Loading...
HomeMy WebLinkAboutSW8051018_COMPLIANCE_20120627STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 D 5 I D 15 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE C�l COMPLIANCE EVALUATION INSPECTION DOC DATE Z-o/Z 062-7 YYYYMMDD OCT-20' 200B MON 10:20 Ail NCDENR FAX NO, 910 350 2004 ' P. 09 Tarawa Terrace* II Stormwater Permit No, SW8 051018 Onslow County Designer's Certification tate Stormwater Management Systems Permit No. SW8 051018 MOD 1, _-•r�toMr{s 3._41s , as a duly registered Ic-N&n4usa- in the State of North Carolina, having been authorized to observe erio icail weeW� the construction of the project, -T-AfIA, W n r Ea.e,� ?wrrs tr 6 Po.rD_ (Project) _ for Or,-LkPmL M"4NE cow commjd rttEs (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications, The checklist of items on page 2 of this form is included in the Certification. (Voted deviations from approved plans and specification: Registration Number 3114+ Date L - It- + z oqs�\ SEAL. 0C� `0'4 O �•�pQ:'FESSI 311 4 Of" '/�� As i 111oP`\\ Page 8 of 9 OCT-20-2008 110N 10:20 All NCDENR FAX NO. 910 350 2004 P. 10 State Stormwater Management Systems PeLnlLt No. SW8 051018 MOD Certification Requirements: ✓ 1The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. Ail the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the system. ✓ 5. The outlet/bypass structure elevations are per the approved plan. F. The outlet structure is located per the approved plans. ✓ 7. Trash rack is provided on the outletibypass structure. ✓ 8. All slopes are grassed with permanent vegetation. ✓ 9. Vegetated slopes are no steeper than 3:1: ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ✓ 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12. Required drawdown devices are correctly sized per the approved plans, ✓ 13. All required design depths are provided. ✓ 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system+ dimensions are provided per the approved plans. cc, NCDPNR-DWQ Regional Office onslow County Building Inspections Page 9 of 9 LITTLEJOHN ENGINEERING ASSOCIATES June 12, 2012 North Carolina Department of Environment and Natural Resources 1 Division of Water Quality l Stormwater Supervisor Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Stormwater Designer's Certifications Camp Lejeune, North Carolina LEA Project No. 24235 Permit No. SW8 051018 MOD Attn: Ms. Georgette Scott Construction has been completed in the Tarawa Terrace 11 development (Permit No. SW8 05 10 18 MOD). Please find the Designer's Certification forms for the ponds below: Phase 6 Pond Note that this is a final certification for the Tarawa Terrace II development. Please contact me should you have any questions or require any additional information. Sincerely, LITTLEJOHN ENGINEERING ASSOCIATES, INC. Thomas J. Davis, PE 1935 21STAVENUE SOUTH, NASHVILLE, TENNESSEE 37212 T 615.385.4144 F 615.385.4020 Nashville I Chattanooga I Decatur I Knoxville I Orlando I Phoenix I Tri-Cities www.Icaincccom Engineering Planning Landscape Architecture Land Surveying Environmental Services Health and Safety Economic Development r� 1 OOf-20-2008 MON 10:20 AM NODENR ) `� FAX NO, 910 350 2004 P, 09 State Stormwater Management Systems Permit No. SW8 051018 MOD Tarawa Terrace II Stormwater Permit No. SW8 051018 Onslow County Designer's Certification I, TgJIMhy 3, 4,115 , as a duly registered in the State of North Carolina, having been authorized to obsery periodically weekly/ full time) the construction of the project, 1�4^WA TXAiZACE BOY 5co.n IfAAP i�d_ QoND (Project) for k .Ar n4 mAttkoe c xrs CoMIhUN jTIc5 (Project Owner) hereby state that, to the nest of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications, The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: "S�- -- Signature Ir Registration Number 3 11 ++ Date SEAL GAfR 0��� p OF . • 31144 /ikMASn tr10P\\�� REC.IEIVEI] JUN 14 2011 Bid: Page 8 of 9 'r OCT-20-2008 NON 10:20 AK NCDENR FAX N0, 910 350 2004 P. t0 Certification Requirements: State Stormwater Management Systems Permit No_ SW8 051018 MOD 1. The drainage area to the system contains approximately the permitted acreage. J 2. The drainage area to the system contains no more than the permitted amount of built -upon area. J 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. J 5. The outletlbypass structure elevations are per the approved plan. ✓ 6. The outlet structure is located per the approved plans. ✓ 7. Trash rack is provided on the outlet/bypass structure. ✓ 8. All slopes are grassed with permanent vegetation. ✓ 9. -Vegetated slopes are no steeper than 3:1.- ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. ✓ 15. The required system dimensions are provided per the approved plans. cc'. NCDPNR-DWO Regional Office Onslow County Building Inspections Page 9 of 9 OCT-20-2008 MOM 10:20 AM NODENR t Tarawa Terrace II Stormwater Permit No. SW8 051018 Onslow, County Designer's Certification FAX NO. 910 350 2004 P. 09 State Stormwater Management Systems Permit No. SW8 051018 MOD I, TK-MA3 3. Dki ks , as a duty registered F0611N664 in the State of North Carolina, having been authorized to obsery eriodical weekly/ full time) the construction of the project, Rp.WA T'ERR�c,�. `� P%Asc- 5 Say-n4 - &Na (Project) for ►DTI-+ AMe- MARLINE LOAF-S ['aMMvou M65 _(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications, The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification; Signature Registration Number 30 Date (0-13-if SEAL CARO�ji 31 44 I NE�c �cO`���� ,1 11'04fASi i i i,'DP\��� IZE -C EIVED JUN 14 2011 BY: Page 8of9 OCT-20-2008 NCN 10:20 AM NCDENR FAX NO. 910 350 2004 P. 10 Certification Requirements: State Stormwater Management Systems Permit No. SW8 051018 MOD 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. ✓ 6. The outlet structure is located per the approved plans. ✓ T. Trash rack is provided on the outlet1bypass structure. 8. All slopes are grassed with permanent vegetation. ✓ 9. Vegetated slopes are no steeper than 3:1: 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ✓ 11. The permitted amounts of surface area anti/or volume have been provided. ✓ 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. ✓ 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. ✓ 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 9 of 9 -J OCT--20-2008 MON 10:20 AM NCDENR (� FAX N0, 910 350 2004 F. 09 State Stormwater Management Systems Permit No. SW8 051018 MOD Tarawa Terrace II Stormwater Permit No. SW8 051018 Onslow County Designer's Certification I, T144,hA6 I fla is , as a duly registered ctiowUse-in the State of North Carolina, having been authorized to observe periodically weekly/ full time) the construction of the project, Tik2p.WAA R�.c.E #la,5� 5 0004 oe1D (Project) for A" LAt4-nc IMA(L%WE 6.05 GvM^J0 rrIa5 (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification; Signature Registration Number 31114 Date 6- t3 - I( JU1� l � 2411 'By SEAL Page 8 of 9 1 OCT--20-2008 MON 10:20 AM NCDENR FAX N0, 910 350 2004 P. 10 State Stormwater Management Systems Permit No. SW8 051018 MOD Certification Requirements: ✓ 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. ✓ 7. Trash rack is provided on the outletibypass structure. ✓ 8. All slopes are grassed with permanent vegetation. vl 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system_ 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12. Required drawdown devices are correctly sized per the approved plans. ✓ 13. All required design depths are provided. ✓ 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. ✓ 15. The required system dimensions are provided per the approved plans. cc: NCDFNR-DWQ Regional Office Onslow County Building Inspections A:"&= C ETVED JUN 14 2011 L 'Y' Page 9 of 9 LITTLEJOHN ENGINEERING ASSOCIATES June 13, 2011 North Carolina Department of Environment and Natural Resources Division of Water Quality Stormwater Supervisor Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Stormwater Designer's Certifications Camp Lejeune, North Carolina LEA Project No. 24235 Permit No. SW8 051018 MOD Attn: Ms. Georgette Scott Construction has been completed in areas of the Tarawa Terrace II development (Permit No. SW8 051018 MOD). Please find the Designer's Certification forms for the ponds below: Boy Scout Camp Road Pond Phase 5 North Pond Phase 5 South Pond Note that this is still a partial certification for the Tarawa Terrace 11 development. The Phase 6 area is still under construction. Please contact me should you have any questions or require any additional information. Sincerely, LITTLEJOHN ENGINEERING ASSOCIATES, INC. Thomas J. Davis, OE ECEIVEID �. JUN 14 2011 BY: 1935 21ST AVENUE SOUTH, NASHVILLE, TENNESSEE 37212 Engineering T 615.385.4144 F 615.385,4020 Planning Landscape Architecture Nashville I Chattanooga I Decatur I Orlando I Phoenix I Tri-Cities Land Surveying Environmental Services www.leainc.com Health and Safety Economic Development LITTLEJOHN ENGI.NE'ERING ASSOCIATES June 8, 2010 i Ms. Georgette Scott ; North Carolina Department of Environment and Natural Resources*` Division of Water Quality .,' ';IUN } 4 Stormwater.Supervisor z_ 01V -Wilmington Regional Office' B 127 Cardinal Drive Extension " Wilmington, NC 28405 RE: Stormwater Designer's Certifications Camp Lejeune, North Carolina : LEA Project No. 24235 . r Dear Ms. Scott: Construction has been completed at the projects listed below at Camp Lejeune: " Watkins Village: Permit No. SW8 060323 Knox Cove: Permit No. SW8 070708 - Tarawa Terrace 11: Permit No. SW8 OS 1018 Modification Please find attached Designer's Certification forms for each of these projects. Note that at the Tarawa Terrace II project location, only the Tarawa Boulevard Pond is being certified at this time as the other ponds have not yet been completed and are under construction. . Please contact me should you have any questions or require any additional information. Sincerely, LITTLEJOHN ENGINEERING ASSOCIATES, INC. Derek Baalbergen, P.E. 1435 21STAVENUE SOUTH, NASHVILLE,TEN NESSEE. M12 Engineering T 615.385A W4 F 6 i 5.385.4020 Planning Landscape Architecture N.ishville I Chartannoga I DQr-arur 1 Tri-Gives Land Surveying Enaironmenral Services w,vw.leainc.Cori, HHc!tirir and Saf o:y 'OCT-20-2008 MON 10:20 AM NCOENR FAX NO, 910 350 2004 F. 09 Tarawa Terrace 11 Stormwater Permit No, SW8 051018 Onslow County Designer's Certification State Stormwater Management Systems Permit No. SW8 051018 MOD r I, 11 0 M ,S . 94 vas , as a duly registered a i n P_e in the State of North Carolina, having been authorized to observe' (periodically/ vyPAWrf-ft11'f jiaaiO the construction of the project, I i CAawa i e l�a�e_ .11__— �Q/'aw� Qf,d. Ponek (Project) for M1&„k� wr,ne- Co. Cap,'e (Project Owner) hereby state that, to the nest of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Nofed deviations from approved {Mans and specification: Signature Registration Number % t r I-F 4 Date sure 10 2010 Page 8 of 9 SEAL �H lCAO // 91 �2 '0F . 31144 &: 1io St�Ji1�P���� 'OCT-20-2008 MON 10:20 AM NCDENR FAX NO, 910 350 2004 P. 10 Certification Requirements: State Stormwater Management Systems Permit No. SW8 051018 MOD ✓ 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. ✓ 6. The outletlbypass structure elevations are per the approved plan. ✓ 6. The outlet structure is located per the approved plans. .✓ 7. Trash rack is provided on the outlet/bypass structure. ✓ 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1: 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12, Required drawdown devices are correctly sized per the approved plans. ✓ 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. ✓ 15. The required system dimensions are provided per the approved plans. CC' NCDENR-DWO Regional Office Onslow County Building Inspections Page 9 of 9 Number Measure Type reatment Numb Permit Number Expiration Inspection Date Status 1 WDP SWP 043 SW8010420 11-07-2019 10/16/2019 In Compliance 1 WDP SWP 044 SW8010420 11-07-2019 10/16/2019 In Compliance 1 WDP SWP 062 SW8010420 11-07-2019 10/16/2019 In Compliance 2 WDP SWP 060 SW8030720 01-26-2019 9/9/2019 In Compliance 3 VU SWP 035 SW8 050817 09-29-2019 11/6/2019 In Compliance 3 WDP SWP 084 SW8 050817 09-29-2019 12/1/2019 In Compliance 4 WDP SWP 063 SW8 051018 12-13-2019 10/16/2019 In Compliance 4 WDP SWP 064 SW8 051018 12-13-2019 10/16/2019 In Compliance 4 WDP SWP188 SW8 051018 12-13-2019 10/16/2019 In Compliance 4 WDP SWP 189 SW8 051018 12-13-2019 10/16/2019 In Compliance 4 WDP SWP 190 SW8 051018 12-13-2019 8/5/2019 In Compliance 5 WDP SWP 065 SW8 051065 03-14-2020 12/11/2019 In Compliance 6 WDP SWP 071 SW8 060137 03-03-2020 10/11/2019 In Compliance 7 WDP SWP 081 5W8 060323 04-10-2020 12/2/2019 In Compliance 7 WDP SWP 082 SW8 060323 04.10-2020 12/2/2019 In Compliance 7 WDP SWP 327 SW8 060323 04-10-2020 12/2/2019 In Compliance 8 WDP SWP 169 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 170 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 171 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 172 SW8 081015 . 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 173 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 174 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 175 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 176 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 328 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 329 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 330 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 331 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 332 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 333 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 334 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 335 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 WDP SWP 336 SW8 081015 10-21-2019 9/1/2019 In Compliance 8 IB SWP 369 SW8 081015 10-21-2019 9/1/2019 In Compliance 9 WDP SWP 165 SW8 081016 Dec 3, 2018/10 17 2019 10/17/2019 In Compliance 10 WDP SWP 167 SW8 081202 8-2-2019 7/31/2019 In Compliance 10 WDP SWP 168 SW8 081202 8-2-2019 7/31/2019 In Compliance 11 WDP SWP 218 SW8 090517 01-05-2020 12/10/2019 In Compliance 12 WDP SWP 321 SW8 110906 04-30-2020 11/8/2019 in Compliance 12 WDP SWP 322 5W8 110906 04-30-2020 8/7/2019 In Compliance 12 WDP SWP 323 SW8 110906 04-30-2020 10/17/2019 In Compliance 12 WDP SWP 324 SW8 110906 04-30-2020 11/6/2019 In Compliance 12 IB SWP 409 SW8 110906 04-30-2020 12/15/2019 In Compliance 12 SF SWP 410 SW8 110906 04-30-2020 12/15/2019 In Compliance 13 WDP SWP 292 SW8 120101 1-24-2020 7/31/2019 In Compliance 13 WDP SWP400 SW8120101 1-24-2020 7/31/2019 In Compliance 13 WDP SWP401 SW8120101 1-24-2020 7/31/2019 In Compliance 14 WDP SWP 290 SW8 120102 01-30-2020 11/6/2019 In Compliance 15 WDP SWP 349 SW8 120201 02-03-2020 11/14/2019 In Compliance 16 WDP SWP 313 SW8 120302 04-12-2020 11/7/2019 In Compliance 17 WDP SWP 034 SW8 980204 07-06-2019 10/15/2019 In Compliance 17 WDP SWP 079 SW8 980204 07-06-2019 12/2/2019 In Compliance EC j% ztF- JUN 0 z 2020 BY: