Loading...
HomeMy WebLinkAboutSW8030101_CURRENT PERMIT_20030715STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 225a/9I DOC TYPECURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ,�rr�vzls' YYYYMMDD O� WAr, R Michael F. Easley, Governor 0 William G. Ross Jr., Secretary �Q North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E.,Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality July 15, 2003 Mr. Michael T. McGuire, Vice President Home Depot U.S.A., Inc., Real Estate Law 2455 Paces Ferry Road Atlanta, GA 30339 Subject: Permit No. SW8 030101 Home Depot Jacksonville High Density Stormwater Project Onslow County Dear Mr. McGuire: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Home Depot Jacksonville on July 11, 2003. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 030101 dated July 15, 2003, for the construction of Home Depot Jacksonville. This permit shall be effective from the date of issuance until July 15, 2013, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the storm_ water management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form ,of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSSarl: S:IWQSISTORMWATIPERMIT1030101.ju103 cc: Esmail Ghadrdan, P.E., Greenberg Farrow Onslow County Building Inspections Linda Lewis Wilmington Regional Office Central Files N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service =oA Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 INCDENR State Stormwater Management Systems Permit No. SW8 030101 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Michael McGuire, Home Depot U. S.A., Inc_ Home Depot Jacksonville Onslow County FOR THE construction, operation and maintenance of a dry detention basin in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to -as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 15, 2013, and shall be subject to the following specified conditions and limitations:. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from a total of 625,280 square feet of impervious area. The dry detention basin must be operated with a pre-treatment grassed swale. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 211,048 square feet for Outparcel B. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 State Stormwater Management Systems Permit No. SW8 030101 Project Name: Permit Number: Location: Applicant: Mailing Address: DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Home Depot, Jacksonville SW8 030101 Onslow County Mr. Michael T. McGuire, Vice President Real Estate Application Date: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: Drainage Area, acres: Onsite, sq. ft.: Outparcel B, sq. ft.: Total Impervious Surfaces, sq. ft.: Home Depot: Outparcel B: Home Depot U.S.A., Inc. 2455 Paces Ferry Road Atlanta, GA 30339 July 11, 2003 Sandy Run Branch 1 White Oak WOK02 19-10-1 "SC NSW" 16.23 483,080 223,936 625,280 414,232 211,048 Basin Depth, feet: 1.8 TSS removal efficiency: 85%, a vegetated filter is required Bottom Elevation, FMSL: 28.0 Permitted Surface Area, sq. ft.: 39,780 @Bottom Permitted Storage Volume, cubic ft.: 75,402 Temporary Storage Elevation, FMSL: 29.80 Controlling Orifice: 3" 0 pipe (drawdown in 2-5 days) Permitted Sediment Storage Volume, cubic ft.: 16,756 3 State Stormwater Management Systems Permit No. SW8 030101 II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency, The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance -activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior, to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 4 State Stormwater Management Systems Permit No, SW8 030101 10. Prior to the sale of Outparcel B, the following conditions and restrictions must be recorded on the deed with the appropriate office of the register of deeds: a. The following covenants are intended to ensure ongoing compliance with State S tormwater M anagement P ermit N umber S W8 0 30101, a s issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. S, C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. f. Outparcel B is limited to a maximum of 211,048 ft2 of built -upon area. This maximum amount includes that built -upon area which is constructed within the property boundaries of the outparcel and that portion outside the outparcel's property boundaries between the edge of the existing paved area and the property line. Built -upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina, and parking areas, but does not include raised, open wood decks, or the water surface of swimming pools. g. The runoff from all built -upon area on the outparcel must be collected and. directed into the permitted stormwater management system, as shown on the approved plan. h. Built -upon area in excess of the maximum amount shall require a permit modification from the Division of Water Quality. The connection from the outparcel's collection. system into the permitted stormwater system shall be made such that short-circuiting or bypass of the system does not occur. If the ownership of the outparcel is not retained by the permittee, a separate offsite stormwater management permit shall be submitted to the Division of Water Quality by the owner prior to any construction. 11. . The permittee shall submit final site layout and grading plans for any permitted future areas and outparcels shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 5 State Stormwater Management Systems Permit No. SW8 030101 14. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved' plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition,.or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 15. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 16. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 9 State Stormwater Management Systems Permit No. SW8 030101 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any -permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 15th day of July, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.FE', Director Division of Water Quality By Authority of the Environmental Management Commission 7 State Stormwater Management Systems Permit No. SW8 030101 Home Depot Jacksonville Stormwater Permit No. SW8 030101 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved {Mans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification:. _ SEAL Signature Registration Number Date State Stormwater Management Systems Permit No. SW8 030101 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2: The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The.outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections 0 ? State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION I. Applicants name (specify the name of the corporation, individual, etc. who owns the project): -HOME DEPOT U.S.A., INC. 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Jeff Israel, Senior Corporate Counsel — Real Estate ici�2elT HcGuire ;V,P., Real ES�ee 3. Mailing Address for person listed in item 2 above: 2455 Paces Ferry NW, Atlanta, GA 30339 City: State: Zip: Telephone Number:,.( 770)_ 433)8211_ 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Home Devot 3. Location of Project (street address): SEQ Western Blvd. & U.S. Hiehwav 17 City: Jacksonville, NC County: Onslow 6. Directions to project (from nearest major intersection): From intersection of Western Blvd._ and U.S. 17, 400 feet southwest along _southeast side of U.S. 17 to beginning of Hole -Depot sir,P 7. Latitude: 34046'31"N Longitude: 77023_' 32"W -_ _ of project 8. Contact person who can answer questions about the project Name: Shetif Afifi Telephone Number: ( 770 ) 303-1033 II. PERMIT INFORMATION: 1. Specify whether project is (check one): xx New Renewal Modification Form S) U-101 Version 3.99 Page 1 of 4 • 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known)_ 3. Specify the type of project (check one): Low Density X High Density )%Y Redevelop Ganeral Pe--mit Othe- 4. Additional Project Requirements (check applicable blanks): —CAINLA Vfajor _XX_Gedimentation/Erosion Control `dG4/401 Permit _V-PDES Stornmwater Information on required state permits can be obtained by contacting the Customer Str7 ce Center at 1-8i7-6Zi-b7sS. . M. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. ALo attar, a de Died narative (one to two pages) describing stormwater management for the project . Enhanced szrassed swale and dry detention pond (85% TSS removal.) 2. 5tormwater runoff from this project drains to the White Oak Rive_ basin. 19.86 acres 4. Pro .Ut U�cn Free: 85 3. Total Project 4rea:Project Bu � j 5. How many drainage areas does the project have? one 6. Complete the following information for each drainage area. If there are more I'= ttuc erainaEe area= in the project, attach an additional sheet with the information for each area provided r- the =.a fo.-mat as telov,'- Basi.nJh.forSnation'_ I { '.DCa:Ild' - Frea'1 UralSla�' Receiving Stream Flame Sandv Run Branch Sandy Run Branch Receiving Stream Class susw ! SCNSW Drainage Area I 223,936 sf Existing Impervious' Area 292,288 sf 169,013 sf Proposed Imge_r,ious'Area 414 232 sf 211,048 sf Impervious` Area (total) I6Q% Exist. 85% Pro 68% Exist. / 857. Prop. Imoe_rvious.:Sur ceArea::,.:;:,;: : , Dra�rrage:Area1 `.:';:::'.,:..:, iJrauiaga e-=•`.;:..,. ` `;': On -site Buildings I 26,912 Rf - - On -site Streets On -site Parking 287,720 sf 0-n-site Sidewalks f other on -site Off -site f Total: 414,232 sf Total: 211,048 sf Imae-:oat .tre2 is de red as '.te bu: ! upon aT-z i.,¢c::iding, but nnr i. iced to, bu:idtr, , roams side-xatks, a Ive? areas, etc. Form SWU-101 Version 3.99 p7oe 2 of 4 ao 7. How was the off -site impervious area listed above derived? Field survey take --offs ' rV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar'material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. BuiIt-upon area In excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. AlI permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) Listed below must be submitted for each BUT specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Forest SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form S WU-101 Version 3.99 . Page 3 of 4 't VI_ SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Ini 'als • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management S • Two copies of plans and specifications, including:r - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf; please complete this section. Designated agent (individual or firm): SHERIF AFIFI - GREENBERG FARROW ARCHITECTURE Mailing Address: 1755 THE EXCHANGE City: ATLANTA State: GAi", Zip: - 30336 Phone:( 770 } 303-1033 VIII. APPLICANT'S CERTIFICATION Fax: ( 770 ) 303-2389 I, (print or type name of person listed in General Information, item 2) MICHAEL T . McGUIRE certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC ?H .I000. Home Depot,U.S 4., Inc., a Delaware corporation Signature: Name: TTit1e :. -- . WW Senior Corporate Counsel - Real ESWO C� Form SWU-101 Version 3.99 Date: EOOZ 9 0 83J ((Cha.v—,1 tUPre— v. P. Reco Lau) Page 4 of 4 Zomiot Cotboms Conan, 8i;q p1m d 0 631 i� The Home Depot Western Boulevard Q U. S. Hwy. 17 Jacksonville, North Carolina exendeL4 Oe+(?4 L�q Operation and Maintenance Agreement DWQ Project — Onslow County North Carolina Division of Water Quality RECEIVED "�_d) FEB 17 2003 nwQ PROJ # 5!�Q30!D[ A Permanent Water Quality Pool is included on the property for the purpose of protecting the water quality of the receiving creek during construction and permanently following completion of construction. The pool is included on plans prepared by Greenberg Farrow Architecture and dated November 15, 2002. They are identified as C-4.0, C-4.1, and C-4.2 of Greenberg Farrow Architecture Project No. 200102629. Following construction, stabilization of surface areas draining to the pool, and acceptance of the work maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the water quality pool system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the filter bed and orifices of any obstructions such that draw -down of the pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper function. 4. Remove accumulated sediment from the water quality system semi-annually or when depth is reduced to 75% of the original design depth. Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads C28.3 feet at the water quality Control Structure the sediment shall be removed. 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow. G. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the water quality system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify the Department of Environment and Natural Resources Division of Water Quality of any problems with the system or prior to any changes to the system or responsible party. acknowledge and agree that included in any purchasers agreement will be provisions for the shared maintenance cost of the permanent Water Quality Pool that receives the surface storm drainage from the lot or lots owned. The shared cost of the required maintenance on the Pool shall be based on the area from each site contributing flow to the Pool and dividing it by the total area flowing into the Pool from all sites. The percentage of shared cost is established as follows: Shared Cost Water Quality Pool Lot A- 0.829% Lot B- 0.171 % The shared cost for the required maintenance will be validated by copies of maintenance notifications and invoices for expenses incurred. All parties will be notified when a site ownership changes and each site's pro-rata percentage of maintenance cost will be published to the two site owners. The Maintenance Agreement has no expiration date, but shall be perpetual. The Maintenance Agreement can be voided but only if: all parties agree and the off -site property owner complies with watershed protection requirements by some other means; and the governmental office having jurisdiction for watershed protection approves the new means of watershed protection. Print name: _Title: Jeff Israel 2 33 aces erry Rd. Address: AtI"anta, GA 30339 Phone: (770) 433-8211 Signature: ,3Ifiie;3 I159n ;atm.o3 UT6TOQ3l3:a tons Date: VEB Q 6 2003 I, a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of — and acknowledge the due execution of the foregoing water quality basin maintenance requirements. Witness my hand and official seal, �' / y l� r,•r1 ' SEAL Notary Pubjs . DsKalb County, Georgia. My commission expires My Commission ExOfes Aug. 19. 2003, Recorded: Deed Book: Page Number: .f State Stormwater Management Systems Permit No. SW8 030101 'Home Depot Jacksonville "Stormwater Permit No. SW8 030101 Onslow County Designer's Certification i, .�smgtiLa.�v.�,a►] , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, �,E��'tiT 1lV (Project) t_V-6—; �A C, for ��^� ��Pa� �_(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification:. / SEAL ,y�111111111111 Signature .•`S'��� CApt''% Registration Numb r 2-0SO Date 212 Lo f o4- SEAL = ' - rR •. eyn3t4-c, r . ,,'+IIJ'IJ•111����1�,' n State Storrnwater Management Systems Permit No. SW8 030101 Certification Requirements: f ✓ 1. The drainage area to the system contains approximately the permitted acreage. 2: The drainage area to the system contains no more than the permitted amount of built -upon area. ✓3. All the built -upon area associated with the project is graded such that the / runoff drains to the system. � 4. The outlet/bypass structure elevations are per the approved plan. vl""5. The outlet structure is located per the approved plans. ✓ 6. Trash rack is provided on the outlet/bypass structure. Z7. All slopes are grassed with permanent vegetation. $. Vegetated slopes are no steeper than 3:1. v""'9. The inlets are located per the approved plans and do not cause short- circuiting of the. system. _AZ10. The permitted amounts of surface area and/or volume have been provided. ✓ 11. Required drawdown devices are correctly sized per the approved plans. ✓12 All required design depths are provided. ✓ 13. All required parts of the system are -provided, such as a vegetated shelf, and a forebay. ✓14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections l•