Loading...
HomeMy WebLinkAboutSW6210303_Pipes Phase 2_20210329Design Pipes OBJECTIVE: DESIGN PIPE Erosion/Sediment Control PROJ. NAME Watson Ridge Phase 2 HUA No. DD2006 LOCATION: Lxe/flarnet County NC Design calculations for Storm Drainage Pipes at final runoff coefficient of site PIPE NO. DETERMINE Q25 Q=CIA Area (ac) BASIN INFLOW Q25 PREV PIPE FLOW Q25 TOTAL Q25 MAX. PIPE FLOW Q—CdA (Orifice Equation) Cd � q Dia (ft) h = HW/D Qmax DETERMINE Q25 Q=CIA Area (ac) BASIN INFLOW Q25 PREV PIPE FLOW Q25 TOTAL Q25 MAX. PIPE FLOW Q=CdA (Orifice Equation Cd= Dia (ft) — h = HW/D Qmax c� .9 (paved), c� 30 (grass), c=,6 (gravel) I = 8.72 0.328 (paved) 2.96 (grass) 10.3 CFS 0 CFS, 10.3 CFS 2 g h g = 32.2 FT. / SEC 0.6 1.5 A 1.76625 1.5 0.5 10.4 cfs I 0 (gravel) . SQ.) PIPE NO. 2 c= .9 (paved), c= .30 (grass), c=.6 (gravel) I = 8.72 0.063 (paved) 0.1134 (grass) 0.8 CFS 0 CFS, 0.8 CFS 2 g h (g = 32.2 FT. / SEC 0.6 1.5 1 A= 1.76625 0.5 8.5 cfs 0 (gravel) I SQ.) Design Pipes OBJECTIVE: DESIGN PIPE Erosion/Sediment Control PROJ. NAME Watson Ridge Phase 2 HUA No. DD2006 LOCATION: I-ce"Harnet County NC Design calculations for Storm Drainage Pipes at final runoff coefficient of site PIPE NO. DETERMINE Q25 Q�CIA Area (ac) BASIN INFLOW Q25 PREV PIPE FLOW Q25 TOTAL Q25 MAX. PIPE FLOW Q=CdA (Orifice Equation) Cd = Dia (ft) h — HW/D Qrnax DETERMINE Q25 Q=CIA Area (ac) BASIN INFLOW Q25 PREV PIPE FLOW Q25 TOTALQ25 MAX. PIPE FLOW Q—CdA (Orifice Equation Cd� Dia (ft) h= HW/D Qmax c= .9 (paved), c� .30 (grass), c= .6 (gravel) I � 8.72 0.464 (paved) 1.356 (grass) 7.2 CFS 0 CFS, 7.2 CFS 2 g h g = 32.2 FT. / SEC 0.6 1.5 A 1 �76625 3.5 0.7 15.9 C fs 5 0 (gravel) - SQ.) PIPE NO. 6 c= .9 (paved), c=.30 (grass), c�.6 (gravel) I = 8.72 0-364 (paved) 3-0734 (grass) 10.9 CFS 0 CFS, 10.9 CFS 2 g h (g = 32.2 FT, / SEC 0.6 2 A 3.14 4 0,9 30.2 CA 0 (gravel) . SQ.) Design Pipes OBJECTIVE: DESIGN PIPE Eros ion/Sed iment Control PROJ. NAME Watson Rid-e Phase 2 HUA No. DD2006 LOCATION: Lxedlamet County NC Design calculations for Storm Drainage Pipes at final runoff coefficient of Site PIPE NO. 3 DETERMINE Q25 Q=CIA c= .9 (paved), c= .30 (grass), c= .6 (gravel) Area (ac) I � 8.72 0.281 (paved) 2.8615 (grass) 0 (gravel) BASIN INFLOW Q25 9.7 CFS PREV PIPE FLOW Q25 0 CFS, TOTAL Q25 9.7 CFS MAX. PIPE FLOW Q-CdA -2g h (g - 32.2 FT. / SEC. SQ. (Orifice Equation Cd � 0.6 Dia (ft) - 1.5 A 1.76625 h - 2 HW/D 0.5 Qmax 12.0 C fs PIPE NO. 7 DETERMINE Q25 Q=CIA c� .9 (paved), c- .30 (grass), c= .6 (gravel) Area (ac) I = 8.72 0-5066 (paved) 2.8615 (grass) 0 (gravel) BASIN INFLOW Q25 11.5 CFS PREV PIPE FLOW Q25 0 CFS, TOTALQ25 11.5 CFS MAX. PIPE FLOW Q=CdA 2 g h (g 32.2 FT. / SEC. SQ. (Oriflee Equation Cd- O�6 Dia (ft) 2 A= 3.14 h� 3 HW/D 0.5 Qmax 26.2 CfS PIPE NO. 8 DETERMINE Q25 Q=CIA c� .9 (paved), c= .30 (grass), c- .6 (gravel) Area (ac) 1- 8.72 0.2629 (paved) 0.2629 (grass) 0 (gravel) BASIN INFLOW Q25 2.8 CFS PREV PIPE FLOW TOTAL Q25 MAX. PIPE FLOW (Orifice Equation) Qmax Q25 0 CFS, 2.8 CFS Q=CdA 2 g h Cd — 0.6 Dia (fl) 2 A — h — 3 HW/D 0.7 26.2 efs ( g = 32.2 FT. / SEC. SQ. ) 3.14 Design Pipes OBJECTIVE: DESIGN PIPE Eros ion/Sediment Control PROJ. NAME Watson Ridge Phase 2 HUA No. DD2006 LOCATION: Lee/Hamet County NC Design calculations for Storm Drainage Pipes at final runoff coefficient of site PIPE NO. DETERMINE Q25 Q=CIA Area (ac) BASIN INFLOW Q25 PREV PIPE FLOW Q25 TOTAL Q25 MAX. PIPE FLOW Q=CdA (Orifice Equation) Cd — Dia (ft) h — HW/D Qmax c— .9 (paved), c�,30 (grass), c=.6 (gravel) I = 8.72 0.2492 (paved) 1.0684 (grass) 4.8 CFS 0 CFS, 4.8 CFS 4 0 (gravel) 2 g b ( g � 32.2 FT. / SEC. SQ.) O�6 1.5 A 1.76625 3.5 0.95 15.9 CA