy nature and inability to be maintained. 7. The supplement reports an impervious area of 72,573 ft�, but the application and calculations use 70,60E ft2. Please clarify and revise the application or calculations as needed. 8. The supplement reports a permanent pool volume of 10,031 ft', but the calculations use 11,466 ft3. Please clarify and revise. 127 Cardinal I)r. Ext., WifminatWi, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 5M., recycled110% post -consumer paper Mr. Norris .tune 23, 2000 Stormwater Project No. SWS 000527 ---------------------------------------------- 9. The supplement reports that a I.5" orifice will be used, but the plans and calculations indicate that a 1.25" orifice will be used. Please clarify and revise. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 23, 2000, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation ofNCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent along with a copy of this letter. All original documents must be revised and returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please fee] free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:1WQSISTORMWATIADDINFO\000527.,1UN cc: Linda Lewis James W. Forman, P.E. 127 Cardinal Dr. Ext., Wimington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recvcfed/10% host -consumer winer -is.-'F-wi't.."&',�`d,e,xw,7 5"i OFFIL4UJL'.ONL.l�`,a t. .. ;ib?.�. fix•%.>.S::t �x.4� ��.{l.-�i'..Sc»i�:.�C;.� m�:-� �'j;`�.s M Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Oakwood Mobile Homes, Inc. 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): George T. Norris, General -Manager y 3. MaiIing Address for person listed in item 2 above: P.O. Box 958 City: Morehead City - - State: NC Zip: 28557 Telephone Number: ( 252 ) 24772122 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name an plans, specifications, letters, operation and maintenance agreements, etc.): Oakwood Mobile Homes, Inc. 5. Location of Project (street address): NE side of US Hwy 70, west of Morehead City City: Morehead_ City County: Carteret 6. Directions to project (from nearest major intersection): _ _approximately 2.5 miles on the NE side of Hwy 70, west _of NQrehead City, from the intersection of Hwy 70 &'Hwy 24 7. Latitude: 34 °44' 50" Longitude: 76 °50' 00" of project 8. Contact person who can answer questions about the project: Name: .lames W. Forman Telephone Number: ( 252 247-7479 IT. PERMIT INFORMATION: 1. Specify whether project is (check one): N New Renewal Modification Form SWU-101 Version 3.99 Pam 1 of 4 at 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) _ 1 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): �CAMA Major X Sedimentation/Erosion Control - 404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project, all ^impervious ---runoff to be directed to the wet detent�ond _ 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Project Area: 3.30 . acres 4. Project Built Upon Area: 50.5 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are mole than. two drainage areas in the project,.attach an additional sheet with the information for each area provided in the same format as below. Basminformaion "�,, ��Drainage Azea 1�"" �., b, DrairiageArea Receiving Stream Name Ne ort River' Receiving Stream Class SA Drainage Area 77656 5F Existing Impervious* Area 0.00 SF Proposed Irn ervious"Area 70608 8F % Impervious* Area (total) 20.9% :•'r "s.^" mE ' > sat. A., ervouA. - Dra vag,Ar a MXyrDraina ,i gefArema:-a 2 On -site Buildings 2050 SF On -site Streets 3462 SF On -site Parking 4480 SF. _ On -site Sidewalks N/A Other on -site (gravel) 60616 SF Off -site N / A Total: 70608 SF Total: " Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? NIA IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons clairning under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS' The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement ,. Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of VI. S'UBMI-ITAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual.or firm):^ Stroud_ Engineering, P.A. / ,Tames W. Forman, P.E. Mailing Address:151—A Hwy 24 City: Morehead City, Phone;( 252_ )_ 247-7479 VIII. APPLICANT'S CERTIFICATION State: 14C Zip: 28557 Fax: ( 252 ) 247-4098 I, (print or type name of person listed in General Inforniation, item 2) George T. Norris, General Manager certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be r orded nd that the proposed project complies with the requirements of 15A NCAC 2H .1000. 1 , /1 Signature: Date: o o ° Form SWU-101 Version 3.99 Page 4 of 4 Permit No. ' 'w 8 boo S-aj (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMW ATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application fohn, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and' outlet structure details. I. PROJECT INFORMATION Project Name: Oakwood Mobile Homes, Inc. Contact Person: James W. Forman, Jr. ,P. E. Phone Number: (252 ) 247-7479 For projects with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation 0.7 ft. Permanent Pool Elevation 6.2 ft. Temporary. Pool Elevation 7.4 ft. (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 4850 sq. ft. (water surface area at the orifice elevation) Drainage Area 77656 SF -a-c7.- (on -site and off -site drainage to the basin) Impervious Area 72573 sF (on -.rite and off -site drainage to the basin) volumes Permanent Pool Volume 10031 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 7223 cu. ft. (volume detained above the permanent pool) Forebay Volume 2474 cu. it. (approximately 20% of total volume) Other parameters SA/DAI 6. 145% (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1.5 in. (2 to 5 day temporary pool draw -dawn required) Design Rainfall 1.0 in_ Design TSS Removal 2 90 % (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Footnotes: I When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious.% and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. '- In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 909c TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit' Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and'erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does 0 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 a • Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 7511/o of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.13 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feet in the forebay, the sediment shall`be rinovcd. Sediment Ren\oval t 1. 3.95 f 7 Bottom Elevation 3.2 FOREBAY BASIN DIAGRAM (fill in the blanks) Fyn _ r ti ~ Permanent Pool Elevation 6.2 Sediment Removal Elevation 2.07 75% %-------------------------------- :-------•--------!--- Bottom Elevation 0 7 25% / MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover. 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures Iisted above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: George T. Norris Title:_ General_ Manager Address:_ P.Q. Box 95g_ Morehead City, NC _28557 Phone Signature: Date: M (,) I U Z J-3�) Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, _ .._ -t �Z �gp , a Notary Public for the State of i County of /'AVC _ - _ _ _ , do hereby certify that `7 personally appeared before me this /Drday of 0&4 Od , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. itnes y and and of rficial seal, SEAL My commission expires er. 003 Form SWU-102 Rev 3.99 Page 4 of 4 STROUD ENGINEERING, P.A. Hestron plaza Two 151-A Hwy. 24 MOREHEAD CITY, NC 28557 (252) 247=7479 To IV• dt Wyitr �U [N 12-1 ,r. ` EKf W1*1 M4bn WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via ❑ Shop drawings ❑ Copy of letter ❑ Prints ❑ Change order ❑ Plans DATE O 0d RE: OQ.kwDoJ I4a b e;geu ❑ Samples the following items: ❑ Specifications DESCRIPTION 1 e s per• THESE ARE TRANSMITTED as checked below: ❑ For approval El For your use ❑ As requested > For review and comment ❑ FORBIDS DUE REMARKS ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections DWQ ❑ Resubmit e a oxn�c es fnr approval pftoj # ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: !f enclosures are not as noted, kindly notify us at once t I ■ Oakwood Mobile Homes, Inc, Site Improvements ■ Stormwater Management Plan May 3, 2000 RECEIVED MAY 1 .i 2000 DWQ p&OJ # Prepared by: Stroud Engineering, P.A. Hestron Plaza Two 151-A Hwy 24 Morehead City, NC 28557 Table of Contents Narrative Vicinity Map Stormwater Management Permit Application Form Wet Detention Basin Supplement Supporting Calculations Construction Specifications Section 02200 --- Earthwork Section 02485 — Seeding and Mulching Section 02513 — Bituminous Concrete Paving Section 02720 — Storm Drainage System Drawings (Attached) Sheet 1 of 4 — Site plan Sheet 2 of 4 — Stormwater and Erosion Control plan Sheet 3 of 4 — Pond details Sheet 4 of 4 — Details Oakwood Mobile Homes, Inc. Site Improvements Stormwater Management Plan May 3, 2000 Narrative Project Description This project includes the construction of 60,616 square feet of graveled parking area, 9,959 square feet of roadway and parking, and 2,050 square feet in buildings. The total disturbed area of the project is 2.43 acres including the areas mentioned above and some additional grading. The site is being constructed for use as a mobile home storage lot. All work will be done within the boundaries of this tract of land. Stormwater Management Plan The project is being developed as a high density project. The total acreage of the drainage area to the wet detention pond is 1.78 acres. The pond is sized to retain runoff from the impervious areas discussed above. Drainage from the project site will be to install three drop inlets around the site, as shown on the plans, and have the stormwater drain into the forebay of the pond. The outfall from the detention pond is the ditch located on the west side of the property, which eventually runs into the Newport River. Coastal Stormwater Regulations The North Carolina Division of Environmental Management implemented coastal stormwater regulations in coastal counties on January 1, 1988. These regulations are detailed in 15 NCAC 2H.1000 Stormwater Runoff Disposal. These rules allow for a development to be considered under various options. This project is submitted for approval consideration under Section .1003(d)(1). OAKWOOD HOMES INC. SITE IMPROVEMENTS BEAUFORT, NC CARTERET COUNTY SITE LOCATION MAP MANSFIELD QUADRANGLE, 1994 1 " = 2000' h� �d S 16'37'3`. r RAP = V 23.34 iGTH dIDTH = 5 OVERFLOW DEVICE RE IVED .,NESS = 1.5' SEE SHEET 3 FOR CE S flrr� �11 0 MAY 1' l 2000 111 i I I SEE SHEETT' I.IIUI I II DWQ PROD # lL� •� Y ` \ mY A a1 h i P l rl TO QU77em) M s4 \\\ as 0 y/\ UP UP VVV \ UP .,o yA� Nor TAX [IP . A.3 Appendices NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: "Bank and channel lining procedures", New York Department of Transpomdon, Division of Design and Construction, 1971) Note: To use the following chart you must know: (1) Q full capacity (2) Qto (3) V full S (4) VIo 1 where Q = discharge in efs and V Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute, flow velocity Vo at culvert or paved channel outlet.. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do=Ao, where A.= cross -sectional area of flow. at outlet. For multiple culverts, use Do=l .25xDo of single culvert. Step 3) For apron grades of 10% oksAecper, use recommendations For next higher zone.; (Zones 1 through 6). 25 20 - 15- rL LL w 10- 5- �Innn m�sAA cram - .ue. Win`Wult !i�»trnearnrr,l. r�vRwrprr�r�►Q� r�rrros�u®®omo �rrmv�rr�auu��-wu�rm �wr-.�a�wsau.d 0a�m mm a�mmmxvmm� oQ.isam��'�nrv�� rorromur�er�omm� �®mum' o�rmrruunm rvm>.rnrs>�' wrm�rolumvimma��� 0 Fie xr is +a .r Figure 8.06.b.1 1 I I I 10' 15' 20' 25' DIAMETER (Ft.) Imo. I ZN3 8.06.5 K� W zTO II rF1 ApWN MAT PROTECT CULVEAr LS t0 PREVENT SCOUR ROLE USE L2 ALWAYS L2 t_ STONE FILLING (FINE) CL. A 3 x .Do 4 x Do 2 1 STONE FILLING (LIGHT) CL. 8 3 x Do 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 4 x Do 8 x Do 4 STONE FILLING (HEAVY) CL 1 4 x Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 x Do 10 x Do 6 STONE FILLING (HEAVY) • CL. 2 6 x Do 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE), Fig. 8.06.b.2 . Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIXES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1) Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps=20" or 550 lbs. Step 2) Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.) Note: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Mannin's Min. thickness (inches) In.. of lining (inches) Fine 3 0.031 9 12 -Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev. I Z93 `"",%Iviffiff"', .1CAR.9 , • r.•.••.� 4 ••i SECTION 02200 S �L �3 :_` EARTHWORK �'c�` ' �FNCI N��'* �Nr: rr LP •••• ...••. �a , PART 1 -GENERAL Nn� 1.1 APPLICABLE PUBLICATIONS: The publications listed below form a part o is specifications to the extent referenced. The publications are referred to in the text by the basic designation only. references shall be made to the "Latest Edition" of the cited publications. 1.1.1 American Association of State Highway and Transportation Officials (AASHTO) specifications and tests, T 99 The Moisture Density Relations of Soils Using a 5.5 lb. [2.5 kg] Rammer and a 12 in. [305 mm] Drop T 180 The Moisture Density Relations of Soils Using a 10 lb. [4.54 kg] Rammer and an 18 in. (457 mm] Drop 1.1.2 American Society for Testing and Materials (ASTM) Publications: D 422 Particle Size Analysis of Soils D 698 Laboratory Compaction Characteristics of Soil Using Standard Effort (24,000 ft. Ib.-f 1 ft.) D 1140 Amount of Material in Soils Finer than the No. 200 (75-mm) Sieve D 1883 Bearing Ratio of Laboratory Compacted Soils D 2487 Classification of Soils for Engineering Purposes D 4318 1984 Liquid Limit, Plastic Limit and Plasticity Index of Soils 1.1.3 North Carolina Department of Transportation, "Standard Specification for Roads and Structures", January 1, 1990 (NCDOT Specifications). A copy of the NCDOT Specifications shall be at the project site in the possession of the Contractor. The specifications referenced are incorporated and become a part of this specification. Section 520 Aggregate Base Course 1.2 DESCRIPTION OF WORK: The work includes excavating, filling, general fill, preparation of subgrades for pavements, and site grading to establish the lines and grades indicated. 1.3 DELIVERY, STORAGE, AND HAULING: Perform in a manner to prevent contamination or segregation of materials. 1.4 CRITERIA FOR BIDDING: Base bids on the following criteria: 02200-1 Oakwood Homes, Inc. 513100 a. Surface elevations are as indicated. b. Pipes or other artificial obstructions, except those indicted, will not be encountered 1.5 PROTECTION: 1.5.1 Site Drainage: Provide for the collection and disposal of surface and subsurface water encountered during construction. 1.5.1.1 Surface Drainage: Completely drain construction site during periods of construction to keep soil materials sufficiently dry to permit construction operations to successfully progress. Provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove the unsuitable material and provide new soil material as specified herein. 1.5.2 Protection of Underground Utilities: The contractor shall verify locations of existing utilities prior to excavation. If utilities are to remain in place, provide adequate means of support and protection during earthwork operations. 1.5.3 Movement of construction machinery and equipment over any pipes during any stage of construction shall be at the Contractor's risk. Repair or remove and provide new pipe for existing or newly -installed pipe that has been displaced or damaged. 1.5.4 Protection of Existing Facilities: Protect structures, utilities, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout and other hazards created by earthwork operations. 1.5.5 Protection of Trees and Root Systems: Perform excavation within drip -line of large trees to remain by hand, and protect the root system from damage or dry out to the greatest extent possible. Maintain moist condition for root system and cover exposed roots with burlap. Paint root cuts of 1" diameter and larger with emulsified asphalt tree paint. 1.5.6 Sedimentation and Erosion Control: Contractor shall install silt fencing as indicated adjacent to graded areas to trap runoff and sediments from construction areas and denuded soil areas. Graded areas shall be seeded and mulched within 15 days of when final grades are established. No additional payment will be made for placement erosion control measures required in addition to those indicated in the Contract Documents. 1.6.6 Use of explosives is not permitted. PART 2-PRODUCTS 2.1 SOIL MATERIALS: Shall be free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, frozen, deleterious. or objectionable materials. Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the location of intended use. 2.1.1 8ackfill Material: Shall be granular or sandy material of ASTM D2487 Classification GW, GP, GM, GC, SW, SP or SM. Soil material produced by on -site excavation may be used as backfll material if it is not wet and it meets these specifications. 2.2 Topsoil: Provide in accordance with Section 02485, "Seeding and Mulching. 02200-2 Oakwood Homes, Inc. 513100 2.3 Aggregate Base Course (ABC): Provide NCDOT Aggregate Base Course, Type A in accordance with NCDOT Specifications, Section 520. PART 3 - EXECUTION 3.1 UNCLASSIFIED EXCAVATION: 3.1.1 All excavation under this section shall be classified as unclassified excavation. 3.1.2 Unauthorized Excavation: Consists of removal of materials beyond indicated subgrade elevations or dimensions without specific direction of Engineer.. Unauthorized excavation, as well as remedial work directed by Engineer, shall be at Contractor's expense. 3.1.4 Cold Weather Protection: Protect excavation bottoms against freezing when atmospheric temperature is less than 35 degree F (1 degree C). 3.2 GRADING: 3.2.1 General: Uniformly grade areas within limits of grading under this section, including adjacent transition areas. Smooth finished surface within specified tolerances, compact with uniform levels or slopes between points where elevations are indicted, or between such points and existing grades. Grade areas as shown on the Drawings to prevent ponding. 3.2.2 Lawn or Unpaved Areas: Finish areas to receive topsoil to within not more than 0.10' above or below required subgrade elevations. 3.2.3 Pavements and Shoulders! Shape surface of areas under pavement and shoulders to line, grade and cross-section, with finish surface not more than 112" above.or below required subgrade elevation. 3.3 FILLING AND BACKFILLING: Fill and backfill to the contours, elevations, and dimensions indicated as described herein. Compact each lift before the overlaying lift is placed. 3.3.1 Ground Surface Preparation: Remove vegetation, debris, unsatisfactory soil materials, obstructions, and deleterious materials from ground surface prior to placement of fills. Plow, strip, or break-up surfaces so that fill material will bond with existing surface. 3.3.2 Placement of Fill and Backfill: Place backfill and fill materials in layers not more than 8" in loose depth for material compacted by heavy compaction equipment, and not more than 4" in loose depth for material compacted by hand -operated tampers. Before compaction, moisten or aerate each layer as necessary to provide optimum moisture content. Compact each layer to required percentage of maximum dry density or relative dry density for each area classification. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice. 3.3.3 Adjacent to Structures: Place backfill and fill materials evenly adjacent to structures, piping or conduit to required elevations. Take care to prevent wedging action of backfill against structures or displacement of piping or conduit by carrying material uniformly around structure, piping or conduit to approximately same elevation in each lift. 3.4 Placement of Aggregate Base Course: Contractor shall utilize methods of handling, hauling and placement of ABC which will minimize segregation and contamination.. Aggregate which is contaminated with soil materials, mud or other foreign materials shall be removed and replaced at no additional cost to the owner. 02200-3 Oakwood Homes, Inc. 513100 3.4 COMPACTION: 3.4.1 General: Control soil compaction during construction providing minimum percentage of density specified for each area classification as indicated below. Remove and replace, or scarify and air dry, soil material that is too wet to permit compaction to specified density. Soil material that has been removed because it is too wet to permit compaction may be stockpiled or spread and allowed to dry. Assist drying by disking, harrowing or pulverizing until moisture content is reduced to a satisfactory value. 3.4.3 Percentage of Maximum Density Requirements: Compact soil to not less than the following percentages of maximum density. 3.4.3.1 Pavements: Compact top 12"'of subgrade at 100% density in accordance with ASTM D 698. Each layer of backfill or fill material below top 12" shall be compacted to 98% maximum density. 3.4.3.2 Lawn or Unpaved Areas: Compact top 6" of subgrade and each layer of backfill or fill material at 95% density in accordance with ASTM D 698. 3.4.5 Grade Control: During construction, maintain lines and grades including crown and cross -slope of subbase material. 3.5 COMPACTION OF AGGREGATE BASE COURSE: Each layer of aggregate placed shall be compacted to 100 percent of density obtained by compacting sample of aggregate compacted in accordance with AASHTO T180. Aggregate material shall be compacted at a moisture content which is approximately that required to produce a maximum density indicated by the sample tested as indicated above. 3.5 STABILITY OF EXCAVATIONS: Slope sides of excavations to comply with local codes and ordinances having jurisdiction. Shore and brace where sloping is not possible because of space restrictions or stability of material excavated. Maintain sides and slopes of excavations in safe condition until completion of backfilling. 3.6 SHORING AND BRACING: Provide materials for shoring and bracing, such as sheet piling, uprights, stringers and cross -braces, in good serviceable condition. Establish requirements for trench shoring and bracing to comply with local codes and authorities having jurisdiction. Maintain shoring and bracing in excavations regardless of time period excavations will be open. Carry down shoring and bracing as excavation progresses. 3.7 DEWATERING: Prevent surface water and subsurface or ground water from flowing into excavations and from flooding project site and surrounding area. Do not allow water to accumulate in excavations. Remove water to prevent softening of soil detrimental to stability of subgrades and pavements., Provide and maintain pumps, well points, sumps, suction and discharge lines, and other dewatering system components necessary to convey water away from excavations. Establish and maintain temporary drainage ditches and other diversions outside excavation limits to convey rain water and water removed from excavations to collecting or run-off areas. Do not use trench excavations as temporary drainage ditches. 3.8 FIELD QUALITY CONTROL: 3.8.1 Quality Control Testing During Construction: When excavation has reached required subgrade elevations before the aggregate base course is placed, provide proof rolling of the prepared pavement subgrade with a heavy roller or loaded dump truck (+25 tons) in the presence of the Engineer. The 02200-4 Oakwood Homes, Inc. 5/3/00 proof rolling shall be covered by the wheels of the proof roller operating at a speed between 2-1/2 and 3- 1/2 miles per hour. Any areas that rut or pump excessively shall be allowed to dry or shall be undercut and backfilled with acceptable material as directed by the Engineer. After undercut and backfill operations are complete, a final proof rolling of the undercut areas will be performed in the presence of the Engineer. Proof rolling done without the Engineer or the Engineer's representative present shall be proof rolled again in the presence of the Engineer or his representative. No additional payment will be allowed for areas proof rolled without the Engineer present. 3.9 MAINTENANCE: 3.9.1 Protection of Graded Areas: Protect newly graded areas from traffic and erosion. Keep free of trash and debris. Repair and re-establish grades in settled, eroded, and rutted areas to specified tolerances. 3.9.2 Reconditioning Compacted Areas: Where completed compacted areas are disturbed by subsequent construction operations or adverse weather, scarify surface, re -shape, and compact to required density prior to further construction. 3.9.3 Settling: Where settling is measurable or observable at excavated areas during general project warranty period, remove surface (pavement, lawn or other finish), add backfill material, compact, and replace surface treatment. Restore appearance, quality, and condition of surface or finish to match adjacent work, and eliminate evidence of restoration to greatest extent possible. 3.10 DISPOSAL OF EXCESS AND WASTE MATERIALS: 3.10.1 Excess Material: Remove acceptable material to be reused to area on project site designated by the Owner or Engineer. Stockpile soil or spread as directed by Engineer. Unused material shall become the property of the Contractor and shall be disposed of as waste material. 3.10.2 Waste Material: Waste materials shall become the property of the Contractor and disposed of off of project property. Disposal shall be at an approved site meeting all applicable local, state and federal regulations. Contractor is responsible for meeting all applicable local, state and federal regulations for transport and disposal of waste materials. Fees for disposal are to be paid by the Contractor. END OF SECTION 02200-5 Oakwood Homes, Inc. 5/3/00 SECTION 02513 • S Q�. iCx BITUMINOUS CONCRETE PAVING IN PART 1 -GENERAL ,''•i,�1' L!'AM' �,.� • 1�H1 1.1 RELATED DOCUMENTS: The general provisions of the Contract, including General and Special Conditions and Division-1/'� Specification sections, apply to work of this section. . 1.1.1 Related Work Specified Elsewhere: A. Earthwork: Section 02200 1.2 REFERENCE DOCUMENTS: 1.2.1 American Association of State Highway and Transportation Officials (AASHTO) specifications and tests. M301 Joint Sealants, Hot -Poured, for Concrete and Asphalt vements T-99 The Moisture Density Relations of Soils Using a 5.5 lb. [2.5 kg] Rammer and a 12 in. [305 mm] Drop 1.2.2 North Carolina Department of Transportation, "Standard Specification for Roads and Structures", January 1, 1990. A copy of the NCDOT Specifications shall be at the project site in the possession of the Contractor. The specifications referenced are incorporated and become a part of this specification. Section 520 Aggregate Base Course Section 605 Bituminous Tack Coat Section 645 Bituminous Concrete Surface Course, Types 1-1 and 1-2 1.2.3 American Society for Testing and Materials (ASTM) publications. D36 Softening Point of Bitumen (Ring -and -Ball Apparatus) D70-82 Specific Gravity and Density of Semi -Solid Bituminous Materials D146-90 Sampling and Testing Bitumen -Saturated Felts and Woven Fabrics for Roofing and Waterproofing D412-87 Vulcanized Rubber and Thermoplastic Rubbers and Thermoplastic Elastomers-Tension D517-92 Asphalt Plank 1.2A Manufacturers Instructions: Where installation, handling or storage of a material is to be in accordance with the manufacturers instructions, a copy of the instructions for the particular product shall be at the project 02513 - 1 Oakwood Homes, Inc. 513100 site in the possession of the Contractor. The instructions as provided by the manufacturer are incorporated and become a part of this specification. 1.3 DESCRIPTION OF WORK: The extent of work under this item includes the placement of tack coat, aggregate base course and bituminous concrete pavement for the pavement areas described in the Contract Documents for the Lump Sum Base Bid. Bituminous concrete paving shall also mean bituminous paving, asphalt, or asphalt concrete as may be used in other sections of the specifications or drawings. 1.4 SUBMITTALS: 1.4.1 Material Certificates: A. Bituminous Concrete Paving: Provide 2 copies of materials certificates signed by the material producer and the Contractor, and notarized, certifying that each material item complies with, or exceeds, specified requirements. B. Job Mix Formula: Provide 2 copies of the; proposed job mix formula at least 15 days prior to beginning work. If this formula has not been previously approved by N.C. D.O.T. for the type of pavement specified, Contractor shall, at his own expense take whatever measures are necessary in order to obtain said approval prior to beginning work or have a mix design prepared by an approved Testing Lab. C. Tack Coat: Provide 2 copies of materials certificates signed by the material producer and the Contractor, and notarized, certifying that each material item complies with, or exceeds, specified requirements. PART 2-PRODUCTS 2.1 Aggregate for Aggregate Base Course: Aggregate meeting the requirements of NCDOT Specifications, Section 520. 2.2 Bituminous Surface Course, Type 1-2: Materials meeting the requirements of NCDOT Specifications, Section 645. 2.3 Tack Coat: Material meeting the requirements of NCDOT Specifications, Section 605-2. PART 3 - EXECUTION 3.1 GENERAL: 3.1.1 Weather Limitations: Construction operations shall be conducted in accordance with the weather limitations given in the applicable sections of "Standard Specifications for Roads and Structures" as issued by N. C. Department of Transportation. No asphalt concrete shall be placed when the ambient temperature is less than 40 degrees F in the shade away from artificial heat. 3.1.2 Grade Control: Establish and maintain required lines and elevations as necessary to match existing grades and/or proposed grades on the drawings. In areas where pavement overlay is to be placed, Contractor shall, in the presence of the Engineer, identify bird bath areas (small localized depressions in the pavement surface where water ponds) in the existing pavement. Care shall be taken in placement of new pavement to shape new pavement surface to eliminate.bird bath areas from the existing pavement areas and prevent bird bath areas in any new pavement surfaces. Bird bath areas existing after placement of final pavement surface shall be identified and corrected at no additional costs to the Owner. 02513 - 2 Oakwood Homes, Inc. 5/3/00 3.1.3 Subgrade: Shape surface of areas under base course to line, grade and cross-section shown on drawings, with finish surface not more than 112" above or below the required subgrade elevation. Prepare soil subgrade in accordance with Section 02200, "Excavation," of these specifications. 3.1.4 Patches; Patches in driveways and roadways shall be graded to depth required to match existing pavement or to provide minimum pavement specified. 3.2 Aggregate Base Course: Place base course material on prepared subgrade in layers of uniform thickness, conforming to indicated cross-section and thickness. Maintain optimum moisture content for compacting subbase material during placement operations. When a compacted base course is shown to be 6" thick or less, place material in a single layer. When shown to be more than 6" thick, place material in equal layers, except no single layer more than 6" or less than 3" in thickness when compacted. Grade the base course evenly to thickness indicated on drawings and compact to 100%, AASHTO T 99. Maintain a uniform surface on the base course until.the placement of the bituminous surface course is complete. 3.2.1 Proof Rolling of Aggregate Base Course: Provide proof rolling of the compacted aggregate base course with a heavy roller or loaded dump truck (+25 tons) in the presence of the Engineer. The proof rolling shall be covered by the wheels of the proof roller operating at a speed between 2-112 and 3-112 miles per hour. Any areas that rut or pump excessively shall be allowed to dry or shall be undercut and backfilled with select backfill or coarse aggregate base course as directed by the Engineer. After undercut and backfill operations are complete, a final proof rolling of the undercut areas will be performed in the presence of the Engineer's Representative. Areas too small or irregular in shape for effective proof rolling shall tested for compaction in accordance with these'specifications. 3.3 Tack Coat: Tack coat shall be applied to contact surfaces of previously constructed asphalt or portland cement concrete and surfaces abutting or projecting into asphalt concrete pavement. All application of tack coat shall be in conformance with NCDOT Specifications, Section 605. Tack coat shall be uniformly applied at a rate 0.02 to 0.05 gallons per square yard. No more tack coat material shall be applied than can be covered with base, binder or surface course during the following day's operations. No base, binder or surface mixture shall be deposited thereon until the tack coat has sufficiently cured to properly receive paving. All exposed surfaces, not intended to contact paving, shall be protected sufficiently to prevent tack coat from being tracked or splattered on said surfaces. After the tack coat has been applied, it shall be protected until it has cured for a sufficient length of time to prevent it from being picked up by traffic. 3.4 Placing Bituminous Concrete Pavement: Place bituminous concrete pavement in as continuous an operation as possible. The Contractor shall spread the materials to uniform density and strike a smooth finish true to cross-section and free from inequalities.' Spread mixture at minimum temperature of 225 degrees F. Place each course in the required amounts, so that when compacted, they will conform to the indicated grade, cross section, and thickness. Asphalt shall be put down in one course. Provide joints between old and new pavements and between successive days' work for continuous bond between adjoining work. Clean contact surfaces and apply tack coat. 3.4.1 Rolling: Begin rolling when bituminous concrete mixture will bear roller weight without excessive displacement. Repair surface defects with hot bituminous concrete material as rolling progresses. Cut out and patch defective areas and roll to blend with adjacent satisfactory paving. Continue rolling until maximum density is attained and roller marks eliminated. 3.4.2 Protection of Pavements: Protect paving from damage and vehicular traffic until bituminous concrete mixture has cooled and attained its maximum degree of hardness. 02513 - 3 Oakwood Homes, Inc. 513100 3.5 FIELD QUALITY CONTROL: 3.5.1 Pavements: Test the in -place bituminous concrete courses for compliance with requirements for thickness and surface smoothness. Repair or remove and replace unacceptable paving as directed by the Engineer. : 3.5.1.1 Thickness: In -place compacted thickness will not be acceptable if exceeding following allowable variation from required thickness: A. Course Aggregate Base Course: 112", plus or minus A. Bituminous Concrete Course: 114", plus or minus 3.5.1.2 Surface Smoothness: Test finished surface of each bituminous concrete course for smoothness, using 10" straightedge applied parallel with, and at right angles to centerline of paved area. Surfaces will not be acceptable if exceeding the following tolerances for smoothness: A. Wearing Course Surface: 118" Check surfaced areas at intervals as directed by the Engineer. END OF SECTION 02513 - 4 Oakwood Homes, Inc. 513100 CAKu� �.. SECTION 02720 STORM DRAINAGE SYSTEM PART 1 -GENERAL 1.1 APPLICABLE PUBLICATIONS: The publications listed below form a part of extent referenced. The publications are referred to in the text by the basic desigr 1.1.1 North Carolina Department of Transportation, "Standard Specifications for Roads and Structures', January 1, 1990 (NCDOT Specifications). A copy of the NCDOT Specifications shall be at the project site in the possession of the Contractor. The specifications referenced are incorporated and become a part of this specification. Section 840 Minor Drainage Structures Section 1005 General Requirements for Aggregates Section 1016 Select Backfill Material Section 1032 Culvert Pipe 1.1.2 American Association of State Highway and Transportation Officials (AASHTO) specifications and tests. T-99 The Moisture Density Relations of Soils Using a 5.5 lb. [2.5 kg] Rammer and a 12 in. [305 mm] Drop 1.1.3 American Society for Testing and Materials (ASTM): D 698 Laboratory Compaction Characteristics of Soil Using Standard Effort (24,000 ft. lb.-flft.) 1.2 DESCRIPTION OF WORK: The work includes new storm drainage systems and related work. The storm drainage system consist of storm drainage piping, inlets and manholes. Provide each system complete and ready for operation. provide the storm drainage complete including equipment, materials, installation and workmanship as specified herein. Pre -cast concrete or unit masonry drainage structures meeting the requirements of the Contract Documents may be used at the discretion of the Contractor. 1.3 SUBMITTALS: 1.3.1 Manufacturer's Catalog Cuts and Test Reports a. Reinforced Concrete Pipe b. Gaskets d. Trench Backfill Material 1.3,2 Shop Drawings: Submit detailed shop drawings for pre -cast concrete drainage structures including frames, grates, covers and steps. Shop drawings shall contain complete information in detail to show compliance with material requirements of this specification. 1.4 DELIVERY, STORAGE, AND HANDLING OF MATERIALS: 1.4.1 Delivery and Storage: Oakwood Homes, Inc. 513100 02720-1 1.4.1.1 Pipe: Inspect materials delivered to site for damage. Store materials on site in enclosures or under protective coverings. Store rubber gaskets under cover, out of direct sunlight. Do not store materials directly on the ground. Keep inside of pipes and fitting clean and free of dirt and debris. 1.4.2 Handling: Handle pipe, fittings and other accessories in such a manner as to ensure delivery to the trench in sound, undamaged condition. PART 2-PRODUCTS 2.1 PIPE: 2.1.1 Concrete Pipe and Fittings: Pipe shall reinforced concrete pipe in accordance with NCDOT Specifications, Section 1032-1(B), Class III, wall B. 2.1.1.1 Joints: Pipe shall have bell and spigot or tongue and groove joints with rubber gaskets in accordance with NCDOT Specifications, Section 1032-1(F) and referenced specifications. 2.3 CONCRETE DRAINAGE STRUCTURES: Construct of precast or cast -in -place concrete in accordance with NCDOT Specifications, Section 840. PART 3 - EXECUTION 3.1 PIPE INSTALLATION: 3.1.1 General: Each section of pipe shall be carefully examined before being laid, and defective or damaged pipe shall not be used. Proper equipment shall be provided for lowering sections of pipe into proper position. No pipe shall be laid in water, and no pipe shall be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. Pipe shall be laid true to the grades indicated and shall rest upon the pipe bed for the full length of each section. Pipe having its grade and/or joint disturbed after laying shall be taken up, cleaned, and re- laid. Where pipes connect to drainage structures, exposed ends of pipe shall be cut flush with the face of the structure unless otherwise indicated. Cut ends of pipe shall be ground smooth of rough edges and metal spurs. All pipe shall be laid with markings on top. Inner surfaces shall abut neatly, tightly and smoothly. All pipe in place shall be approved by the Engineer before being covered and concealed. Rejected pipe shall become the property of the Contractor and promptly removed from the site. 3.1.2 Pipe Laying and Jointing: Inspect pipe and fittings before and after installation; defective pipe shall be replaced with new materials. Provide equipment for lowering pipe sections into trenches. Lay pipe with the bell ends in the upgrade direction. Adjust spigots in bells to give a uniform space all around. Blocking or wedging between bells and spigots will not be permitted. replace pipe or fittings that do not allow sufficient space for proper caulking or installation of joint material with new pipe or fittings of correct dimensions. At the end of each days work, close ends of pipe temporarily with wood blocks or bulkheads. Provide batterboards spaced not more than 26 feet apart along the trench or use the laser beam method for ensuring proper slope and elevation. Pipe grades or joints that are disturbed after laying shall be removed, cleaned and reinstalled. 3.2 SPECIAL REQUIREMENTS FOR INSTALLATION OF STORM DRAINAGE SYSTEM: 3.2.1 Concrete Pipe: ACPA "Concrete Pipe Installation Manual' or ACPA "Concrete Pipe Handbook," Chapter 9. Clean and dry surfaces receiving lubricants, adhesives or cements. Affix gaskets to pipe not more than 24 hours prior to installation of the pipe. Protect gaskets from sun, blowing dust, and other deleterious agents. Remove loose or improperly affixed gaskets and provide new gaskets before installation of the pipe. Align each pie section with the previously installed section and pull the joint together. If the gasket becomes looses and can be seen through the exteriorjoint recess when the pipe is pulled up to within 1. 0 inch of closure, remove the pipe and remake the joint. 3.2.2 Bedding Requirements: Over excavate soft weak or wet material as required. Use NCDOT type 67 cousre aggregate for bedding material placed in a maximum 6 inch thick layer and compacted to density equal to at least 85 percent of that obtained by compacting a sample in accordance with AASHTO T99. Oakwood Homes, Inc. 5/3/00 02720-2 Grade bottom of trench to provide uniform bedding for at least 10 percent of pipe outside diameter on undisturbed soil or prepared bedding material. 3.2.3 Connection to Existing Structures. Pipe connections to existing structures shall be made in such manner that the finished work will conform as nearly as practicable to the essential applicable requirements specified for new structures, including all necessary concrete work, cutting, and shaping. 3.3 BACKFiLLING AND COMPACTION: Construct backfill in two operations, initial and final, as indicated and specified in this section. Initial backfilling shall be careful hand tamping of 6 inch loose lifts of granular fill placed under the pipe haunches and progressing evenly on each side and along the full length of the pipe. Ensure that material is tamped firmly under the pipe haunches. Backflling shall continue equally on both sides of the pipe in 6 inch thick loose lifts. Final compaction shall be uniform over the entire length of the pipe and shall be to 98 percent of the maximum density in accordance with ASTM D 698. No backfilling shall be started until drainage system is inspected and approved by the Engineer. No aggregate base course shall be placed in pavement areas until backfill and compaction are approved by the Engineer. 3.4 DRAINAGE STRUCTURES: 3.5 GENERAL EXCAVATION AND TRENCHING: Fill in areas adjacent to area of pipe installation shall be backfilled and compacted at same time as pipe and as'indicated in Section 02200, entitled "Earthwork" of these specifications 3.5.1 Excavation: Remove unsuitable material that is incapable of supporting concrete structure for a depth of 12 inches and replace with a foundation of bedding stone as specified in paragraph 3.2.2 of this specification. Compact bedding material to 95 percent of AASHTO T99 maximum density. No structure shall be constructed in water or when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. END OF SECTION Oakwood Homes, Inc. 513100 02720-3 SECTION 02900 SEEDING AND MULCHING PART 1 - GENERAL ``��jr'111urrrrr Roll. SEAL •• �i V� �� : • ` h Cl N 1.1 Description of Work: Seed and mulch all areas which are disturbed by the Contractor's operations and which are not to be covered by concrete or asphalt. PART 2 - PRODUCTS 2.1 Seed: The seed mixture shall comply with the seeding schedule as shown on the drawings. All seed shall be labeled in accordance with U.S. Department of Agriculture "Rules and Regulations under the Federal Seed Act" in effect at date of purchase of seed. All seed shall be furnished in standard containers. Seed which has become moldy, wet or otherwise damaged in transit or storage shall not be accepted. Seed purity, germination and weed content shall comply with the following: Description Minimum Seed Purity Minimum Germination Maximum Weed Seed Sericea Lespenseza 98 85 0.50 Pensacola Bahiagrass 80 70 1.00 Weeping Lovegrass 95 85 1.00 Korean Lespedeza 97 85 1.00 2.2 Lime: Lime shall be agriculture grade, ground limestone. Ground limestone shall contain not less than 88% of calcium carbonate content equivalent and shall be of a fineness to 90% will pass through a Number 10 sieve and not less than 50% through a Number 50 sieve. 2.3 Fertilizer: All fertilizer shall be delivered in bags or other convenient standard containers with name of material, name of manufacturer, net weight and analysis on each bag or container. 2.4 Mulch: Shall consist of small grain straw or tame hay, free of undesirable weed seed. Mulch shall be applied at the rate of 2 tons per acre. 02900-1 PART 3 - EXECUTION 3.1 Grassing Procedure: 3.1.1 Advance Preparation: Areas to be graded shall be brought to the proper line, grade and cross section, as shown on the plans or as previously constructed before grassing operations are started. If any damage by erosion or other causes has occurred after the completion of grading and before beginning the application of fertilizer and lime, the Contractor shall repair such damage. This shall include filling washes, smoothing irregularities and repairing other incidental damage. Minor shaping and smoothing of uneven and rough areas outside of the graded section shall be done as directed by the Engineer in order to provide for more effective erosion control and for ease of subsequent mowing operations. 3.1.2 Tilage: All graded areas shall be thoroughly tilled to a depth of at least 4" by plowing, disking, harrowing or other approved methods until the condition of the soil is acceptable. Where soil conditions are such that difficulty is encountered in getting clods and lumps effectively pulverized, the Contractor shall use rotary tillage machinery until the mixing of the soil is acceptable to the Engineer and no clods or lumps remain larger that 1 '/2" in diameter. 3.1.3 Cleanup: After completion of the tillage operation, the surface shall be cleared of stones, debris or other objects larger than 1 '/z" in thickness or diameter and other objects that might become a hindrance to maintain operations. 3.1.4 Applying Lime and Fertilizer: Following the cleanup operation, lime and fertilizer shall be spread uniformly over the areas to be grassed and shall be thoroughly mixed with the soil to a depth of approximately 3". Fertilizer shall be applied at a rate of 1,000 pounds per acre; 10-10-20 or equivalent. Apply lime at the rate of two tons per acre. In all cases where practicable, approved mechanical spreaders shall be used for spreading fertilizer and lime. 3.1.5 Seeding: Seed shall be sown within 24 hours following the application of fertilizer and lime as specified herein before. Seed shall be uniformly sown at the rate specified by the use of approved mechanical seeders. The seeds shall be covered and lightly compacted by means of a cultipacker or light roller. On slopes inaccessible to compaction equipment, the seed shall be covered by dragging spiked chains, by light harrowing or by other satisfactory methods. Within 36 hours following completion of seed application the entire area shall then be mulched and the mulch shall be anchored. 3.2 Hydraulic Seeders: May be used for application of seed and fertilizer. Seed shall not remain in water containing fertilizer for more than 30 minutes prior to application unless otherwise permitted by the Engineer. 02900-2 3.3 Maintenance: The Contractor shall maintain seeded areas until an approved stand of grass has been achieved. He shall add fertilizer or seed to bare areas as required and water and mow as necessary to acquire a good stand of grass. 3.4 Quality Control: It is the intent of this specification that the Contractor be obligated to deliver a satisfactory stand of perennial grass. If this is necessary to repeat any or all of the work, including plowing, fertilizing, watering and seeding, the Contractor shall repeat these operations at no additional cost until a satisfactory stand is obtained. 3.5 Payment: Payment for seeding and mulching shall be included in the lump sum bid price for the Work. **END OF SECTION`* 02900-3