Loading...
HomeMy WebLinkAboutSW8021126_HISTORICAL FILE_20030205STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT SW NO. DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE � COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD W 1F9 N Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Mr. Jon T. Vincent, Member Manager Bradley Point, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Dear Mr. Vincent: Alan W. Klimek, P.E., Director Division of Water Quality Wilmington Regional Office February 5, 2003 Subject: Permit No. SW8 021126 Dollar General Hampstead High Density Stormwater Project Pender County The Wilmington Regional Office received a complete Stormwater Management Permit Application for Dollar General Hampstead on January 29, 2003. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 211.1000. We are forwarding Permit No. SW8 021126 dated February 5, 2003, for the construction of Dollar General Hampstead. This permit shall be effective from the date of issuance until February 5, 2013, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form ofa written petition; conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this pcnnit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/arl: S:1WQSISTORMWATIPERMIT1021126.FEB03 cc: Phil Tripp, P.E. Pender County Building Inspections Linda Lewis Wilmington Regional Office Central Files N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 A*A NCDENR Customer Service 800-623-7748 J Project Name: Permit Number: Location: Applicant: Mailing Address: + "ti State Stormy+pater Management Systems ~ Permit No. SWS 021126 DIVISION OF WATER QUALITY PROJECT DESICN DATA SHEET Dollar General Hampstead Application Date: River Basin / Receiving Stream: Index Number: Classification of Water Body: Drainage Area, acres: Onsite, ft2: Offsite, ft2: Total Impervious Surfaces, ft2: Building ft2: Parking, ft2: Walks, ft2: Future, ft2: Pond Depth, feet: TSS removal efficiency - Permanent Pool Elevation, FMSL: Permitted Surface Area, ft2: Permitted Storage Volume, ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: Permitted Forebay Volume, ft3: SW8 021126 Pender County Mr. Jon T. Vincent, Member Manager Bradley Point, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 January 29, 2003 Cape Fear / Harrisons Creek CPF23 18-74-49 "C Sw" 2.69 2.69 0 81,508 12,985 51,832 1,691 15,000 5.0 90% (no filter is required) 48.0 10,608 @Permanent Pool 17,311 49.5 1.25" cp pipe (drawdown in 2-5 days) 6,335 f 3 State Stormwater Management Systems Pennit No. SW8 021 126 11. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved t Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains will not be allowed in the-stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to. design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 4 -A State Stormwater Management Systems Permit No. S W 8 021126 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Joni T. Vincent Dollar General Hampstead Pender County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 5, 2013, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS l . This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 81,508 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 15,000 ft'. 4. All stonuwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 r State Stormwater Management Systems Permit No. SW8 021126 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Dollar General Hampstead Permit Number: SW8 021126 Location: Applicant: Mailing Address: Application Date: River Basin / Receiving Stream: Index Number: Classification of Water Body: Drainage Area, acres: Onsite, ftz: Offsite, ft2: Total Impervious Surfaces, ft2: Building ftz: Parking, ft2: Walks, ftz: Future, ftz: Pond Depth, feet: TSS removal efficiency: Permanent Pool Elevation, FMSL: Permitted Surface Area, ft2: Permitted Storage Volume, ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: Permitted Forebay Volume, ft3: Pender County Mr. Jon T. Vincent, Member Manager Bradley Point, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 January 29, 2003 Cape Fear / Harrisons Creek CPF23 18-74-49 "C Sw" 2.69 2.69 0 81,508 12,985 51,832 1,691 15,000 5.0 90% (no filter is required) 48.0 10,608 cr Permanent Pool 17,311 49.5 1.25"cp pipe (drawdown in 2-5 days) 6,335 3 State Stormwater Management Systems Pen -nit No. SW8 021126 IL SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stor nwater treatment device, and prior to occupancy of the facility. 9. The pennittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major pen -nit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 4 State Stormwater Management Systems Permit No. SW8 021126 10. The pernittee shall submit final site layout and grading plans for any permitted future built -upon areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount allowed under this permit, a modification to the permit must be submitted and approved prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. Prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 13. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. M. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit transfer request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The pen-nittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 5 State Stormwater Management Systems Permit No. SW8 021126 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The perrnittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 5th day of February, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION — -12, .,,0 eqaAk. 1PAlan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission 0 TRIPP ENGINEERING, P.C. 4E19 CheStnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (9.10) 763-5631 January 29, 2003 RECEIVED NCllENl2 . Division Water Quality JAN 2 9 2003 127 Cardinal Drive Wilmington, NC 28405-3845 BY- Attn: Ms. Linda Lewis Ile: Dollar General Hampstead SW8 021126 New Hanover County, NC TE 02067 Dear Linda: , In response to your correspondence dated January 21, 2003, we offer the following: 1. A corrected supplement has been provided with 17,311 ac listed for the temporary volume. 2. Weir notch has been relocated and a baffle provided. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. &--7/ - � Charles D. Cazier, E.I. CDC:dcb Enc. P. 1 COMMUNICATION RESULT REPORT ( JAN.21.2003 12:40PM ) TTI NCDENR WIRO FILE MODE OPTION ADDRESS (GROUP) RESULT PAGE --------------------------------------------------------_------------------------------------------- 995 (MEMORY TX 9-7635631 OK P. 2/2 ---------------------------------------- REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER WAT Date: Jant To: Phil Company: FAX #: 219 E-2) BUSY E-4) NO FACSIMILE CONNECTION Michael F. Easley, Governor William G. Ross, Jr„ Secretary North Caroiina Department of Environment and Natural Resources I Alan W, Klimek. P.E., Director Division of Water Quality Wilmington Regional Office FAX COVER SHEET 1003 No. of pages:4r ,E. From: Linda Lewis Engineering Water Quality Section - Storrawater 131 FAX # 910-350-2004 Phone # 910-395-3900 DWQ Stormwater P roiect Number: SWS 021126 Project Name: j Dollar General -Hampstead MESSAGE: Dear Phil: The calculations indic ate that the temporary pool volume is 17,311, but 18,233 is reported on the supplement. Please rrect and revise. If 17,311 is the correct number, T can make that change, Please provide additional flow path length by relocating the weir notch and adding a baffle, as shown on the attachad ckntnh ;�' , of Date: January 21, 2003 To: Phil Tripp, P.E. Company: Tripp Engineering FAX #: 763-5631 Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources FAX COVER SHEET DWQ Stormwater Project Number: SW8 021126 Project Name: Dollar General -Hampstead MESSAGE: Dear Phil: Alan W. Klimek, P.E., Director Division of Water Quality Wilmington Regional Office No. of Pages: X From: Linda Lewis Water Quality Section - Stormwater FAX # 910-350-2004 Phone # 910-395-3900 The calculations indicate that the temporary pool volume is 17,311, but 18,233 is reported on the supplement. Please correct and revise. if 17,311 is the correct number, 1 can make that change. Please provide additional flow path length by relocating the weir notch and adding a baffle, as shown on the attached sketch. The permit has been drafted, and upon timely receipt of the required information, the permit will be issued. S:\WQS\STORMWAT\ADDINFO\2003\021126.JAN03 Av WC-bEN N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.G. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 S 39'27'29" E 26.00' EIP TS —--�_�X.,s I • /� , I OUTLET r j STRUCTURE nO 50, I el) 1 (SEE DETAIL) L'rfE {{1�C I I CD I I r 1 ° 49, 5 k 1 w F43.01 5 °4.90 I 1 I - csch 1 OPOSED DREILN710N I< POND 50.27 °� T.O.B. 50.0 T T _ 9 F.P. 49.5 / N.P. 48.0 �-- — — —f I BOTTOM 43.0 210.00 EIP3. ? f; —EXISTING POND > Lot A-1 E. Austin Corp. "Go Cos" 1286 , PG 128 -) Pd O C2 �e We r, nOfc6 Dz Pro yr de b 2? Fic/e„ LINE TABLE LINE BEARING LENGTH L1 S39'27'29"E 9.00 L2 N 50'32' 31 "E 35.79 Durwood T. Brodshow Janice Brodshow DO 1019. PG 330 S,Gv F () 2 112 Cry e eral -H, ske2Cl