Loading...
HomeMy WebLinkAboutSW8020931_COMPLIANCE_20041203STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE 6? �2 YYYYMMDD State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Division of Land Resources Land Quality Section Michael F. Easley, Governor William G. Ross Jr., Secretary RECEIVE] DEC U 3 2004 BY: 4O NAA NCDENR NORTH CAROLINA DEPARTMENT OF E:NVIRONHENT •Nn NATURAL RESOLRCES December 2, 2004 NOTICE OF VIOLATIONS OF THE SEDIMENTATION POLLUTION CONTROL ACT CERTIFIED MAIL 7004 1 160 0004 4619 7312 RETURN RECEIPT REQUESTED South College Association L.P. Mr. Robinson D. Everett, Managing Partner P.O. Box 586 Durham, NC 27702 Project Name: Still Meadow Village -Ph. 2 Project No: Newha-2003-103 New Hanover County Dear Mr. Everett: On December 1, 2004, personnel of this office inspected a project located on NC 132 (South College Road) in New Hanover County, North Carolina. This inspection was performed to determine compliance with the North Carolina Sedimentation Pollution Control Act of 1973. The inspection revealed a land -disturbing activity of approximately 9.02 acres being conducted. It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The purpose of this letter is to inform you that this activity was found to be in violation of the Act, NCGS 11 3A-50 to 66, and Title 15A, North Carolina Administrative Code, Chapter 4. If you feel that you are not responsible for the following violations, please notify this office immediately. The violations that were found are: 1 . Failure on a tract of more than one acre, when more than one acre is uncovered, to provide a permanent ground cover sufficient to restrain erosion on such exposed areas within 30 working days or 90 calendar days, whichever is the shorter after completion of construction or development. G.S. 1 13A-57(3) and 1 5A NCAC 4B.0107(b) and 15A NCAC 4B.01241e). Ditches are bare along western and southern edges. 2. Failure on a tract of more than one acre, when more than one acre is uncovered, to install sedimentation and erosion control devices sufficient to retain the sediment generated by the land -disturbing activity within the boundaries of the tract during construction upon and development of the tract. G.S. 113A-57;3j. Drop inlets are unprotected and sediment is running off -site. 3. Failure to take all reasonable measures to protect all public and private property from damage by such land -disturbing activities. 1 5A NCAC 4B.0005. Sediment is leaving the site. 4. Failure within 15 working days of 30 calendar days (whichever period is shorter) of completion of any phase of grading to plant or otherwise provide exposed, graded slopes or fills with ground cover, devices, or structures sufficient to restrain erosion. G.S. 113A-57(2). There are bare and eroding slopes around pond in northwest corner. 127 Cardinal Drive ExIen ur, Wilmington, N.E. 28405-3845 • Telephone 910-395.3900 • Fax 910.350-2004 An Equal Opporlunily Affirmative Action Employer 1 114 5. Failure to maintain satisfactorily all temporary and permanent erosion and sedimentation control measures and facilities during the development of a site. 15 NCAC 413.013. Erosion control measures are non-existent around drop inlets. To correct these violations, you must: A. Re -seed and mulch drainage ditches: south property edge, southwest corner to along western edge, and beside storm water pond along southern edge between Phase 1 and Phase 2. B. Install drop inlet protection devices around drop inlet located along southern edge of Phase 2. C. Re -grade Ito remove erosion gullies), re -seed, and mulch slopes around sediment pond in northwest corner of site. Please note that merely planting grass seed does not satisfy the requirements of "vegetative cover" or of "ground cover sufficient to restrain erosion." These requirements are not satisfied until a standing cover of grass or other ground cover is established which is, in fact, sufficient to restrain accelerated or man-made erosion. The initial one day civil penalty could be an assessment of up to $5,000.00. A time period for compliance is not required for this initial one day civil penalty pursuant to NCGS 113A-61 .1 (c) and NCGS 113A-64(a)(1). An initial one day civil penalty is being considered for this project. If the violations described in this Notice are not corrected within 28 days following your receipt of this Notice, the Division of Land Resources may take additional appropriate legal action against you pursuant to NCGS 113A-64. That action could be the assessment of additional civil penalties and may result in the initiation of other remedies as prescribed by the Act. If additional civil penalties are assessed for the violations, the amount may be up to $5,000.00 per day for each day of the violation pursuant to NCGS 1 33A-64(a)(1). If all violations are corrected within the time period specified for compliance, additional civil penalties or legal remedies will not be pursued. Any new land -disturbing activity associated with this project should not begin until the area presently disturbed is brought into compliance with the Act. When corrective actions are complete, you should notify this office so that the work can be inspected. You should not assume that the site is in compliance with the Act until we have so notified you. In addition, once compliance has been achieved, all installed measures must be satisfactorily maintained until development is complete and the site is fully stabilized to avoid further violations of the Act. We solicit your cooperation, and would like to avoid taking further enforcement action. At the same time, it is your responsibility to understand and comply with the requirements of the Act. Copies of the relevant statute and administrative rules may be examined at this office or will be sent to you upon request. Should you have questions concerning this Notice or the requirements of the Act, please contact either Schuyler Snowdon or me at your earliest convenience. Please do not hesitate to contact me regarding any questions you might have about this matter. Sincerely, Daniel Sams, P.E., M.E. Regional Engineer cc: Sedimentation Specialist WiRO-LOS Rick Shiver, OWO Supervisor-WiRO Linda Lewis, DWO-SW-Wiro Enclosure: Inspection Report .� C Case ## A'ORT11 C-4ROLIN/1 DI..Pr?RTiWI-'ArT Ol l-NYIRONMENT,4ND NATURAL RESOURCES 1AND QUALM'SECTIOV 727 Cardinal Drive, Ex!., Wilmington, NC 28405-3845 (910) 395-3900 Count}' Project: S� ; E�-0r+d Vi{��.� River Basinw1,�C. person Financially Responsible:e�sn Address: tJ 13_o1C ~S r^. I:tny kna vv�L 77Qc�— 1. Project Location 5, Co 1 t.o Z Pictures: No ❑ Yes Prints ❑ Slides ❑ [digital ❑ Video ❑ 2. NVeather and Soil Conditions la's Ada-1. 3. Is site currently- under notice of violation Yes ❑ No 4. Is the site in compliance with the S.PC.A. and the rules? Yes ❑ No ❑ If no, check violations below: 5. Violations: ❑ a. No approved plot, G.S. 113A-57(4) and 15A NCAC 413.0107(c) ❑ g. Inadequate buffer zone, C.S. 113A-57(1) ❑ b. Failure to follow approved plan, C.S. 113A-61.1 ❑ h. Graded slopes and fills too steep, C.S. 113A-57(2) ❑ C. Failure to submit revised plan, G.S. 113A-54.1(b) and or 15A NCAC 413.0124(d) 15A NCAC 413,0118(a) "P1, Unprotected exposed slopes, G.S. 113A-57(2) Q(d. Faihire to provide adequate groundcover, G.S. 113A-57(3) and F j. Failure to maintain erosion control measures, 15A NCAC 413.0107(b) or 15A NCAC 413.0124(e) 15A NCAC 413.0113 ,® e, lilsUfflClent 111easures to retain sediment on site, C.S. 113A-57(3) ❑ k. Other (describe) f. Failure to take all reasonable measures, 15A NCAC 413.0105 6. NPDES Permit Violation? lesp, No ❑ Describe byt4rywrpMl Nor L PC 7. Has sedimentation darnage occurred since last inspection% YerJ, If}'es, where? (check ail that upply): No ❑ Lake/natural watercourse on the tract ❑ , . Lake/natural watercourse off the tract ❑ Other property;K Description: Degree of damage: Slight ❑ Moderate W Severe ❑ 8. Contact made with (Name) MA _ Title Inspection Report given ❑ or sentf' to Person Financially Responsible Date given/sent _ t-� HOC) 9. Corrective actions needed: ✓n L. L1-Ct� 1 (f>y P v- f h �/a 1 1 Y [ CAS . tt5l 1 &L VV s I T (r ►'1 f k P CGt Ye 1 iaC5. I1.__InLLr-0rl__5e A_ d N fi. - r�a�� .�r-i� .(' � __�7s„�f �51°!' f�� �t IG N"tgi,•� f-0 S.' in + _ C_C_jA-L_v[d—k3 10. Comments: kesead 1f. eS _ �� �t� ee+ 5d �'_} e d eSi Cearv4�d' �Eto (opt t.MfSCt��t �`ciF,�_ Gt �_�e5io�1 Px5i:4ait S'fby't..fr. -C*- - tna-8.__V_Y' o1' I P L��SfA r „1 lid rl`r CJ `t L "t t C�/q St' [r �` l'R ' a'�"r r•J'� ✓'fin 1'4 LA' �' ✓� f ��a 1s, v�� a ,r c� � �t � �e t� �` � v:..r ��t � �"—��i' -ice � �, f� a .�-1i-- ���rjj5'� �� Y ��P ✓' C� �i•- S � '� � . r Deport by: 5st�.E f np� ,�t�.+ �+�1v,'j-ji>rn:-r r%t- Others present �ar�� 1'y1,�%✓ _ _, Date of Inspection: Time arriving at site: % ( a Time leaving site: 2--C) a cc: f Q� W A PF9 Michael F. Easley, Governor p William G. Ross Jr., Secretary �O G North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E.,Director p Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality February 26, 2004 Mr. Robinson O. Everett, Partner South College Associates PO Box 586 Durham, NC 27702 NOTICE OF INSPECTION: Still Meadow Village Apartments Stormwater Project No. SW8 020931 New Hanover County Dear Mr. Everett: Please find attached a copy of the completed form entitled "Stormwater Compliance Inspection Report". The report summarizes the findings of a recent inspection of the project's stormwater controls conducted on February 23, 2004 to determine compliance with Stormwater Permit Number SW8 020931 issued on December 13, 2002. A summary of the findings and comments are noted under Section 4 of the report. Please inform this Office in writing before April 1, 2004 of the specific actions that will be undertaken and the time frame required to correct the deficiencies. Failure to provide the requested information, when required, may initiate enforcement action. If you have any questions please contact me at the Wilmington Regional Office, telephone number (910) 395-3900. Sincerely, Gary Beecher Environmental Technician RSS/ghb: S:IWQSISTORMWATIINSPECT1020931 cc: Wilmington Regional Office Gary Beecher N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 s s� INCD f�t STORMWATER COMPLIANCE INSPECTION REPORT Project Name: Still Meadow Village Apartments Project Number: 020931 Control Measure: Wet Pond Water Body: CSW Classification: Motts Creek Directions to site: Carolina Beach Road 2. Inspection Date: February 23, 2004 Weather Conditions: Dry and Sunny 3, Compliance Issues: Y N ❑ ❑ The drainage area (including offsite) and built -upon area to the permitted system are per the approved plan. No unpermitted offsite drainage enters the system. ❑ ❑ All the built -upon area associated with the project is graded such that the runoff drains to the system. ❑ ❑ For pond shnfiltration, the outlet/bypass structure relative elevations are per the approved plan. (Must be verified via as -built survey if in question). ❑ ❑ The inlets and outlet structure are located per the approved plans and do not cause short-circuiting. ❑ ® A trash rack is provided over the outlet weir and orifice. ❑ X All slopes are grassed with permanent vegetation and are not eroding. ❑ ❑ Vegetated slopes are no steeper than 3:1. ❑ ❑ The approximate amount of permitted surface area has been provided. (Must be verified via as -built survey or designer's certification.) ❑ ❑ Required drawdown devices are correctly sized per the approved plans. All required design depths are provided. ❑ ❑ All required parts of the system are provided, such as a vegetated shelf, and a forebay. ❑ ❑ The designer's certification has been submitted. ❑ ❑ The required deed restrictions are correctly recorded and submitted. ❑ ❑ The number of lots or outparcels is per the permitted amount. ❑ ❑ The built -upon area on the lots or outparcels does not appear to exceed the maximum amount (must be verified via as -built survey if in question) ❑ ❑ Curb outlet swales are constructed, located properly, are 100' long and have dense vegetated cover. ❑ ❑ The road, cul-de-sac, parking lot and sidewalk widths are per the approved plan. ❑ X Required maintenance is being performed. ❑ ❑ Outparcels have their own offsite permit. ❑ ❑ For low density projects, roadside swales are 3:1, vegetated and stable. ❑ ❑ For low density projects, there are no unpermitted pipes on the project. 4. Required Actions: (Explain each deficiency and what needs to be done to bring the system back into compliance) (a) A trash rack needs to be installed above the outlet structure ASAP. (b) The large drainage Swale on site is badly eroded. The sides need to be stabilized with grass or sod. (c) There is an abundant amount of construction generated trash within and around the pond. The trash is not only an eyesore it can also clog the outlet structure and hamper the efficiency of the pond. (d) The sides of the pond are badly eroded and need to be stabilized with grasstsod or mulch. (e) There is a large pile of sediment that is running off into the pond. The pile which is located behind the dumpster needs to be removed. Due to the abundance of impervious surface on the site, the pond should be fully functional as a Stormwater Detention Pond. Inspector: Gary Beecher Water Quality/Wilmington Regional Officel(910) 395-3900 Ext 222 RSSlghb: S:IWQSISTORMWATIINSPECTIsw8 020931 t State Stormwater Management Systems Permit No. SW8 020931 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO South College Associates Still Meadow Village Apartments Phase 2 New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 13, 2012, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 151,188 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded casements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 State Stormwater Management Systems Permit No. SW8 020931 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Still Meadow Village Apartments Phase 2 Permit Number: SW8 020931 Location: New Hanover County Applicant: Mr. Robinson O. Everett, Partner Mailing Address: South College Associates PO Box 586 Durham, NC 27702 Application Date: December 13, 2002 Receiving Stream/River Basin/Index 9: Cape Fear / Motts Creek Classification of Water Body: "C Sw" Drainage Area, acres: 9.02 Total Impervious Surfaces, ft2: 151,188 Pond Depth, feet: 5 TSS removal efficiency: 90% (no filter is required) Permanent Pool Elevation, FMSL: 19 Permitted Surface Area, ft2: 14,783 @Permanent Pool Permitted Storage Volume, ft3: 12,976 Temporary Storage Elevation, FMSL: 19.8 Controlling Orifice: 2" pipe (drawdown in 2-5 days) Permitted Forebay Volume, ft3: 7,244 3 State Stormwater Management Systems Permit No. SW8 020931 II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 4 State Stormwater Management Systems Permit No. SW8 020931 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. Prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 13. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The pennittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit transfer request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 5 State Stormwater Management Systems Permit No. SW8 020931 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The pennittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the l 3th day of December, 2002. NORTH CAROLINA EIYVIRONMENTAL MANAGEMENT COMMISSION Lek ?an Klimek, ., irector ion of Water Quality By Authority of the Environmental Management Commission 0 State Stormwater Management Systems Permit No. SW8 020931 Still Meadow Village Apartments Phase 2 Stormwater Permit No. SW8 020931 New Hanover County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 7 State Stormwater Management Systems Permit No. SW8 020931 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections 0 DETENTION POND ANALYSIS FILE NAME: #VALUE! PROJECT #: SW8 20931.00 REVIEWER: nml PROJECT NAME: Still Meadow Village DATE: Receiving Stream: Motts Creek Class: Drainage Basin: CFR Index No. Site Area Drainage Area IMPERVIOUS AREAS 13-Dec-02 C Sw 9.02 acres 1 X0 square feet Area = 9.02 acres Buildings 48316.00 square feet parking 90496.00 square feet sidewalks 12376.00 square feet square feet square feet square feet TOTAL'51188 40: square feet SURFACE AREA CALCULATION % IMPERVIOUS 38.48% Des. Depth 5 TSS: 90 Rational C Rational Cc= 0.12 SAIDA Ratio 2.71 Req. SA 10643 sf Prov. SA _<4944 sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* Des. Storm > inches Rv= 0.40 Bottom 14 msl Perm. Pool 19,0 msl Design Pool 19.8 msl Design SA 17200 sf Req. Volume 1297 cf Prov. Volume :1,2976 cf ORIFICE CALCULATION OM 1 Perm. Pool Volume= 39997 Req. Forebay Volume= 7999.4 Provided Volume= 7244.00 Percent= 1$14 SA @ _ Elevation= Avg. Head = 0.36 ft Q2 Area = 3.75 sq. in. Flow Q2, cfs 0.075 cfs Q5 Area = 1.50 sq. in. Flow Q5, cfs 0.03.0 cfs Orifice Area 3.14 sq. in. No. of Orifices 0.063 cfs Diameter, inches 2 L16:; weir H x W ......: . ;: inx in Drawdown = 2 ''. days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines DETENTION POND ANALYSIS FILE NAME: #VALUE! PROJECT #: SW8 20931.00 REVIEWER: nml PROJECT NAME: Still Meadow Village DATE: 26-Nov-02 Receiving Stream: Motts Creek Class: C SW Drainage Basin: CFR Index No. Site Area 9.02 acres Drainage Area911_square feet Area = 9.02 acres IMPERVIOUS AREAS Buildings 48316.00 square feet parking 90496.00 square feet sidewalks 12376.00 square feet square feet square feet square feet TOTAL t51 88p0',; square feet SURFACE AREA CALCULATION % IMPERVIOUS 38.48% Des. Depth 5 TSS: 90 Rational C Rational Cc= 0.12 SA/DA Ratio 2.71 % Req. SA 10643 sf Prov. SA :..49.44'_ sf VOLUME CALCULATION * place a "1" in the box if Rational is used .j, Rational ?* Des. Storm ;:......�.4= inches Rv= 0.40 Bottom 14 msi Perm. Pool :.........';:.... ms l 1 Design Pool 19.8 msl , Design SA 17000 sf Req. Volume Prov. Volume ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 0.40 ft 0.075 cfs 0.030 cfs weir H x W days FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= SA @ _ Elevation= Q2 Area = 3.55 sq. in. Q5 Area = 1.42 sq. in. Orifice Area 0.00 sq. in. Q= 0.000 cfs :.:.: in x COMMENTS Surface Area, Volume and Orifice are within Design Guidelines in NCDENR STORMWA]CER MANAGEMENT PLAN STILL MEADOW VILLAGE APARTMENT PHASE 2 3, 2002 CL1 I=�N']': SOU 1 I-1 CUl�I.� =?GL', EISSOCIt1'T`GS ���•�.�w,CApo��''•. PO BOX 586 DURI=IAM, NC 27702 STRO�UD ENGINEEIUNG, P.A. 102D MARKET ST. WILMINGTON, N.C. 28403 (910)815-0775 = V r- 0 /p ••. 9 'R SEAL. 0643 f ilc f.\mastcr\pw-27 f \wpci\dcnrswcov.v.,pd NARRATIVE Project Descr•ipt1011 The purpose of the proposed development is to allow Cor the proposed multi -family development. Approximately 8.48 ,icres will be disturbed during the construction period. The site is 9.02 acres located ill the Masonboro"I'ownship of New Hanover County, 1 mile north of the Monkey Junction intersection oil NC 1 ;2. Site Dcuri tion The site has flat topography in the areas not previously clisturbccl. Soil stock pile are located at the north, south, and western boundaries of the property. There is a small drainage ditch which traverses the property with its invert at the western border of the property. Waters from the site drain to Mott Creep, stream class CSW. Stormwater from the site will be collected in one OF drop inlets and (9) curb inlets. Waters will be conveyed'to the proposecl'detention pond for treatment and rclease at rates not to exceed pre -development rates. Adiacent Properties Land use in the vicinity is zoned residential and multifamily. The land immediately to the south rind west is single-family homes. The area to the east is developed multifamily homes. Areas to the north arc presently irnclevelolSecl. Sails The soil, as formed in the SCS Soil Survey ofNew Hanover County, is Leon, Lynn Haven and Mrtrville. The majority of the property is considered to be poorly drained with permeability rates less than 6 inches/hour at the surface and less than 2 inches/hour in the subsoil. The soil erodibility Factor (K Factor) ranges from 0.1 to 02 for the depths to be excavated. tile: f:lmastcrlpw?711�vpclls�vnarra.wpd L y I-V Lei S, L t Mu Mu Le V Ly 4j. "j.k Y, Kr Le - MLJ I.Y A . L4! Kr Ly Ly Rm i; LL I-S Lr. Lc Sc wr Jo c Kr Ly myllll� rc)vo r1 1, ,',I , i 111 / r - 5 -'� J t � L' i is -+- � ,, >I �LYr:- / / L\ 1ti " i Cr EN, 'Kr Kr Hill LL. Z4 r CIL, L LY K r 1 0 IZ, r n Pnl! -ry 17.1 "'i y Kr It A , . R111111 Kr L9 PROJECT: STILT_ MEADOW PROJECT V: PVT+-271 DATE: 08I29102 NEW HANOVER COUNTY STORMWATER TOTAL DRAINAGE AREA (AC) PROPOSED IMPERV AREA (AC)= 3.47 % 1MPER AREA = 0.385 PROPOSED PERVIOUS AREA (AC)= 5.55 % PERVIOUS STATE REQUIRED STORAGE FOR 1ST IN OF RAINFALL RUNOFF = 0.05 + 0.009 X °IAMPERV = RUNOFF = 0.306310311 REQUIRED VOLUME = 1.0 IN X RUNOFF X AREA X 43560 SFIACII2 INIHR VOLUME (CF) = 1297& STATE REQUIRED SURFACE AREA 00 % TSS REMOVAL 5.0 FT DEEP POND, 38,5% IMPERVIOUS SAIDA = 2.71 SURFACE AREA (SF) =SAIDA X AREA X 43560/100 110648 USE PREDEVELOPMENT C = 0.25 USE FULLY DEVELOPED C = 0.95 PROPOSED COMPOSITE "C" = .95 X .385 + ,25 X .615 INTENSITY WITH 5 MIN T, 2 YR INTENSITY (INIHR)= 5.88 10 YR INTENSITY(INIHR)= 7.23 25 YR INTENSiTY(INIHR)= 8.15 100 YR INTENSITY(INIHR)= 9.6 2 YR. PREDEVELOPMENT FLOW 0 � CIA Opre(CFS) = 13.3 C = 0.25 1 (INIHR) = 5.88 A = AREA(AC) :9.02 2 YR. POST DEVELOPMENT FLOW Q = CIA Opost(CFS) = 27.5 C = 0.52 1 (INIHR) = 5.8E A = AREA(AC) =9.02 10 YR. PREDEVELOPMENT FLOW Q = CIA Opre(CFS) = 16.3 C = 0.25 I (INIHR) = 7.23 A = AREA(AC) = 9.02 10 YR. POST DEVELOPMENT FLOW 0 = CEA Qpost(CFS) _ 33.0 C = 0.52 1 (INIHR) = 7.23 A = AREA(AC) = 9.02 25 YR. PREDEVELOPMENT FLOW 0 = CIA Opre(CFS) = 18.4 C = 0.25 1 (INIHR) = 8.15 A = AREA(AC) = 9.02 25 YR. POST DEVELOPMENT FLOW 0 = CIA Qpost(CFS) = 38.2 C = 0.52 1 (INIHR) = 8.15 A = AREA(AC) = 9.02 100 YR. PREDEVELOPMENT FLOW Q = CIA Qpre(CFS) = 21.G C = 0.25 i (INYH{R) M 9.60 A = AREA (AC) 9.02 100 YR. POST DEVELOPMENT FLOW 0 = CIA Qpost(CFS) = 4 5. 0 C = 0.52 1 (INIHR) _ 9.60 A = AREA(AC) 7 9.02 PROJECT: STILI. MEADOW PROJECT t/: PW-271 DATE: 08/29/02 SOIL AS GIVEN BY THE NEW HANOVER COUNTY SOIL SURVEY - MURVILLE, LEON, LYNN HAVEN HYDROLIC GROUP "C" CURVE NUMBER IMPERVIOUS = 98 OPEN SPACE (75% GRASS) = 74 COMPOSITE CURVE NUMBER (CN) = 98 X (.385) } 74 X (.615) = 83.23 S = (10001CN) -10 = 2.014 PRECIPITATION 2 YR 24 HOUR STORM (IN) = 4.50 PRECIPITATION 10 YR 24 HOUR STORM (IN) = 7.00 PRECIPITATION 25 YR 24 HOUR STORM (IN) = 8.05 PRECIPITATION 100 YR 24 HOUR STORM (IN) = 10.00 2 YR RUNOFF =(P - .2S)^21(P + .8S) = 2.75 10 YR RUNOFF =(P - .2S)^2/(P + .8S) = 5.05 25 YR RUNOFF =(P - .2S)"2/(P + .8S) = 6.05 100 YR RUNOFF =(P - .2S)^2/(P + .8S) = 7.93 TIME TO PEAK (Tp) (MIN) = (43.5 X AREA X RUNOFF)/POST Q 2 YR Tp (MIN) = 39A 3 10 YR Tp (MIN) = 58.55 25 YR Tp (MIN) = 62.21 100 YR Tp (MIN) = 69.21 REQUIRED STORAGE 2YR STORAGE (CF) = (Opost - Qpre)Tp X 1.30 X 60 = 46618 10YR STORAGE (CF) = (Qpnst - Qpre)Tp X 1.30 X 60 = 85776 25YR STORAGE (CF) = (Opost - Qpre)Tp X 1.39 X 60 = 102727 100YR STORAGE (CF) _ (Opost - Qpre)Tp X 1.39 X 60 = 13462.4 POND DIMESIONS AND VOLUMES BELOW PERMANENT POOL ELEV. SAFOREBAY VOL FOREBAY SA POND (FT) (SF) (Cr) (SF) 14 4G3 3964 19 2675 7845 12469 TOTAL 7845 TOTAL % FOREDAY 16.0 POND DIMENTIONS AND VOLUMES ABOVE PERMANENT POOL ELI=V. SA POND INCREMENTAL CUM VOL (FT) (SF) VOL (CF) (CF) 13 14044 20 17457 1G201 16201 21 19477 18467 34658 22 21159 20318 54086 23 22890 22025- 77010 24 24676 23783 100793 25 27741 26209 127002 2G 31701 29721 156723 STATE STORAGE DEPTH= 0.50 STATE STORAGE POND ELEVATION = 19.80 2 YR STORM STAGE(FROM ROUTING)= 2.63 2 YR STORM POND ELEVATION = 21.63 10 YR STORM STAGE(FROM ROUTING):4.05 10 YR STORM POND ELEVATION = 23.05 25 YR STORM STAGE(FROM ROUTING):4.70 25 YR STORM POND ELEVATION = 23.70 100 YR STORM STAGE(FROM ROUTING 5,84 100 YR STORM POND ELEVATION = 24.84 VOL POND (CF-) 41083 41083 s PROJECT: STILL MEADOW PROJECT #: PW-271 DATE: 08/29/02 DRAWDOWN TIME (2-5 DAY) TOTAL STORAGE (CF) = 12976 2 DAY FLOW (CFS) = 104001(2 X 24 X 60 X 60) = 0.075093924 5 DAY FLOW (CFS) = 109401(5 X 24 X 60 X 60) = 0,030037560 O=AXCd(2XGXH)".5 A=AREA Cd = ORIFICE COLFF. = 0,0 G = GRAVITY = 32.2 F/SEC^2 H=HEIGHT(FT) 0.80 2 DAY AREA A = 0!(Cd(2 X G X H)".5 (SF) 0.02464 DIAMETER (IN) = 5 DAY AREA A = Ol(Cd(2 X G X H)^.5 (SF) 0.00986 DIAMETER (IN) = DRAWDOWN ORIFICE IS 2.0 INCHES IN DIAMETER DRAWDOWN RATE(CFS) 0.06644 DRAWDOWN TIME (DAY) 2.26036 EMERGENCY SPILLWAY DESIGN O = 3.3LH"1.5 100 YR O(CFS;45.0 L (FT) ? H (FT) = 1 LENGTH (FT) = 14 RIP RAP APRON APRON AT FES OUTFALL PIPE DIAMETER = 3C" = 2.5' FROM 25 YR PIPE DESIGN SHEET, VELOCffY = 4.58 FPS ZONE 2 CLASS 8 APRON MATERIAL LENGTH = 6 X DIAMETER = 6 X 2.5' = 15' WIDTH = 3 X DIAMETER = 3 X 2.5' = 7.5' OUTFALL APRON TO BE 7.5' WIDE X 15' LONG X 18" THICK 2.13 1.34 S � v � J m � w to a IL O Z) F- m_ ul LL O L J w a_ [L C F-tj mwu]NN r]mvmrntnMo� .r �n N w ] r� rn r cn � w � a, N m a n M v UJ 111 CO CO [D m n O O W IL � 1- m O M N W F J � J m m N Q Q m m W m m N m 0 Q m m O J m 1ul u] J] m [D tT} m m fv m N to N m N V N ty M lL n. > LL M 4 rl W 4'] u� u] u'] O N Z '- •- N tv � .- UI — �v Ntntn mC] naa Qtfl mr-vo � N I. W tD r] In O O v rn lG r� m 1� m Q n m m m O m O V m f� r al I- N N lu —x IL - rU a U Q O a v)Z N o N N cn 0 0 CL U �j U Lll (L R r O o a o o F- lu { 1 W L X LU Q O o o c� O 4 O O rj O o C,7 In fl. U U W r r '�- ul o[i co c�i m ao w W m m m m to m W m rn u •. 2 t., .n �r] •n �n in In Ln .n in in In 1n CL O V - U N m w ul m } p Cn N n. UJ o — d Y (D } a U k() F- W O ul O :L J o U U = F F � J z [Y 2 vrnomr. �nr�,Mr�r�wM�no rn w i- •r F-- O Ci .- N C] Q O O p r O r N rn O ❑. 'NiQ LLJ W � J O 4J ( 7 LU T n 1 < F O IN In o to to rn v J w Z <L F- V to V If] O ._. N VIV . I. p 0 00 } w m o 000 00 00 00 o I.0 Uy U iC 0 S rn �. w _i 0 CW7 ,JJ LLA N U n N N to N M v v] v v, v1 tr �n ill ?f to FO ❑ u (] D U U U 0 V U O L1 p U u. W L W 1� zD 0 p d w¢ w (C ¢ U s n j Q 0 m r r N M r N M O In v m N V <p f• n a J 11 O NCDENR STORMWATER MANAGEMENT PLAN STILL MEADOW VILLAGE APARTMENT PHASE 2 SI :1�'i 1=.M13:1`�1z 3, 2002 R1=a.VIS.h,D �N �AR04 D 1_�,C E, MB I--E,R 3, 2002 ` O .•;sss ro ' •.-� -: • O �'-° .0 SEAL . - CIA [-{,N'l.': SOU 1'1-1 COI--L1-G1=? .ASSOCIA'T':I=JS 1?O .13OX 586 . F . f— DURAM,,NC- 27702 •'�`�� ;,�,, STROUD LNGINELRING, PA. 102D MARKET ST. W LMINGTON, N.C. 28403 (910) 815-0775 l -'ilc f:\master\hw-271 \wpd\cicnrswco\,.wpc4 it PROJECT: STILL MEADOW PROJECT #: PW-271 DATE: 08129/02 REVISED: 1213/2002 NEW HANOVER COUNTY STORMWATER TOTAL DRAINAGE AREA (AC) PROPOSED IMPERV AREA (AC)= 3.47 % IMPER AREA = 0.385 PROPOSED PERVIOUS AREA (AC)= 5.55 % PERVIOUS = 0.615 STATE REQUIRED STORAGE FOR i ST IN OF RAINFALL RUNOFF = 0.05 + 0.009 X %1MPERV = RUNOFF = 0.396310311 REQUIRED VOLUME = 1.0 IN X RUNOFF X AREA X 43560 SF1AC112�1WHR VOLUME (CF) = 12976 STATE REQUIRED SURFACE AREA 90 % TSS REMOVAL 5.0 FT DEEP POND, 38.5% IMPERVIOUS SAIDA = 2.71 SURFACE AREA (SF) =SAJDA X AREA X 43560/100 110648 POND DIMESIONS AND VOLUMES BELOW PERMANENT POOL ELEV. SA FOREBAY VOL FOREBAY SA POND (FT) (SF) (CF) (SF) 14 463 2986 15 782 623 4274 16 1167 975 5626 17 1612 1390 7037 18 2114 1863 8504 19 2910 2512 11873 TOTAL 7362 TOTAL % FOREBAY 18.3 POND DIMENTIONS AND VOLUMES ABOVE PERMANENT POOL ELEV. SA POND INCREMENTAL CUM VOL (FT) (SF) VOL (CF) (CF) 19 14783 20 17457 16120 16120 21 10477 18467 34587 22 21159 20318 54905 23 22890 22025 76930 24 24676 23783 100713 25 27741 26209 126921 26 31701 29721 156642 STATE STORAGE DEPTH= 0,80 STATE STORAGE POND ELEVATION = 19.80 DRAWDOWN TIME (2-5 DAY) TOTAL STORAGE (CF) = 12976 2 DAY FLOW (CFS) = 104901(2 X 24 X 60 X 60) _ 5 DAY FLOW (CFS) = 109401(5 X 24 X 60 X 60) _ Q= A X Cd(2 X G X H)A.5 A= AREA Cd = ORIFICE COEFF. = 0.6 G = GRAVITY = 32.2 FISECA2 H=HEIGHT(FT; 0.80 2 DAY AREA A = QI(Cd(2 X G X H)A.5 (SF. 0.02458 5 DAY AREA A = Q1(Cd(2 X G X H)A.5 (SF: C.00983 DRAWDOWN ORIFICE IS 2.0 INCHES 1N DIAMETER DRAWDOWN RATE(CFS) = 0.06661 DRAWDOWN TIME (DAY) 2.25474 VOL'POND (CF) 3630 4950 6332 7771 10189 32871 0.075093924 0.030037569 DIAMETER (IN) = 2.12 DIAMETER (IN) = 1.34 r .T NCDENR STORMWATER MANAGEMENT PLAN STILL MEADOW VILLAGE APARTMENT PHASE 2 S 1=' l-l"fT--W Bj-R 3, 2002 04 DI=�C.I=.MB��.R 3 2002 .`•P� �,...[... �0 "r • n n C1:.1 F-"N'1'. SOUTH COLT I-GFEI ASSOCTAITf �',s DURFIAM, NG,'127702 STRO UD ENGINEERING, P.A. 102D MARIU T ST. WILMINGTON, N.C. 28403 (910)815-0775 1{ilc f.\masrct7\pw-271 \wpcl\dcm•swcov.wpcl PROJECT: STILL MEADOW PROJECT #: PW-271 DATE: 08129/02 REVISED: 121312002 NEW HANOVER COUNTY STORMWATER TOTAL DRAINAGE AREA (AC) PROPOSED IMPERV AREA (AC)= 3.47 % IMPER AREA = 0.385 PROPOSED PERVIOUS AREA (AC)= 5.55 % PERVIOUS STATE REQUIRED STORAGE FOR 1ST IN OF RAINFALL RUNOFF = 0.05 + 0.009 X %IMPERV = RUNOFF = 0.396310311 REQUIRED VOLUME = 1.0 IN X RUNOFF X AREA X 43560 SFIACII2 INIHR VOLUME (CF) = 12976 STATE REQUIRED SURFACE AREA 90 % TSS REMOVAL 5.0 FT DEEP POND, 38.5% IMPERVIOUS SAIDA = 2.71 SURFACE AREA (SF) =SAIDA X AREA X 43560110D 110648, POND DIMESIONS AND VOLUMES BELOW PERMANENT POOL ELEV, SA FOREBAY VOL FOREBAY SA POND VOL POND (FT) (Sr) (CF) (SF) (CF) 14 463 2986 15 782 623 4274 3630 16 1167 975 5626 4950 17 1612 1390 7037 6332 18 2114 1863 8504 -.--7774 19 2910 2512 11873 10189 TOTAL 7362 TOTAL 32871 % FOREBAY 18.3 POND DIMENTIONS AND VOLUMES ABOVE PERMANENT POOL ELEV. SA POND INCREMENTAL CUM VOL (FT) (SF) VOL (CF) (CF) 19 14783 20 17457 16120 16120 21 19477 18467 34587 22 21159 20318 54905 23 2289C 22025 76930 24 24676 23783 100713 25 27741 26209 126921 26 31701 22721 156642 STATE STORAGE DEPTH= 0.80 STATE STORAGE POND ELEVATION = 99.80 DRAWDOWN TIME (2-5 DAY) TOTAL STORAGE (CF) = 12976 2 DAY FLOW (CFS) = 10490I(2 X 24 X 60 X 60) = 0.075093924 5 DAY FLOW (CFS) = 109401(5 X 24 X 60 X 60) = 0,030037569 Q= A X Cd(2 X G X H)",5 A= AREA Cd = ORIFICE COEFF, = 0,6 G = GRAVITY = 32.2 FISEC"2 H=HEIGHT(FT; 0,80 2 DAY AREA A = QI(Cd(2 X G X H)".5 (SF 0.02458 DIAMETER (IN) _ 5 DAY AREA A = QI(Cd(2 X G X H)".5 (SF. 0.00983 DIAMETER (IN) _ DRAWDOWN ORIFICE IS 2.0 INCHES IN DIAMETER DRAWDOWN RATE(CFS) = 0,06661 DRAWDOWN TIME (DAY) 2,25474 r 2,12 1.34 I