HomeMy WebLinkAboutSW8051065_APPROVED PLANS_20200602PERMIT NO
DOC TYPE
DOC DATE
STORMWATER DIVISION CODING SHE
POST -CONSTRUCTION PERMITS
SW8 uSILc
❑ CURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
YYYYMMDD
n
LA
cD
O
T"
+13
O
CO
3.0
r.+
.E
L
0
a
ROY COOPER
Covernor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Directar
July 9, 2020
NORTH CAROL.INA
Environmental Quality
United States Marine Corps Camp Lejeune
Attm Mr. Neal Paul
1005 Michael Road
Camp Lejeune, NC 28547
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 051065
P-1148 2nd LAR Armory Operations & Maintenance Facilities FSRG
Onslow County
Dear Mr. Paul:
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for
the subject project on June 2, 2020. The Division is hereby notifying you that permit SW8 060137 has been renewed on
July 9, 2020, and shall be effective until March 14, 2028. For your records, please find enclosed a renewed, updated,
and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that
the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the
previous terms to provide you with a better understanding of your obligations under the permit.
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit. The plans originally approved on March 3, 2006 and most
recently revised on January 10, 2007, will remain in full force and effect in accordance with the regulations set forth in
Title 15A NCAC 2H.1000.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written
petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or
via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit
shall be final and binding.
If you have any questions, need additional copies of the permit or approved plans, please contact Daniel Sams in the
Wilmington Regional Office, at (910) 796-7215 or dan.sams@ncdenr.gov.
Sincerely,
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/dan:111StormwaterlPermits & Pro ,L ets120201051065 HD12020 07 permit 051065
cc: Wilmington Regional Office Stormwater File
ME
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
����JJJI}� Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
m va^" P 910.796.7215
State Stormwater Management Systems
Permit No. SW8 051065
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
United States Marine Corps
FSRG Operations & Maintenance Facility, 2nd LAR Armory
McHugh Blvd & 0 Street, Camp Lejuene - Onslow County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Energy,
Mineral and Land Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until March 14, 2028, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 106,722 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans. There is no built -upon area available for
future development in this permit.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 1 of 4
State Stormwater Management Systems
Permit No. SW8 051065
0
The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, acres:
Onsite, ftz:
Offsite, ftz:
b. Total Impervious Surfaces, ft2:
C. Design Storm, inches:
d. Pond Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL:
g. Permanent Pool Surface Area, ftz:
h. Permitted Storage Volume, ft3:
i. Temporary Storage Elevation, FMSL:
j. Controlling Orifice:
k. Permitted Forebay Volume, ft3:
I. Receiving Stream/River Basin:
M. Stream Index Number:
n. Classification of Water Body:
Il. SCHEDULE OF COMPLIANCE
4.36
189,922
0
106,722
1
4.5
90%
14.0
9,890
15,752
15.4
1.5" O pipe
4,916
Cogdels Creek / White Oak
19-23
"SC;NSW"
The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system, as the
permanent pool volume is less than 30,000 cubic feet.
Page 2 of 4
State Stormwater Management Systems
Permit No. SW8 051065
6. The facilities shall be constructed, operated and maintained in accordance with
the provisions of this permit, the approved plans and specifications, and the
supporting documents attached to this permit and on file with the Division.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
Page 3 of 4
State Stormwater Management Systems
Permit No. SW8 051065
III. GENERAL CONDITIONS
This permit is not transferable to any person or entity except after notice to and
approval by the Director. The permittee shall submit a completed and signed
"Permit Transfer Application Form" (available on the Division website)
accompanied y the required tee and supporting documentation as listed on the
form, to the Division at least 60 days prior to any one or more of the following
events:
a. The sale or conveyance of the project area in whole or in part, except in
the case of an individual lot sale that is made subject to the recorded
deed restrictions and protective covenants-
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS
55-14-05 or NCGS 57D-6-07 and 08,
c. Bankruptcy;
d. Foreclosure, subject to the requirements of Session Law 2013-121.
2. Any individual or entity found to be in noncompliance with the provisions of this
stormwater management permit or the requirements of the Stormwater rules is
subject to enforcement procedures as set forth in NCGS 143 Article 21.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit issued shall continue in force and effect until the permittee files a
request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. A permit renewal request must be submitted at least 180 days prior to the
expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
Permit issued this the 8th day of July 2020.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 4 of 4
UEMLH U5t ONLY
Date Peceived
Fee Paid
Permit Number
oa 1 620PO
sswRo51065— 3765` `=
s 8 OSf o
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shalt renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60. (c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 051065
2. Project name: 2nd LAR Armory_ Operations & Maint Facilities FSRG_
3: Project street address: XXX
City: MCB Camp Leleune County: Onslow
ZIP: 28542
4. What, if any, changes have been made to the project as permitted? N/A
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: h_ttpsaldeg.nc.govlab nc.gov/about/divisions/enerq
mineral-land-resourceslener -mineral-land-rules/stormwater- ro ram/ ost-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https:Hdeg.nc.gov/about/divisions/energy-mineral-land-
resources/energy- mine ral-land-rules/stormwater-programlpost-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Lejeune
2. Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
4. Mailing Address: MCB Camp Leicune 1005 Michael Rd.
City: MCB Camp Leleune State: NC
ZIP: 28547-2521
5. Street Address:
City:
6. Phone. (910) 451-2213 Email: neai.paul@usmc.mil
State: ZIP:
SO.
JUN Dzo `r
BY:__ t.
MIN
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW%ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
Aj:��3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
AL�4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
AA�5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online _services/search/by title/ Business Registration
JUN 0 z 2020 .�
By,•
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
�•1
1 i 1',
�i
�'
3 �
:'�'
..� •
.s , r
l N -
D. PERMITTEE'S CERTIFATION
-,the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, corr ct and complete
Signature: Date: M
a Notary Public for the State of
County of do hereby certify
oing instrument. Witness my hand and official seal,
personally appeared before me
20,-_�_, and acknowledge the due
nee
EF
JUN 02 2020
BY. �I
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
k
(` �V f
[i h 3
D. PERMITTEE'S/CERTIFICATION
I, C- C /-��� the person legally responsible for the permit, certify that I have
a copy of the Permit and O& greement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership.Ok information provided on this permit renewal application is, to the best of my
knowledge, correct an o ete.
Signature: Date:
NOT
I, e
a Notary Public for the State of
4 County of �� ( Q'k , do hereby certify
that personally appeared before me
this the C?Q da of 1 20 7 , and acknowledge the due
exec ujn,N' NV�*going instrument. Witness my hand and official seal,
rY y
10 e Signature:
iECElifbE
1UN 0 2 2010
BYE
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
ejNo�,
State Stormwater Management Systems
Permit No. SW8 051065
FSRG Operations & Maintenance Facility, 2nd LAR Armory
Stormwater Permit No, SW8 051065
Onslow Count
Designer's Certification
- das a duly registered 1ttr a�� /1����
inAhe State of North Carolina, oGing been authorized to observe (periodically/ weekly/
full time) the construction of the project,
",�V t At-- enter
(Project)
for ��{r14........�di - -..... chi L �vrs '�Proiect Owner) hereby state that, to the
best of my abilitie6, due care and ilige ce was used in the observation of the.project
construction such that the construction was observed to be built within substantial
compliance and-intent.of.the_a proved. pl�a ns --a n-d 5.pecificatians...
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
7
SEAL
ee°a
JUN 0 2 2020
BY.
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 051065
Certification Requirements.
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
�j'
amount of built -upon area.
19t3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
g164. All roof drains are located such that the runoff is directed into the system.
-5. The outlet/bypass structure elevations are per the approved plan.
&6. The outlet structure is located per the approved plans.
e7. Trash rack is provided on the outlet/bypass structure.
A/48. All slopes are grassed with permanent vegetation.
�9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
&Z-1
circuiting of the system.
1. The permitted amounts of surface area and/or volume have been
14&12,provided.
Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
AIA_4. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
�15. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
JUN 022020
$r
Page 7 of 7
Burd, Tina J
From: Burd, Tina J
Sent: Thursday, June 18, 2020 3:37 PM
To: Barraco CIV Talia M
Subject: SW8 051065 - 2nd LAR Armory Operations & maint Facilities FSRG
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on June 2, 2020. The project has
been assigned to Dan Sams and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties,
Application Completeness Review Checklist (Non -Transfers) - Short Version
Project Name: pw �6 2 Aa J „A,.'R, Date Delivered to WIRO: 20-
Project County/Location: C ►S-s a mclb BIMS Received/Accepted Date: ( 2 -z
Rule(s): "2017 Coastal 2008 Coastal 1995 Coastal BIMS Acknowledged Datel:
Phase II Universal 1988 Coastal
Permit Action: New
Major Mod / Minor Mod / enewal
Permit Type: ice[ LD / LID Overall / HD &LD Combo
General Permit / Offsite / Exempt / Rescission
Development Type: Commercial / Residential the Jets •— JAILI�4er
Subdivided?: Subdivision or Single Lot A
�"
Permittee Type & Documents Needed:
Property Owner(s) Purchaser
Lessee
Viable?Viable?
Viable?
Deed Purchase Agmt
Lease
Not Subdivided: Deed
Subdivision: Common Area Deed
Paperwork
El New Permit #z:
� xisting Permit #:
Expriation Date3: as 2-07-
E�Offsite to SWB:
Lot is in Master Permit?
FTE Cert on File?
FlHOA Developer
Viable? Viable?
Election Minutes
KPeppiication
e: r7$505 (within bmo) Check#(s):
FISupplement2 (1 new form or for older forms: 1 original perSCM)
F_10&M2
Soils Report (lnfii or PP)
Calculations (signed/sealed)
Deed Restrictions, if subdivided
Project Narrative
FIUSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?:
Mans (2 Sets)
F-1PE Certification
Electronic Copies
Easements, Recorded (2017 Rules)
NOTES:
1Enter BIMS Acknowledged Date on this Sheet
2For New Projects -Enter New Permit # on Supplements & Deed Restiction Templates.
3if w/in 5 months and they are requesting a mod, STOP. Needs a renewal first.
EMAILED ENGINEER DATE:
REVIEWER NAME:
Comments:
G:WQ\\\Reference Libra ry\Procedures\Check lists\Completeness Review Checkiist_2020 0131
ONo Fee
Y / N
U
of
_
Ld
�
W
>
-
U
J o�sw<N3
o
m
-
o���zWs
mg
rc�ciH
wni�..
-
wII
M
gg
j>a
vwio
W
II'pi>
irc
U
if
Nnd 311S 9NIISIX3
S3111110VJ 33NVNhNIVV4 GNV MOEN OdSJ
- --------------- - - Pk-d S133rOdd NOOM 90,A3 0
VNIIOHVO HIt ON '3Nnlr T drivo 3M SdNOD 3NIM
A 'AVN CIN'VWVVOO ONIHAMIONA S9111-110V� I c)
'3
"I Z-11
C
LL II
-E, -v
vx
Es
J1
II�t �I � � �'��v ����t I)�)t11��� s
L J;I
V iH
011
111T
r 'p
yl
//"o
j,
s � 4 6
%\1
40 i5
p
gu gig
GOW - S
Rig
3 ma 3 4, 1 Ph
a
6
N
I
O
Z
w
W
F
O
o:
z
O
w
12
12
133HS S31ON WEND
u
�3�aw
a�o5311111OV3 3ONN3iNlYNONNOI1V8V3W00Skj
HSVM IMSINUNW daN0
OAJ
Vl00 HltlON �dWO
(INVWWOOONIt33N1JN3S311IlIOV�IN r�
�w
No
� <ma
o N
a<H Ki%
<b=F��
�V �F t=i e��G4pq
MM
gpw ��w
Z �=a=moo ��m oQyW=�m3�o
cr
LLj
v� � a�opWQ xtufad=��o3�=
w•
M,-W :�!g
�o i; m�
O � o�Ya�oW a�MH U Wh=
Lou
go
Z y-waoa�`,f LL�P 3��q<SwW
Z
W
C7 r�riamosow�ffimwtkaa�p��o
ohm
a =
E wHO-
00
S S- S Sxw
WW vamaa=opuo<eo oca_wa ap<�'3 p��w vr�_xncw4<xc,w-w¢wa
N
J-ppw mo
z
m „
'p �p
sQ
� F�g
o
I IS
Lc`' �rcN z o -ypNrQ x s� N3N - w Z w p ptt �o
2 a pz = x z w xa w
p
w � w
= w
w ' a
s s s s
U.
ou Nrd A813NO39 311S
NIV 3dO 08S2 30NVN31 h ONY SNOIIV8 N
"I"IamsvH Rtll-d SiDIPOdd NOON 90,�J
'k VN1108VD HDION '3Nn3r 91 dM� ISVG SdNO3 INIM"
'ITR f: DNIU33NIEM 5311111OVzi -IVPI
u
r
c
m
CD
NVld 30VNIVNO ONY MOM
0
S31illIOVJ 33NVN31NIVN aNV MOON D8SJ
IIBNSVH Stll—d SI03P08d N
W ODH go'Aj .11.�- 11.0N '111111 31 dViVO 3SY9 Sd803 3NIM
QNVV4V4OO E)NI833NION3 S3WIlOVJ IVAVN
5
08
V
22
Cj
a
z z 2 z A K R
t
z Z
y IId
R 5 higm.n
L-
Li
g2,
-Jo
O2
N
R 2
ml
:31
t2
�2
'
Z- Iz 1.
XOT 0 a
a
71
Li
Ljj
cr-
� 16
MIUMS illHdSV
x
8 12
133US 0 Li(D �2,MMo
<
is <
�ms
F—
OHL
6:
m
NVId 1081NOO AWGIS ONY NOIS083
CD
S311l113V3 33NVN31NIVN ONV SNOl1Vd3dO 98
"I"IBMSVH 8Vh—d S133rOdd NOON SO,AJ
VNnodv3 HINON '3Nn3r 31 dwo 3SW Sdd03 3wNj
aN=00 ONIU33N]DN3 SJL
Z
%
j tl
(DO z 0
M
Z z
F= a 11) 11 .
T ==! fl.
x D
Ld M
—Xx—u—max
41
< it
IX z
C4 w z
ui
cs
o
C)su
C < i5
0 UJ z
Z
x
z
0
0-
ui
T z
X----t-XX-XX
xx
133815 .0,
Md,-
LC
C\
n I
.1-13, H
SlIV130 9NJAVd ON V 3115
. ........ ......
S311nlOVJ 33NARNIM ONY SN011Vd3dO 98si
Stll—d S103rOdd NOON go,Aj
'3Nn3r
VNI108VO HINON 3l dVIVO 3M SADD AIM
GNMA00 ONIH33NION3 S3111llDVJ IVA
co
'04'
V!
t7
z
co
X-
X.
vi
aQ
(L
CL
z
w
V)
w-j
w
a.
a0.
x
@
Z
U,
<
U)
V)
z
al
<
�z Z.
0.
<
Li
z
i5
in
CD I
T-U
V)
- F4
7z, 79,z
V)
x
<
SL w,
z <
z
0
m
w
w
D
tr
101
1 CIJ I
IX
I
n
Ln
It
rl-�
0 1 u I
"I"Mov H
IV130 30YNIVdG GNV 9NIOVd9
?6
o
S3111110VJ 33NVN31NIVM ONV SNO11V 83dO 98SJ
SIONOdd NOOM 90
vNnoNvo HIWN '3Nn3P 31 dvivo 3SV8 SdNOO 3 1 h
M
ONM O'D SNJHB3Nl9NA S311111OV.1.1V�AVN IN
Jug -
It
"&
<
2
a A 11
cS
=C===
wo.
ig
IR d
N1.
9
oz
o
n
It,
g
w
We
5 rz g
8
- - - - - ------- - -------------- - - ..... . ....
I
V)
w
Za
u
w
E
a, Z.
It
fi
3w
C)
t
<
tf
a
C\
0 1
NVId N01IN3A38d Wunimd 831VMN801S
-1%
S3111110VJ 30NVN3iNIVN ONY SNOUV83dO 98
SWA
MI—d SiONOH NOOM 90,IJ
'3Nn3r
VNIIO�<i HIAON 11 dhV3 3SVG Sd800 3NIM.
oumu
..ONVI12aO ON11133NION3 S31illIOV.I.IIFAV.N
z
Rs$S Pe
CL
(L
<
<
01,
�41!11 ��i
D
x
x
"if 11 HT'l
L
pY Lla
N
x
Y h
29
o El
z
R
z
0
z
0
V)
0
w
w
x
- - ----------
iig
1;s
z
5g lt
of
.z
4d&�,g
6 w
L4
�Zd
m
7
H
<
W i-'; I
cn
X
r. 0
m
Old WIMAAd Nounmd 831VAANdO1S
SIMM MONENJ BY SHUNdO 9HJ
PHA QMMd NOOR MAJ
WMv WMN Am M dM 35V9 SEWO 3NIiNW
x,n
I
7A "N'.
. ................. ...... ..
ONVW'V4OC)E)NI�93NION383111113VJIVA
is N 0
0
M S! le 4
in R: 91,
Pi 9d 01 Not q 1 1 i OR
41 J11 l!n! P I R -;- Y
;R i 129,m N luns , , , - Th
ug 1 '1100 H11 " " 1 , ,
my Hia
Ln
1!
oil
i €p W
-Nor
P! R NNEW I w R 6
is Hsi 29 H FIRMHus Tl limp i N ! P ! if 11W
A
M
lif 0
km 1 HA 1 'in N
1:! gig 1111% Hpni
M :11H H1011
K
i $o
1q; MAT
1
:01
ffl 11
q
! 11 PT: MOR
1
-I N"
pit
9 eg— 1-
allow 1
! a
1: Jim Cw
!go"
jqj
No !soma
glo I I W "Ps
4
a
MIT
U
All
an- W
MON SAH 0 win:
I
Mail
'S 11TST —,U- "is 1ph
is
g;jj! A
1,
lljH111 Nil 9
j
os j4
"21 "
a
NM
lip W
I
I
s N a
I
Wi --1 up - an
JIM W 1, a go 11 fai
!so Al
Hip InIn "a
!11 !1: H! lip P M!
11; am, 111. T NQ illy, 41 HII 11 !P; P IM 1911 zip!
— 5�H a,
W Hil W AW HIM W 1;11 1 ! H11 !on !; ;P
ill of: T 1110 NNI! ;!: a ism, ! i ult yin
'gasit as Apo -1 H V! WIN fy yj n I 1H: W 11HI PHI HIM
M
I A's 2
al AM
go z62i, , i0l. ;1H 1 M ME
1110 1 Si n !W ,
ISM " 1" ER: . Hn M 'd
An ns
ov. I
E Reel gli I ung
fwabY
BIN
Wf
Hil HiN 11111, 01 11111v
pill
ld"AwaNjN
s
by
WMMu
. .50111.
is
MRS!
H"now
1!dl 1HIM
ill!
QNph !j
'a
AL H L
-k
scw,�n
]W§
Q is
Win
o
WINIM,
moh;s at Is
,ij
Wus 1
i oil ou
jq1N
11 10"i 0i H
1
11
od 1
w" W11
Wililp
no
1
HIM Wl 1 1
nVaTh.. -I—
�A i
5
H
1
HIP
i
j ! ; -.
wyla
1
NUT!
A. vO 0111
l 1 j!"
re A
I
Od 38 Mal,
WHIM 5 Him
ell
WON
RON Hew Ell
lag
Hop
M-10
)'I
ORB
qRl"!
IT
LIN