HomeMy WebLinkAboutNCC211880_ESC Approval Submitted_20210326ROY COOPER�aa`+TATEp
Governor
DIONNE DELLI-GATTI - - -
Secretary -
BRIAN WRENN MM
Director NORTH CAROLINA
EnvfronmaMat 41+At�/'
March 19, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
American Emergency Vehicle
Attention: Greg Warmuth, Controller
165 American Way
Jefferson, NC 28640
RE: Project Name: AEV Parking Expansion
Acres Approved: 4
Project ID: ASHE-2021-002
County: Ashe
City: Jefferson
Address: Northwest Drive
River Basin: New
Stream Classification: C, ORW
Submitted By: BREC, PA
Date Received by LQS: February 24, 2021
Plan Type: New
Dear Mr. Warmuth:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The modifications required for
approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000_ Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions
for the WO annual permit fee. After the fee is received, you will receive the COC via email. You MUST
obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCGOI. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas@nederingov or Paul Clark at Paul.clarlc@ncdenr.gov. If the owner/operator of this project
changes in the future, the new responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
i9wNorth Carolina Department of Environmental Quality I Division of Energy, Mi¢eral and Land Resources
Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105
336-776-9800
Letter of Approval with Modifications
American Emergency Vehicle
March 19, 2021
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, onceit is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. .
Your cooperation is appreciated.
Sincerely,
,�fjyYc�.cdc.r
Tamera Epliqiq E
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGOI Fact Sheet
c: BREC, P.A.
1520 Meadowview Drive
Wilkesboro, NC 28697
Letter of Approval with Modifications
American Emergency Vehicle
March 19, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: AEV Parking Expansion
Project ID: ASHE-2021-002
County: Ashe
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
Any off -site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill.
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
2. Be advised this project is in an area containing outstanding resource waters. Additional
measures may be required - The applicant is responsible for the control of sediment on -site.
If the approved erosion and sedimentation control measures prove insufficient, the applicant
must take those additional steps necessary to stop sediment from leaving this site. [15A
NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities