HomeMy WebLinkAboutSW8051018_COMPLIANCE_20120627STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 D 5 I D 15
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
C�l COMPLIANCE EVALUATION INSPECTION
DOC DATE
Z-o/Z 062-7
YYYYMMDD
OCT-20' 200B MON 10:20 Ail NCDENR
FAX NO, 910 350 2004 ' P. 09
Tarawa Terrace* II
Stormwater Permit No, SW8 051018
Onslow County
Designer's Certification
tate Stormwater Management Systems
Permit No. SW8 051018 MOD
1, _-•r�toMr{s 3._41s , as a duly registered Ic-N&n4usa- in the
State of North Carolina, having been authorized to observe erio icail weeW�
the construction of the project,
-T-AfIA, W n r Ea.e,� ?wrrs tr 6 Po.rD_
(Project) _
for Or,-LkPmL M"4NE cow commjd rttEs (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications,
The checklist of items on page 2 of this form is included in the Certification.
(Voted deviations from approved plans and specification:
Registration Number 3114+
Date L - It- + z
oqs�\
SEAL.
0C� `0'4 O
�•�pQ:'FESSI
311 4
Of"
'/�� As
i 111oP`\\
Page 8 of 9
OCT-20-2008 110N 10:20 All NCDENR
FAX NO. 910 350 2004 P. 10
State Stormwater Management Systems
PeLnlLt No. SW8 051018 MOD
Certification Requirements:
✓ 1The drainage area to the system contains approximately the permitted
acreage.
✓ 2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
✓
3.
Ail the built -upon area associated with the project is graded such that the
runoff drains to the system.
✓
4.
All roof drains are located such that the runoff is directed into the system.
✓
5.
The outlet/bypass structure elevations are per the approved plan.
F.
The outlet structure is located per the approved plans.
✓
7.
Trash rack is provided on the outletibypass structure.
✓
8.
All slopes are grassed with permanent vegetation.
✓
9.
Vegetated slopes are no steeper than 3:1:
✓
10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
✓
11.
The permitted amounts of surface area and/or volume have been
provided.
✓
12.
Required drawdown devices are correctly sized per the approved plans,
✓
13.
All required design depths are provided.
✓
14.
All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15.
The required system+ dimensions are provided per the approved plans.
cc, NCDPNR-DWQ Regional Office
onslow County Building Inspections
Page 9 of 9
LITTLEJOHN ENGINEERING ASSOCIATES
June 12, 2012
North Carolina Department of Environment and Natural Resources 1
Division of Water Quality l
Stormwater Supervisor
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
RE: Stormwater Designer's Certifications
Camp Lejeune, North Carolina
LEA Project No. 24235
Permit No. SW8 051018 MOD
Attn: Ms. Georgette Scott
Construction has been completed in the Tarawa Terrace 11 development (Permit No. SW8 05 10 18 MOD). Please
find the Designer's Certification forms for the ponds below:
Phase 6 Pond
Note that this is a final certification for the Tarawa Terrace II development.
Please contact me should you have any questions or require any additional information.
Sincerely,
LITTLEJOHN ENGINEERING ASSOCIATES, INC.
Thomas J. Davis, PE
1935 21STAVENUE SOUTH, NASHVILLE, TENNESSEE 37212
T 615.385.4144 F 615.385.4020
Nashville I Chattanooga I Decatur I Knoxville I Orlando I Phoenix I Tri-Cities
www.Icaincccom
Engineering
Planning
Landscape Architecture
Land Surveying
Environmental Services
Health and Safety
Economic Development
r�
1
OOf-20-2008 MON 10:20 AM NODENR ) `� FAX NO, 910 350 2004 P, 09
State Stormwater Management Systems
Permit No. SW8 051018 MOD
Tarawa Terrace II
Stormwater Permit No. SW8 051018
Onslow County
Designer's Certification
I, TgJIMhy 3, 4,115 , as a duly registered in the
State of North Carolina, having been authorized to obsery periodically weekly/ full
time) the construction of the project,
1�4^WA TXAiZACE BOY 5co.n IfAAP i�d_ QoND
(Project)
for k .Ar n4 mAttkoe c xrs CoMIhUN jTIc5 (Project Owner) hereby state that, to the
nest of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications,
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
"S�- --
Signature
Ir
Registration Number 3 11 ++
Date
SEAL
GAfR 0���
p
OF .
• 31144
/ikMASn tr10P\\��
REC.IEIVEI]
JUN 14 2011
Bid:
Page 8 of 9
'r
OCT-20-2008 NON 10:20 AK NCDENR
FAX N0, 910 350 2004 P. t0
Certification Requirements:
State Stormwater Management Systems
Permit No_ SW8 051018 MOD
1.
The drainage area to the system contains approximately the permitted
acreage.
J
2.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
J
3.
All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4.
All roof drains are located such that the runoff is directed into the system.
J
5.
The outletlbypass structure elevations are per the approved plan.
✓
6.
The outlet structure is located per the approved plans.
✓
7.
Trash rack is provided on the outlet/bypass structure.
✓
8.
All slopes are grassed with permanent vegetation.
✓
9.
-Vegetated slopes are no steeper than 3:1.-
✓
10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11.
The permitted amounts of surface area and/or volume have been
provided.
✓
12.
Required drawdown devices are correctly sized per the approved plans.
13.
All required design depths are provided.
14.
All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
✓
15.
The required system dimensions are provided per the approved plans.
cc'.
NCDPNR-DWO Regional Office
Onslow County Building Inspections
Page 9 of 9
OCT-20-2008 MOM 10:20 AM NODENR t
Tarawa Terrace II
Stormwater Permit No. SW8 051018
Onslow, County
Designer's Certification
FAX NO. 910 350 2004 P. 09
State Stormwater Management Systems
Permit No. SW8 051018 MOD
I, TK-MA3 3. Dki ks , as a duty registered F0611N664 in the
State of North Carolina, having been authorized to obsery eriodical weekly/ full
time) the construction of the project,
Rp.WA T'ERR�c,�. `� P%Asc- 5 Say-n4 - &Na
(Project)
for ►DTI-+ AMe- MARLINE LOAF-S ['aMMvou M65 _(Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications,
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification;
Signature
Registration Number 30
Date (0-13-if
SEAL
CARO�ji
31 44
I NE�c �cO`����
,1
11'04fASi i i i,'DP\���
IZE
-C EIVED
JUN 14 2011
BY:
Page 8of9
OCT-20-2008 NCN 10:20 AM NCDENR
FAX NO. 910 350 2004 P. 10
Certification Requirements:
State Stormwater Management Systems
Permit No. SW8 051018 MOD
1.
The drainage area to the system contains approximately the permitted
acreage.
✓
2.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
✓
3.
All the built -upon area associated with the project is graded such that the
runoff drains to the system.
✓
4.
All roof drains are located such that the runoff is directed into the system.
5.
The outlet/bypass structure elevations are per the approved plan.
✓
6.
The outlet structure is located per the approved plans.
✓
T.
Trash rack is provided on the outlet1bypass structure.
8.
All slopes are grassed with permanent vegetation.
✓
9.
Vegetated slopes are no steeper than 3:1:
10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
✓
11.
The permitted amounts of surface area anti/or volume have been
provided.
✓
12.
Required drawdown devices are correctly sized per the approved plans.
13.
All required design depths are provided.
✓
14.
All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
✓
15.
The required system dimensions are provided per the approved plans.
cc:
NCDENR-DWQ Regional Office
Onslow County Building Inspections
Page 9 of 9
-J
OCT--20-2008 MON 10:20 AM NCDENR (� FAX N0, 910 350 2004 F. 09
State Stormwater Management Systems
Permit No. SW8 051018 MOD
Tarawa Terrace II
Stormwater Permit No. SW8 051018
Onslow County
Designer's Certification
I, T144,hA6 I fla is , as a duly registered ctiowUse-in the
State of North Carolina, having been authorized to observe periodically weekly/ full
time) the construction of the project,
Tik2p.WAA R�.c.E #la,5� 5 0004 oe1D
(Project)
for A" LAt4-nc IMA(L%WE 6.05 GvM^J0 rrIa5 (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification;
Signature
Registration Number 31114
Date 6- t3 - I(
JU1� l � 2411
'By
SEAL
Page 8 of 9
1
OCT--20-2008 MON 10:20 AM NCDENR FAX N0, 910 350 2004 P. 10
State Stormwater Management Systems
Permit No. SW8 051018 MOD
Certification Requirements:
✓
1.
The drainage area to the system contains approximately the permitted
acreage.
✓
2.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
✓
3.
All the built -upon area associated with the project is graded such that the
runoff drains to the system.
✓
4.
All roof drains are located such that the runoff is directed into the system.
5.
The outlet/bypass structure elevations are per the approved plan.
6.
The outlet structure is located per the approved plans.
✓
7.
Trash rack is provided on the outletibypass structure.
✓
8.
All slopes are grassed with permanent vegetation.
vl
9.
Vegetated slopes are no steeper than 3:1.
10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system_
11.
The permitted amounts of surface area and/or volume have been
provided.
✓
12.
Required drawdown devices are correctly sized per the approved plans.
✓
13.
All required design depths are provided.
✓
14.
All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
✓
15.
The required system dimensions are provided per the approved plans.
cc: NCDFNR-DWQ Regional Office
Onslow County Building Inspections
A:"&= C ETVED
JUN 14 2011
L 'Y'
Page 9 of 9
LITTLEJOHN ENGINEERING ASSOCIATES
June 13, 2011
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Stormwater Supervisor
Wilmington Regional Office
127 Cardinal Drive Extension
Wilmington, NC 28405
RE: Stormwater Designer's Certifications
Camp Lejeune, North Carolina
LEA Project No. 24235
Permit No. SW8 051018 MOD
Attn: Ms. Georgette Scott
Construction has been completed in areas of the Tarawa Terrace II development (Permit No. SW8 051018
MOD). Please find the Designer's Certification forms for the ponds below:
Boy Scout Camp Road Pond
Phase 5 North Pond
Phase 5 South Pond
Note that this is still a partial certification for the Tarawa Terrace 11 development. The Phase 6 area is still under
construction.
Please contact me should you have any questions or require any additional information.
Sincerely,
LITTLEJOHN ENGINEERING ASSOCIATES, INC.
Thomas J. Davis, OE
ECEIVEID
�.
JUN 14 2011
BY:
1935 21ST AVENUE SOUTH, NASHVILLE, TENNESSEE 37212 Engineering
T 615.385.4144 F 615.385,4020 Planning
Landscape Architecture
Nashville I Chattanooga I Decatur I Orlando I Phoenix I Tri-Cities Land Surveying
Environmental Services
www.leainc.com Health and Safety
Economic Development
LITTLEJOHN ENGI.NE'ERING ASSOCIATES
June 8, 2010
i Ms. Georgette Scott ;
North Carolina Department of Environment and Natural Resources*`
Division of Water Quality .,' ';IUN } 4 Stormwater.Supervisor z_ 01V
-Wilmington Regional Office' B
127 Cardinal Drive Extension "
Wilmington, NC 28405
RE: Stormwater Designer's Certifications
Camp Lejeune, North Carolina :
LEA Project No. 24235 .
r Dear Ms. Scott:
Construction has been completed at the projects listed below at Camp Lejeune: "
Watkins Village: Permit No. SW8 060323
Knox Cove: Permit No. SW8 070708
- Tarawa Terrace 11: Permit No. SW8 OS 1018 Modification
Please find attached Designer's Certification forms for each of these projects.
Note that at the Tarawa Terrace II project location, only the Tarawa Boulevard Pond is being
certified at this time as the other ponds have not yet been completed and are under construction. .
Please contact me should you have any questions or require any additional information.
Sincerely,
LITTLEJOHN ENGINEERING ASSOCIATES, INC.
Derek Baalbergen, P.E.
1435 21STAVENUE SOUTH, NASHVILLE,TEN NESSEE. M12 Engineering
T 615.385A W4 F 6 i 5.385.4020 Planning
Landscape Architecture
N.ishville I Chartannoga I DQr-arur 1 Tri-Gives Land Surveying
Enaironmenral Services
w,vw.leainc.Cori, HHc!tirir and Saf o:y
'OCT-20-2008 MON 10:20 AM NCOENR
FAX NO, 910 350 2004 F. 09
Tarawa Terrace 11
Stormwater Permit No, SW8 051018
Onslow County
Designer's Certification
State Stormwater Management Systems
Permit No. SW8 051018 MOD
r
I, 11 0 M ,S . 94 vas , as a duly registered a i n P_e in the
State of North Carolina, having been authorized to observe' (periodically/ vyPAWrf-ft11'f
jiaaiO the construction of the project,
I
i CAawa i e l�a�e_ .11__— �Q/'aw� Qf,d. Ponek
(Project)
for M1&„k� wr,ne- Co. Cap,'e (Project Owner) hereby state that, to the
nest of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Nofed deviations from approved {Mans and specification:
Signature
Registration Number % t r I-F 4
Date
sure 10 2010
Page 8 of 9
SEAL
�H lCAO //
91
�2 '0F .
31144 &: 1io
St�Ji1�P����
'OCT-20-2008 MON 10:20 AM NCDENR
FAX NO, 910 350 2004 P. 10
Certification Requirements:
State Stormwater Management Systems
Permit No. SW8 051018 MOD
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
✓ 2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
✓ 6. The outletlbypass structure elevations are per the approved plan.
✓ 6. The outlet structure is located per the approved plans.
.✓ 7. Trash rack is provided on the outlet/bypass structure.
✓ 8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1:
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
✓ 12, Required drawdown devices are correctly sized per the approved plans.
✓ 13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
✓ 15. The required system dimensions are provided per the approved plans.
CC' NCDENR-DWO Regional Office
Onslow County Building Inspections
Page 9 of 9
Number
Measure Type
reatment Numb
Permit Number
Expiration
Inspection Date
Status
1
WDP
SWP 043
SW8010420
11-07-2019
10/16/2019
In Compliance
1
WDP
SWP 044
SW8010420
11-07-2019
10/16/2019
In Compliance
1
WDP
SWP 062
SW8010420
11-07-2019
10/16/2019
In Compliance
2
WDP
SWP 060
SW8030720
01-26-2019
9/9/2019
In Compliance
3
VU
SWP 035
SW8 050817
09-29-2019
11/6/2019
In Compliance
3
WDP
SWP 084
SW8 050817
09-29-2019
12/1/2019
In Compliance
4
WDP
SWP 063
SW8 051018
12-13-2019
10/16/2019
In Compliance
4
WDP
SWP 064
SW8 051018
12-13-2019
10/16/2019
In Compliance
4
WDP
SWP188
SW8 051018
12-13-2019
10/16/2019
In Compliance
4
WDP
SWP 189
SW8 051018
12-13-2019
10/16/2019
In Compliance
4
WDP
SWP 190
SW8 051018
12-13-2019
8/5/2019
In Compliance
5
WDP
SWP 065
SW8 051065
03-14-2020
12/11/2019
In Compliance
6
WDP
SWP 071
SW8 060137
03-03-2020
10/11/2019
In Compliance
7
WDP
SWP 081
5W8 060323
04-10-2020
12/2/2019
In Compliance
7
WDP
SWP 082
SW8 060323
04.10-2020
12/2/2019
In Compliance
7
WDP
SWP 327
SW8 060323
04-10-2020
12/2/2019
In Compliance
8
WDP
SWP 169
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 170
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 171
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 172
SW8 081015 .
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 173
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 174
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 175
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 176
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 328
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 329
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 330
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 331
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 332
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 333
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 334
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 335
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
WDP
SWP 336
SW8 081015
10-21-2019
9/1/2019
In Compliance
8
IB
SWP 369
SW8 081015
10-21-2019
9/1/2019
In Compliance
9
WDP
SWP 165
SW8 081016
Dec 3, 2018/10 17 2019
10/17/2019
In Compliance
10
WDP
SWP 167
SW8 081202
8-2-2019
7/31/2019
In Compliance
10
WDP
SWP 168
SW8 081202
8-2-2019
7/31/2019
In Compliance
11
WDP
SWP 218
SW8 090517
01-05-2020
12/10/2019
In Compliance
12
WDP
SWP 321
SW8 110906
04-30-2020
11/8/2019
in Compliance
12
WDP
SWP 322
5W8 110906
04-30-2020
8/7/2019
In Compliance
12
WDP
SWP 323
SW8 110906
04-30-2020
10/17/2019
In Compliance
12
WDP
SWP 324
SW8 110906
04-30-2020
11/6/2019
In Compliance
12
IB
SWP 409
SW8 110906
04-30-2020
12/15/2019
In Compliance
12
SF
SWP 410
SW8 110906
04-30-2020
12/15/2019
In Compliance
13
WDP
SWP 292
SW8 120101
1-24-2020
7/31/2019
In Compliance
13
WDP
SWP400
SW8120101
1-24-2020
7/31/2019
In Compliance
13
WDP
SWP401
SW8120101
1-24-2020
7/31/2019
In Compliance
14
WDP
SWP 290
SW8 120102
01-30-2020
11/6/2019
In Compliance
15
WDP
SWP 349
SW8 120201
02-03-2020
11/14/2019
In Compliance
16
WDP
SWP 313
SW8 120302
04-12-2020
11/7/2019
In Compliance
17
WDP
SWP 034
SW8 980204
07-06-2019
10/15/2019
In Compliance
17
WDP
SWP 079
SW8 980204
07-06-2019
12/2/2019
In Compliance
EC j% ztF-
JUN 0 z 2020
BY: