Loading...
HomeMy WebLinkAboutSW8080945_HISTORICAL FILE_20200623STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 og�o�46 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 'Lo'Ln o[o Z,3 YYYYMMDD W) 0 co O w T L 0 a C � C M `o E a 9) z 6 C '^ V C 2 m � g N O � w LL Z Q� 7 a N Y Z :3 i o W " Z Z Z $ " a C U U U E co • I J JUN 2 q 2020 4 L u § SE M m °.s o 5s l'. rz ,p�pery�� fp N W�lJ _ yr5 N U N �%Y Ol VI N L4W51 E Zrq � Cull w�b' V Z� wC30 ��o L h a� Eco # 04 o N R$ 15, �liF VAN P. LO IT CD 0 Go 0 �m (.L T 10 E�� G O 1� c=a p �anp V GI m v m CL 0� T m E RU Ni m Fl Burd, Tina J From: Burd, Tina J Sent: Wednesday, July 1, 2020 10:36 AM To: Barraco CIV Talia M Subject: SW8 080945 - MCAS New River CALA The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on June 23, 2020. The project has been assigned to Kellie Norris and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 .ri.n�ran-n. e...nw .ww�er Oda, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Application Completeness Review Checklist (Non -Transfers) - Short Version Project Name: K GAS Mt,J 'Zil CA Lb. Date Delivered to WIRO: (o I z 26 26 Project County/Location: p r,)i g tx",.z / I -irk c� BIMS Received/Accepted Date: (p Z026 Rule(s): El2017 Coastal ©2008 Coastal F-11995 Coastal BIMS Acknowledged Date': Phase II F Universal 1:11988 Coastai Permit Action: New Major Mod / Minor Mod Aff�� Permit Type: <55 LD / LD Overall / HD &LD Combo General Permit / Offsite / Exempt / Rescission Development Type: Commercial / Residential / O�r� riJS rr7v'T .�Ja Subdivided?: Subdivision or Single Lot Permittee Type & Documents Needed: ElProperty owner(s) Purchaser Lessee FiViabie? J�,,o DViabie? Viable? Deed D P u rcha se Agmt Lease Not Subdivided: Deed FiSubdivisiom Common Area Deed Paperwork New Permit #Z: Existing Permit #: 5s-1E5 &?jo 7 ¢5 Expriation Date3: F-10ff5ite to SW8: Lot is in Master Permit? FIFE Cert on Flle? FIHOA 1-1 Developer Viable? Viable? Election Minutes ®Application Fee: M$505 (within 6mo) Check##(s): ElSupplement2 (1 new form or for older forms: I originol per SCM) DO&M2 Soils Report (infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative MUSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Plans (2 Sets) MPE Certification Electronic Copies Easements, Recorded (2017 Rules) NOTES: 'Enter BIMS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Restiction Templates. aif w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. EMAILED ENGINEER DATE: Comments: REVIEWER NAME: KELI.1 E rr G:WQ\\\Reference Library\Proceaures\Checklists\Completeness Review Checklist_2020 01 31 E]No Fee Y / N I DEPARTMENT OF THE NAVY TELEPHONE: OFFICER IN CHARGE OF CONSTRUCTION 910-449-5587 .� i RESIDENT OFFICER IN CHARGE OF CONSTRUCTION FAX 910 449-6403 ' NAVAL FACILITIES ENGINEERING COMMAND CONTRACTS IN REPLY REM TO: 1005 MICHAEL ROAD CAMP LEJEUNE, NC 28547-2521 JAX/ijb 21 Jul 2011 From: Jim Burns, SCM OICC To: Carl Baker, Deputy PWO Subj: N40085-07-D-1911 T.O. 0030, CALA AND FIRE TRAINER INTERIM FACILITIES, MCAS NEW RIVER, STORM WATER PERMIT SW8-080945 Ref: (a) Storm Water Permit SW8-080945 Encl: (1) Engineering Certification 1. As required by reference (a), enclosure (1) provides the Engineer's Certification. 2. If there are any further questions concerning the subject contract, please call the undersigned at (910) 449-5587. VJJ�B u rn sP.E. July 2 3 202o $Y—�— Quality Performance ... Quality Results 1�r ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH interim Director February 6, 2019 U.S. Marine Corps Base Camp 1,ejeune Attn: Carl Baker, Deputy Public Works Officer Building 1005 1\11ch:`iel Rd. Camp Lejeune, NC 28547 NORTH CAROLINA Environmental Quality Subjec.i: notice of Permit Extension and Renewal Request Stale Slormwater Management Permit No. SW8 071034 — MSOS Compound Paving State Stormwater Management Permit No. SW8 080522 — Counter Battery & HP Road Stale Stormwater Management Permit. No. SW8 080910 —Additions to Regimental HQ P1221 State Stormwater Management Permit No. S%A18 080931 — f35 Range Container Storage State Stormwater Management Permit No. SW8 080945 — CALA Ordinance. Loading Area Camp Le,jeune, Onslow County Dcar Mr. Baker: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of stater Quality (DWO) to the Division of Energy, Mineral and Land Resources (DE1v1LR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified, transferred, or renewed. Please note that this letter references D1'--MI. t as the Division responsible for issuance - of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January -1, 2008, and December 31, 2010. The law extended the effective period of any stormwater permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. Accordingly, these permits, which were set to expire on the following dates, shall now be effective from the date of issuance until the new expiration date, as noted below, which includes all available extensions: Permit No. Last Issued Original Expiration Date New Expiration Date SW8 071034 September 23, 2010 December 13, 2017 March 22, 2019 SW8 080522 August 11, 2011 Juiie 17, 2018 November 6, 2018 SW8 080910 November 29, 2011 September 26, 2018 October 28, 2018 SW8 080931 September 27, 2011 October 9, 2018 January 12, 2019 SW8 080945 November 17, 2011 November 6, 2018 December 20. 2018 These State Stormwater Management Permits for the subject projects were last issued as noted above to U.S. Marine Corp Base Camp Lejeune and expired as noted above. Per 15A NCAC 2H.1045(3) (tire stormwater rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at S505.00. If this is still an active project, please complete and submit a renewal application prior to March 12, 2019. The renewal application can be found at the following website under the Applications Forms sectioni littps://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-inirieral-land-rules/stormwater- prograrnlpost-construction. Please note that if they have not already been submitted to the Division, the permit renewal request must be accompanied by the required Designer's Certification and the recorded documents (if applicable). ][this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. Please be advised that you are required to comply with the tenns, conditions and limitations of the Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H .1003 and North Carolina General Statute 143-214.7 until you submit the required Permit Transfer Application Form to the Division and receive approval from the Division to transfer the permit or, if the site has not been built, submit a request to North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources naani uwairw � w Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910.796,7215 State Soormwater- Permits Page 2 of 2 rescind the pc -nit acid receive approval. This includes providing the necessary operation and maintenance of the permitted stormwater system. The Permit Transfer Application Form is available on our website at: htthsJ/deq.nc.gov/abeut/divisioils/energy-mineral-land-resources/energy-mineral-land-rules/storinwater- program/post-construction. 1. The operation of the stormwater treatment system without a valid and active permit, and/or failure to provide the Designer's Certification andlr failure to operate and maintain the stormwater treatment system, are violations of NCGS A3 Article 21 and may result in appropriate etiforcernettt action. If you have any questions regarding this matter, please contact Garrett Zorda at (910) 796-7215 or garrett.zorda@nc(ienr.gov. Sincerely, Danny Smith 'irtterirn Director Division of Energy, .Mineral and Land Resources GI)Slgdz: 111Stormwater\Permits & Projects120071071034 HD12019 02 req_rern 071034 111Storrnwat.er\Permits SL Projects120081080522 HD12019 02 req ren 080522 \%\Stormwater\Permits & Projects120081080910 PID12019 02 req_ren 080910 111Stormwater\Perrnits & Pr ojects12008108093I IgD12019 02 recLren 080931 111Stormwater\Permits '. Projects120081080945 HD12019 02req_ren 080945 cc: Wilmington Regional Office File