HomeMy WebLinkAboutNCC211716_NOI Application_20210322Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 3/17/2021 3:19:08 PM (NCG01 NOI Submission)
Approve by Clark, Paul 3/19/2021 2:11:06 PM (Review- Construction NOI 48044)
• The task was assigned to Clark, Paul by round robin distribution 3/17/2021 3:19 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 19, 2021 5:00
PM 3/17/2021 3:19 PM
Submit by Selkane, Aziza 3/22/2021 6:35:06 PM (Payment Verification for NCC211716)
* Catawba County
• Selkane, Aziza assigned the task to Selkane, Aziza 3/22/2021 6:33 PM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 30, 2021 5:00 PM
3/19/2021 2:11 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting IT No
an NOI that was r Yes
rejected before?
1a. Project Name * Bethany Church Road Landfill Cap Improvements
1 b. Specific Lot This field Tray be used to list specifc lot nunbers.
Numbers 302497, 302496, 24798, 302147, 24796
1 c. Parcel ID List all Rios associated w ith this project.
Number(s) (PIN) 375020716008, 375020801754, 365902798449,365902778941, 365902871934
2. County* Catawba
3. Highway or Street 2436 Bethany Church Rd
Address* Street name only is acceptable if no address number assigned yet
4. City or Township* Newton
5. State * NC
6. Zip Code* 28658
7. Latitude* Enter the latitude in decimal degrees
35.6536
8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative)
-81.1620
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
04/01/2021
Estimated Construction Project Start Rate
10. Date to End *
12/22/2021
Estinated Construction Project End Date
11. SIC (Primary) *
Other (9999)
Standard Industrial aassification for Development
12. Acres to be
54.00
disturbed*
(including off -site borrow and waste areas)
13. Total site area 163.04
(acres) *
14. Post- 0.00
construction ([stineted)
impervious area
(acres) *
NCC Project NCC-CATAW-2021-Bethany Church Road Landfill Cap
Tracking ID Improvements
Assigned automatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Hagan Fork
Wate rbody* %rna of waterbody into which storrrwater runoff will discharge
15b. Waterbody 11-76-5-2-(1)
Index No. * NCWaterbody Index Number
Stormwater P No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fl rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * Catawba County
It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Mick
IF Corporation, enter Faegistered Agent First %rre
3. Last Name* Berry
It Corporation, enter Pbegistered Agent Last %rre
3b. Title County Manager
4. Permitee E-mail mberry@catawbacountync.gov
Address*
5. Permittee 8284658201
Telephone No.*
6. Permittee Mailing Street Address
Address* 25 Government Drive
Address Line 2
City
Newton
Fbstal / Zip Code
28658
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
V Yes
Street Address
25 Government Drive
Address Line 2
City
Newton
Fbstal / Zip Code
28658
State / Ffovince / i egion
NC
Country
us
State / Frovince / Region
NC
Country
us
8. Type of Ownership is only individual if an individual is naned in B.1. above.
Ownership* Government -County
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Nathalia
Contact - First
Name *
2. Primary Site
Queen
Contact - Last
Name *
3. Title
Environmental Engineer
4. Site Contact E-
nqueen@catawbacountync.gov
mail Address*
5. Site Contact
828-465-9469
Telephone No.
6. Organization
Catawba County
Name
7. Site Contact
Street Address
Mailing Address*
25 Government Drive
Address Line 2
city
Newton
Fbstal / Zip Code
28658
8. Consultant Name
(Optional)
McGill Associates, P.A.
First and Last narre
9. Consultant E-mail
scott.burwell@mcgillassociates.com
This person will be copied on all correspondence.
10. Consultant
8282520575
Telephone No.
11. Billing E-mail
(For Annual Fee correspondence)
mberry@catawbacountync.gov
Default is legally responsible person a-rrail
12. Billing
(For Annual Fee correspondence)
Telephone
8284658201
Default is legally responsible person telephone
State / Rovince / Region
NC
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 02/16/2021
Approved *
2. E&SC Plan Project Catav-2021-010
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Mooresville (MRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan mcgillscanner@gmail.com_20210223_150359.pdf 344.45KB
Approval letter or Mast beRDFformat
Grading Permit
6. Site Location Map Mast be RDFforrret (lint 20 NB)
17.00707 - BCRL Cap Project-G-001.pdf 2.57MB
Rease do not upload entire set of E&SC plans.
7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies if necessary.
8. NOI Certification Signed NCG01.pdf 575.33KB
Form Wst be RDFforrret
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* IT The Legally Responsible Person named on this Notice of Intent
f Authorized Responsible Person* (signing on behalf of Legally Responsible
Person named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name * Mick Berry
Title County Manager
Organization Legally Responsible Entity
Catawba County
Date * 03/17/2021
F. Tracking and COC Info
NOI Tracking No. 48044
NC Reference No.
NCG01-2021-1716
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC211716
Coverage (COC)
Uses 'count_nurrber' variable (increrrented by SP)
No.*
Count Number 1716
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2021
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC211716-2021
Invoice Due Date 4/18/2021
Initial Fee $ 100.00
Invoice Status OPEN