Loading...
HomeMy WebLinkAboutSW8910314_CURRENT PERMIT_20200821STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 TI1731q DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE o�OoYoN oZI YYYYMMDD ROY COOPER Governor MICHAEL S. VEGAN Secretary BRIAN WitENN Director August 21, 2020 NORTH CAROLINA Environmental Quality Pender County Board of Education Pender County Utilities Attn: Dr. Steven Hill, Superintendent Attn: Kenny Keel, Public Utilities Director PO Box 1239 PO Box 995 Burgaw, NC 28425 Burgaw, NC 28425 Subject: State Stormwater Management Permit No. SW8 910314 Topsail Elementary School Low Density Project Pender County Dear Dr. Hill and Mr. Keel: The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the subject project on May 27, 2020. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in 15A NCAC 2H.1000 (1995 Rules). We are hereby forwarding modified Permit No. SW8 910314 dated August 21, 2020, for the construction of the built -upon areas (BUA) and vegetated conveyances associated with the subject project. Please note that the modified, updated, and re -issued permit does not impose new or different terms; it merely clarifies the requirements of the rules and restates some of the previous terms to provide you with a better understanding of your obligations under the permit. This permit shall be effective from the date of issuance until rescinded and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. Please refer to Attachment C for a detailed description of the current proposed modification. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. Please add the attached plans to the previously approved plan set. Please replace the previous application (SWU 101), supplement, operation and maintenance agreement with the attached modified versions. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Christine Hall in the Wilmington Regional Office, at (910) 796-7215 or christine.hall@ncdenr.gov. Sincerely, );,..Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Application Documents D � QNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 mar+-.i .ft "° o.,.�.n °' °+.''""'"A mepi 910.796.7215 r State Stormwater Permit No. SW8 910314 Page 2 of 2 DES/canh: 111StormwaterTermits & Projects11991\910314 t.D12020 08 permit 910314 cc: Jason Clark, PE; Norris & Tunstall Consulting Engineers William Nelson, Construction Manager, Pender County Schools Pender County Planning Department Wilmington Regional Office Stormwater File State Stormwater Management Permit No. SW8 910314 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 (1995 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Pender County Board of Education and Pender County Utilities Topsail Elementary School 17385 US 17, Hampstead, Pender County FOR THE construction, management, operation and maintenance of built -upon area (BUA) for a 25% low density project (the "low density area") discharging to Class SA-HQW as outlined in the application, approved stormwater management plans, supplements, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable parts of this permit_ This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 353,959 square feet. The BUA requirements and allocations for this project are as follows: a. LOW DENSITY AREA BUA LIMITS. The low density area must not exceed 25% per the requirements of the 1995 Rules stormwater rules. Within this low density area, this permit approves a percent BUA of 25% and the construction of a total of 353,959 square feet of BUA, which includes 7,752 square feet of future BUA. 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. Page 1 of 5 State Stormwater Management Permit No. SW8 914314 3. LOW DENSITY AREA REQUIREMENTS. The low density area requirements for this project are as follows: a. LOW DENSITY AND CONVEYANCE DESIGN. The low density area is permitted based on the design criteria presented in the supplement and as shown in the approved plans and specifications. This low density area and conveyances must be provided and maintained at the design condition. b. PIPING. Other than the piping shown on the approved plans, only minimal amounts of piping under driveways and roads is allowed within the low density area when it cannot be avoided. No additional piping is allowed. c. VEGETATED CONVEYANCES. The only runoff conveyance systems allowed are vegetated conveyances such as swales with minimum side slopes of 11 (H:V) as defined in the stormwater rules and approved by the Division. 4. VEGETATED BUFFERS. A 30-foot wide vegetative buffer must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The buffer is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED BUFFER. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF UNTREATED STORMWATER. Stormwater from the low density area (including roof drains), must be released at the edge of the vegetated buffer and allowed to flow through the buffer as dispersed flow. 5. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system and maintenance accesses must be located in public rights -of -way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. 6. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired Immediately. a. PROJECT CONSTRUTION, OPERATION AND MAINTNEANCE. During construction, all operation and maintenance for the project and stormwater system shall follow the Erosion Control Plan requirements until the Sediment-Eresion Control devices are no longer needed. b. FINAL GRADING. The vegetated areas and vegetated conveyances shall be entirely constructed and vegetated. Once the final grading is completed and the site is stabilized, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. Page 2 of 5 State Stormwater Management Permit No. SW8 910314 7. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the BUA, details, etc. b. Redesign or addition to the approved amount of BUA. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 8. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 9. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement and the Swale System Maintenance Requirements, a part of the Low Density Supplement, to assure that all components of the permitted on -site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. In the event that the low density area fails to meet the requirements of low density, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 10. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. Page 3 of 5 State Stormwater Management Permit No. SW8 910314 11, TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part; ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; iii. Bankruptcy; iv. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 12. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplements, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at ail times. c. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. d. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 5 State Stormwater Management Permit No. SW8 910314 Permit modified, updated, and reissued this the 21It day of August 2020. NORTH CAR LINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 910314 Page 5 of 5 State Stormwater Management Permit No. SW8 910314 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As -Built Permittee Certification As -Built Designer's Certification General MDC As -Built Designer's Certification for Low Density Projects A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW$ 910314 AS -BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02W.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. ❑ Check here if this is a partial certification. Section/phase/SCM #? ❑ Check here if this is part of a Fast Track As -built Package Submittal, Printed Name Signature 1, , a Notary Public in the State of County of do hereby certify that personally appeared before me this day of 20 and acknowledge the due execution of this as -built certification. (SEAL) Witness my hand and official seal My commission expires Permrttee s Certification NCAC .1042(4) Completed 1 = Provided "NIA g, k. A. DEED RESTRICTIONS 1 BUA RECORDS 1. The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1 B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1: The SCMs and the components of the runoff collection 1 conveyance Y N system are located in recorded drainage easements. or 2. A copy of the recorded plat(s) is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that Y N have an SCM include the following: or 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y N NCGS 143 Article 21 if the SCM is removed, relocated or altered or without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and Y N appears in the chain of title. or F. OPERATION AND MAINTENANCE PLAN — maintenance records are being kept -in a known set location for each SCM and are available for Y or N review. G. DESIGNER'S CERTIFICATION FORM — has been provided to the Y N Division. or Page 1 of 7 State Stormwater Management Permit No. SW8 910314 Note 1- Acceptable records include ARC approvals, as -built surveys, and county tax records. Provide an explanation for every requirement that was not met, and for every "NIA" below. Attach additional sheets as needed. Page 2 of 7 State Stormwater Management Permit No. SW8 910314 AS -BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name NC Registration Number SEAL: Signature_ Date Consultant's Mailing Address: City/State/ZI P Phone Number Consultant's Email address: CO Circle N if the as -built value differs from the Plan. If N is circled, provide an explanation on Page 2. ME = not evaluated (provide explanation on page 2) OO NIA = not applicable to this SCM or project. Consultant's Certification NCAC .1003((3) & General MDC OAs-built ©N/E G NIA .1050 A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is Y or N bypassed. 4. Runoff from offsite areas and/or existing BUA is directed Y or N into the permitted SCM and is accounted for at the full build -out potential. 5. The project controls runoff through an offsite permitted Y or N SCM that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design Y or N criteria. B. VEGETATED SETBACKS 1 BUA 1. The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N b2 2 is located in the setback. 4. BUA that does not meet the requirements of NCGS 143- Y or N 214.7 (b2)(2) is located within the setback and is limited to: Page 3 of 7 State Stormwater Management Permit No. SW8 910314 a. Publicly funded linear projects (road, greenway sidewalk) b. Water -dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the setback as dispersed flow. OAs-built ©N/E ON/A. C. STORMWATER OUTLETS — the outlet handles the peak Y N flow from the 10 year storm with no downslo a erosion. or D. VARIATIONS 1. A variation (alternative) from the stormwater rule Y N provisions has been implemented. or 2. The variation provides equal or better stormwater control Y N and equal or better protection of surface waters. or E. COMPLIANCE WITH OTHER REGULATORY PROGRAMS Y N has been met. or F. SIZING -the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required Y or N storm depth. G. CONTAMINATED SOILS — infiltrating SCM's are not Y or N located in or on areas with contaminated soils. H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1 V (provide Y or N supporting documents for soils and vegetation). I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the Y or N discharge point during the peak flow from the 10 year storm. J. EXCESS FLOWS —An overflow 1 bypass has been Y N provided. or K. DEWATERING — A method to drawdown standing water has Y or N been provided to facilitate maintenance and inspection. L. CLEANOUT AFTER CONSTRUCTION — the SCM has been Y or N cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes Y or N >11. N. DESIGNER QUALIFICATIONS (FAST -TRACK PERMIT) — The designer is licensed under Chapters 89A, 89C, 89E, or Y or N 89F of the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked "NIA" or "WE", below. Attach additional pages as needed: Page 4 of 7 State Stormwater Management Permit No. SW8 910314 AS -BUILT DESIGNER'S CERTIFICATION FOR LOW DENSITY PROJECTS I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in 15A NCAC 02H.1003, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. ❑ Check here if this is a partial certification. Section or phase ❑ Check here if this is part of a Fast -Track As -Built Package Submittal per 15A NCAC 02H .1044(3). ❑ Check here if the Designer did not observe the construction but is certifying the project. ❑ Check here if pictures of the project are provided. Printed Name Signature NC Registration Number Date SEAL: Consultant's Mailing Address: City: State: zip: Phone:() Consultant's Email address: O Circle N if the as -built value differs from the Plan/permit. If N is circled, provide an explanation on page 3. O NIE = Not Evaluated (provide explanation on page 2). OO NIA = Not Applicable to this project/plan. Consultant's Certification (MDC 15A NCAC 02H .1003) Project Density and Built -Upon Area OAs-built ONIE ONIA 1. The project has areas of high density based on natural drainage area boundaries, variations in land use or construction phasing. Y or N 2. The project's built -upon area does not exceed the maximum limit specified in the permit. Y or N Dispersed Flow OO As -built OO N1E ONIA 1, The project maximizes dispersed flow through vegetated areas and minimizes channelized flow. Y or N Page 5 of 7 State Stormwater Management Permit No. SW8 910314 Vegetated Conveyances OAs-built ©N/E ®NIA 1. Stormwater that is not released as dispersed flow is transported Y N by vegetated conveyances. or 2. The project has a minimal amount of non -vegetated conveyances Y N to reduce erosion. or 3. Other than minimal piping under driveways and roads, no piping Y N has been added beyond what is shown on the approved plans. or 4. Side slopes are no steeper than 3N:1V. Y or N 5. The conveyance does not erode in response to the peak flow from Y N the 10-year storm. or Curb outlet systems (if applicable) OAs-•built ©N/E ®NIA 1. The swale or vegetated area can carry the peak flow from the Y N 10-year storm at a non -erosive velocity. or 2. The longitudinal slope of the swale or vegetated areas does not Y N exceed 5%. or 3. The swale has a trapezoidal cross-section and a minimum bottom Y N width of two feet. or 4. The minimum length of the swale or vegetated area is 100 feet. Y or N 5. Side slopes are no steeper than 3N:1V. Y or N 6. The project utilizes treatment swales designed per Section .1061 Y N in lieu of the curb outlet system requirements. or Vegetated Setbacks (if applicable) OAs-built ©NIE ©NIA 1. The width of the vegetated setback is at least 50'. Y or N 2. The width of the vegetated setback has been measured from the normal pool of impounded waters, the MHW line of tidal waters. Y or N or the top of bank of each side of rivers or streams. 3. The vegetated setback is maintained in grass or other vegetation. Y or N 4. BUA that meets the requirements of NCGS 143-214.7(b2)(2) is Y or N located in the setback. 5. BUA that does NOT meet the requirements of NCGS 143- 214.7(b2)(2) is located within the setback and is limited to: • Publicly -funded linear projects (road, greenway, or sidewalk) Y N • Water dependent structures or • Minimal footprint uses such as poles, signs, utility appurtenances, and securi lights. 6. The amount of BUA within the setback is minimized, and Y N channeling of the runoff from the BUA has been avoided. or T Stormwater is not discharged (via swale or pipe) through a vegetated setback. Stormwater is released at the edge of the Y or N setback and allowed to flow through the setback as dispersed flow. Page 6 of 7 State Stormwater Management Permit No, SW8 910314 Outlets OAs-built ON/E ®NIA 1. Stormwater outlets do not cause erosion downslope of the discharge point during the peak flow from the 10-year storm. Y or N Variations OAs-built ON/E ®NIA 1. The project has variations from the MDC that were not previously approved. (Modification may be required.) Y or N Deed restrictions (if applicable) OAs-built ON/E ©NIA 1. Deed restrictions are recorded and ensure that the project and the BUA will be maintained in perpetuity consistent with the permit, approved plans, and specifications. Y or N For Subdivisions Only (Residential or Commercial) OAs-built ON/E ®NIA 1. The number of platted lots is consistent with the approved plans. Y or N 2. The project area is consistent with the approved plans. Y or N 3. The layout of the lots and streets is consistent with the approved plan. y or N 4. The width / radius of streets, paved accesses, cul-de-sacs and sidewalks is consistent with the approved plan. Y or N 5. No piping, other than those minimum amounts needed under a driveway or under a road, has been added. Y or N B. The lot grading, road grading, vegetated conveyances, piping, inverts, and elevations are consistent with the approved plans. Y or N Provide an explanation below for every MDC that was not met, and for every item marked "NIA" or "N/E." Attach additional pages as needed. Page 7 of 7 0 00 O z w 4 a ae � o °° o D N u m Q N m m o6 O f-r 4r H N f�*1 M m _ ¢ O F M � m a p N C N n C � — "2 m fV m � V O ro � a0 C m LI)O 6. N N cA ui Ln C «3 N OO a m Ou3 m (.+ N N W y kn N Ln � � ro � w- .n En 0. u •� G O O U G id cC z C a V] E " a o c b C 71 9yJ J O � O � O � � 0.. O ❑ .0 � � � G O «�+ j0. �., p C cy . G •- u N 3 - a n o .o uo y Q V a a o a, -a cs C ' b C i rn Q o w p m a o c N c i o N cO •p '� y � '� O Cl. G O .mayy ? 11 6 C. E J N G1=1 G a � o .+ C � on a J m 4 ¢ C 00 0 ti DEMLR USE ONLY Date Received Fee Paid Permit Number aG 3, L5 D 10,3141 Applicable Ru es: ❑ Coastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph lI - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original � hW&1� I. GENERAL INFORMATION `� 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Topsail Elementary School Addition, Phase I _ 2. Location of Project (street address): 17385 US 17 City:I-Iampstead County:Pender Zip:28443 3. Directions to project (from nearest major intersection): From the intersection of US 17 and NC 210 in Hampstead, the school is approximately 2.75 miles North _ 4. Latitude:34° 23' 38.4" N Longitude:77° 40' 41.1" W of the main entrance to the project. II. PERMIT INFORMATION: I. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modifications tRene7nals 7oith modifications also requires SKU-102 — Rentwal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number SW8 910314 , its issue date (if known) 04-29-91 and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density ❑High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the Stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part Vl: http://Vortal.ncdenr.orglweb/Ir/rules-and-regulations) MAY z 7 iom Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 .i 1 I +L i�ies'� ; � { i �i 't t� �r, *1_ , err : �s z'f .� ,, a.... l�luneT -H III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who Qwns the ro'ect): Applicant/Organization:I'ender County Board of Education Signing Official & Title:Steven Hill, Superintendent b.Contact information for person listed in item la above: Street Address:925 Penderlea Highway City:Burgaw State:NC Zip:2842 Mailing Address (if applicable): P.O. Box 1239 City:Burgaw State:NC Zip:28425 Phone: (910 ) 259-2187 Email:steven hill !_pender.kl2.nc.us Fax: N A c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Pender Count chools Signing Official & Title:William Nelson Construction ManagerManagerL Safety Organizer b.Contact information for person listed in item 3a above: Mailing Address:P.O. Box 1239 City:Burgaw State:NC Zip:28425_ Phone: (910 ) 663-3570 Fax: (_ ) N/A_ Email:william nelsonOpender.k12.nc.us 4. Local jurisdiction for building permits: Pender County Infections & Permitting Point of Contact:K. Scott Henry, Director Phone #: Dorm SWU-101 Version Oct. 31, 2013 Page 2 of 6 (910 2 9-1201 �:� ��_�. f, , � R� \:, . S� } � ���� %2` & .�}� �.y � [/�� � III. CONTACT INFORMATION bwwr 4-a� 1. a. Prink Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Pender County Utilities Signing Official & Title:Kenny Keel, Public Utilities Director b.Contact information for person listed in item la above: Street Address:605 E. Fremont Street City:Burgaw State:NC Zip:28425 Mailing Address (if applicable):11. . Box 995 City:Burgaw Phone: (910 ) 259-0212 Email:kkeel@12endercouiitync.gov State:NC Zip:28425 Fax: ( ) N/A _ Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State:Zi Phone: ( ) Fax: Ismail: 4. Local jurisdiction for building permits: Pender County Ins ections & Permitting Point of Contact:K. Scott Henry, Director Phone #: w Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 910 25 -1201 ECEIVE MAY 2 7 2020 By:-- ��� ..13 � �;` is .�.F; 'Y� � �.?.«� �E� :, t ' _ I � �.,�1� �,t r � ��r IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. This modification is to bring the existing 1991 Permit (,SW8 910314) up to date under the 1991 low -density rules. Both Pender County Schools & Pender County Utilities are now on the permit because Pender County Utilities now owns a small portion of the project area. 2.a.If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ® Other: 1291 SW Permit (SW8 910314) Date: 04-29-91 b. If claiming vested rights, identify the regulation(s) the proje t has been designed in accordance with: ❑ Coastal SW — 1995 ❑ Ph II — Post Construction Mr- M1 ao Wes) 3. Stormwater runoff from this project drains to the White Oak (Per GIS Map) River basin. 4. Total h pertyArea: 32.5 acres 5. Total Coastal Wetlands Area: 0 acres N_eJ 6. Total Surface Water Area: 0 acres Wo ' t.c+ 7. Total Pre) 4,Area (4) -- Total Coastal Wetlands Area (5) —Total Surface Water Area (6) = Total Project Area`: .4 32.5 acres Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calplate overall percent built upon area (BLIA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 25 9. How many drainage areas does the project have?l (For high density, count 1 for each proposed enginee I W, stormwater BMP. For low density and other projects, use I for the whole property area) "N 1ffi 1) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 1 Drainage Area Drainage Area _ Receiving Stream Name UT Old Topsail Creek Stream Class SA; HQW Stream Index Number * 18-87-12 Total Drainage Area (sf) 1,415,836 32.5 AC On -site Drainage Area (sf) 1,415,836 32.5 AC Off -site Drainage Area (sf) 0 0 Proposed Im ervious Area** (sf) 353,959 8.12 AC % Impervious Area** (total) 25% lm "ervious" Surface Area Drainage Area 1 Drainage Area 1 Drainage Area _ Drainage Area On -site Buildings/Lots (so 82,855 1.90 AC On -site Streets (so 0 0 On -site Parking (sf) 223,059 5.12 AC On -site Sidewalks (sf) 40,293 0.92 AC Other on -site (sf) 0 0 Future (sf) 7,752 0.18 AC Off -site (sf) 0 0 Existing BUA*** (sf) 0 0 Total (sf): 353,959 8.12 AC " Stream Class and Index Number can be determined at: http://portal.ncdenr.orgl7ueb/7uq[ps/csu/classrflcations ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. � ,e care,c�. i re c ucec� 0 3 - C o on ill bk bC, 1 V o1 n Oct. Q u o y.�, O �l� � m �emlfr- Uun Donn - U 1 Version Oct. 1, 2! ii Pagg,e 3 f 6 �LI \tV e_$ �0rliDyl a *"Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stornavater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://12ortaI.ncdenr.org/web/wq/ws/su/bml2-manual. V1. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/webZwa/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://Zj2ortal.ncdenr.org/web/wa ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htW://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. I� 'ti Is 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form, (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. p 4. Permit application processing fee of $505 payable to NCDFNR. (For an Express review, refer to littl2://www.envliel12.org/pages/onestol2exi2ress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management f 6. A USGS map identifying the site location. if the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'h mile of the site boundary, include the V2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy).. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers.S d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of }` impounded structures, the banks of streams and rivers, the MHW or NJ-1W line of tidal V �� waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tid I waters. i. Dimensioned property/project boundary with bearings & distances.l(n�-- j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who 8 �s made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculation, `,�' o. Drainage areas delineated (included in the main set of plans, not as a separate documen ���(� �4 Form SWU-101 Version Oct. 31, 2013 Page 4 of 6, BY• Sa �� - ' ;. l 1 1 ' l LJ •.. ,,. � et '�I ��3 i u . t � � 4� p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1522 Page No: 254 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. httn:/ /www.secretary.state,nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http�////portal.ncdenr.org/web/Ir/state- stormwater-forms dots. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and /or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engincer:T. Jason Clark, P.E. Consulting Firm: Norris & Tunstall Consulting Engineers, P.C. Mailing Address:2602 Iron Gate Drive, Suite 102 City:Wilmington _ State:NC Zip:28412 Phone: (910 ) 343-%53 Fax: 910 343- 604 Emaii:.jclark@ntengineers.com & anorris@ntengineers.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. ECEIV' s MAY 2 7 2020 6Y• Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 PA ,y��� . 'psi.,.. • ��.:.: ':`� � `�a -j... 6it'r.q., As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: 1, a Notary Public for the State of . County of do hereby certify that personally appeared before me this — day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item Ia) Steven Hit! Superintendent certify that the information included o this permit application form is, to the best of my knowledge, correct and that the project will be co tcted in onformance with the approved plans, that the required deed restrictions and protective covenants w 11 be rec ded, and that the proposed project complies with the requirements of the applicable stormw5�r rule u'pAgr A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature:_ 1, �-I�-1.0.1., iG µ,d h ew a Notary Public for the State of Date: N�- County of Jae rid e-'r , do hereby certify that s t �k c `" t- `I personally appeared before me this lT %ay of (VI " _ and acknowledge the due execu 'on of th lapplication for a stormwater permit. Witness my hand and official seal, _ei I � w ' �ZHW.� ''tkOTi .0), SEAL My commission expires ` 3 ^ °� o 4 Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 MAY 2 7 2020 By:--- R� � �_.---- |( .� y \\ ��� ` � ` � .. . � j m% _ � � .§2; \] �+k±� w� _� & ����'��\ % / � ��� _ - � �� V k np �0��» t\ :` � � R p,.� C >� 9>� ; � ' bou".49--, As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of . County of do hereby certify that personally appeared before me this — day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Kenny Keel, Public Utilities Director certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable storTater rules tin er 15 NCAC 2H .I000 and any other applicable state stormwater requirements. Signature: Date: 5 iq 2 11 e 4S0 �✓ a Nota Public for the tate of AJdX x- c Cf.Qd�i� my of d'I�LJ / 6LWIO0�P� do hereby certify that k�• /C �e personally appeared before me this A� day of `a KIL .%2.(J . and acknowledge the dduue excution of the application for a stormwater permit. Witness my hand and official seal, _ �' A! 1.[ NOTARY PUBLIC VER '9 Form SWU-101 Version Oct. 31, 2013 SEAL 16 _ j9,2 zl a ,& My commission expires E 0 E I%Lf!F n MAY 2 7 2020 , a' BY• Page 6 of 6 5U Permit No. J D 1 1-03 1 I (to he provided by DEMLR) State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORK[ LOW DENSITY SUPPLEMENT N1 WMI This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in Session Law 2008-211, 15A NCAC 2H .1000, Session Law 2006-246 and the State of North Carolina Stormwater Best Management Practice Manual. Curb and gutter systems are allowed provided they meet the requirements in 15A NCAC 2H .1008(g). YY1 y\�i.� 6y) I. PROJECT INFORMATION ��jY- ��— (sw � q � �7 1 Project Name : Topsail Elementary School Addtion, Phase 1 Contact Person: T. Jason Clark, P.E. Phone Number: 910 343-9653 Number of Lots:N/A Allowable Built Upon Area (BUA) Per Lot*:NIA Number of Dwelling Units Per Acre**: Low Density Development (check one): ® without curb & gutter ❑ with curb & gutter, outlets to (check one): ❑ Swales ❑ Vegetated Area *if lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. BUA shall be shown in units of square feet. **(Phase 11 Post -Construction [non -SA] only) II. BUILT UPON AREA Refer to DEMLR's forms and applications website for specific language that must be recorded in the deed restrictions for all subdivided projects. (http://portal,ncdenr.org/webAr/state-stormwater- r Complete the following calculation in the space provided below where: 9 �� • SA Site Area - the total project area above Mean High Water. MAY. 2 7 2020 • DF Density Factor - the appropriate percent built upon area divided by 100. ey: • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. of Lots - the total number of lots in the subdivision. • BUA per Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. • Total allowable lot BUA - the computed allowable built upon area for all lots combined. • Total BUA from lot listing - the sum of built upon area allocated for each lot on the list of non -uniform lots. Form SW401-Low Densily-Rev.3-2/10/09 Page 1 of 4 �,t',_�.,.___�._�...._ _.J.._ �� �� �!`;�• 1. ,i ��:., 'i 3 '; k d� r f f f i i. '" ''� 'Calculation: Fer-tn if'ofm-lot-sizes: 'r b J0 (SA: 32.5 AC ft2 x DF: 25) - (RA: 0 ft2) _SOA: 0 ft2) = BUA per Lot = 8.12 AC / 353,959 ft2 (No of Lots: �) For non -uniform lot sizes: I l a. (SA: ft2 x DF: }� RA: ft2) - (OA: ft2) = Total allowable lot BUA = ft2 - Y% f t, b. Total BUA let l�st-ing= 353959sf. b must be o a III. DESIGN INFORMATION Complete the following table. If additional space is needed the information should be provided in the same format as Table I and attached to this form. Rainfall intensity data can be found in Appendix 8.03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual or at http://hdse. nws. noaa.gov/hdsc/pfds/ Table 1. Swale design information based on the 10-year storm. Swale No. Drainage Area Lcj Impervious Area (ac) Grassed Area (ac) C Q (cfs Slope (% Vallaw f s) Vachial f s Flow Depth (ft) I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 � Form SW401-1-ow Density-Rev.3-2/10/Oy Page 2 of 4 MY 2 7 2010 BY• •IV. ' .REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H .1000, NCDENR BMP Manual (2007), Session Law 2006-246, and Session Law 2008-21 1. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below. If any item is not met, then _iustification must be attached. Only complete items n through p for projects with curl) outlets. Page/Plan�At Initials Sheet No. a. f For projects in the 20 coastal counties: Per NCAC 2H.1005, a 50 foot wide vegetative buffer is provided adjacent to surface waters. For Redevelopment projects, a 30' wide vegetative buffer adjacent surface waters is provided. b. t For HQW or ORW projects outside the 20 coastal counties: A 30 foot wide vegetative buffer is provided adjacent to surface waters. C. t For Phase II Post -Construction projects: All built upon area is located at least 30 feet landward of all perennial and intermittent surface waters. d. Deed restriction language as required on form SWU- l 01 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to the sale of any lots. e. Built upon area calculations are provided for the overall project and all lots. f. Project conforms to low density requirements within theplieable-per 15 f1-I 1W si -u1c. � g. Side slopes of swales are no steeper than 3:1; or no steeper than 5:1 for cci oi�twales. h. Longitudinal slope of swales is no greater than 5%; fornon-curb outlet projects, calculations for shear stress and velocity are provided if slope is greater than 517o. i. At a minimum, swales are designed to carry the 10 year storm velocity at a non -erosive rate. j. Swales discharging to wetlands are designed to flow into and through the wetlands at a non - erosive velocity (for this flow requirement into wetlands, non -erosive is velocity a 2 ft/s). k. Swale detail and permanent vegetation is specified on the plans. 1. Swale detail provided on plans; includes grass type(s) for permanent vegetative cover. m. Swales are located in recorded drainage easements. n.tt Length of Swale or vegetated area is at least 100 feet for each curb outlet. o.tt The system takes into account the run-off at ultimate built -out potential from all surfaces draining to the system (delineate drainage area for each swale). p." Curb outlets direct flow to a Swale or vegetated area. t Projects in the Neuse, Tar -Pamlico, Catawba River basins, and Randleman Lake may require additional buffers. tt Only complete these items for projects with curb outlets. Form SW401-Low Density-Rev.3-2110/09 Page 3 of 4 ECIVE MAY 2 7 2020 BY• 0 e I ILI V. SWALE SYSTEM MAINTENANCE REQUIREMENTS 1. Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time; and grass will not be mowed too close to the ground or "scalped". 2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build-up, erosion, and trash accumulation. 3. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed and in a timely manner based on the monthly inspections. Side slopes must be maintained at the permitted slope. S. Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Energy, Mineral and Land Resources. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DEMLR of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title:Steven Hill. Superintendent of Pender County Board of Education Phone Signature: v� Date: _.Z- Note: The legnI wponsible party should not be a homeowners association rayless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I rG 2 eli�+ 2 h V�� G cLr c4 l j a Notary Public for the State of , County of -e y- —do hereby certify that pr' e U t'r` 1� personally appeared before me this _ day of. �ctn ua r"f G a ° Q , and acknowledge the due execution of the forgoing swale maintenance requirements_ Witness my hand and official seal, !notary signat - ryTN � NOT z q,py � SLALIC My commission ex �iJtV'['E MAY 2 7 2020 BY• Form SW401-Low Density -Rev.3-2/10/09 Page 4 of 4 Permit Number SW8910314 Central Files: APS _ SWP 8/21/2020 Permit Tracking Slip Program Category Status Project Type State SW Active Major modification Permit Type Version Permit Classification State Stormwater 1.10 Individual Primary Reviewer Permit Contact Affiliation christine.hall William Nelson Construction Mgr Coastal SWRule PO Box 1239 Coastal Stormwater - 1995 Burgaw NC 28425 Permitted Flow Facility Facility Name Major/Minor Region Topsail Elementary School Minor Wilmington Location Address County 17385 US Hwy 17 Pender Facility Contact Affiliation Hampstead NC 28443 Owner Owner Name Owner Type Pender County BOEIPender County Utilities Government - County Owner Affiliation Steven Hill PO Box 1239 Dates/Events Burgaw NC 28425 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 4/29/1991 5/27/2020 8/21/2020 8/21/2020 Regulated Activities Requested /Received Events State Stormwater - Low Density Outfall Waterbody Name Streamindex Number Current Class Subbasin