Loading...
HomeMy WebLinkAboutNCC211974_ESC Approval Submitted (2)_20210401Planning Department Wake Forest Town Hall — 3rd Floor 301 S Brooks Street Wake Forest, NC 27587 P: 919-435-9510 1 F: 919-435-9539 www.wakeforestnc.gov Project Title: Greenway Village at Heritage Apartments Construction Drawings Project Address: 1891 SOUTH FRANKLIN STREET (Unverified) Date: Monday, March 1, 2021 Please review the attached comment letter from the Town of Wake Forest Technical Review Committee (TRC) for your project. Please address any comments and resubmit as a signature set at your earliest convenience using the 'Post Approval Upload" button. If you would like to meet with any of the TRC members to review your comments, you may contact them directly. When responding to comments, please make sure to state how you have addressed the comment in your revisions, or the comment may remain open on the next review. WHEN SUBMITTING PLEASE SUBMIT A FULL SET OF PLANS FOR SIGNATURE AND COMBINE THE FILES INTO A SINGLE PDF PRIOR TO UPLOADING. Sincerely, Patrick Reidy I preidy@wakeforestnc.gov Senior Planner 919-435-9515 1. Architectural Approval Required Patrick Reidy Planning Staff cannot sign off on construction drawings until Architectural 9194359515 Approval has been obtained by the Design Review Board, Staff has not preidy@wakeforestnc.gov received an the application. Graham Smith Noted. We are working with architect to readytheir drawings. 919.8053586 graham@sitecollaborative.com HeritageApartments_Land Disturbing Permit.pdf 2. Engineering B Carrie Mitchell What is the status? (919) 435-9443 cmitchell@wakeforestnc.gov Johnny Edwards Driveway permit is in progress and pending the approval of the NCDOT road (919) 8284428 improvements associated with the Heritage Retail Project. 401/404 permits are info@jaeco.com not applicable for this project. Created with idtPlans Review Greenway Village at Heritage Apartments Construction Drawings Page 1 of 3 3/1/21 Carrie Mitchell What is the status of the NCDOT Driveway Permit? Will need to have prior to pre- (919) 435-9443 construction meeting. cmitchell@wakeforestnc.gov 003 202000504 HeritageApts_L-2.0_Lay+MatPlan.pdf 3. Planning B Patrick Reidy When will route be determined? If you are going to do it now, easement will need 9194359515 to obtained from property owner prior to release of CDs. If you want, you make preidy@wakeforestnc.gov the greenway a separate CD submittal for future review, just update the now to say so Graham Smith The greenway is a future CD submittal phase. 919.8053586 graham@sitecollaborative.com Patrick Reidy Adjust note on plan to state that it will be provided under separate cover. We 9194359515 want the greenway to be installed prior to the CO of any buildings. pre i dy@wakeforestnc.gov Graham Smith Note has been adjusted accordingly. 919.8053586 graham@sitecollaborative.com Patrick Reidy Consider item closed. Keeping open as a reminder to applicant and staff. 9194359515 pre i dy@wakeforestnc.gov Graham Smith Noted. 919.8053586 graham@sitecollaborative.com 4. Planning B Patrick Reidy Provide FIL estimate to Jonathan Jacobs to review. Fee will be due prior to 9194359515 release of CDs preidy@wakeforestnc.gov Graham Smith Noted. We will compile soon and/or prior to our next submittal. 919.8053586 graham@sitecollaborative.com 003 HeritageApts_L-2.0.pdf 'Pag 5. Planning B Patrick Reidy For apartments, bike parking must be covered. This can be provided with a roof 9194359515 structure where racks are located or adjacent to the buildings with an overhand preidy@wakeforestnc.gov provided Graham Smith Bike Parking now to be located inside ground floor of Building B. 919.8053586 graham@sitecollaborative.com Patrick Reidy E-mail coordinating this has been sent to architect and engineer. Please 9194359515 provide note once a consensus has been made. pre i dy@wakeforestnc.gov Created with idtPlans Review Greenway Village at Heritage Apartments Construction Drawings Page 2 of 3 3/1/21 Graham Smith 919.8053586 graham@sitecollaborative.com Patrick Reidy 9194359515 preidy@wakeforestnc.gov 6. Planning B Patrick Reidy 9194359515 preidy@wakeforestnc.gov Graham Smith 919.8053586 graham@sitecollaborative.com Patrick Reidy 9194359515 preidy@wakeforestnc.gov Johnny Edwards (919) 8284428 info@jaeco.com i believe this was handled via that email correspondence. please advise if further clarification needed. Consider item closed, but keeping open for building permit review. My understanding is that NCDOT did not approve this location. Please revise. Sheets updated with latest approvals/guidance from NCDOT No crosswalk shown. Please provide documentation Via e-mail from NCDOT to Jonathan Jacobs and I.. documentation provided via email on 2/9/21 Patrick Reidy Staff has a coordination call with developer/Travis about road improvements on 9194359515 Monday. Will discuss this item. It may require a revision to the CDs, but willing to preidy@wakeforestnc.gov release this set to allow construction to commence. 7. Final Plat Patrick Reidy 9194359515 preidy@wakeforestnc.gov Graham Smith 919.8053586 graham@sitecollaborative.com Patrick Reidy 9194359515 preidy@wakeforestnc.gov 8. Permits When will final plat for easements. buffers, and ROW dedication be recorded? We would prefer to have that submitted prior to the construction starting. Noted, once easements and ROW locked in plat will be recorded. Keeping open for plat review. Carrie Mitchell Regarding the future greenwayconnection: Itwill require a flood study and (919)435-9443 401/404 permits. cmitchell@wakeforestnc.gov [Edited By Carrie Mitchell] Graham Smith Noted - that will be handled Via a next phase and prior to CO. 919.8053586 graham@sitecollaborative.com Created with idtPlans Review Greenway Village at Heritage Apartments Construction Drawings Page 3 of 3 3/1/21