Loading...
HomeMy WebLinkAboutSW8050817_HISTORICAL FILE_20081218STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 05 oar DOC TYPE ' ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE 0 COMPLIANCE EVALUATION INSPECTION DOC DATE 200 & ) Z 16 YYYYMMDD P,01 TRANSACTION REPORT DEC-19-2008 FRI 09:32 AM FOR: NCDENR 910 350 2004 SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP � >K �c DEC-19 09:30 AM 917576257434 1150" 12 FAX TX OK 801 TOTAL 1M 50S PAGES: 12 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER STREET William G. Ross, -fr., Secretary Dater _ No. Pages (excl. cover): 9 ��� ,qy►�-� f xpress Permitting To: 4*- From: Sandra. Exum Co: Phone ( 10) 796-7265 Fax: � � � q 1 rax: (910, 35) 0-2004 Rt::,,p- Lq-1 h" k-, yi-k/ 4*� Hard Coriv to follow 127 Cardinal Drive Extension, Wilmington, NC 28405 e (910) 796-7215 • An Equal Opportunity AFlirmative Action Employer �CF w A rE9Q �O G 6 o � December 18, 2008 Michael F. Easley, Governor William G_ Ross Jr., Secretary North Carolina. Department of Environment and Natural Resources Commanding Officer c/o Carl Baker, Deputy Public Works Officer Marine Corps Base, Camp Lejeune Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: Stormwater Permit No. SW8 060817 MOD P-647 New River MCAS Water Treatment Facility 1 Postal Facility CC# N62470-02-B-20391 unknown High Density Project Onslow County Dear Mr. Baker: Coleen H"Sullins Director Division of Water Quality :�--The.Wilmington,Regional .Office. received a complete,Stormwater Management•Permit Application,for It �.�, the modification of P-647 New River MCAS Water Treatment Facility/ Postal Facility on December 10, rT^l 2008. Staff review of the plans and specifications has determined that' -the project, as proposed, will ,a :..comply with the Stormwater Regulations set forth in Title 15A NCAC'1'2HA000 and Session Law 2008- 4, ;.211, as applicable. We are forwarding Permit No. SW8 050817 dated`December 18, 2008, for the construction of the subject project. This permit modification revises Permit No. SW8 050817, issued'onrSbpt6mber:29; 2005, as follows to include the Postal Facility: 1%, Increases, the drainage area for the Vortechnics Unit from'54:014'sq� ft1o' 78,843 sq ftz .2., .Increases, the permitted built -upon area -for the Vortechnics Unit from.27,443 sq ft'to•45,738 sq a. ft. ;; .. Please•add the plans,.approved with this permit modification to the plans, approve d'with'th e September 29, 2005 permit. This permit shall be,effective from the date of issuance until September 29, 201'5 and'shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson, or me at (910) 796-7215. Sincerely, Georgette Scott Stormwater Supervisor Surface Water Protection Section GDS/can: S:IWQSISTORMWATIPERMIT1050817MOD.dec08 cc: C. Allan Bamforth, Jr.Engineer-Surveyor, Ltd Christine Nelson Bradley Bennett, DWQ Central Office One Wilmington Regional Office N,gv�nhCarolina C'.PntraFlip, l Fil11vaturallJ North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: %vsv_"_%vnc«_:tterqualitygrg Fax (910)350.2004 1-877-623-6748 An Equal Opportunity/Alfirrnative Action Employer — 50% Recycled130% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 050817 MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding General & MCB Camp Lejeune P-647, New River MCAS Water Treatment Facility / Postal Facility White Street & Curtis Road, MCAS New River, Onslow County FOR THE construction, operation and maintenance of a wet detention pond and a Vortechnics Unit, currently in the preliminary evaluation period, in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211, as applicable (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 29, 2015, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1.* This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Sections 1.6 and 1.7 on page 3 of this permit. The wet detention pond has been designed to handle the runoff from 88,370 ftz 9nd the Vortechnics Unit has been designed to handle the runoff from 45,738 ft of impervious area. The Vortechnics Unit will require monitoring under the innovative design guidelines for two full years after construction is complete and the drainage area is stabilized. 3. The tract will be limited to the amount of built -upon area indicated in Sections 1.6 and 1.7 on page 3 of this permit, and per the approved plans and as listed on the application. This permit does not provide for any future built -upon area. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 5. The built -upon areas associated with this modification to the project shall be located at least 50 feet landward of all perennial and intermittent surface waters. Page 2 of 9 State Stormwater Management Systems Permit No. SW8 050817 MOD 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 3.25 Onsite, ft : 141,570 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 88,370 C. Design Storm, inches: 1 d. Pond Depth, feet: 3.5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSI : 13.62 9. Permanent Pool Surface Areq, ft : 11,442 h. Permitted Storage Volume, ft : 8,680 i. Temporary Storage Elevation, FMSL: 14.27 j. Controlling Orifice: 1.26" O pipe k. Permanent Pool Volume, ft3 29,848 I. Permitted Forebay Volume, ft3: 10,541 M. Receiving Stream/River Basin: Stick Creek 1 White Oak n. Stream Index Number. 19-15 o. Classification of Water Body: "SC HQW NSW" 7. The following design criteria have been provided in the Vortechnics Unit and must be maintained at design condition: a. Drainage Area,, Acres: 1.81 Onsite, ft : 78,843 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 45,738 C. Design Storm, inches: 1.5 d. Avg. Annual TSS removal efficiency: 90% e. Volume to be treated, ft3: '5,650 f. Specified Vortechnics Model: Model 4000 g. Size, LxW, ft.: 12 x 6 h. Vortechnics Treatment Capacity, cfs: 4.5-6.0 i. Design Storm Flow, cfs: 1.51 j. Sediment Storage, yd3: 2.4 k. Receiving Stream/River Basin: Strawhorn Creek 1 White Oak 1. Stream Index Number: 19-13-1 M. Classification of Water Body: "SC HQW NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 050817 MOD 3. Decorative spray fountains will be allowed in the wet detention pond, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in this pond is 118 horsepower. 4. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater systems function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. Access to the stormwater facilities shall be maintained via appropriate easements at all times. Page 4of9 State Stormwater Management Systems Permit No. SW8 050817 MOD 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. MONITORING REQUIREMENTS 1. These monitoring requirements shall be in effect for two years after the project is completed and the drainage area to the Vortechnics Unit has been stabilized. 2. The Vortechnics Unit shall be monitored. Grab samples shall be obtained at a point upstream of the Vortechnics Unit and downstream of the Vortechnics Unit to demonstrate the efficiency of the practice (inflow/outflow). The sample locations will be DI-4 for inflow and somewhere between the outlet of the Vortechnics pipe at the unit and the end of the outlet pipe before it enters surface waters for outflow. 3. Samples shall consist of a grab sample of the first flush inflow and the discharge outflow. The first flush inflow sample window is within the first 30 minutes of a discernable inflow from a representative storm event. The discharge outflow sample window is within the first 30 minutes of discharge from a representative storm event. Samples must be collected in each quarter of each year of the permit. 4. Monitoring parameters shall include, at a minimum, the items listed below. Additional monitoring parameters may be required later to address water quality issues in the affected area. a. ' Total Suspended Solids e. Temperature b. Turbidity f. Conductivity C. Fecal Coliform g. Dissolved Oxygen d. pH Page 5 of 9 State Stormwater Management Systems Permit No. SW8 050817 MOD 5. All samples shall be collected from a representative storm event. A representative storm event is an event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours during which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. For example, if it rains for 2 hours without producing any collectible discharge, and then stops, a sample may be collected if a rain producing discharge begins again within the next 10 hours. The storm event date, total rainfall and duration must be recorded for both the storm event prior to the sampled event and the sampled event. 6. The permittee shall split samples with the DWQ for at least one sample event per year. The permittee shall make arrangements with Regional Office staff to deliver the samples to a certified laboratory of the State's choosing. 7. All sample results shall be submitted to NCDENR within 30 days of receiving the laboratory results. All submitted data shall reference the project name, location, and permit number. Results must be submitted to: NCDENR-DWQ ATTN: Ken Pickle Stormwater and General Permits Unit 1617 Mail Service Center Raleigh, NC 27699-1617 A copy of the lab sampling results shall also be submitted to: NCDENR-DWQ ATTN: Linda Lewis Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405. 8. The permittee may petition DWQ to have monitoring requirements modified, reduced, or eliminated after 20 valid data points have been submitted for each BMP. A facility may opt to monitor more frequently than quarterly to generate the 10 required data points from 20 different storms, as long as the data is collected over the course of at least two full years with samples collected in each season. Modification shall be determined on a case -by -case basis. 9. The permittee shall collect samples at a selected point upstream of the Vortechnics Unit and at the piped outlet of the Vortechnics Unit. Upon the submission of the first laboratory report, the permittee shall submit a plan sheet marked with the sample locations. IV. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 050817 MOD 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 18th day of December 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 7 of 9 State Stormwater Management Systems Permit No. SW8 050817 MOD P-647 New River MCAS Water Treatment Facility /Postal Facility Stormwater Permit No. SW8 050817 CC# N62470-02-B-2039 / unknown Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 8of9 State Stormwater Management Systems Permit No. SW8 050817.MOD Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. .10. The inlets are located per the approved plans and do not cause short- circuiting of the system. .11. The permitted amounts of surface area and/or volume have been provided. .12. Required drawdown devices are correctly sized per the approved plans. _13. All required design depths are provided. _14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. .15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 9 of 9 I Date Received Pee Paid Permit Number I - Q— 01 - 971F3 (D 4195.0-1t7 ram) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This forrn may be photocopied for use as an original 1. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Commanding Officer, Marine Corps Base, Camp Lejeune 2, Pri.nt Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl H. Baker, P.E., Deputy Public Works Officer _ 3. Mailing Address for person listed in item 2 above: Building "1005 Michael Road City:MCB Camv Le'eune State:NC Zip:28547 Phone: (910 ) 451-2213 Fax: (910 _) 451-2927 Emaii:carl.h.baker@usmc.mil 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P-647 New River MCAS Water Treatment Facility / Postal Facility 5. Location of Project (street address): Curtis Rd. and Bancroft St City:Cam p Lejeune County:Onslow Zip:28547 6. Directions to project (front nearest major intersection): Easton Curtis Rd. from Rt. "1.7. Turn right on Bancroft St. one block east of White Street 7. Latitude:34° 43' 434" N Longitude:77° 26' 937" 8. Contact person who can answer questions about the project: of project Name:Randy_ Scott Telephone Number: (910 ) 449-5401 _ Email:randy.scott@usmc.m it II. PERMIT INFORMATION: 1. Specify whether project is (check one): ❑New ❑Renewal ®M"icaLo4, g r Form SWU-101 Version 09.25.08 Page 1 of 4 i i. 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 050817 and its issue date (if known)September 29,�2005 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control 0404/401 Permit ❑NPDES Industrial Stormwater Ill. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Drainage Area 1 wilI be conveved to a proposed water Quality pond, which is designed to release 1" of runoff from 2-5 days. Drainge Area 2 wiIl be treated by a Vortechics device for the first]" and will be discharged to an existing stormwater pipe system. T T 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Property Area: 5.06 acres 4. Total Coastal Wetlands Area:-N/ A acres 5. Total Property Area (3) - Total Coastal Wetlands Area (4) = Total Project Area**: 5.06 acres 6. (TotaI Impervious Area / Total Project Area) X 100 = Project Built Upon Area (BUA): 60.2 % 7. How many drainage areas does the project have? 2 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the sarne format as below. For high density proiects, complete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Diamage Area 2 Receiving Stream Name Stick Creek Sfawhorn$Creek Stream Class &Index No. SC; HQW; NSW SC; HQW; NSW Total Drainage Area (sf) 141,570 (3 .a�� 78,843 On -site Drainage Area (so 141,570 78,843 Off -site Drainage Area (so 0.00 0.00 Existing Impervious* Area (so 54,547 14,375 ,.1 Proposed Impervious*Area (so 33,823 31363 % Impervious* Area (total) 62.4 58 Impervious:Srirface Area ._; .,, _. Drariia e Area 1 g , Drainage?Area 2' On -site Buildings (sf) 7,388 8,312 On -site Streets (so 6,098 9,577. On -site Parking (sf) 20,337 12,048 On -site Sidewalks (so 0.00 927 Other on -site (sf) 13,447 1,024 Off -site (sf) 41,100 13,850 Total (so: 88,370 45,738 4dV. * Impervious area is defined as the built upon area including, but trot limited to, buildings, roaA., arkMg•areas, sidewalks, gravel areas, etc. Form SWU-101 Version 09.25.08 Page 2 of DWQ "Total project area shall be calculated to exclude Coastal Wetlands from use when calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area (BLIA). 9. How was the off -site impervious area Listed above derived? N/A Projects in Union County: Contact the DPVQ Central Office staff to check to see if you project is located within a Threatened & Endangered .Species watershed that may he subject to more stringent storrnwater requirements. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from htt h2o_enr.state.nc.us su bm forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at (919) 807-6300 for the status and availability of these forms. Forms can be downloaded from http://112o.enr.state.nc.us/su/bmp forrns.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401.-13ioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401.-Permeable Pavement Form SW401-Cistern Form SWU-101 Version 09.25,08 Low Density Supplement Cu:t'.? Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Cistern Supplement ,�y t^ :i l.a'srir 9 1✓iiiJ ir:a.s Page 3 of 4 C;".' VI. SUBMITTAL REQUIREMENTS o" Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at littp.://h2o.enr.state.ne.us/su/insi—inal)s.htni) Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form r0& • Original and one copy of the Deed Restrictions & Protective Covenants Form (if K/a. required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP K • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable -to NCDENR nez "31 • Calculations & detailed narrative description of stormwater treatment/management Ca /3 • Copy of any applicable soils report • Two copies of plans and specifications (scaled, signed & dated), including: Cd/3 - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf (such as additional information requests), please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):C. Allan BamforthJr.,Engineer-Surveyor, Ltd. Mailing Address:2207 Hampton Boulevard City:Norfolk State:VA Zip:23517 Phone: 757 627-7079 EmaiLalb@baniforth.com Vill. APPLICANT'S CERTIFICATION Fax: (757 ) 625-7434 1, (print or type name of person listed in General Information, item 2) Carl Baker, Deputy Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project wilt be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be,rec rde , and that the proposed project complies with the requirements of 15A NCAC 2H .1006, / Signature: Dater.4 U. Wl- Farm SWU-101 Version 09.25.08 Page 4 0€4 Pen -nit No.sl (�� (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality s,rORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan. Review: A complete stormwater management plan submittal includes an application fonn, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: MCAS New Raver Water 'Treatment Facilit Contact Person: PANID M. 1iE1ER Phone Number: k91232=,021 For projects with multiple basins, spec;ify which basin this worksheet applies to: N/A elevations Basin Bottom Elevation 10.12 ft. (floor of the basin) Permanent Pool Elevation 13.62 It. (elevation of the orifice) Temporary Pool Elevation -DTI ft. (elevation: of the discharge structure overflow) (4. Z7 ;4CLC'�fi areas Permanent Pool Surface Area 11,442 sq. ft. (water surface area at the orifice elevation) Drainage Area _ 3.25 ac. (on -.site and off -site drainage to the basin) Impervious Area _ Z._Q3 ae, (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 29,848 cu. ft. (combined volume of main basin and forebay) Temporary fool Volume 8,680 cu. ft. (volume detained above the permanent pool) forebay Volume 10,541 cu. ft. (approximately 20% of total volume) Other parameters SA/DA1 Diameter of Orifice Design Rainfall Design TSS Removal 2 1.26 in. I _ in. 90 % (surface area to drainage area ratio from DWQ table) (2 to 5 day temporary pool draw -down required) (rninimurn 85% required) Form SWU-102 Rev 3.99 Page I of 4 Ir . Footnotes: When using the Division SA/DA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct -value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting docmnentation is attached, If the applicant has designated an agent in the Stor umater Management Permit Application Form, the agent may.initial below. If a requirement has not been met, attach justification. Applicants Initials 12 iyi H a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). M 4 b. The forebay volume is approximately equal to 20% of the basin volume. �n4 c. The temporary pool controls runoff from the design storm event. DWd. The temporary pool draws down in 2 to 5 days. N/A e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive now calculations) f. The basin length to width ratio is greater than 3:1. }-� g. The basin side slopes above the pennanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. J. A trash rack or similar device is provided for both the overflow and orifice. N/A k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. I. if the basin is used for sediment and erosion control during construction, cleati out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (cheek one) 0 does XXdoes not incorporate a vegetated filter at the outlet. This system, (cheek one) 0 does yffkdoes not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days'as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maxinium height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into �accumulated sediments. When the permanent pool depth reads jQL(g. feet in the main pond, the sediment shall be removed. When the permanent pools reads d-C of feet in the forebay, the sediment shall be removed. Sediment ken oval El. 10. 62- Botto111 EII anon 10. 12 FOIMBAY BASIN DIACRA 1 ill in the blanks) Permanent Pool Elevation : L 3.62 -----Sediment Removal Elevation__J10.;62 --__ 75% Bottom Elevation MAIN POND 10...12 ♦25% 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of4 Aa d 1. 2005 9:19AM No-9797 V 9 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that 1 am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: LArry Readal,_ Commander, US Navy _ i7-2521 Note: She legally responsible party should not be a homeowners association unless more than 50°/o of the lots have been sold and a resident of the subdivision has been named the president. e a Notary Public for the State of County of do hereby certify that Z911V . /c 'Zev personally appeared before me this - /14 day of of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ��r Form SWU-102 Rev 3.99 Page 4 of 4 VcvI-TC—Ct{ S UQtT MUOEL 4cw Sw8 050af l OPERATION The Vortechs Stormwater Treatment System is a hydrodynamic separator designed to enhance gravitational separation of floating and settling materials from stormwater flows. Stormwater flows enter the unit tangentially to the grit chamber, which promotes a gentle swirling motion., As polluted water circles within the grit chamber, pollutants migrate toward the center of the unit where velocities are the lowest. The majority of settlable solids are left behind as stormwater exits the grit chamber through two apertures on the perimeter of the chamber. Next, buoyant debris and oil and grease are separated from water flowing under the baffle wall due to their relatively low specific gravity. As stormwater exits the System through the flow control wall and ultimately through the outlet pipe, it is relatively free of floating and settling pollutants. Over time a conical pile tends to accumulate in the center of the unit containing sediment and associated metals, nutrients, hydrocarbons and other pollutants. Floating debris and oil and grease form a floating layer trapped in front of the baffle wall. Accumulation of these pollutants can easily be assessed through access manholes over each chamber. Maintenance is typically performed through the manhole,over the grit chamber. MAINTENANCE The Vortechs System should be inspected at regular intervals and maintained when necessary to ensure optimum performance. The rate at which the System collects pollutants will depend more heavily on site activities than the size of the unit, e.g., unstable soils or heavy winter sanding will cause the grit chamber to fill more quickly but regular sweeping will slow accumulation. INSPECTION Inspection is the key to effective maintenance and is easily performed. Vortechnics recommends ongoing quarterly inspections of the accumulated sediment. Pollutant deposition and transport may vary from year to year and quarterly inspections will help insure that Systems are cleaned out at the appropriate time. Inspections should be performed more often in the winter, months in climates where sanding operations may lead to rapid accumulations, or in equipment washdown areas. It is very useful to keep a record of each inspection. A simple form for doing so is attached herewith. The Vortechs System should be cleaned when inspection reveals that the sediment depth has accumulated to within six inches of the dry -weather water surface elevation. This determination can be made by taking 2 measurements with a stadia rod or similar measuring device; one measurement from the manhole opening to the top of the sediment pile and the other from the manhole opening to the water surface. The System should be cleaned out if the difference between the two measurements is six inches or less. Note: To avoid underestimating the volume of sediment in the chamber, the measuring device must, be lowered to the fop of the sediment pile carefully. Finer, silty particles at the top of the pile typically offer less resistance to the end of the rod than larger particles toward the bottom of the pile, . . N CLEANING Maintaining the Vortechs System is easiest when there is no flow entering the System. For this reason, it is a good idea to schedule the cleanout during dry weather. Cleanout of the Vortechs System with a vacuum truck is generally the most effective and convenient method of excavating pollutants from the System. If such a truck is not available, a "clanisheil" grab may be used, but it is difficult to remove all accumulated pollutants with such devices. In Vortechs installations where the risk of large petroleum spills is small, liquid contaminants may not accumulate as quickly as sediment. However, an oil or gasoline spill should be cleaned out immediately. Motor oil and other hydrocarbons that accumulate on a more routine basis should be removed when an appreciable layer has been captured. To remove these pollutants, it may be preferable to use adsorbent pads since they are usually cheaper to dispose of than the oil water emulsion that may be created by vacuuming the oily layer. Trash can be netted out if you wish to separate it from the other pollutants. Accumulated sediment is typically evacuated through the manhole over the grit chamber. Simply remove the cover and insert the vacuum hose into the grit chamber. As water is evacuated, the water level outside of the grit chamber will drop to the some level as the crest of the lower aperture of the grit chamber. It will not drop below this level due to the fact that the bottom and sides of the grit chamber are sealed to the tank floor and walls. This "Water Lock" -feature prevents water from migrating into the grit chamber, exposing the bottom of the baffle wall. Floating pollutants will decant into the grit chamber as the water level there is drawn down. This allows most floating material to be withdrawn from the same access point above the grit chamber. If maintenance is not performed as recommended, sediment may accumulate outside the grit chamber. If this is the case, it may be necessary to pump out all chambers. It is a good idea to check for accumulation in all chambers during each maintenance event to prevent sediment build up there. Manhole covers should be securely seated following cleaning activities, to ensure that surface runoff does not leak into the unit from above. w Construct New Post Office MCAS New River Camp Lejeune, North Carolina Stormwater Management The project site is located in the southwest quadrant of the intersection of Curtis Road and Bancroft Street within the Camp Lejeune military installation MCAS New River, North Carolina. The proposed project is a single -story Post Office Facility and associated parking area and sidewalks. The structure will have a foot print area of approximately 4,500 square feet. The project site is 0.84 acres. The total impervious area for the site is 0.41 acres or 48%. The receiving stream for this project is the New River in the White Oak River Basin, Stream Class SC. A portion of the project site is included in the drainage area for existing Stormwater Permit No. SW8 050817 that was approved for the P-647 New River MCAS Water Treatment Facility. This Permit was approved in a letter dated September 29, 2005. A portion of the site overlaps the Permit's Drainage Area 2 to the Vortechs unit and adds additional area. Existing Conditions The existing site consists of open sand and/or grass covered area with isolated areas of minimal surface demolition debris. At one time the existing site had building and pavement areas totaling 0.46 acres, some of which have been removed (see attached P- 647 New River MCAS Water Treatment Facility, demolition site plan CD102). The site is relatively level with less than I -foot change in elevation in 50 feet. All land disturbing activity will take place on site within the limits of the project. The proposed site does not have any Buffer requirements and is not located within a Buffer. Stormwater Information The existing site has an underground storm piping system. A portion of the proposed stonnwater will drain by swales to an existing ditch along Bancroft Street. The remaining stormwater will drain to the existing stormwater system through a series of pipes and catch basins and into a Vortechs unit. The existing Vortechs unit is a model 4000 with a design system capacity of between 4.5 — 6.0 cfs. The area draining to the unit includes the existing drainage area with the addition of our site for a total area of 1.81 acres at 58% impervious. The design storm is 1.5 inches. The total calculated flow to the Vortechs system for the design storm is 1.51 cfs, which is below 4.5 cfs. A bypass system is required around the unit so that it does not exceed maximum capacity during large rainfall events. An orifice was sized in the bypass structure to limit the flow to the Vortech unit to 4.5 cfs. An overflow weir is also provided in the structure, the weir pECEIVE DEC 10 2008 DwO PROD # height was set for the design flow of 4.5 efs with a safety factor of 2. There is no off -site drainage onto the site and all built upon area will be collected. Road construction across other property will not be necessary to access the site. KF-(71 F,i N/ P;0 DEC 1 0 2oo8 os. Ln�rnlrrnn�rclr nnr INrn-RR1R GS I1.5. Cf(n.[MJfAL SVRYF.Y Rv. JACKSOrN11,lE SUUlF[011AppANCIF w.trr %%aaF► NMO-t+yy 1l_orlWnr.Nurw.W Ar •• 71}I _ _ — .. � r _—����r�� ��_ �ulMr.Mr frrY vwF.°LW1.11rw rwrrvnr..n O •-••- •+riMw.r wrr,.rr"YM �_ rm ri1WrtNrr nV� M V w.orn�.,nr..�s.. r.m..c,u_.w IAC1C5(1NVRJ�i501ff}I�NC j8 ��v+�. �.r Ia 4iF�„ �l Yp�L Ywrt1. �6 q S1tYOOfI[4[�EY0010]I .0 � r+.•rw `! � S7 W�rl �oonluxcw wmrou"rMUM.lw rlu[v rn •f1s1n uf[avrl NEW POST OFFICE MCAS, NEW RIVER CAMP LEJEUNE, NORTH CAROLINA VICINITY MAP ECEIVE DEC 10 2008 D DWO PROJ # PREFFNAL SPLCFICATIONS CONSTRUCT NEW POST OFFICE MARINE CORPS AIR STATION NEW RIVER, NORTH CAROLINA AIE Contract No. 04-5031 El"rojects Work Order No. 793683 E C E I V E D DEC 10 2008 DWQ PROJ # C. ALLAN BAMFOR`I"H, JR., ENGINEER -SURVEYOR, LTD. NORI{OLK, VIRGINIA October 2008 � tLL�11i � i Irt�iL/r�1i r r r r Q 6 AL �-'302 Construct Postal Facility 07082 SECTION 01 57 13.00 22 EROSION AND SEDIMENT CONTROL 07/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM D 3787 (2001) Bursting Strength of Textiles - Constant -Rate -of -Traverse (CRT), Ball Burst Test ASTM D 4533 (1991; R 1996) Trapezoid Tearing Strength of Geotextiles ASTM D 4632 (1991; R 2003) Grab Breaking Load and Elongation of Geotextiles NORTH CAROLINA SEDIMENT CONTROL COMMISSION (NCSCC) NCSCC ESCM (1993; revised 2006) Erosion and Sediment Control Planning and Design Manual 1.2 DESCRIPTION OF WORK The work includes the provision of temporary and permanent erosion control measures to prevent the pollution of air, water, and land within the project limits and in areas outside the project limits where work is accomplished in conjunction with the project. 1.3 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Construction Sequence Schedule; G SD-03 Product Data Sediment/Silt Fence Dust Suppressors Filter Fabric 1.4 CONSTRUCTION SEQUENCE SCHEDULE Submit a Contractor furnished construction work sequence schedule, al E C E f V E I SECTION 01 57 13.00 22 Page 1 DEC 10 2008 DWQ PROJ # � Construct Postal Facility 07082 minimum of 10 days prior to start of construction. The work schedule shall coordinate the timing of land disturbing activities with the provision of erosion control measures to reduce on site erosion and off site sedimentation. Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and pollution. 1.5 STATE APPROVED PLAN The erosion control plan indicated has been approved by the State. No additional State review and approval of the erosion control plan is required, unless the Contractor desires to modify the erosion control plan indicated. Should the Contractor desire to modify the State approved plan, a resubmittal to the State, including the State's approval is required prior to the start of construction. The contractor shall be responsible for any additional costs and time incurred as a result of the resubmittal of the previously approved erosion control plan. The contractor shall anticipate a minimum 45 day review period by the State. Provide and maintain erosion control measures in accordance with NCSCC ESCM, and as specified herein. PART 2 PRODUCTS 2.1 SEDIMENT/SILT FENCE 2.1.1 State Standard Sediment/Silt Fence NCSCC ESCM Standard 6.62, sediment/silt fence (maximum height of 18 inches). 2.2 INLET PROTECTION 2.2.1 State Standard Inlet Protection NCSCC ESCM Standard 6.51, using hardware cloth and gravel. 2.3 CONSTRUCTION ENTRANCE 2.3.1 State Standard Construction Entrance 2.3.1.1 Aggregate NCSCC ESCM, Standard 6.06. 2.3.1.2 Filter Fabric A woven or nonwoven polypropylene, nylon, or polyester containing stabilizers and/or inhibitors to make the fabric resistant to deterioration from ultraviolet, and with the following properties: a. Minimum grab tensile strength (TF 25 #1/ASTM D 4632) 180 pounds b. Minimum Puncture (TF 25 #4/ASTM D 37B7) 75 psi in the weakest direction c. Apparent Opening Size 40-80 (U.S. Sieve Size) d. Minimum Trapezoidal tear strength (TF 25 #2/ASTM D 4533) 50 pounds SECTION O1 57 13.00 22 Page 2 Construct Postal Facility 07082 2.4 DUST SUPPRESSORS Calcium chloride, or other standard manufacturer's spray on adhesives designed for dust suppression. 2.5 TEMPORARY SEEDING 2.5.1 State Standard Temporary Seeding Provide seed, lime, fertilizer, and mulch in accordance with NCSCC ESCM, Standards 6.10 and 6.14. Provide straw mulch. PART 3 EXECUTION 3.1 CONSTRUCTION SEQUENCE SCHEDULE Stabilize areas for construction access immediately with gravel. Install principal sediment basins and traps before any major site grading takes place. Provide additional sediment/silt fences as grading progresses. Provide inlet and outlet protection around existing drainage structures, and inlet and outlet protection at the ends of new drainage systems. Stabilize graded and disturbed areas immediately after grading. Permanent stabilization shall be provided immediately on areas that have been final graded. Temporary seeding and mulching shall be provided on disturbed areas as specified in the paragraph entitled "Temporary Seeding." Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and sediment deposition. Remove temporary erosion control measures at the end of construction and provide permanent seeding. 3.2 SEDIMENT/SILT FENCES Install posts at the spacing indicated, and at an angle between 2 degrees and 20 degrees towards the potential silt load area. Sediment/silt fence height shall be approximately 16 inches. Do not attach filter fabric to existing trees. Secure filter fabric to the post and wire fabric using staples, tie wire, or hog rings. Imbed the filter fabric into the ground as indicated. Splice filter fabric at support pole using a 6 inch overlap and securely seal. 3.3 INLET PROTECTION Provide stakes evenly spaced around the perimeter of the inlet, a maximum of 3 feet apart. Stakes shall be driven immediately adjacent to the drainage structure, a minimum of 18 inches into the ground. The fabric shall be securely fastened to the outside of the stakes, with the bottom of the fabric placed into a trench and backfilled. 3.4 CONSTRUCTION ENTRANCE Provide as indicated , a minimum of 6 inches thick, at points of vehicular ingress and egress on the construction site. Construction entrances shall be cleared and grubbed, and then excavated a minimum of 3 inches prior to placement of the filter fabric and aggregate. The aggregate shall be placed in a manner that will prevent damage and movement of the fabric. Place fabric in one piece, where possible. Overlap fabric joints a minimum of 12 inches. SECTION 01 57 13.00 22 Page 3 Construct Postal Facility 07082 3.5 DUST SUPPRESSORS Immediately dampen the surface before calcium chloride application. Apply dust suppressors on unsurfaced base, subbase and other unsurfaced travel ways. Apply calcium chloride at the rate of 1.0 to 1.25 pounds per square yard of surface for pellets for the initial application. For subsequent applications of calcium chloride, application rates may be approximately 75 percent of initial application rates. Do not apply when raining or the moisture conditions exceed that required for proper application. Apply other dust suppressors in accordance with manufacturers instructions. Protect treated surfaces from traffic for a minimum of 2 hours after treatment. Repeat application of dust suppressors as required to control dust emissions. 3.6 TEMPORARY SEEDING 3.6.1 Time Restrictions Within 48 hours after attaining the grading increment specified herein, provide seed, fertilizer, mulch and water on graded areas when any of the following conditions occur: a. Grading operations stop for an anticipated duration of 30 days or more. b. when it is impossible or impractical to bring an area to finish grade so that permanent seeding operations can be performed without serious disturbance from additional grading. c. Grading operations for a specific area are completed and the seeding seasons specified for permanent seeding is more than 30 days away. d. when an immediate cover is required to minimize erosion, or when erosion has occurred. e. Provide on erosion control devices constructed using soil materials. 3.6.2 Seeding Requirements 3.6.2.1 State Standard Seeding Requirements Provide seed, lime, fertilizer, and mulch in accordance with NCSCC ESCM, Standards 6.10 and 6.14. Provide straw mulch in an air dried condition, and secure mulch in place. 3.6.2.2 Permanent Seeding Temporary seeding shall be removed, and permanent seeding shall be provided during the specified planting season. Provide seed, lime, fertilizer and mulch in accordance with NCSCC ESCM, Standards 6.10 and 6.14. 3.7 MAINTENANCE AND INSPECTION Inspect erosion control devices after each rainfall and daily during pro longed rainfall. Remove sediment deposits after each rainfall or when sediment reaches approximately one-half the barrier height. Immediately repair damaged erosion control devices and damaged areas around and SECTION 01 57 13.00 22 Page 4 Construct Postal Facility 07082 underneath the devices. Maintain erosion control devices to assure continued performance of their intended function. Modify the erosion control plan as required to control problem areas noticed after each inspection. Modifications shall be approved by the Contracting Officer. 3.8 CLEAN UP At the completion of the job, or when directed or approved by the Contracting Officer, temporary erosion control devices shall be removed. Erosion control devices and areas immediately adjacent to the device shall be filled (where applicable), shaped to drain and to blend into the surrounding contours, and provided with permanent seeding. Erosion control devices may remain in place after job completion when approved by the Contracting Officer. -- End of Section -- SECTION O1 57 13.00 22 Page 5 Construct Postal Facility 07082 SECTION 31 23 00,00 20 EXCAVATION AND FILL 04/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. AMERICAN WATER WORKS ASSOCIATION (AWWA) AWWA C600 (2005) Installation of Ductile -Iron Water Mains and Their Appurtenances ASTM INTERNATIONAL (ASTM) ASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates ASTM C 33 (2003) Standard Specification for Concrete Aggregates ASTM D 1140 (2000; R 2006) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve ASTM D 1556 (2007) Density and Unit weight of Soil in Place by the Sand -Cone Method ASTM D 1557 (2007) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3) ASTM D 2321 (2005) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications ASTM D 2487 (2006) Soils for Engineering Purposes (Unified Soil Classification System) ASTM D 2922 (2005) Density of Soil and Soil -Aggregate in Place by Nuclear Methods (Shallow Depth) ASTM D 3017 (2005) water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth) ASTM D 4318 (2005) Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D 698 (2007el) Laboratory Compaction C E V E D Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 DEC 1 a 2C3$ kN-m/cu. m.) ) CM DWQ SECTION 31 23 00.00 20 Page 1 PROD # Construct Postal Facility 07082 U.S. ARMY CORPS OF ENGINEERS (USACE) EM 365-1-1 (2003) Safety -- Safety and Health Requirements 1.2 DEFINITIONS 1.2.1 Capillary water Barrier A layer of clean, poorly graded crushed rock, stone, or natural sand or gravel having a high porosity which is placed beneath a building slab with or without a vapor harrier to cut off the capillary flow of pore water to the area immediately below a slab. 1.2.2 Degree of Compaction Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557, for general soil types, abbreviated as percent laboratory maximum density. 1.2.3 Hard Materials Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal. 1.3 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section O1 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Dewatering work plan Submit 15 days prior to starting work. SD-06 Test Reports Borrow Site Testing; G Fill and backfill test Porous fill test for capillary water barrier Density tests Copies of all laboratory and field test reports within 24 hours of the completion of the test. 1.4 DELIVERY, STORAGE, AND HANDLING Perform in a manner to prevent contamination or segregation of materials. SECTION 31 23 00.00 20 Page 2 Construct Postal Facility 07082 1.5 CRITERIA FOR BIDDING Base bids on the following criteria: a. Surface elevations are as indicated. b. Pipes or other artificial obstructions, except those indicated, will not be encountered. C. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction. e. Material character is indicated by the boring logs. f. Hard materials will not be encountered . g. Borrow material in the quantities required is not available on Government property. h. Blasting will not be permitted. Remove material in an approved manner. 1.6 REQUIREMENT$ FOR OFF SITE SOIL Soils brought in from off site for use as backfill shall be tested as indicated below and not brought on site until Borrow Site Testingreports have been approved by the Contracting Officer. Do not furnish or transport soils onto the MCB Camp Lejeune when such act would violate the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) or the General Statutes of North Carolina. Provide certification that all soil furnished under the contract contains no petroleum or hazardous or toxic materials as defined in DoD Instruction 4715.6, which implements 10 U.S.C. 2692. The following methods shall be used to determine if soil meets this standard: If the total amount of soil to be brought onto the MCB Camp Lejeune for a single contract is less than 200 cubic yards, certify the soil meets the standard by inspecting for "Apparent Contamination" (visual or other indications of contamination including abnormal or unnatural color, chemical or petroleum odors, or,saturation with a chemical or petroleum). Soil which is contaminated, as determined by inspecting for "Apparent Contamination", shall not be utilized on the MCB Camp Lejeune or outlying fields. If the total amount of soil to be brought onto the MCB Camp Lejeune for a single contract is greater than 200 cubic yards, provide certification that the soil meets the standard by analytical testing performed by a laboratory holding current certification from the North Carolina Department of Environment and Natural Resources, Division of water Quality. Collect one representative sample of the soil to be used for each 200 cubic yards or fraction thereof, and analyze for Gasoline Range Organics, Diesel Range Organics, oil and Grease, and 8 RCRA Metals (Totals). If any of the test results are greater than the Method Detection Limits for petroleum, the soil from which the sample was taken shall not be certified as meeting the standard. If any test results are greater than the following North Carolina soil -to -groundwater target concentrations for the 8 RC�iA rmerals f V E U � 1 �srs SECTION 31 23 00.00 20 Page 3 DEC 1 O 2008 DWQ PROJ # Construct Postal Facility 07082 the soil from which the sample was taken shall not be certified as meeting the standard. All units are mg/kg (ppm); Arsenic 26.2; Barium 846; Cadmium 2.72; Chromium 27.2; Lead 274.06; Mercury 0.0154; Selenium 12.2; and Silver 0.223. 1.7 QUALITY ASSURANCE 1.7.1 Dewatering Work Plan Submit procedures for accomplishing dewatering work. 1.7.2 Utilities Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Excavation made with power -driven equipment is not permitted within two feet of known Government -owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer. PART 2 PRODUCTS 2.1 SOIL MATERIALS 2.1.1 Satisfactory Materials Any materials classified by ASTM D 2487 as GW, GP, GM, GP -GM, GW-GM, GC, GP -GC, GM -GC, SW, SP, SM,SP-SM, free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, and frozen, deleterious, or objectionable materials. Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location. 2.1.2 Unsatisfactory Materials Materials which do not comply with the requirements for satisfactory materials. Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous construction. Unsatisfactory material also includes material classified as satisfactory which contains root and other organic matter, frozen material, and stones larger than 2 inches. The Contracting Officer shall be notified of any contaminated materials. 2.1.3 Common Fill Approved, unclassified soil material with the characteristics required to compact to the soil density specified for the intended location. 2.1.4 Backfill and Fill Material ASTM D 2487, classification GW, GP, SW, SP, SM with a ASTM D 4318 liquid limit less then 20, ASTM D 4318 plastic limit less than 6; percent by weight passing ASTM D 1140, No. 200 sieve less than 20; and free of rubble, organics, clay, debris, and other unsuitable material. SECTION 31 23 00.00 20 Page 4 Construct Postal Facility 07082 2.1.5 Topsoil Natural, friable soil representative of productive, well -drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth,. Amend topsoil pH range to obtain a pH of 5.5 to 7. 2.2 POROUS FILL FOR CAPILLARY WATER BARRIER ASTM C 33 fine aggregate grading with a maximum of 5 percent by weight passing ASTM D 1140, No. 200 sieve, or coarse aggregate Size 57, 67, or 77 and conforming to the general soil material requirements specified in paragraph entitled "Satisfactory Materials." 2.3 UTILITY BEDDING MATERIAL Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D 1557 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide ASTM D 2321 materials as follows: a. Class I: Angular, 0.25 to 1.5 inches, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells. b. Class II: Coarse sands and gravels with maximum particle size of 1.5 inches, including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D 2487. 2.4 BORROW Obtain borrow materials required in excess of those furnished from excavations from sources outside of Government property. 2.5 BURIED WARNING AND IDENTIFICATION TAPE Polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW' or similar wording. Color and printing shall be permanent, unaffected by moisture or soil. Warning Tape Color Codes Yellow: Electric Yellow: Gas, Oil; Dangerous Materials Orange: Telephone and other Communications Blue: Water Systems Green: Sewer Systems White: Steam Systems SECTION 31 23 00.00 20 Page 5 Construct Postal Facility 07082 2.5.1 Warning Tape Acid and alkali -resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.003 inch. Tape shall have a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation. 2.6 DETECTION WIRE FOR NON-METALLIC PIPING Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG. PART 3 EXECUTION 3.1 PROTECTION 3.1.1 Shoring and Sheeting Provide shoring sheeting where necessary. In addition to Section 25 A and B of EM 385-1-1, include provisions in the shoring and sheeting plan that will accomplish the following: a. Prevent undermining of pavements, foundations and slabs. b. Prevent slippage or movement in banks or slopes adjacent to the excavation. 3.1.2 Drainage and Dewatering Provide for the collection and disposal of surface and subsurface water encountered during construction. 3.1.2.1 Drainage So that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils, prevent erosion and undermining of: foundations. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site, the area immediately surrounding the site, and the area affecting operations at the site shall be continually and effectively drained. 3.1.2.2 Dewatering Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be SECTION 31 23 00.00 20 Page 6 Construct Postal Facility 07082 permitted within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. while the excavation is open, the water level shall be maintained continuously, at least I foo below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. 3.1.3 Underground Utilities Location of the existing utilities indicated is approximate. The Contractor shall physically verify the location and elevation of the existing utilities indicated prior to starting construction. The Contractor shall scan the construction site with electromagnetic and sonic equipment and mark the surface of the ground where existing underground utilities are discovered. 3.1.4 Machinery and Equipment Movement of construction machinery and equipment over pipes during construction shall be at the Contractor's risk. Repair, or remove and provide new pipe for existing or newly installed pipe that has been displaced or damaged. 3.2 SURFACE PREPARATION 3.2.1 Clearing and Grubbing unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and vegetation and other items that would interfere with construction operations within the clearing limits. Remove stumps entirely. Grub out matted roots and roots over 2 inches in diameter to at least 18 inches below existing surface. 3.2.2 Stripping Strip suitable soil for topsoil to a minimum depth of 18 inches in building and pavement areas without contamination by subsoil material from the site where excavation or grading is indicated and stockpile separately from other excavated material. Extend stripping and unsuitable soil removal at least 5 feet beyond new building and pavement lines. Refer to boring logs and geotechnical information. Satisfactory material unsuitable for use as topsoil shall be stockpiled and used for backfilling. Locate topsoil so that the material can be used readily for the finished grading. where sufficient existing topsoil conforming to the material requirements is not available on site, provide borrow materials suitable for use as topsoil. Protect topsoil and keep in segregated piles until needed. 3.2.3 Unsuitable Material Remove vegetation, debris, decayed vegetable matter, sod, mulch, and rubbish underneath paved areas or concrete slabs. 3.3 EXCAVATION Excavate to contours, elevation, and dimensions indicated SECTION 31 23 00.00 20 Page 7 Reuse eca faxva�edE I V E D`C 10 2LU8 PROS # DWG} Construct Postal Facility 07082 materials that meet the specified requirements for the material type required at the intended location. Keep excavations free from water. Excavate soil disturbed or weakened by Contractor's operations, soils softened or made unsuitable for subsequent construction due to exposure to weather. Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed. Refill with backfill and fill material and compact to 95 percent of ASTM D 1557 maximum density. Unless specified otherwise, refill excavations cut below indicated depth with backfill and fill material and compact to 95 percent of ASTM D 1557 maximum density. Satisfactory material removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced with satisfactory materials to the indicated excavation grade; except as specified for spread footings. Determination of elevations and measurements of approved overdepth excavation of unsatisfactory material below grades indicated shall be done under the direction of the Contracting Officer. 3.3.1 Structures With Spread Footings Ensure that footing subgrades have been inspected and approved by the Contracting Officer prior to concrete placement. Fill over excavations with concrete during foundation placement. 3.3.2 Pipe Trenches Excavate to the dimension indicated. Grade bottom of trenches to provide uniform support for each section of pipe after pipe bedding placement. Tamp if necessary to provide a firm pipe bed. Recesses shall be excavated to accommodate bells and joints so that pipe will be uniformly supported for the entire length. 3.3.3 Excavated Materials satisfactory excavated material required for fill or backfill shall be placed in the proper section of the permanent work required or shall be separately stockpiled if it cannot be readily placed. Satisfactory material in excess of that required for the permanent work and all unsatisfactory_ material shall be disposed of as specified in Paragraph "DISPOSITION OF SURPLUS MATERIAL." 3.3.4 Final Grade of Surfaces to Support Concrete Excavation to final grade shall not be made until just before concrete is to be placed. 3.4 SUSGRADE PREPARATION Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. The surface shall be scarified to a depth of 6 inches before the fill is started. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to the specified density. when .the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill. Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, SECTION 31 23 00.00 20 Page 8 Construct Postal Facility 07062 pneumatic -tired rollers, steel -wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to plus or minus 2 percent of optimum moisture. Minimum subgrade density shall be as specified herein. 3.4.1 Proof Rolling Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping, proof roll the existing subgrade of the building and paved areas with six passes of a 7 to 10 ton, pneumatic -tired roller or a dump truck loaded with 6 cubic yards of soil. Operate the roller or truck in a systematic manner to ensure the number of passes over all areas, and at speeds between 2 1/2 to 3 1/2 miles per hour. When proof rolling under buildings, the building subgrade shall be considered to extend 5 feet beyond the building lines, and one-half of the passes made with the roller shall be in a direction perpendicular to the other passes. Notify the Contracting Officer a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the Contracting Officer. Rutting or pumping of material shall be undercut as directed by the Contracting Officer and replaced with fill and backfill material.. 3.5 FILLING AND BACKFILLING Fill and backfill to contours, elevations, and dimensions indicated. Compact each lift before placing overlaying lift. 3.5.1 Common Fill Placement Provide for general site. Use satisfactory materials. Place in 10 inch lifts. Compact areas not accessible to rollers or'compactors with mechanical hand tampers. Aerate material excessively moistened by rain to a satisfactory moisture content. Finish to a smooth surface by blading, rolling with a smooth roller, or both. 3.5.2 Backfill and Fill Material Placement Provide for paved areas, utility trenches, and under concrete slabs. Place in 10 inch lifts. Do not place over wet or frozen areas. Place backfill material adjacent to structures as the structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against the structure. 3.5.3 Backfill and Fill Material Placement Over Pipes and at Walls Backfilling shall not begin until construction below finish grade has been approved, underground utilities systems have been inspected, tested and approved, forms removed, and the excavation cleaned of trash and debris. Backfill shall be brought to indicated finish grade. Heavy equipment for spreading and compacting backfill shall not be operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power -driven hand tampers suitable for the material being compacted. Backfill shall be placed carefully around pipes or tanks to avoid damage to coatings, wrappings, or tanks. Backfill shall not be placed against foundation walls prior to 7 days after completion of the walls. As far as practicable, backfill shall be brought up evenly on each side of the wall and sloped`to� ` L SECTION 31 23 00.00 20 Page s DEC 10 200$ DWQ Construct Postal Facility 07082 drain away from the wall. 3.5.4 Porous Fill Placement Provide under floor and area -way slabs on a compacted subgrade. Place in 4 inch lifts with a minimum of two passes of a hand -operated plate -type vibratory compactor. 3.5.5 Trench Backfilling Backfill as rapidly as construction, testing, and acceptance of work permits. Place and compact backfill under structures and paved areas in 10 inch lifts to top of trench and in 10 inch lifts to one foot over pipe outside structures and paved areas. Place backfill in 4 to 6 inch lifts when hand compaction is used. 3.6 BORROW Where satisfactory materials are not available in sufficient quantity from required excavations, approved borrow materials shall be obtained as specified herein. 3.7 BURIED WARNING AND IDENTIFICATION TAPE Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 6 inches below top of subgrade. 3.8 BURIED DETECTION WIRE Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over it's entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe. 3.9 COMPACTION Determine in -place density of existing subgrade; if required density exists, no compaction of existing subgrade will be required. 3.9.1 General Site Compact underneath areas designated for vegetation and areas outside the 5 foot line of the paved area or structure to 85 percent of ASTM D 1557. 3.9.2 Structures, Spread Footings, Concrete Slabs, and Utility Trenches Compact top 18 inches of subgrades to 95 percent of ASTM D 1557. Compact fill and backfill material to 95 percent of ASTM D 1557 3.9.3 Adjacent Area Compact areas within 5 feet of structures to 90 percent of ASTM D 1557 SECTION 31 23 00.00 20 Page 10 Construct Postal Facility 07082 3.9.4 Paved Areas Compact top 18 inches of subgrades to 95 percent of ASTM D 1557. Compact fill and backfill materials to 95 percent of ASTM D 1557. 3.10 FINISH OPERATIONS 3.10.1 Grading Finish grades as indicated within one -tenth of one foot. Grade areas to drain water away from structures. Maintain areas free of trash and debris. For existing grades that will remain but which were disturbed by Contractor's operations, grade as directed. 3.10.2 Topsoil and Seed Provide as specified in Section 01 57 13.00 22 EROSION AND SEDIMENT CONTROL. 3.10.3 Protection of Surfaces Protect newly backfilled, graded, and topsoiled areas from traffic, erosion, and settlements that may occur. Repair•or reestablish damaged grades, elevations, or slopes.- 3.11 DISPOSITION OF SURPLUS MATERIAL Remove from Government property surplus or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber. 3.12 FIELD QUALITY CONTROL 3.12.1 Sampling Take the number and size of samples required to perform the following tests. 3.12.2 Testing Perform one of each of the following tests for each material used. Provide additional tests for each source change. 3.12.2,1 Fill and Backfill Material Testing Test fill and backfill material in accordance with ASTM C 136 for conformance to ASTM D 2487 gradation limits; ASTM D 1140 for material finer than the No. 200 sieve; ASTM D 4318 for liquid limit and for plastic limit; ASTM D 698 or ASTM D 1557 for moisture density relations, as applicable. 3.12.2.2 Porous Fill Testing Test porous fill in accordance with ASTM C 136 for conformance to gradation specified in ASTM C 33. 3.12.2.3 Density Tests Test density in accordance with ASTM D 1556, or ASTM D 2922 and ASTM D 3017. When ASTM D 2922 and ASTM D 3017 density tests are used, verify density test results by performing an ASTM D 1556 density test at a location already ASTM D 2922 and ASTM D 3017 tested as specified herein. Perform an SECTION 31 23 00.00 20 Page 11 Construct Postal Facility 07082 ASTM D 1555 density test at the start of the job, and for every 10 AST14 D 2922 and ASTMi D 3017 density tests thereafter. Test each lift at randomly selected locations every 2000 square feet of existing grade in fills for structures and concrete slabs, and every 2500 square feet for other fill areas and every 2000 square feet of subgrade in cut. Include density test results in daily report. a. Bedding and backfill in trenches: One test per 100 linear feet in each lift. -- End of Section -- SECTION 31 23 00.00 20 Page 12 Construct Postal. Facility 07082 SECTION 33 40 00 STORM DRAINAGE UTILITIES 01/08 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) AASHTO M 198 (2005) Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants AMERICAN CONCRETE PIPE ASSOCIATION (ACPA) ACPA 01-102 (2000) Concrete Pipe Handbook ACPA 01-103 (2000) Concrete Pipe Installation Manual ASTM INTERNATIONAL (ASTM) ASTM C 443 (2005a) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets ASTM C 478 (2007) Standard Specification for Precast Reinforced Concrete Manhole Sections ASTM C 76 (2007) Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe ASTM C 923 (2007) Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals ASTM C 990 (2006) Standard Specification for Joints for Concrete Pape, Manholes and Precast Sox Sections Using Preformed Flexible Joint Sealants ASTM D 1751 (2004) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types) ASTM D 1752 (2004a) Standard Specification for SECTION 33 40 00 Page 1 Construct Postal Facility 07082 Preformed Sponge Rubber Cork and Recycled PVC Expansion ASTM D 4101 (2007) Standard Specification for Polypropylene Injection and Extrusion Materials U.S. GENERAL SERVICES ADMINISTRATION (GSA) FS A-A-60005 (Basic) Frames.Covers, Gratings, Steps, Sump and Catch Basin, Manhole U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA) 29 CFR 1910.27 Fixed Ladders 1.2 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G° designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: So-03 Product Data Placing Pipe Printed copies of the manufacturer's recommendations for installation procedures of the material being placed, prior to installation. SD-07 Certificates Frame and Cover for Gratings Certification on the ability of frame and cover or gratings to carry the imposed live load. 1.2.1 LEED Submittal Requirements a. Recycled Content LEED: Provide cut sheets and invoices indicating material's recycled content percentages of post -consumer recycled content, and post-industrial recycled content. b. Regional Materials LEED: Provide cut sheets and invoices indicating location of final manufacturer's origin for all products and materials from within a 500 mile radius. 1..3 DELIVERY, STORAGE, AND HANDLING 1.3.1 Delivery and Storage Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. Materials shall not be stored directly on the ground. The inside of pipes and fittings shall be kept free of dirt and debris. Before, during, and after installation, plastic pipe and SECTION 33 40 00 Page 2 Construct Postal Facility 07082 fittings shall be protected from any environment that would result in damage or deterioration to the material. The Contractor shall have a copy of the manufacturer's instructions available at the construction site at all times and shall follow these instructions unless directed otherwise by the Contracting Officer. Solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install plastic pipe shall be stored in accordance with the manufacturer's recommendations and shall be discarded if the storage period exceeds the recommended shelf life. Solvents in use shall be discarded when the recommended pot life is exceeded. 1.3.2 Handling Materials shall be handled in a manner that ensures delivery to the trench in sound, undamaged condition. Pipe shall be carried to the trench, not dragged. PART 2 PRODUCTS 2.1 LEED REQUIREMENTS Recycled Content LEED: Ensure LEED certification by acquiring project products and materials containing recycled material to the greatest extent possible, and highest percentage of recycled content possible. Use materials with recycled content such that the sum of post consumer recycled content plus one-half of the post-industrial content meets or exceeds 5 percent of the total value of that product. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total recycled content requirements. Manufacturer's location for regionally manufactured materials LEED: Ensure LEED certification by acquiring and using regionally manufactured project products from within a 500 mile radius to the: greatest extent possible. Use and acquire material regionally such that 20 percent of all project material value is from within a 500 mile radius. 2.2 PIPE FOR STORM DRAINS Pipe for culverts and storm drains shall be of the sizes indicated and shall conform to the requirements specified. 2.2.1 Concrete Pipe Concrete pipe shall conform to ASTM C 75, Class III, unless indicated otherwise. 2.2.1.1 Joint Sealants Provide primers and lubricants as recommended by the manufacturer. Concrete pipe joints shall be suitable for use with the joint sealants specified. a. Butyl gaskets. b. AASHTO M 196, Type B preformed plastic gaskets. 2.3 MISCELLANEOUS MATERIALS 2.3.1 Concrete Unless otherwise specified, concrete and reinforced concrete shall conform SECTION 33 40 00 Page 3 Construct Postal Facility 07082 to the requirements for 4000 psi concrete under Section 03 30 00 CAST -IN -PLACE CONCRETE. The concrete covering over steel reinforcing shall not be less than 1 inch thick for covers and not less than 1-1/2 inches thick for walls and flooring. Concrete covering deposited directly against the ground shall have a thickness of at least 3 inches between steel and ground. Expansion -joint filler material shall conform to ASTM D 1751, or ASTM D 1752, or shall be resin -impregnated fiberboard conforming to the physical requirements of ASTM D 1752. 2.3.2 Precast Reinforced Concrete Structures Precast reinforced concrete structures shall be manufactured in accordance with ASTM C 478, except as specified herein. ASTM C 990, butyl gaskets or AASHTO M 198, Type B gaskets for joint connections. 2.3.3 Frame and Cover for Gratings Shall be cast iron or ductile iron conforming to FS A-A-60005, figure numbers as indicated. 2.3.4 Drainage Structure Steps Zinc -coated steel conforming to 29 CFR 1910.27. As an option, plastic or rubber coating pressure -molded to the steel may be used. Plastic coating shall conform to ASTM D 4101, copolymer polypropylene. Rubber shall conform to ASTM C 443, except shore A durometer hardness shall be 70 plus or minus 5. Aluminum steps or rungs will not be permitted. Steps are not required in storm structures less than 4 feet deep. 2.4 RESILIENT CONNECTORS Flexible, watertight connectors used for connecting pipe to manholes and inlets shall conform to ASTM C 923. PART 3 EXECUTION 3.1 LEED REQUIREMENTS a. Recycled Content LEED: Document cut sheets and invoices indicating material's recycled content percentages of post -consumer recycled content, and post-industrial recycled content for LEED submittal requirements, see Section 01 33 29 LEED(tm) DOCUMENTATION. b. Regional Materials LEED: Document cut sheets and invoices indicating location of final manufacturer's origin for all products and materials from within a 500 mile radius for LEED submittal requirements, see Section 01 33 29 LEED(tm) DOCUMENTATION. 3.2 WASTE MANAGEMENT LEED Separate all waste material in accordance with the Construction Waste Management Plan. Place and/or dispose of all waste materials such that a minimum of 50 percent is diverted from landfill by either salvage, recycling plan, and/or reuse. Provide invoices, plant slips, certification indicating total quantities of waste material, and amounts diverted by way of means as stated above for SECTION 33 40 00 Page 4 Construct Postal Facility 07082 LEED submittal requirements, see Section 01 33 29 LEED(tm) DOCUMENTATION. 3.3 EXCAVATION FOR STORM DRAINS AND DRAINAGE STRUCTURES Excavation of trenches, and for appurtenances and backfilling for storm drains, shall be in accordance with the applicable portions of Section 31 23 00.00 20 EXCAVATION AND FILL and the requirements specified below. 3.3.1 Trenching The width of trenches at any point below the top of the pipe shall be not greater than the outside diameter of the pipe plus the indicated dimensions to permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Sheeting and bracing, where required, shall be placed within the trench width as specified. Contractor shall not overexcavate. Where trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures will be necessary. Cost of this redesign and increased cost of pipe or installation shall be borne by the Contractor without additional cost to the Government. 3.3.2 Removal of Unstable Material Where wet or otherwise unstable soil incapable of properly supporting the pipe, as determined by the Contracting Officer, is unexpectedly encountered in the bottom of a trench, such material shall be removed to the depth required and replaced to the proper grade with select granular material, compacted as provided in paragraph BACKFILLING. When removal of unstable material is due to the fault or neglect of the Contractor while performing shoring and sheeting, water removal, or other specified requirements, such removal and replacement shall be performed at no additional cost to the Government. 3.4 BEDDING The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe. 3.4.1 Concrete Pipe Requirements When no bedding class is specified or detailed on the drawings, concrete pipe shall be bedded in a soil foundation accurately shaped and rounded to conform to the lowest one-fourth of the outside portion of circular pipe or to the lower curved portion of pipe arch for the entire length of the pipe or pipe arch. When necessary, the bedding shall be tamped. Bell holes and depressions for joints shall be not more than the length, depth, and width required for properly making the particular type of joint. 3.5 PLACING PIPE Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Pipe shall not be laid in water, and pipe shall not be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. SECTION 33 40 00 Page 5 Construct Postal Facility 07082 3.5.1 Concrete Pipe Laying shall proceed upgrade with tongue ends of tongue -and -groove pipe pointing in the direction of the flow. 3.6 JOINTING 3.6.1 Concrete Pipe 3.6.1.1 Flexible Joints Install pipe and fittings in accordance with paragraph entitled "General Requirements for Installation of Pipelines" of this section and with the provisions for rubber gasket jointing and jointing procedures of ACPA 01-103 or of ACPA 01-102, Chapter 9. Make joints with the gaskets previously specified for joints with this piping. Gaskets and jointing materials shall be as recommended by the particular manufacturer in regard to use of lubricants, cements, adhesives, and other special installation requirements. Surfaces to receive lubricants, cements, or adhesives shall be clean and dry. Gaskets and jointing materials shall be affixed to the pipe not more than 24 hours prior to the installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all times. Gaskets and jointing materials shall be inspected before installing the pipe; any loose or improperly affixed gaskets and jointing materials shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pushed home. If, while the joint is being made the gasket becomes visibly dislocated the pipe shall be removed and the joint remade. 3.7 DRAINAGE STRUCTURES 3.7.1 Manholes and Inlets Use precast concrete base sections. Make inverts in precast concrete bases with a smooth -surfaced semi -circular bottom conforming to the inside contour of the adjacent drainage sections. For changes in direction of drains and entering branches into the structure, make a circular curve in the structure invert of as large a radius as structure size will permit. For precast concrete construction, make joints between sections with the gaskets specified for this purpose; install in the manner specified for installing joints in concrete piping. Give a smooth finish to inside joints of precast concrete storm structures. Parging will not be required for precast concrete structures. Make joints between concrete structure and pipes entering structure with the resilient connectors specified for this purpose or mortared to produce a watertight joint; install in accordance with the recommendations of the connector manufacturer. Where a new structure is constructed on an existing line, remove existing pipe as required to construct the structure. Cut existing pipe so that pipe ends are approximately flush with the interior face of structure wall, but not protruding beyond into the structure. 3.8 FIELD QUALITY CONTROL 3.8.1 Field Tests and Inspections The Contracting Officer will conduct field inspections and witness field tests specified in this section. The Contractor shall perform field tests SECTION 33 40 00 Page 6 Construct Postal Facility 07082 and provide labor, equipment, and incidentals required for testing. Be able to produce evidence, when required, that each item of work has been constructed properly in accordance with the drawings and specifications. 3.8.2 Pipeline Testing Check each straight run of pipeline for gross deficiencies by holding a light in a manhole; it shall show a practically full circle of light through the pipeline when viewed from the adjoining end of line. -- End of Section -- �� E C E I V E SECTION 33 40 00 Page 7 DEC 10 LUU$ DWO PROJ # 1�. L GE 0 0 d �T - Geolechnical • Environmental . Testing REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNCIAL ENGINEERING SERVICES Proposed Post Office P-672 Camp LeJeune, North Carolina G E T PROJECT NO: EC08-295G October 6, 2008 Prepared for Kroskin Design Group 6160 Kempsville Circle Norfolk, Virginia 23502 ATTN: MR. Tom Beverly, AIA Prepared by GET Solutions, Inc. C E V E U0 DEC 10 2O03 owo PROJ # 504 E. Elizabeth Street Ste. 2, Elizabeth City, NC 27909 ♦ Phone 252-335-9765 ♦ Fax 252-335-9766 info@getsolutionsinc.com S616ti0ns,, lne October 6, 2008 Geoicdrnirnt • Envimoitnenfnl • Testing TO: Kroskin Design Group 6160 Kempsville Circle Suite 316A Norfolk Virginia 23502 Attn: Mr. Tom Beverly, AIA RE: Report of Subsurface Investigation and Geotechnical Engineering Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G Dear Mr. Beverly: In compliance with your instructions, we have completed our Geotechnical Engineering Services for the referenced project. The results of this study, together with our recommendations, are presented in this report. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. We trust that the information contained herein meets your immediate need, and we would ask that you call this office with any questions that you may have. Respectfully Submitted, G E T Solutions, Inc. - I/N e. AV ,J JI�`I1� r Gerald W. Stalls Jr., P.E. Senior Project Engineer NC Reg. # 034336 Camille A. Kattan, P.E. Principal Engineer NC Reg. # 14103 Copies: (4) Client SEAL 034336 :.�`� • CMG I NE�� • �.`� ,,tirrrrirrrrrr CAR SEA! - ` 014103 - A. K •��•rrrr�.�tii 504 last Elizabeth Street; Suite 2 • Elizabeth City, NC 27909 + Phone: (252)315-9765 • Pax: (252)335-9766 infoCgetsohrtionsine. Coll 4. TABLE OF CONTENTS 1.0 PROJECT INFORMATION...................................................................................1 1.1 Project Authorization..............................................................................1 1.2 Project Description.................................................................................1 1.3 Purpose and Scope of Services............................................................2 2.0 FIELD AND LABORATORY PROCEDURES ................ 2.1 Field Exploration.................................................................................... 3 2.2 Laboratory Testing........::........................................................................4 3.0 SITE AND SUBSURFACE CONDITIONS............................................................ 5 3.1 Site Location and Description................................................................ 5 3.2 Subsurface Soil Conditions....................................................................6 3.3 Groundwater Information.......................................................................7 4.0 EVALUATION AND RECOMMENDATIONS........................................................7 4.1 Clearing and Grading.............................................................................7 4.2 Subgrade Preparation............................................................................8 4.3 Structural Fill and Placement.................................................................9 4.4 On -Site Excavated Soils — BMP Pond...................................................9 4.5 Building Foundation Design Recommendations..................................10 4.6 Foundation Excavations......................................................................10 4.7 Building Foundation Settlements.........................................................11 4.8 Seismic Design Recommendations.....................................................11 4.9 Building Floor Slabs............................................................................. 11 4.10 Pavements...........................................................................................12 4.11 Storm Water Ponds..................................................................14 5.0 CONSTRUCTION CONSIDERATIONS..............................................................15 5.1 Drainage and Groundwater Concerns.................................................15 5.2 Excavations.........................................................................................15 6.0 REPORT LIMITATIONS.....................................................................................16 APPENDIX I -BORING LOCATION SKETCH APPENDIX II - BORING LOGS APPENDIX III - GENERALIZED SOIL PROFILE APPENDIX IV — SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET APPENDIX V — CLASSIFICATION SYSTEM FOR SOIL EXPLORATION E C E I V B DEC 10 2008 DwQ PROJ # i Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G 1.0 PROJECT INFORMATION 1.1 Project Authorization: G E T Solutions, Inc. has completed our Geotechnical Engineering study for the Proposed Post Office P-672 located in Camp LeJeune, North Carolina. The geotechnical engineering services were conducted in general accordance with G E T Proposal No. PEC08-158G, dated July 30, 2008. Authorization to proceed with the services was received from Mr. Tom Beverly with Kroskin Design Group on the date of September 3, 2008. 1.2 Project Description: It is our understanding that the proposed construction at this site is planned to consist of building a new single story post office structure along with associated site infrastructure components including a parking lot and associated drive lanes as well as a stormwater management pond (BMP). The structure will have a foot print area of approximately 4,500 square feet. The structure is to be of a combination of load bearing concrete masonry unit (CMU) walls and structural steel frame design supported by shallow foundations and slab -on - grade construction. The loading conditions associated with the proposed structure were not known at the time of this report. However, based on our experience with similar projects the maximum anticipated column and/or wall loads are not expected to exceed about 50 kips and/or 2 kips per linear foot, respectively. The proposed finished first floor elevation of the structure is to be at 18.5 feet MSL. The existing site grade elevations within the limits of the proposed building area were noted to range from about 16.5 feet MSL to 17.3 feet MSL. Accordingly, the fill depth necessary to establish the design grade elevations within the building area is anticipated to range from about 1 to 2.5 feet. It is our understanding that the site previously contained an existing pile supported structure. Furthermore, it has been noted that following the structure's demolition the pile foundations were cut-off below grade and allowed to remain in -place. If any of the noted information is incorrect or has changed, please inform G E T Solutions, Inc. so that we may amend the recommendations presented in this report, if appropriate. Soluilons;an_c. Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G 1.3 Purpose and Scope of Services: The purpose of this study was to obtain information on the general subsurface conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated-. 1. General assessment of the soils revealed by our borings and test pit excavations performed at the proposed development. 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or structure performance, including existing fills, surficiallsubsurface organics, or expansive soils. 4. Soil subgrade preparation, including stripping, grading, and compaction, as well as providing Engineering criteria for placement and compaction of approved structural fill material, including weather and equipment effects. 5. Construction considerations for fill placement, subgrade preparation, and foundation excavations. 6. Seismic site classification provided based on the results of 25-foot deep SPT borings, our experience with the subsurface soils within the vicinity of the project site, and the requirements provided in the North Carolina State Building Code (2006 International Building Code with North Carolina Amendments) section 1615.1; Table 1615.1.1. 7. Feasibility of utilizing a shallow foundation system for support of the proposed buildings. Design parameters required forthe foundation systems, including foundation sizes, allowable bearing pressures, foundation levels, and expected total and differential settlements. 8. Typical pavement section recommendations based on the explored subgrade soil conditions and the expected volume of traffic, as well as our experience with similar soil conditions. 9. Permeability (infiltration) values are provided based on the results of one (1) Saturated Hydraulic Conductivity Test, and one (1) 15-foot deep boring, as well as our experience with similar soil conditions. z ® E C E I V DEC 10 Z:1:3 P - �,J — GET E f Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G The scope of services did not include an environmental assessment for determining the presence or absence -of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, color, unusual or suspicious items or conditions are strictly for the information of the client. Prior to development of this site, an environmental assessment is advisable. 2.0 FIELD AND LABORATORY PROCEDURES 2.1 Field Exploration: Our field exploration services consisted of three (3)15- to 25-foot deep Standard Penetration Test (SPT) borings (designated as B-1, B-2 and BMP-1), which were drilled within the proposed building and storm water pond areas. Additionally, a total of four (4) 4-foot deep test pit excavations (designated as T-1 through T-4) were performed within the proposed building and pavement areas. The test pit excavations were performed in order to determine the extent of demolition debris within the surficial soils andlor to potentially locate existing pile foundations. The SPT borings were performed utilizing mud -rotary drilling techniques with a CME 55 ATV -mounted drill rig. Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586. The tests were performed continuously from the existing ground surface to a depth of 10 feet and at 5-foot intervals thereafter to the boring termination depth of 35-feet. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30-inch long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment of penetration was recorded and is shown on the boring logs_ The sum of the second and third penetration increments is termed the SPT N-value. A representative portion of each disturbed split -spoon sample was collected with each SPT, placed in a glass jar, sealed, labeled, and returned to our laboratory for review. The results of the borings are presented in Appendix II (Boring Logs) and Appendix Ili (Generalized Soil Profile) included with this report, which corroborate the stratigraphy depicted by the original study. The boring schedule noting the SPT boring and test pit depths and locations is presented in Table I on the following page of this report. 5olutions,lnc. i Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G Table I — Boring Schedule Boring Number Boring Depth (feet) _ Boring Location B-1 25 Northeast Corner of Proposed Post Office Building B-2 25 Southwest Corner of Proposed Post Office Building BMP-1 15 Approximate Center of Proposed BMP Pond T-1 4 Southeast Corner of Proposed Post Office Building T-2 4 Northwest Corner of Proposed Post Office Building T-3 4 Proposed Parking Lot; East End; Approximate Center T-4 4 Entrance Lane South of Proposed Parking Lot; Approximate Center The boring locations were established and located in the field by a representative of G E T Solutions, Inc. by measuring from existing landmarks. The approximate boring locations are shown on the "Boring Location Plan" (Appendix 1) attached to this report. This plan was developed based on the site plan provided to G E T Solutions, Inc. by C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 2.2 Laboratory Testing: Representative portions of all soil samples collected during drilling were sealed in glass jars, labeled, and transferred to our Elizabeth City laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. A total of four (4) representative split spoon soil samples were selected and subjected to natural moisture and 4200 sieve wash testing and analysis in order to corroborate the visual classification of the encountered soils_ These test results are tabulated on the followirig page of this report and are also presented on the "Log of Boring" sheets (Appendix I1), Solutions, lnc. ' Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08.295G Table II - Laboratory Test Results Boring.. Sample Depth Natural., 4200_ Classification No. No. ff t)� Moisture Sieve Content" (%) B-1 S-5 8-10 23.8 20.8 SM B-2 S-4 6-8 31.5 13.2 SM BMP-1 S-2 3-4 15.7 23.4 SM BMP-1 S-3 4-6 20.0 30.0 SC-SM 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Location and Description: The project site is located in the southwest quadrant of the intersection of Curtis Road and Bancroft Street within the Camp LeJeune military installation in North Carolina. Atthe time of our field investigation services the property was generally observed to consist of an open sand and/or grass covered area with isolated areas of minimal surface demolition debris. It is our understanding that this site previously contained a structure that was demolished and removed from the project site. Accordingly, this site is susceptible to have deposits of demolition debris, existing foundations, and/or unsuitable bearing soil conditions. Furthermore, it has been noted that following the structure's demolition the pile foundations were cut-off below grade and allowed to remain in -place. Based on the site plan provided to G E T Solutions, Inc. by C. Allan Bamforth, Jr. Engineer -Surveyor, LTD, the majority of the site appeared to be relatively level with approximately 1-foot change in elevation in 50 feet. Furthermore, the existing site grade elevations within the construction limits generally ranged from about 14.6 to 18.5 feet MSL. The northernmost site boundary consists of Curtis Road. The westernmost boundary consists of an existing building and associated asphalt parking lot. The southernmost boundary consists of an existing structure (Bldg. 112) and associated asphalt paved parking lot. The easternmost boundary consists of Bancroft Street. Solutioris, Inc.', Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G 3.2 Subsurface Soil Conditions: Generally, the surficial and shallow subsurface soils encountered at the boring and test pit locations to an average depth of 2.4 feet were noted to be granular in nature and classified to consist of SAND (SP-SM, SM) with varying amounts of silt, clay, and demolition debris (i.e. concrete fragments, brick fragments, stone, etc.). These granular soils were noted to extend from the existing site grade elevations to a depth ranging from approximately 2 to 3 feet. However, these soils were not encountered at the location of test pit locations T-1 and T-4. The surficial soils encountered at the location of Test Pit excavations T-1 and T-4 were noted to consist of Tan SAND (SP-SM, SM) and TOPSOIL, respectively. Furthermore, the existing pile foundations that were noted to have been cut-off below grade were not encountered at the location of Test Pit excavations T-1 through T-4. Beneath the varying surface conditions, the subsurface soils encountered at the boring locations were noted to consist of very loose to dense SAND (SP, SP-SM, SM, SC) with varying amounts of silt and clay. A deposit of very loose SAND (SM) mixed with organics was encountered at the location of boring T-1 at a depth of 0.83 to 1-foot below existing site grade elevations. A brief description of the natural subsurface soil conditions encountered at the boring locations is tabulated below: RANGES OF AVERAGE STRATUM DESCRIPTION SPT(') N- DEPTH (Feet) VALU ES . Borings: B-1, B-2,,BMP,-1, aincl T-1:through. T-4 SAND (SP-SM, SM) with varying amounts of silt and demolition debris (concrete fragments, brick 0 to 2.4 1 6 to 49 fragments, stone, etc.); Borings B-1, B-2 and BMP- 3, as well as Test Pits T-2 and T-3 0 to 1.5 IA TOPSOIL; Test Pit T4 only NIA SAND (SP, SP-SM, SM, SC) with varying amounts 2.4 to 25 11 1 to 43 of silt and clay 0.83 to 1.5 I IA SAND (SM) mixed with organics; Test Pit T-1 only NIA Note (1) SPT = Standard Penetration Test, N-Values in Blows -per -foot Solutions, :li�c: Report of Subsurface Investigation and Geotechnical Engineering Services 1 0/6/08 Proposes! Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G The subsurface description is of a generalized nature provided to highlight the major soil strata encountered. The records of the subsurface exploration (Boring Log and the Generalized Soil Profile sheets) attached to this preliminary report should be reviewed for specific information as to individual borings. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the transition may be gradual. 3.3 Groundwater Information: The groundwater level encountered at the boring locations was noted to occur at a depth ranging from about 4 to 6 feet below the varying existing site grade elevations. Based on the existing topographic information provided on the project site plans performed by C. Allan Bamforth, Jr. Engineer -Surveyor, LTD, the encountered ground water level corresponds to an elevation ranging from 11.5 to 12 feet MSL. Groundwater conditions will varywith environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, sidewalks, etc.). In the project's area, seasonal groundwater fluctuations of-±- 2 feet are common; however, greater fluctuations have been documented, and the groundwater table could occur near the surface. We recommend that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on the construction procedures, if necessary. 4.0 EVALUATION AND RECOMMENDATIONS 4.1 Clearing and Grading: The proposed building and pavement construction areas should be cleared by means of removing vegetation, associated root mat, and topsoil; where encountered. Based on a review of the soils encountered at the test boring and test pit excavation locations, it is anticipated that the site will require a cut depth of about 1.5 to 2 feet in order to remove the Topsoil materials and/or subsurface organic laden granular soils, where encountered. However, as indicated by the results of our test borings and test pit excavations, the cut depth necessary to remove the surfcial and/or shallow subsurface organic soils (1.5 feet) is anticipated to be limited to the southeast portion of the proposed construction areas. This cut is expected to be deeper in isolated areas to remove deeper deposits of organic soils, which may become evident during the clearing. Solutions,`li�c. I • Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G Furthermore, the soils encountered throughout the majority of the building and parking lot areas were generally noted to contain varying amounts of demolition debris. The demolition debris was further noted to consist primarily of stone, as well as fine concrete and brick fragments. Based on the soils conditions encountered at the boring and test pit locations, these soils are not anticipated to hinder the use of shallow foundation design. Additionally, at this time it is not anticipated that they will be required to be removed. However, it is considered necessary to perform additional test pit excavations during construction procedures to ensure the suitability of the subgrade soils to provide foundation, slab, and pavement support. This is considered necessary as sites where previously existing structures that have been demolished typically require excavation to remove unsuitable conditions. Additional information regarding the subgrade evaluation procedures as well as the recommended test pit operations are provided below. The project's budget should include an allowance for subgrade improvements (undercut and backfill with select fill). It is recommended that the clearing operations extend laterally at least 5 feet beyond the perimeter of the proposed building and pavement areas. 4.2 Subgrade Preparation: Following the clearing operation and prior to site grading or any fill placement, the subgrade soils should be evaluated by G E T Solutions, Inc. for stability. Accordingly, the subgrade soils should be proofrolled to check for pockets of soft material hidden beneath a crust of better soil. Several passes should be made by a large rubber -tired roller or loaded dump truck over the construction areas (where possible), with the successive passes aligned perpendicularly. The number of passes will be determined in the field by the Geotechnical Engineer depending on the soils conditions. Any pumping and unstable areas observed during proofrolling (beyond the initial cut) should be undercut and/or stabilized at the directions of the Geotechnical Engineer. As indicated above, it is recommended that the subgrade evaluation include a series of test pit excavations in order to further evaluate the suitability of the subgrade soils to properly support the foundations and slab members as well as the proposed pavement section. The depth and location of the test pit excavations should be determined in the field during construction by the Geotechnical Engineer. Following the proofroll and approval by the engineer, it is recommended that, within the construction areas, natural soils below stripped grade should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum drydensity (ASTM D1557), as tested to a minimum depth of 18-inches. This densification will require the use of a large vibratory roller. 5olutlorss, .Inc. • Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G 4.3 Structural Fill and Placement: Following the proper compaction and approval of the natural subgrade soils by the Geotechnical Engineer, the placement of the fill required to establish the design grades may begin. Any material to be used for backfill or structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable structural fill material should consist of sand or gravel containing less than 20 percent by weight of fines (SP, SM, SW, GP, GW), having a liquid limit less than 20 and plastic limit less than 6, and should be free of rubble, organics, clay, debris and other unsuitable material. All structural fill should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum dry density. A representative of G E T Solutions, Inc. should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. Backfill material in utility trenches within the construction areas should consist of structural fill (as described above), and should be compacted to at least 95 percent of ASTM D1557. This fill should be placed in 4 to 6 inch loose lifts when hand compaction equipment is used. 4.4 On -Site Excavated Soils — BMP Pond: The subsurface soils encountered at the location of boring BMP-1 were noted to consist of SAND (SP-SM, SM) mixed with demolition debris (concrete, stone, brick fragments, etc.) to a depth of about 2.5 feet below the existing site grade elevations. Underlying these surficial materials, the underlying soils were noted to consist of Silty SAND (SM) with clay to Silty Clayey fine SAND (SC-SM) with silt to a depth of about 13 feet. These sufcial materials and underlying natural granular soils encountered at the boring locations do not appear to meet the recommended structural fill requirements provided in Section 4.3 of this report. Accordingly, they are not recommended to be re -used as select fill materials. Beneath the above noted soil conditions, the underlying granular soils were noted to consist of SAND (SP, SP-SM) to a depth of about 18 feet below the existing site grade elevations. These soils appear to meet the recommended structural fill requirements provided in Section 4.3 of this report and are anticipated to be suitable for re -use as select fill material. 5oludons, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services 1016108 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: ECOS-295G The soils noted to consist of SAND (SC-SM, SM with clay) or SAND (SP-SM, SM) with demolition debris should be stockpiled separately from the suitable select fill soils (SAND; SP, SP-SM). Furthermore, although the granular soils noted to occur at depths extending from 13 to 18 feet appear to meet the requirements noted in the previous section of this report for suitable select fill materials they will need to be stock pilled in order to dry and obtain a moisture content suitable for compaction. Furthermore, additional sampling and laboratory analysis should be performed during construction procedures to substantiate the suitability of the subsurface soils for their intended use. 4.5 Building Foundation Design Recommendations: Provided that the previously recommended earthwork construction procedures are properly performed, the proposed buildings can be supported by shallow spread footings bearing over firm natural soil or well -compacted structural fill material. The footings can be designed using a net allowable soil pressure of up to 2000 pounds per square foot (psf). In using net pressures, the weight of the footings and backfiIl over the footings, including the weight of the floor slab, need not be considered. Hence, only loads applied at or above the finished floor need to be used for dimensioning the footings. In order to develop the recommended bearing capacity, the base of the footings should have an embedment of at least 24 inches beneath finished grades, and wall footings should have a minimum width of 24 inches. In addition, isolated square pier footings, if used, are recommended to be a minimum of 3 feet by 3 feet in area for bearing capacity consideration. The recommended 24-inch footing embedment is considered sufficient to provide adequate cover against frost penetration to the bearing soils. 4.6 Foundation Excavations: Immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footing and floor slab areas be compacted using hand operated mechanical tampers, to a dry density of at least 95% of the Modified Proctor maximum dry density (ASTM D 1557) as tested to a depth of 12 inches, for bearing capacity considerations. In this manner, any localized areas, which have been loosened by excavation operations, should be adequately re -compacted. In addition to compaction testing, hand auger borings with Dynamic Cone Penetrometer (DCP) testing should be performed within the base of the foundation excavations to ensure that the footing bearing soils are suitable for foundation support. li Solutions, lnc. , Report of Subsurface Investigation and Geotechnical Engineering Services 10/6108 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G Soils exposed in the bases of all satisfactory and remedied foundation excavations should be protected against any detrimental change in condition such as from physical disturbance, rain or frost. Surface run-off water should be drained away from the excavations and not be allowed to pond. If possible, all footing concrete should be placed the same day the excavation is made. If this is not possible, the footing excavations should be adequately protected. 4.7 Building Foundation Settlements: It is estimated that, with proper site preparation (as previously presented), the maximum resulting total settlement of the proposed building foundations should be up to 1-inch. The maximum differential settlement magnitude is expected to be about '/2-inch between adjacent footings (wall footings and column footings of widely varying loading conditions). The settlements were estimated on the basis of the results of the field penetration tests. Careful field control will contribute substantially towards minimizing the settlements. 4.8 Seismic Design Recommendations: It is noted that, in accordance with the NC Building Code; Chapter 16, this site is classified as a site Class D, based on which seismic designs should be incorporated. This recommendation is based on the data obtained from the completed 25-foot deep SPT borings, as well as our experience with SPT borings and CPT soundings with shear wave velocity testing performed within the vicinity of this project site. In order to substantiate the site classification provided above a 100-foot deep CPT boring and soil shearwave velocity testing with liquefaction potential analysis should be performed. G E T Solutions, Inc. would be pleased to provide these services should they be determined necessary. 4.9 Building Floor Slabs: The floor slabs may be constructed as slab -on -grade members provided the previously recommended earthwork activities and evaluations are carried out properly. It is recommended that all ground floor slabs be directly supported by at least a 4-inch layer of relatively clean, compacted, poorly graded sand (SP) or gravel (GP) with less than 5 percent passing the No. 200 Sieve (0.074 mm). The purpose of the 4-inch layer is to act as a capillary barrier and equalize moisture conditions beneath the slab. The slabs can be designed with the use of a subgrade modulus on the order of about 125 psi/in for compacted structural fill_ Solubons,lric: _ Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, Forth Carolina GET Project No: EC08-295G It is recommended that all ground floor slabs be 'floating" if no turn down slab/foundation system is implemented. That is, generally ground supported and not rigidly connected to walls or foundations. This is to minimize the possibility of cracking and displacement of the floor slabs because of differential movements between the slab and the foundation. It is also recommended that the floor slab bearing soils be covered by a vapor barrier or retarder in order to minimize the 'potential for floor dampness, which can affect the performance of glued tile and carpet. Generally, use a vapor retarder for minimal vapor resistance protection below the slab on grade. When floor finishes, site conditions or other considerations require greater vapor resistance protection, consideration should be given to using a vapor barrier. Selection of a vapor retarder or barrier should be made by the Architect based on project requirements. 4.10 Pavements: The California Bearing Ratio (CBR) testing was not included as a part of our scope of services. Accordingly, in order to substantiate the recommendations provided below and on the following page of this report and/or to determine the subgrade soils CBR design values in order to complete the pavement design, CBR bulk soil sampling and laboratory analysis should be performed. However, based on our experience with similar soil conditions, the following minimum pavement sections are provided. i. Light Duty Pavement — Parking Areas: Flexible Pavement SUBGRADE: Stable and approved by the Geotechnical Engineer, and compacted to at least 95% of ASTM D 1557, to a depth of at least 12 inches deep. AGGREGATE BASE: Minimum 8.0 inches of Aggregate Base Material, size NCDOT Type "A". ASPHALT SURFACE: Minimum 2.0 inches of Asphalt Concrete, NCDOT Type SF9.5A or SF9.5B. 5olutfans, Ina Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: ECOS-295G II. Heavy Duty Pavement - Roadway Areas: Flexible Pavement SUBGRADE: Stable and approved by the Geotechnical Engineer, and compacted to at least 95% of ASTM D 1557, to a depth of at least 12 inches deep. AGGREGATE BASE: Minimum 8.0 inches of Aggregate Base Material, size NCDOT Type "A". ASPHALT BASE: Minimum 3.0 inches of Asphalt Concrete, NCDOT Type 1-19.0B. ASPHALT SURFACE: Minimum 2.0 inches of Asphalt Concrete, NCDOT Type SF9.5A or SF9.513. In preparation for a stable subgrade support for the pavement section, the following construction steps are recommended: Following pavement rough grading operations, the exposed subgrade should be observed under proofrolling. This proofrolling should be accomplished with a fully loaded dump truck or 7 to 10 ton drum roller to check for pockets of soft material hidden beneath a thin crust of better soil. Any unsuitable materials thus exposed should be removed and replaced with a well -compacted material. The inspection of these phases should be performed by the Geotechnical Engineer or his representative. 2. If excessively unstable subgrade soils are observed during proofrolling and/or fill placement, it is expected that these weak areas can be stabilized by means of thickening the base course layer to 10 to 12 inches and/or the use of a Geotextile Geogrid (such as Tensar BX1100 or equivalent). These alternates are to be addressed by the Geotechnical Engineer during construction, if necessary, who will recommend the most economical approach at the time. Solutions; ]nc:� Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G Actual pavement section thickness should be provided by the design civil engineer based on traffic loads, volume, and the owners design life requirements. The previous sections represent minimum thickness representative of typical local construction practices and as such periodic maintenance should be anticipated. All pavement material and construction procedures should conform to North Carolina Department of Transportation (NCDOT) requirements. 4.11 Storm Water Ponds: One infiltration test was performed at the location of boring BMP-1. The test was performed at a depth of about 4 feet below current grades. The borehole was prepared utilizing an auger to remove soil clippings from the base. Infiltration testing was then conducted within the vadose zone utilizing a Precision Permeameter and the following testing procedures. A support stand was assembled and placed adjacent to the borehole. This stand holds a calibrated reservoir (2000 ml) and a cable used to raise and lower the water control unit (WCU). The WCU establishes a constant water head within the borehole during testing by use of a precision valve and float assembly. The WCU was attached to the flow reservoir with a 2-meter (6.6 foot) braided PVC hose and then lowered by cable into the borehole to the test depth elevation. As required by the Glover solution, the WCU was suspended above the bottom of the borehole at an elevation of approximately 5 times the borehole diameter. The shut-off valve was then opened allowing water to pass through the WCU to fill the borehole to the constant water level elevation. The absorption rate slowed as the soil voids became filled and an equilibrium developed as a wetting bulb developed around the borehole. Water was continuously added until the flow rate stabilized. The reservoir was then re -filled in order to begin testing. During testing, as the water drained into the borehole and surrounding soils, the water level within the calibrated reservoirwas recorded as well as the elapsed time during each interval. The test was continued until relatively consistent flow rates were documented. During testing the quick release connections and shutoff valve were monitored to ensure that no leakage occurred. The flow rate (Q), height of the constant water level (H), and borehole diameter (D) were used to calculate Ks utilizing the Glover Solution. Based on the results of our field saturated hydraulic conductivity testing procedures and our experience with similar soil conditions encountered at the boring locations, as indicated in the Subsurface Soil Conditions section of this report, the permeability rates noted in Table IV on the following page are provided to aid in the storm water design process. �����MOIUIU.ons, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services 10/6/08 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G Table IV — Saturated Hydraulic Conductivity Test Results Test No ....Test �: Static - _ Percent Silt , Average Infiltration Test Depth (ft*) Groundwater and/or Clay Results (Ksat Values) - Level (-ft.) cm/sec cmlday in7hour. BMP-1 1 4.0 1 6.0 1 23.4 L2.91 E-04 85.7 1.405 " The depths noted above are referenced from the existing site grade elevations at the boring locations at the time of our subsurface exploration procedures. The infiltration test data for the BMP boring are presented in Appendix IV. 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns: Perched groundwater levels are expected to interfere with excavations that extend below a depth ranging from approximately 4 to 6 feet below existing grades, which corresponds to elevations ranging from about 11.5 to 12 feet MSL. Dewatering to a depth ranging from about 4 to 6 feet can most likely be accomplished by pumping from sumps. However, dewatering below the perched water levels may require well pointing. Accordingly, it is recommended thatthe contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact throughout the project site and at specific proposed excavation locations. 5.2 Excavations: In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that all excavations, whether they be utility trenches, basement excavation or footing excavations, be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering Services 1016108 Proposed Post Office P-672 Camp LeJeune, North Carolina GET Project No: EC08-295G The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. We are providing this information solely as a service to our client. G E T Solutions, Inc. is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. 6.0 REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client and C. Allan Bamforth, Jr. Engineer -Surveyor, LTD for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in the foundation recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork and foundation recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of Kroskin Design Group as well as their consultants for the specific application to the Proposed Post Office project located within the Camp LeJeune military installation in North Carolina. 16 GET APPENDICES BORING LOCATION PLAN II. BORING LOGS III. GENERALIZED SOIL PROFILE IV. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET V. CLASSIFICATION SYSTEM FOR SOIL EXPLORATION APPENDIX I - BORING LOCATION PLAN E C E I V E D DEC 1U2N DWO PROD # ' cu Z < = 2 . -2 L / 2 2 2 CL U S $ 2 . 3 % ® C:l w . \ i 3 ® a m � % a. 2\ ~ c § % M w z ) t \F- u u § u � � [ e 2 ) E 9 3 § � \ . K § � m 2 m La u k \ § § 133NiS a31XV9 \ I \ ! � | APPENDIX II - BORING LOGS C 1 V DEC t 0 PF3oJ # bbVq GETPROJECT: Post Office at Camp LeJeune CLIENT: Kroskin Design Group,P.C. ` PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: ECOS-295G — c�.d ur•,..t.r�,rr BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 17' MSL BORING LOG DRILLER: J. Brown (GET) LOGGED BY: P. Lankford, E.I.T. DRILLING METHOD: Mud Rotary (wash) DATE: 9-11-08 B-1 DEPTH TO WATER -INITIAL*: -V 5.5' AFTER 24 HOURS: -:F- CAVING -C c � L n L m o TEST RESULTS Plastic Limit H Liquid Limit Q. a a �, Description a o I a o �, 12 0 CD t^ co m n Moisture Content - M2 co o N-Value - 10 20 30 40 50 60 70 0 0 Gray, moist, Silty fine SAND (SM) with trace demolition debris 2 (concrete, stone, brick fragments etc.) 1 24 SS 3 6 15 3 :...:...:...:.. Dark Gray -Gray, moist, poorly graded fine to medium SAND (SP- a SM) with silt to Silty fine SAND (SM) loose to medium dense ':': 2 24 SS a 8 5 ' 2 5 _ :_ 3 24 SS 2 6 Wet from 5.5 feet 2 ............................ 6 2 10 4 24 SS 4 g :...:...:...:...:...:...:... 2 2 '. 5 24 SS 2 6 20.8;...; �.:...:...:........... tp iiEii 2 ........................ 3 6 16 SS 1g :...:...:...:.......:... 12 5 19 :...:...:...:...:...:... y 13 .... F a: f+, `':' t t i.:r� 7 13 ss z1 21 42 Gray, wet, poorly graded fine to medium SAND (SP) to poorly grade fine to medium SAND (SP-SM) with silt, dense is ia_�•t: 17 7:11 r t 1 18 Gray, wet, Clayey fine SAND (SC) with silt, very loose ..... 8 24 SS 1 2 3 : 6 20 .".."..'. 2 23 t ...... ... ... ...... Gray, wet, Silty fine SAND (SM), very loose 9 24 SS 2 2 4 :.. 25 2 :...:...:...:...:...:... Boring terminated at 25 ft. 30 ................ to - 35 -20 Notes: SS = Split Spoon Sample ST Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: Post Office at Camp LeJeune CLIENT: Kroskin Design Group,P.C. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC08-295G - � �•r.�,n� =a.rnfr�q BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 16' MSL BORING LOG DRILLER: J. Brown (GET) LOGGED BY: P. Lankford E.I.T. DRILLING METHOD: Mud Rotary wash DATE: 9-11-08 B-2 DEPTH TO WATER - INITIAL": g 4' AFTER 24 HOURS: -T CAVING> -C o 0 U �, �, �, TEST RESULTS Plastic Limit I I Liquid Limit m a n description Q d M a: m 3 `D # (D w 0 E oc' m c� z In m to In m a z v o Moisture Content • N-Value - 0 0 10 20 30 40 50 60 70 Tan -Gray, moist, poorly graded fine to medium SAND (SP-SM) with 2 ' 15 silt to Silty fine SAND (SM) with trace demolition debris (concrete, 1 24 SS 6 ' — stone, brick fragments, etc.) a 3 2' : 2 _ Gray -Tan, moist, poorly graded tine to medium SAND (SP-SM) with 2 24 gg 4 8 :...:...:...:...:.. -; . silt to Silty fine SAND (SM) loose to medium dense 4 :...;... 5 5 Gray and wet from 4 feet 3 20 SS 9 10 19 10 - ..... 9 2 5 ........................ : 4 20 SS 14 13. ........... 6 ......................:... 3 5 24 SS s 11 .......:...:...:...:...:... 10 q 6 19 SS 74 24 16 q 43 13 Gray, wet, poorly graded fine to medium SAND (SP) to poorly grade fine to medium SAND (SP-SM) with silt, dense .;.' �:4'.�,. r u ::t1 7 15 SS 19 24 15 ea: h•�• 25 ��� • I .I L i • ...: : Gray, wet, Clayey fine SAND (SC) with silt, very loose 6 8 24 SS 1 :...:.......:...:... 20 0 -s — 9 24 SS 1 } 2 3 ....... :...:...:...:...:...:.. 23 Gray, wet, Silty fine SAND (SM), very loose z5 1 Boring terminated at 25 ft, 30 -15 - 10 ..,.. 35 -20 E C E I Y G -. Notes SS = Split Spoon Sample 57 = Shelby Tube Sample D Q HA = Hand Auger Sample �The initial .,ndaterreading may noto1?n.t fl, BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1565. 21 c 0 c m t d C. IT - kit, I cN:ed:ndr.1•r. s++�rd•raeln� BORING LOG B M P-1 PROJECT; Post Office at Came LeJeune CLIENT: Kroskin Design Group, P.C. PROJECT LOCATION: Camp LeJeune North Carolina PROJECT NO.: EC08-295G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 18' MSL DRILLER: J. Brown (GET) LOGGED BY: P. Lankford, E.I.T. DRILLING METHOD: Mud Rotary (wash) _ DATE: 9-11-08 DEPTH TO WATER - INITIAL*: -V 6' AFTER 24 HOURS: -T— CAVING> L o Z `e -� wo q ~ r' °' OO ~' Description o C N � � � E o o 2 E � cn � o � m o- a, a z o � o TEST RESULTS Plastic Limit I I Liquid Limit Moisture Content - s N-Value - 10 20 30 40 50 60 70 :...:...:...:...:...:...:... : t; L :...:...:...:...:...:...:... :...:...:...:...:...:...:.. :...:...:...:...:...:...:... :...:...:...:...:... . - .. ................ :...:...:...:...:. .:. ..:...:...:...:...:...:...:... ..:...:...�...:...... ... ..,.................... 0 0 49 ] 5 g ] 24 38 21 0. Tan -Gray, moist, poorly graded fine to medium SAND (SP-SM) with silt to Silty fine SAND (SM) mixed with demolition debris (concrete, stone, brick fragments, etc.) Gray -Tan from 2 feet 2. AIR . -�i rxt1: ;::; } i i 1 24 SS 1r 25 21 15 5 2 24 SS 3 a 3 2 Gray, moist, Silty fine SAND (SM) with clay to Silty, Clayey SAND (SC-SM), loose to medium dense Gray and wet from 4 feet 13 Gray, wet, poorly graded fine to medium SAND (SP) to poorly grade fine to medium SAND (SP-SM) with silt, dense 10 3 24 SS 3 a 2 4 20 5S 3 5 5 5 24 SS 2 a q 10 4 6 19 SS 6 15 17 5 15.::. 7 15 SS 16 22 20 o Boring terminated at 15 ft. 20 25 -10 30 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS =Bulk Sample PAGE 1 of 9 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. di GET Gv:rrtnfrW • rrrbrnn mj- rrulnq BORING LOG T-1 PROJECT: Post Office at Camp LeJeune_ CLIENT: _Kros_kin Design Group, P.C. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC08-295G BORING LOCATION: See Attached_ Boring Location Plan SURFACE ELEVATION: 16.5' MSL DRILLER' J. Meads LOGGED BY: P. Lankford, E.I.T. DRILLING METHOD: Test Pit Excavation DATE.: 9-8-08 DEPTH TO WATER - INITIAL*: -2- AFTER 24 HOURS: v CAVING> C. o �� n w g M ` am m m E L CL m a� Description o � m c� �, o E z in �, a7 E 0 m �, ca E l' wm o m Q �, j z o ry a a TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 — 15 a �- z Tan, moist, poorly graded fine to medium SAND (SP-SM) to Silty fin SAND (SM), loose . . ' ...:...:...:...:...:...:...:. .. - ...:...:...:...:...:...:...:. : = Black, moist, Silty fine SAND (SM) mixed with organics, loose — — so Gray -Tan, moist, Silty fine SAND (SM), loose 5 Boring terminated at 4 ft. rz C DEC 1 owf PROD V 1a 5 4 15 6 20 B -5 25 30 -1Q -15 - - Notes, SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of i Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. v GET ` cn r.,: aa.�.cr�ui.raun.S BORING LOG T-2 PROJECT: Post Office at Camp LeJeune CLIENT: Kroskin Design Grou , P.C- PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC08-295G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 17' MSL DRILLER: J. Meads LOGGED BY: P. Lankford, E.I.T. DRILLING METHOD: Test Pit Excavation DATE: 9-8-08 DEPTH TO WATER - INITIAL*: - AFTER 24 HOURS: CAVING -" c C wp m E C D25Cflj]tlon 2 C CL Z al Q7 o y o m a �, M z o TEST RESULTS Plastic Limit F I Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 Q 0 _ 2 Tan, moist, Poorly graded fine to medium SAND (SP-SM) with silt and mixed with stone, loose _..:. - .:... ...: ...:...:.".:... :........... ..:...:...:...:...:...:...:... .. ....... .. . ... ... .. Gray -Tan, moist, Silty fine SAND (SM), loose 5 Boring terminated at 4 ft. 10 q 5 15 6 25 LO 10 30 -15 -20 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the frefd in generai accordance with ASTM 0 1565. d GET ten..-:.:•�R�Fmnsi.rcet»q BORING BORING LOG T-3 PROJECT: Post Office at Camp LeJeune CLIENT: Kroskin Design Groin, P.C. PROJECT LOCATION: Camp LeJeune, North Carolina "PR OJECT NO.: EC08-295G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 16.5' MSL E.I.T.DRILLER: J. Meads LOGGED BY: P. Lankford, E.I.T.R DRILLING METHOD: Test Pit Excavation DATE: 9-8-08 DEPTH TO WATER - INITIAL*: -7- AFTER 24 HOURS: r- CAVING> -C_ o m N w� 5L °' o• m oa' Description a `a C7 ° o m Q ? , 0 rn�� a °' F `° m n a, oo `„ o TEST RESULTS Plastic Limit 1-1 Liquid Limit Moisture Content- go N-Value - 10 20 30 40 50 60 70 — 1e — fl o Gray, moist, poorly graded fine to medium SAND (SP-SM) with silt and mixed with stone, loose . .... . . .............. ................ :...:...:...:...:...:...:... ' :...:...:...:...:...:...:... .. Gray -Tan, moist, Silty fine SAND (SM), loose 5 Boring terminated at 4 ft. E C `r DEC 10 c�,:� DW Q PROD # _ to 4 6 5 15 0 20 6 25 10 30 35 15 -20 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *The initial groundwater Cgjg�aa jagg not be indica live of the-sfatia-groundwater teval WOH = Wejaht pf Hamm" PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1585. Gl GET Gro�nhn:ral•Trslronmen:nl•irsttns BORING LOG. T-4 PROJECT: Post Office at Camp LeJeune _ CLIENT: Kroskin Design Group, P.C. PROJECT CATION: Camp LeJeune, North Carolina _ LOCATION: PROJECT NO.: EC08-295G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 16.5' MSL DRILLER: J. Meads 4 W LOGGED BY: P. Lankford, E.I.T. DRILLING METHOD: Test Pit Excavation DATE: 9-8-08 DEPTH TO WATER -INITIAL*: -V- AFTER 24 HOURS: v CAVING I- C _ m J �u N Q m Q m E a- �, o m Description a '� O CL o m Z E o ��� �' s>3 ' o CO m o- m Z oo v o TEST RESULTS Plastic Limit !-i Liquid Limit Moisture Content -• N-Value - 10 20 30 40 50 60 70 15 a 0 2 1.5 feet of TOPSOIL ' .. ...:...:...:...:... :...:...:... .. :...:...:...:...:...:..:... .................. ............ ..:...:...:...:...:...:...:... - ..,.. 1.5 Gray-Tan, moist, poorly graded fine to medium SAND (SP-SM) with silt to Silty fine SAND (SM), loose Boring terminated at 4 ft. 10 10 q 6 5 15 0 -5 25 -10 10 35 20 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. Y TO SYMBOLS II 0 Symbol Description Strata symbols Fill Silty Sand Poorly graded Sand `"`'' with Silt Clayey Sand Silty Clayey Sand Silty Sand I=E with organics Poorly graded Sand with silt and Uncontrolled Fill Topsoil Misc. Symbols sz Water table during drilling Notes: 1. Exploratory borings were drilled on 9-8-08 using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. 4. These logs are subject to the limitations, conclusions, and C E J,y recommendations in this report_ n DEC 10 2008 5. Results of tests conducted on samples recovered are reported on the logs. DWQ PpOJ # FI-FV.AT70,Vl,%'FEET O ARIMICKIIIII.Im ' MANS& M lip --- - ------ -------------- M= (n iT, >, 5 (D 0 0. z� a- 3 JUJATIX'011 VA.77.7 KEY TO SYMBOLS Symbol Description Strata symbols Ed Fill In Silty Sand FFTTPoorly graded Sand with Silt Clayey Sand Silty Clayey Sand Misc. Symbols Water table during drilling Notes: 1. Exploratory borings were drilled on 9-11-08 using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. 4. These logs are subject to the limitations, conclusions, and recommendations in this report. 5. Results of tests conducted on samples recovered are reported on the logs. FLEl:1770SINFEEr z w w _� J�� tW LLo �•-� O oLL Q � � U -_ w a C7 OO c3 CO a z n U N ❑ IL Q j w >- t„ > > Y �. ,m ¢7¢ U Q ^ 1 ) ) ) m > > > > > > Q Z o 0 qJ U U N �N . H 00 0 Q Lui r ......... �.1 �•1 1•f y � LL c w y o N � � u -a c c m N M _ �D n � w O T C O O COL = O la34,tif Noll YAM KEY TO SYMBOLS Y A Symbol Description Strata symbols Silty Sand Silty Sand rwith organics Poorly graded Sand with silt and Uncontrolled Fill Topsoil - j Notes: 1. Exploratory borings were drilled on 9-8-08 using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re -checked the following day. 43. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. �4. These logs are subject to the limitations, conclusions, and recommendations in this report. I5. Results of tests conducted on samples recovered are reported on the logs. APPENDIX IV - SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET ECEI VED DEC 10 2039 owo (7FiQJ ,�# O O M M O O r f M M M N c0 O oo OD I+ t- (D cD c0 m co (V CC7 N N N N (V N N N o p N D � f4 r O i V p 0 i 7 e � m u1 Q O N ti - ILo N M 'ITO O In M P NY . o y Z .. U V xn m M M M c� M M V N y C O w+ O (U p .,. 7 a1 ] ip 7- G1 �n d In r r C J CO i- i-� M M C? (q 7 O O * a-. w C f- 00 r Ln In N N CD O LO C4 !` N = 7 C LO cu � m 00 O M M M Q 00 00 M co 3 E 01 U ffl -0 N O m w W H O __ _� � O °� p c` W �o d m m co v v v v v v v v is a .• ns W y U o 0 0 0 o a o 0 0 0 o a Y m W W W w w W W w W W W 'a a7 L �" U _^ Z W M r N O m C7 I— 00 I— 00 I— u) I- Ln m N m N m cV r Q1 3 Y y —0 r ; r rn m rn rn Q� CA O m y O c m j O U Z C7 O in 00 ui Q 6' f• I- cD cD 0 [n N 0 y (n O (o o M O n O In O LO O u) O LO O u) o u.) O LO O � �� ;'� o000000000 a ro Z Z U a N Uf m in Lq CO 00 � rY 'V' a � o 0CD00 r- Z r- (0 O N c- N r"' J U 3 � w U _O E Il m m m D u � E d cEi cEi Y 1- N W M u, <n Un LO Ln n Ln I- I+ Ln I- �n Q O N N a a U a/ r M v u, v Un E O a Q O O O Q Q O 0 0 0 0 � A m c _ (i W N 00 1 o 0 0 W CD a E s m a Q a a a p d rn MD N t fI) = Nf`% CND] ro M co co M Cam] Q oC:�oCDfl000ao x = _ oo�ooQQ000 Lei W y O Q O O O O O 0 0 O - N 4F y IZ y +r iL E u 0 = C '� 47 to w ,� Q1 U U O o a LL U r I IL n. d IZ 0- a (L IL IL O 00 rn m O N Ln 00 N 0 O W O N u) N O M O M r V N H U 'a O O (D O O NO MO MO O O LO Q C C (0 (D f- tvy y Q V E _ O u O O O O O O O 0 0 O n (a co id> 06 O O O O p m a �v. 7 ? O m r r ++ p �' r uiCL (n Q > cca 2 O O 0 O Q O G? O Q O O O 0 O 0 O 0 O 0 O 0 Q W w V .. ` Q m c0 I— (D In V M N r- O ,� ' d y W N r r y lyll O J 'p m 1L x Z Z m cl O m-j E U _ a� rn rn 0 m a d G '% y C 'i c Im C Ir > 7 (D Q7 (0 X a m> m m m Z A N Y APPENDIX V - CLASSIFICATION SYSTEM FOR SOIL EXPLORATION E C E I V E= rrnp DEC 10 2:.u0 DW Q P ROJ # GET r Grale Ywiral � G�n•o��mrn�n! • Tneirrg Virginia Beach Office 204 Grayson Road Virginia Beach, VA 23462 (757)518-1703 Williamsburg Office 1592 Penniman Rd. Suite E Williamsburg, Virginia 23185 (757) 564-6452 CLASSIFICATION SYSTEM FOR SOIL EXPLORATION Standard Penetration Test (SPT), N-value Elizabeth City Office 504 East Elizabeth St. Suite 2 Elizabeth City, NC 27909 (252)335-9765 Standard Penetration Tests (SPT) were performed in the field in general accordance with ASCM D 1586. The soil samples were obtained with a standard 1.4" 1.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown an the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. NON COHESIVE SOILS (SILT, SAND, GRAVEL and Combinations) ' Relative Densit Very Loose 4 blows/ft. or less Loose 5 to 10 blows/ft. Medium Dense 11 to 30 blows/ft. Dense 31 to 50 blows/ft. Very Dense 51 blows/ft. or more Particle Size Identification Boulders 8 inch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse 1 to 3 inch diameter Medium 1/2 to 1 inch diameter Fine 1/4 to 1/1 inch diameter Sand Coarse 2.00 mm to 1/4 inch (diameter of pencil lead) Medium 0.42 to 2.00 mm (diameter of broom straw) Fine 0.074 to 0.42 mm (diameter of human hair) Silt 0,002 to 0.074 mm (cannot see particles) CLASSIFICATION SYMBOLS (ASTM D 2487 andD 2488) come —Grained Soils More than 5045 retained on No. 200 sieve GW - Well -graded Gravel GP - Poorly graded Gravel GW-GM- Well -graded Gravel w/Silt GW-GC - Well -graded Gravel w/Clay GP -GM - Poorly graded Gravel w/Silt GP -GC - Poorly graded Gravel w/Clay GM - Silty Gravel GC - Clayey Gravel GC -GM - Silty, Clayey Gravel SW - Well -graded Said SP - Poorly graded Sand SW-SM - Weil -graded Sand w/Silt SW -SC - Well -graded Sand w/Clay SP-SM - Poorly graded Sand w/Silt SP-SC - Poorly graded Sand w/Clay SM - Silty Sand SC - Clayey Sand SC-SM - Silty, Clayey Sand Fine -Grained Soils 50% or more passes the No. 200 sieve CL - Lean Clay CL-ML - Silty Clay ML - Silt OL - Organic Clay/Silt Liquid Limit 50%orgreater CH - Fat Clay MH - Elastic Silt OH - Organic Clay/Silt Flighly Organic Soils PT - Peat COHESIVE SOILS (CLAY, SI LT and Combinations) Consistency Very Soft 2 blows./ft. or less Soft 3 to 4 blow,,/ft. Medium Stiff 5 to 8 blows/ft. Stiff 9 to 15 blows/ft. Very Stiff 16 to 30 blows/ft. Hard 31 blowslft, or more Relative Proportions Descriptive 'Perm Percent Trace 0-5 Few 5-10 Little 15-25 Some 30-45 Mostly 50-100 Strata Changes In the column "Description" on the boring log, the horizontal lines represent approximate strata changes. Groundwater ReadinEs Groundwater conditions will vary .with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as tidal influences and man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, side walks, etc.). Depending on percentage of fines (fraction smaller than No. 200 sieve size), coarse -grained soils are classified as follows: Less than 5 percent GW, GP, SW,SP More than 12 percent GM, GC, SNI, SC 5 to 12 percent Borderline cases requiring dual symbols 6D Plasticity Chart Page 1 of 1 0 10 20 30 40 53 60 70 80 90 100 GET Revision 12112fp7 UQUID LIMIT (LL) {%) P (01I1 ' North Carolina Department of Environment and Natural Resources Request for Express Permit Review NCDENR IA&6 rr For DENR Use ONLY Reviewer: G 0 Submit: LA Time: i • `��- sl �1 Confirm: 1 t" FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(Dncmail.net K\1-10 "'a P. • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(fncmail.net • Mooresville & -Patrick Grogan 704-663-3772 orpatrick.progan0mcmail.net • Washington Region -Lyn Hardison 252-946-9215 orlyn.hardison(@mcmay.net • Wilmington Region -Janet Russeil.910-350-2004 orlanetrussell(obricmail.net NOTE: Project application received after 12 noon will be stamped in the following work day Project Name: POSTAL_ FACILITY, MCAS, NEW RIVER County: ONSLOW Applicant: CART_ H. BAKER, P.E. Company: MCB CAMP LEJEUNE Address:1005 MICHAEL RDCity: CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-451-2213 Fax:910-451-2927 Email: carl.h.baker(@usmc.mil Project Drains into NEW RIVER waters -- Water classification SC, NSW (for classification see- hfto://h2o.enr,state.nc.us/bims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within '/z mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: C. ALLAN_BAMFORTH, P.E., L.S Company: C. ALLAN BAMFORTH, JR, R Address: 2207 HAMPTON BOULEVARD City: NORFOLK, State: VA Zip: 23517 D Phone: 757-627-7079 Fax::757-625-7434 Email: dwc@bamforth.com NOV 2 5 2008 (Check all that apply) DWQ rrsv.f � ❑ Scoping Meeting ONLY ® DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls - Please attach TOPO map marking the areas in questions ® State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond T # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems El High Dens ity—Stormwater Wetlands _ # Treatment Systems ® High Density -Other 1 # Treatment Systems ® MODIFICATION ❑ REVISIONS SW 805081 (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina. Development ❑ Urban Waterfront ❑ Land Quality ® Erosion and Sedimentation Control Plan with 0.84 acres to be disturbed.,(CK # (for DENR use)) WETLANDS QUESTIONS MUST BE ADDRESSED BELOW ❑ Wetlands (401): Check all that apply Isolated wetland on Property ❑ Yes ❑ No Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Minor Variance: ❑ No ❑ YES US ACOE Approval of Delineation completed: ❑ Yes ❑ No Major General Variance ❑ No ❑ YES 404 Application in Process wI US ALOE: ❑ Yes ❑ No 401 Application required: ❑Yes ❑ No if YES, ❑ Regular Permit Received from US ACOE ❑ Yes ❑ No Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Fee Split for multiple permits: (Check# j Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance ❑ Ma'; ❑ Min) $ SW ❑ HD, ❑ LD, ❑ Gen $ 401: $ LQS $ Stream Deter,_ $ C'0 rP-' C_d }-D o+ fr on NCDENR EXPRESS January 2008 RL: Postal Facility, MCAS New River, Camp Lejeune Subject: RI:: Postal Facility, MCAS New River, Camp Lejcune From: "Gregory L. Herron" <glh a bamforth.com> Date: Tue, 25 Nov 2008 15:04:18 -0500 To: "Janet Russell" <Janet.Russellanemail.net> Janet, I have attached a revised Express Request to show the stcrmwater and erosion and control meeting request. Yes. This is for a modification to the existing permit SW8 050817. Mr. Damforth will not be available December 3rd. Thanks, Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax qlh@bamforth.com -----original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.netl Sent: Monday, November 24, 2000 9:05 AM To: Gregory L. Herron Subject: Re: Postal Facility, MCAS New River, Camp Lejcune Greg: ' The Express Request we have on hand from the scoping meeting should be updated to reflect a stormwater & erosion control submittal meeting .request. You are requesting a modification to Sw8 05080 P-647 New River Water Treatment Facility right? I've attached a blank form in case you need one. Thanks, Janet Gregory L. Herron wrote: I Janet, We would like to schedule an express review meeting for stormwater and erosion and sediment control for the Post Office at Camp Lejeune. I have attached a revised stormwater narrative to address the comments of the scoping meeting. Are there any other documents required to schedule the review meetings? Gregory L. Herron C. Allan Ramforth, Jr. Engineer -Surveyor, Ltd, 757-627--7079 757-625-7434 fax glh@bamforth.com Content -Description: REQUES"r FOR EXPRESS-1 12508.doc REQUEST FOR FXPRESS_112508.doc Content -Type: application/msword Content -Encoding: base64 �E C E I V EDD NOV 2 5 2008 DWQ PROJ # l of 1 1 1/25/2008 3:46 PM Postal Facility, MCAS New River, Camp Lejeune Subject: Postal Facility, MCAS New River, Camp Lejcune From: "Gregory L. Herron" <glh i bamforth.com> Date: Mon, 24 Nov 2008 08:52:13 -0500 To: <janet,russell rr ncrnail.net> Janet, We would like to schedule an express review meeting for stormwater and erosion and sediment control for the Post Office at Camp Lejeune. I have attached a revised stormwater narrative to address the comments of the scoping meeting. Are there any other documents required to schedule the review meetings? Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434fax glh@bamforth.com Content -Description: Stormwater narrative_I 1 1908.doe Stormwater narrative_I 11908.cloc Content -Type: application/msword f Content -Encoding: hasc64 NOVE C E I IV I'D 2 4 2008 PRoJ # DWO 1 of 1 1 1/24/2008 8:56 AM Construct New Post Office MCAS New River Camp Lejeune, North Carolina Stormwater Management The project site is located in the southwest quadrant of the intersection of Curtis Road and Bancroft Street within the Camp Lejeune military installation MCAS New River, North Carolina. The proposed project is a single -story Post Office Facility and associated parking area and sidewalks. The structure will have a foot print area of approximately 4,500 square feet. The project site is 0.84 acres. The total impervious area for the site is 0.41 acres or 48%. The receiving stream for this project is the New River in the White Oak River Basin, Stream Class SC. A portion of the project site is included in the drainage area for existing Stormwater Permit No. SW8 050817 that was approved for the P-647 New River MCAS Water Treatment Facility. This Permit was approved in a letter dated September 29, 2005. A portion of the site overlaps the Permit's Drainage Area 2 to the Vortechs unit and adds additional area. .Existing Conditions The existing site consists of open sand and/or grass covered area with isolated areas of minimal surface demolition debris. At one time the existing site had building and pavement areas totaling 0.46 acres, some of which have been removed (see attached P- 647 New River MCAS Water Treatment Facility, demolition site plan CD102). 'rhe site is relatively level with less than 1-foot change in elevation in 50 feet. All land disturbing activity will take place on site within the limits of the project. The proposed site does not have any Buffer requirements and is not located within a Buffer. Stormwater Information The existing site has an underground storm piping system. A portion of the proposed stormwater will drain by swales to an existing ditch along Bancroft Street. The remaining Stormwater will drain to the existing stormwater system through a series of pipes and catch basins and into a Vortechs unit. The existing Vortechs unit is a model 4000 with a design system capacity of between 4.5 — 6.0 cfs. The area draining to the unit includes the existing drainage area with the addition of our site for a total area of 1.81 acres at 58% impervious. The design storm is 1.5 inches. The total calculated flow to the Vortechs system is 1.51 cfs, which is below 4.5 cfs. There is no off -site drainage onto the site and all built upon area will be collected. Road construction across other property will not be necessary to access the site. E C E I V ED NOV 2 4 2008 DWQ PROJ # about blank November 26, 2008 Postal Facility, INICAS, Ncw River Gentlemen: The Express Stormwater submittal meeting for the postal facility has been scheduled with Christine Nelson on December 4, 2008 at 1:30 P11 here in the Wilmington Regional Office, Ms. Rhonda Hall with Express Land Quality (sediment) will also be available to meet at 1:30. If you have sample data from the Vortechs Unit, please bring it to the December 4th meeting. Also, please review the Stormwater submittal requirements, attached. Note that plans should be submitted folded to 9" x 14" in order to tit our file system. Please respond ASAP to confirm and reserve the meeting date and time. Thank you, Janet Russell Express Coordinator of 1 11/26/2008 9:22 AM RE: Postal Facility, MCAS, New River Subject: RE: Postal Facility, MCAS, New River From: "TowlerCIV David W" <david.towlerausntc.mil> Date- Wed, 26 Nov 2008 l 1:02:57 -0500 To: "Janet Russell" <Janel.Russell a nemail.net>, <dwe a bamForth.com>, "Gregory L. Herron" <gl1i a bamforth.com> December 4 at 1:30 pm is good for me, I'll be there. V1r, David w, Towler, EI Marine Corps Base, Camp Lejeune Civil Engineer Public Works Division, Bldg 1005 Civil Design Branch Phone: (910) 451-3239 ext. 3284 -----Original message -- From: Janet Russell[mailto:Janet.Russell@ncmail.netj Sent: Wednesday, November 26, 2006 9:23 To: dwc@bamforth.com; Gregory L. Herron; Towler CIV David w Subject: Postal Facility, MCAS, New River November 26, 2008 *Postal Facility, MCAS, New River* Gentlemen: The Express Stormwater suhmittal meeting for the postal facility has been scheduled with *Christine Nelson on December 4, 2000 at 1:30 PM* here in the Wilmington Regional office. Ms. Rhonda Hall with Express Land Quality (sediment) will also be available to meet at 1:30. If you have sample data from the Vortechs Unit, please bring it to the December 4th meeting. Also, please review the stormwater submittal requirements, attached. Note that plans should be submitted folded to 9" x 14" in order to fit our file system. Please respond ASAP to confirm and reserve the meeting date and time. Thank you, Janet Russell Express Coordinator I of 1 1 1/26/2008 12:39 PM RE: Postal Facility, MCAS, New River Subject; RE. Postal Facility, MCAS, New River From: "Gregory L. Herron" <g1h rr bamforih.com> Date: Wed, 26 Nov 2008 10:20:35 -0500 To: "Janet Russell" <Janet.Russella ncmai1.net> CC: "Anna Lee Bamforth" -alb a bamforth.coni> Janet, Please reserve this date and time for Mr. Bamforth. Also, would you forward a copy of the Vortechs Unit plans for our records. Thanks, Gregory L. Herron C. Allan Bamfcrth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax Lh@bamforth.com -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.netl Sent. Wednesday, November 26, 2DOB 9:23 AM To: David Campbell; Gregory L. Herron; Towler GS05 David W Subject: Postal Facility, MCAS, New River November 26, 2008 -Postal Facility, MCAS, New River* Gentlemen: The Express Stormwater submittal meeting for the postal facility has been scheduled with *Christine Nelson on December 4, 2008 at 1:30 PM* here in the Wilmington Regional Office. Ms. Rhonda hall with Express Land Quality (sediment) will also be available to meet at 1:30. If you have sample data from the Vortechs Unit, please bring it to the December 4th meeting. Also, please review the stormwater submittal requirements, attached. Note that plans should be submitted folded to 9" x 14" in order to fit our file system. Please respond ASAP to confirm and reserve the meeting date and time. Thank you, Janet Russell Express Coordinator I of 1 1 1/26/2008 12:58 PM RL: Postal facility, MCAS, New River Subject: RE: Postal Facility, MCAS, New River From: "Balog CIV David J" <david.balog a usmc,mil> Date: Fri, 7 Nov 2008 13:14:50 -0500 To: <janet.russcll a ncmail.nct> CC: "Balog CIV David J" <david.baloga usmc.mil>, "Humes CIV Kenneth" <kenneth.humes a usmc.mil>, "Raper CIV Patricia H" <patricia.rtper ri usmc.mil>, "Acosta CTR Lauren D" <laurcn.acosta.ctr a usme.mil>, "'fowler CIV David W" <david.towler a usmc.mil>, <james.j.burns u navy,mil>, <marvin.Lcartero navy.mil> Janet, Per our phoncon this morning, the drainage area associated w/ the MCAS water treatment plant Vortechs unit is being treated via the underground BMP. No sampling data has been collected, to date, due to the absence of vegetation in the permitted drainage area. You had recommended that due to DWQ review of the subject project that we expedite stabilization of the adjacent area by sod or an aggressive seeding schedule. I will forward your recommendations to the MCAS OICC office and request expedited stabilization of this drainage area so that monitoring of the unit can begin. (Tom/Jim........ As this project is still under warranty, could you accommodate the State's recommendations?) Base will contact DWQ upon collection of the split samples. If you have any questions in the interim, please let me know. V/R Dave Balog Environmental Protection Specialist Marine Corps Base Camp Lejeune Installations 6 Environment Environmental Management Division Environmental Assessment Section Phone: (910) 451-0147 Mobile: 1910) 546-4450 -----Original Message ----- From: Balog CIV David J Sent: Thursday, November 06, 2008 8:00 To: Humes CIV Kenneth; Raper CIV Patricia H; Acosta CTR Lauren D Subject: FW: Postal Facility, MCAS, New River -----Original Message ----- From: Towler CIV David W Sent: Thursday, November 06, 2008 7:49 To: Gregory L. Herron; dwc@bamforth.com: 'Janet Russell' Cc: Balog CIV David J Subject: HW: Postal Facility, MCAS, New River Janet/Greg, It appears that the project was just finished so the Vortechs Unit sampling hasn't begun yet. V/r, David W. Towler, EI Marine Corps Base, Camp Lejeuno Civil Engineer Public works Division, Bldg 1005 Civil Design Branch Phone: (910) 451-323B ext-3284 -----Original Message ----- From: Balog CIV David J Sent: Wednesday, November D5, 2008 13:09 To: Towler CIV David W Cc: 'marvin.t.carter@nav .mil'; 'iames.j.burnes@navy.mil'; Humes CIV Kenneth; Raper CIV Patricia H; Acosta CTR Lauren D Subject: RE: Postal Facility, MCAS, New River Dave, This project was closed out/BOD'd in late June 08. Permanent seeding schedules were applied that same month but to date a satisfactory stand of vegetation has not been established. As the drainage area to the Vortechs unit has not been stabilized, the monitoring requirements outlined in paragraph 1, section III of cur permit are not yet effective........ thus no sampling data has been ccl.lected. The MCAS Water Treatment Facility is still under warranty so I have forwarded this email to the MCAS OICC office to ask if they can have the contractor apply a temporary/winter seed mix/fertilizer/lime to the area to stabilize the Vortechs drainage area. Once a stand of vegetation has been I of2 11/7/2008 1:21 PM FW: Postal Facility, MCAS, New River .* , -.. Subject: FW: Postal Facility, MCAS, New River From: "Towler CIV David W" <david.towler a usmc.niil> hate: Thu, 6 Nov 2008 07:48:45 -0500 To: "Gregory L. Herron" <glh a bamforth.cotn>, <dwc a batnforth.com>, "Janet Russell" <Janet.Russel l a ncmail.net> CC: "Balog CIV David J" <david.bulog a usmc.mil> Janet/Greg, It appears that the project was just finished so the Vortechs Unit sampling hasn't begun yet. V/r, David W. Towler, EI Marine Corps Base, Camp Lejeune Civil Engineer Public Works Division, Bldg 1005 Civil Design Branch Phone: (910) 451--3236 ext. 3284 -----original Message ----- From: Balog CIV David J Sent: Wednesday, November 05, 2008 13:09 To: Towler CIV David W Cc: 'marvin.t.carter@navy.mii'; 'iames.j.burnes@navy.mil'; Humes CIV Henneth; Raper CIV Patricia H; Acosta CTR Lauren D Subject: RE•. PostaL Facility, MCAS, New River Dave, This project was closed out/BOD'd in late June 08. Permanent seeding schedules were applied that same month but to date a satisfactory stand of vegetation has not been established. As the drainage area to the Vortechs unit has not been stabilized, the monitoring requirements outlined in paragraph 1, section III of our permit are not yet effective........ thus no sampling data has been collected. The MCAS Water Treatment Facility is still under warranty so I have forwarded this email to the MCAS OICC office to ask if they can have the contractor apply a temporary/winter seed mix/fertilizer/lime to the area to stabilize the Vortechs drainage area. Once a stand of vegetation has been established and a representative rain event occurs, Base will forward split samples to DWQ as required under section III of this permit's monitoring requirements. If you have any questions or concerns in the interim, please let me know. V/R Dave Balog Environmental Protection Specialist Marine Corps Base Camp Lejeune Installations & Environment Environmental Management Division Environmental Assessment Section Phone: (910) 451-0147 Mobile: (910) 546-4450 -----Original Message ----- From: Towler CIV David W Sent: Wednesday, November 05, 2008 8:07 To: Balog CIV David J Subject: FW: Postal Faci.Lity, MCAS, New River -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.neti Sent: Tuesday, November 04, 2008 15:37 To: Gregory L. Herron; dwc@bamforth.com; Towler CIV David W; Carter, Marvin T CIV NAVFAC Atlantic, JAXNCA Subject: Postal Facility, MCAS, New River November 4, 2008 •Postal Facility, Air Station Gentlemen: The Express Stormwater Scoping meeting has been scheduled with 'Christine Nelson on November 13, 2D08 at 1:30 PM* here in the Wilmington Regional Office. The associated permit for the P-647 water treatment plant, SW8 050817, has a wet detention pond and a Vortechs Unit for stormwater treatment. The proposed project narrative for the postal facility indicates that the Stormwater runoff will be treated by the Vortechs Unit. The existing Stormwater permit has monitoring requirements for the Vortechs Unit. However, there are no reports in the file. Please forward us copies of the l of 2 1 1/6/2008 3:40 PM 1 W: Postal Facility, MCAS, New River r monitoring reports for this Unit as specified in the stormwater permit. Copies of the reports should be received in time for us to review them prior to the November 13th meeting. If you wish you may fax them to my attention, 910 350-2004, and I will get them to Water Quality/Linda Lewis for review. Please respond within 2 business days to confirm and reserve the scope meeting date. Thanks, Janet Russeli Express Permitting 2 of2 1 1/6/2008 3:40 PM P - LpLk-1 KC A& I.Tc._)j U o_e LJ f rs C:0 f tJ 6 \�a 0-5d$ k-1 For DENR Use ONLY North Carolina Department of Environment and Reviewer: cellslj A Natural Resources Submit: -13 NCDENR Request for Express Permit Review Time: __r_ _sO Confirm: AL_(P__* FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan (POF file and vicinit ma same items expected in the aigglication package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a-ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.leenatcmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.Aronan(ftcmail.net C E >E • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(ftcmail.net • Wilmington Region -Janet Russell 910-350-2004 orianet.russell ncmail.net OC� 3 4 70 NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: POSTAL_ FACILITY, MCAS NEW RIVER,; County, ONSLOW DWQ Applicant: CARL H. BAKER P.E. Company: MCB CAMP LEJEUNE PBOJ # Address: 1005 MICHAEL RDCity: CAMP LEJEUNE, State: NC Zip: 28547 '�r &TC_C',-s Phone:910451-2213 Fax:910-451-2927 Email: cad. h,bakerz_usmc.mil Project Drains into NEW RIVER waters — Water classification SC,_NSW (for classification see- hftp://h2o.enr.state.nc.us/bims/reports/reportsWB.htm1) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within'/z mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: C. ALLAN BAMFORTH, P.E., L.S Company: C. ALLAN BAMFORTH, JR. Address: 2207 HAMPTON BOULEVARD City: NORFOLK, State: VA Zip: 23517 Phone: 757-627-7079 Fax::757-625-7434 Email: dwcp_bamforth.com (Check all that apply) ® Scoping Meeting ONLY 1 ® DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ❑ State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site (SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ElHigh Density -Bio-Retention ^ # Treatment Systems ❑ High Dens ity—Stormwater Wetlands _ # Treatment Systems ❑ High Density -Other — # Treatment Systems ❑ MODIFICATION ❑ REVISIONS SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) WETLANDS QUESTIONS MUST BE ADDRESSED BELOW ❑ Wetlands (401): Check all that apply Wetlands on Site ❑ Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits: Check# isolated wetland on Property ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: acre(s) Minor Variance: ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required: ❑Yes ❑ No If YES, ❑ Regular Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee LAMA $ Variance ❑ Ma'; ❑ Min 1 $ SW ❑ HD, ❑ LD, ❑ Gen $ 401: $ LQS 1 $ Stream Deter,_ $ NCDENR EXPRESS January 2008 r 11111: Camp.b.ejeune Postal Facility Subject: RE: Camp Lejeunc Postal Facilily From: "Gregory L. Herron" <glh a bamrorlh.com> Dale: Tue, 4 Nov 2008 15:33:28 -0500 To: "Tower CIV David W" <david.lowler a usmc.mil> CC: <janctrusseII@ncmaiI.net> Thanks David. Revised narrative attached. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com -----Original Message ----- From: Towler CIV David W [mailto:david.towler@usmc.mil) Sent: Tuesday, November 04, 2008 2:31 PM To: Gregory L. Herron SubjecL: RE: Camp Lejeune Postal Facility Greg, You need to change your narrative. In the narrative you state the site drains to Slocum Creek on the Neuse River Basin. That is at MCAS Cherry Point. Your site is at MCAS New River and is in the White Oak River Basin. Both sites are classified SC waters. If you have any questions just let me know. V/r, David W. Towler, EI Marine Corps base, Camp Lejeune Civil Engineer Public Works Division, Bldg 1005 Civil Design Branch Phone: (910) 451-3238 ext. 3284 -----original Message ----- From: Gregory L. Herron [mailto:glh@hamforth.com) Sent: Tuesday, November 04, 2008 14:24 To: Towler CIV David W Cc: janet.russell@ncmail.net Subject: FW: Camp Lejeune Postal. Facility David, I forgot to copy you on this email earlier. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glhebamEorth.com From: Gregory L. Herron Sent: Tuesday, November 04, 2008 11:09 AM To: Janet Russell (janet.russeliencmaii.net) Subject: Camp Lejeune Postal Facility Janet, Here is the site plan and a revised stormwater narrative. Please let me know if you have any questions. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-1434 fax qih@bamforth.com of 11/4/2008 5:08 PM Postal Facility Marine Corps Air Station New River, North Carolina Stormwater Management The project site is located in the southwest quadrant of the intersection of Curtis Road and Bancroft Street within the Camp Lejeune military installation MCAS New River, North Carolina. The proposed project is a single -story Post Office Facility and associated parking area and sidewalks. The structure will have a foot print area of approximately 4,500 square feet. The project site is 0.84 acres. The total impervious area for the site is 0.41 acres or 48%. The receiving stream for this project is Stream Class SC. �JV;,�,r_ 0p4k-, The project site is included in the drainage area for existing Stormwater Permit No. SW8 050817 that was approved for the P-647 New River MCAS Water Treatment Facility. This Permit was approved in a letter dated September 29, 2008. Our site is part of Drainage Area 2 that drains to the Vortechs unit. The post -developed impervious area on the Post Office Facility site is less than what was included in the permit submittal. , Existing Conditions The existing site consists of open sand and/or grass covered area with isolated areas of minimal surface demolition debris. At one time the existing site had building and pavement areas totaling .46 acres, some of which have been removed. The site is relatively level with less than 1-foot change in elevation in 50 feet. All land disturbing activity will take place on site within the limits of the project. The proposed site does not have any Buffer requirements and is not located within a Buffer. Stormwater Information The existing site has an underground storm water system. All runoff from the current site drains into this system and then through a Vortechs system. A portion of the proposed stormwater will drain by swales to an existing ditch along Bancroft Street. The remaining stormwater will drain to the existing stormwater system through a series of pipes and catch basins. There is no off -site drainage onto the site and all built upon area will be collected. Road construction across other property will not be necessary to access the site. E C E I V E n NOV 0 4 2008 V DWQ PROD # 4 I 6 � � N Total Impervious Area=19,809 Square Feet roP-s.au Aw A1'am1-.no a so Aw Par(L ss3 ` '7 d lr '\ GGT.I.fId A AV W.IJ7! &W E r MW "our 4.J7.3 CO rry and rw1-a xis • �. W Cut(QtlCJ nr(WW �' � �r• -f.MIP wr.r. Aw.a r w Ake ts'r1L ti } vn rpT duKE r9 AFYDr=0E7 er' LIP e7�Daxwr r7 ' (ear rat 4 y Ar MSMS C calkt J am M. 7qM Pi=• yhG ,yti {� CP-49 61 AW AfJ75) AW iw pr ' +�. '� j}yn�j' Aw W7fJM AI"PJ- r ew Mr]CVJ+33PJ rnasr •KEex WO A&TALAND8RWBGWl1b741" ztt11W �4CVh1i�+S AppJ�4 A R [s AS IIO 2W �wu wv aosq -1 'F ?gy r id • ` �r —��- 3r2v-� sva Avv /K r<' L1 70P.A.9Aa � B asS Aw M�X1onJ-Rant Cy MO AW s IL1°AY(J � .1a.1f � OW AvMX 4 A, �' \\\\ AW a»r �s/-.3 -aria _ f7 HOTESE 1:300 0 r 10 0 30m $q y 1- M WP%t r0R K MAD&M MPK ANO 6nM MIE FcUVJn BIM CM u"S 1- 2P AW J7SJ+ UOdW a LFAED nnD WWU POMMM Of 12-03-M NO 1=-01-02 APO tw 1-- Z u wI C27 > DR W= MUM N V= UAVO LtW PeCOM LP b (4-aAI 19v7) Am G U W N VOUM RLSMORS AS W ♦ AS 100' (+5-WL1 7000). LLJ =b !f•SHj% , �. M CCK=CMR DKL 1K USPOMU 10 IEO ri AN7 LDUdE UMSC PFM APO 'pT O Q Dslr$s NOD or ALL WM m Be MWOUm 10 BriE wa aEwm WL Urw FM W .AW A74 LACE AAT tC?A=15 131ID 9M4L K 14r MMY Bea m M A"DMDR Or S A4 `,,w Pftr LEM D. 1S1 hAMM 10 Bi rdlnDlclr.N-ru10E, 11c1Ss RD K F T MHOVY KMM ALL MG 150 MMMR AND I/R= AS 90" MM rke LDBF Q MV%110M 9Y21 ft CDOMM Q M, LPN trt M U OnME i9 DEW BELAI F1PA OAM. P13U rt1A SUM FILL DU0 pht' aAr :�-� CM • ♦ Q MC 12A11A1 FC2 TOPSOL SEE OUMC PLAN FOR FW R[OMRL k ♦ i S. ASTER aD= AC PaCCP 0 AN 112MM MM WVF. Win OOA ND P= z A A DEL[1m rMN STAu 1 )RW 3D BE awul© PM* 10 CP6TE O M Or WW AS yM ♦r PLAAT rAC U= Wa S AAEI ODd%rO1 Ck= COWD" WR Wr1F AMCP IQ71 SS MY U Al M F1 W43 AN DOYP M Ado ALLT CAU%TCWL (SIT CDR" r04 LMn Or r _IOAFSIW SALE 1 MrA). .w w.. RNA GIRDER r � istGy�p fnP' lit t• � ita ` wCD102 3 4 .��_.. Scale = 1" = 60' nge `, E NOV 04 zoosU u r [ W ��t ' a m Z o cr � � t r � o S ! Egla 3 f 1 1+! � NVId 39vNIV'dG V 9NIQV80 �J.11lIDVd 331d�O lSQd MdNON Armu w l6Ytl "'maxis 1W 'rdW7 3[M" � aw���oONYWfW407 P�i[133NIDN�53111�17Ml IMhVN,��m 49I Ml1911''' �E � E 1 f8 � 0 LU 6 pd Wcc ddd• ddd ddd 0- En an 0 0 0 4 ewes U cn L C7 '.- g mar • uU-s �,r rru • r Hr �4 SI M ays J Q 6� rrrf . M Sti'1X. [rIC) J mrr • .n av au . fKr=r rx nW •ia P7 7 rrrr • .r nv 1 an. .rw frW•a ll fn wrx all - 11 w en • �r , � 7 r. rare - w 'M JRN 35heyW DJ am q �a"s %it, �a Wln io \ u Ak LU 'F �. •. •_ tV r 12 � jy8 • � a � y[ �j � � i.77`-� H3iXV8 I Q IL --. � •..n. ror +. +ter �r ear., i� an mn nwa,v+�w-a.a ,nn�W _ f NVId Alflun rP 1f10AV1 /a, l a� 0 91a s a� 1 W z 1. MOV:J 3013301SOd M3N �� a w r rLL 16 a:' SI MU rKlu 'Np1r15 arc SA106 Nufm ; x p U —0NYIx-000-13N10N3 S3111110Vi 3VPIVN 1� S i 9 1€ � oxwxm bMll�xtr9 I)Lxl.1 �... 9 G i i 5 i J� a N. w W a all [CLU Zuz� 2 F-9 0 t! R ho 35 Y is y , wly, w �44 1 a.a �ai3 i a N ate. ab?E- err•6c+.aW 'h !�4 Id�a i rl I+`r rlw fxrl r 1xU,Pl >•r } II' i S n �.J s+f arr-ik1 �r y i " 1 Y. J tn6 y,v ca X. *yfW >o Is9 If' c �„�rt••'t1h 'aSIJ N ! CL C, b0 ]!II 3 i I 'r I �� •1 e � x �r3 �� ---fir '1S •` �1 � H3M9 yy qy �p 0 (] m I N h c _ 8 ! NY'ld NOIiIlOW30 / SNONIONOO 7N11SIX3 1C1 ? kLnIOVJ 331330 SSOd MAN ON y NM �3M ',,owls Sdp'J r p � Il� 1 � S' as » —ONYWWW F1NM33NION3 S3111�17Yd lYnYN r p` r r I e V E y� 8- u w Z �3 rg R o Ll 0 0 0e U roar • (/,�U/.P :ur mrr/• Rw r luV. rsw - ro MMT fri O� Q'LVr' �NJ Carr -S." Z P7 J u�r • f+�W.P nv rcr/ • nr M hK 9// - (!fd II AV _ ?// •PY•ry M1 � h rrn-w w 'an 7 ^i 1 fRli AJ�I+ 0 w ^y1 a5/�li w 'a O .y '1S I l HKXV13 f7 m LU oa I= N LU I= j C► GO Z ul r RE: Postal Facilityrr New River Subject: RE: Postal Facility rr New River From: "Gregory l.. Oerron" <glh rr bamforlh,com> Date: Tue, 4 Nov 2008 08:23:48 -0500 To: "Janet Russell" <]anct.Russel I a nctnai1.net> Janet, Please find attached the stormwater narrative and vicinity map for the Postal Facility project at New River MCAS, Camp Lejeune as requested. The site plan is being completed and will be sent by email later today. Gregory L. Herron C. Allan aamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamEorth.com -----Original Message --_-- From: Janet Russell(mailto:Janet.Russell@ncmail.net] Sent: Monday, November 03, 2008 11:33 AM To: David Campbell; Gregory L. Herron Subject: Postal Facility @ New River November 3, 2008 Gentlemen: We received the Express Request for the Postal Facility @ the New River Air Station on October 30. However, we haven't received a stormwater narrative, vicinity map or any type of site plan. Do you have more information that you can forward' It helps us prepare for a scope meeting if we know the particulars of the project. Thanks, Janet Russell Express Coordinator i Content -Description: Vicinity Map_]03108.pdf Vicinity elan 103108.pdf Content -'type: application/octet-stream Content -Encoding: basc64 Content -Description: Stormwaternarrative_110408.doc Stormwater narrative_110408.docl� Content -Type: application/msword Content -Encoding: basc64 R CEIVE1 NOV 0 4 2008 PROD ti DWQ Iofl 1 1/4/2008 8:48 AM Seoping Meeting for a Postal Facility, Camp Lejeune, NC Subject: Seoping Meeting for a I'oslal Facility, Camp Lejeunc, NC From: "Gregory L, Herron" <glh a barn rorth. com> Date: Thu, 30 Oct 2008 12:19:53 -0400 To: <janet.russell a ncmai1.net> CC: " David W.Towier " <david.towler a usmc.mil> Hi Janet, We would like to schedule a scoping meeting for a Postal Facility project at MCAS, New River, Camp Lejeune. Please find attached an Express Request. November 4th and 12th are not available dates. Thank you, Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434fax glh@bamforth.com Content -Description: REQUEST I.OR EXPRESS_103008.doe REQUEST FOR rXPRESS_103008.doc Content 'Type: application/msword Content -Encoding: base64 I of 1 10/30/2008 1:43 PM about:blank Novetnber 3, 2008 Gentlemen: We received the Express Request for the Postal Facility a the New River Air Station on October 30. However, we haven't received a stormwater narrative, vicinity map or any type of site plan. Do you have more information that you can forward? It helps us prepare for a scope meeting if we know the particulars of the project. Thanks, Janet Russell Express Coordinator l of 1 11/3/2008 11:33 AM RE: Postal -Facility @ New River Subject: RE: Postal Facility rr New River From: "Gregory L. Herron" <glh a batnlorth.com> Oak: Mon, 3 Nov 2008 1 L36:26 -0500 To: "Janet Russell" <Janet.Russell tr ncmail.nct> CC: "David Calnpbell" <dwc u bamf'orth.com> Janet, I will be sending the stormwater narrative and vicinity map this afternoon. The site plan .pdf may not he available until tomorrow. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax glh@bamforth.com -----Original Message ----- From: Janet Russelltmailto:Janet.Russellencmail.netl Sent: Monday, November 03, 2006 11:33 AM To: David Campbell: Gregory L. Herron Subject: Postal Facility @ New River November 3, 2008 Gentlemen: We received the Express Request for the Postal Facility @ the New River Air Station on October 30. However, we haven't received a stormwater narrative, vicinity map or any type of site plan. Do.you have more information that you can forward? It helps us prepare for a scope meeting if we know the particulars of the project. Thanks, Janet Russell Express Coordinator of 1 11/3/2008 1 1:58 AM about:blank November 4, 2008 Postal Facility, Air Station Gentlemen: The Express Stormwaler Scoping meeting has been scheduled with Christine Nelson on November 13, 2008 at 1:30 1'M here in the Wilmington Regional Office. The associated permit for the 11-647 water treatment plant, SW8 050817, has a wet detention pond and a Vortechs Unit for stormwater treatment. The proposed project narrative for the postal facility indicates that the stonmwater runoff will be treated by the Vortechs Unit. The existing stormwater permit has monitoring requirements for the Vortechs Unit. However, there are no reports in the rile. Please forward us copies of the monitoring reports for this Unit as specified in the stormwater permit. Copies of the reports should be received in time for us to review them prior to the November 13th meeting. If you wish you may fax them to my attention, 910 350-2004, and I will get them to Water Quality/Linda Lewis for review. Please respond within 2 business days to confirm and reserve the scope meeting date. Thanks, Janet Russell Express permitting l of I 11/4/2008 3:36 PM RL: Postal -Facility, MCAS, New River Subject: RE Postal Facility, MCAS, New River From: "Towler CIV David W" <david.lowlerrr usmc.mil> Daft: Thu, 6 Nov 2008 09:22:29 -0500 To: "Janet Russell" <lanet.Russell a ncmail.ttet>, "Gregory L. l lerron" <glh a bamforth.com>, <dwc a bamforth,corn>, "Carter, Marvin T CIV NAVPAC Atlantic, JAXNCA" <marvin,l.cnrter rr navy.mil> Janet, Thursday November 13 is good for me. I'll he there. V/r, David W. Towler, EI Marine Corps Base, Camp Lejeune Civil Engineer Public Works Division, Bldg 1005 Civil Design Branch Phone: (910) 451-3236 ext. 3264 -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Tuesday, November 04, 2008 15:37 To: Gregory L. Herron; dwc@bamforth.com; Towler CIV David W; Carter, Marvin T CIV NAVFAC Atlantic, JAXNCA Subject: Postal Facility, MCAS, New River November 4, 2008 'Postal Facility, Air Station Gentlemen: The Express Stormwater Scoping meeting has been scheduled with *Christine Nelson on November 13, 2008 at 1:30 PM• here in the Wilmington Regional Office. The associated permit for the P-647 water treatment plant, SWB 050817, has a wet detention pond and a Vortechs Unit for stormwater treatment. The proposed project narrative for the postal facility indicates that the stormwater runoff will be treated by the Vortechs Unit. The existing stormwater permit has monitoring requirements for the Vortechs Unit. However, there are no reports in the file. Please forward us copies of the monitoring reports for this Unit as specified in the stormwater permit. Copies of the reports should be received in time for us to review them prior to the November 13th meeting. If you wish you may fax them to my attention, 910 350-2004, and I will get them to water Quality/Linda Lewis for review. Please respond within 2 business days to confirm and reserve the scope meeting date. Thanks, Janet Russell Express Permitting 1 of 1 1 1/6/2008 12:54 PM WE: Postal Facility, MCAS, New River Subject: RE: Postal Facility, MCAS, New River From: "Gregory L. Herron" <glh tt bamforth.com> Date: Wed, 5 Nov 2008 08:41:52 -0500 To: "Janet Russell" <Janet.Russell@ncmail.net> Janet, Please reserve the date and time for Mr. Bamforth. Gregory L. Herron C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. 757-627-7079 757-625-7434 fax qlh@bamforth.com -----Original Message ----- From: Janet Russell tmailto:Janet.Russell@ncmail.netJ Sent: Tuesday, November 04, 2008 3:37 PM To: Gregory L. Herron; David Campbell; Towler GS05 David w; Carter, Marvin T CIV NAVFAC Atlantic, JAXNCA Subject: Postal Facility, MCAS, New River November 4, 2008 *Postal Fac.tlity, Air Station Gentlemen: The Express Stormwater Scoping meeting has been scheduled with *Christine Nelson on November 13, 2008 at 1:30 PM* here in the Wilmington Regional Office. The associated permit for the P-647 water treatment plant, SW8 050817, has a wet detention pond and a Vortechs Unit for stormwater treatment. The proposed project narrative for the postal facility indicates that the stormwater runoff will be treated by the Vortechs [snit. The existing stormwater permit has monitoring requirements for the Vortechs Unit. However, there are no reports in the file. Please forward us copies of the monitoring reports for this Unit as specified in the stormwater permit. Coptes of the reports should be received in time for us to review them prior to the November 13th meeting. If you wish you may fax them to my attention, 910 350-2004, and 1 will get them to Water Quality/Linda Lewis for review. Please respond within 2 business days to confirm and reserve the scope meeting date. Thanks, Janet Russell Express Permitting 1 of 1 1 ll6/2008 9:00 AM Arl, lift d �Xai