Loading...
HomeMy WebLinkAboutSW8011117_CURRENT PERMIT_20020509STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW� DOC TYPE CURRENT PERMIT � APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Michael F. Easley, Governor �F W A TES, C �i } William G. Ross, Jr., Secretary �i North Carolina Department of Environment and Natural Resources r Gregory J. Thorpe, Ph.D., Acting Director .� Division of Water Quality Wilmington Regional Office May 9, 2002 Mr. Pat Hall, Pastor Free Will Baptist Church S� l 913 Dickens Drive ' � <( VA'iltrtington, NC 28405 ��` Subject: Permit No. SW8 011117 Free Will Baptist Church High Density Stormwater Project New Hanover County Dear Pastor Hall: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Free Will Baptist Church on April 30, 2002. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 1 5A NCAC 2H.1000. We are forwarding Permit No. S WS 011117 dated May 9, 2002, for the construction of Free Will Baptist Church. This permit shall be effective from the date of issuance until May 9, 2012, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North -Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, -Rick Shiver Water Quality Regional Supervisor RSS/arl: S:IWQSISTORMWATIPERMl.T1011117.MAY cc: James Fentress, P.E. New Hanover County Building Inspections Beth E. Wetherill, New Hanover County Engineering Linda Lewis Wilmington Regional Office Central Files NCDENR N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 State Stormwater Management Systems 4 Permit No. SW8 011117 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Pat Hall, Pastor, Free Will Baptist Church Free Will Baptist Church New Hanover County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered apart of this permit. This permit shall be effective -from the date of issuance until May 9, 2012,.and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of .stormwater described in the application and other.supporting data. .2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, -the Project Data Sheet. The stormwater control has been designedto handle the runoff from 41,635 square feet of impervious area. All. overflows from the system must pass through a.50'-vegetated filter. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The runoff from the 25 year storm is proposed to be contained within the basin, therefore, a bypass structure for the storm event in excess of 1.5" is not required. 6. The runoff from all built -upon area within thepermitted drainage area of this project must be directed into the permitted stormwater control system. 2 t State Stormwater Management Systems Permit No. SW8 011117 Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Name of Receiving Stream/Index #: Classification of Water Body: Basin Depth, feet: Bottom Elevation, FMSL: Drainage Area, acres: Total Impervious Surfaces, ft2: Offsite Area entering Basin, ft2: Required Storage Volume, ft3: Provided Storage Volume, ft': 25.year Storage Elevation, FMSL: Type of Soil: Expected Infiltration Rate: Seasonal High Water Table Elevati Time to Draw Down: Controlling Orifice: DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Free Will Baptist Church SW8 011117 New Hanover County Mr. Pat Hall, Pastor Free Will Baptist Church 913 Dickens Drive Wilmington, NC 28405 April 30, 2002 Cape Fear / Pages Creek / 18-87-22 "SA" 1.25 10.0 2.81 41,635 none per engineer 5,449 15,301 13.0 Kalmia 6 inches per hour on: 7 FMSL 8 hours Bypass at 13.0 3 State Stormwater Management Systems Permit No. SW8 011117 H. SCHEDULE OF COMPLIANCE l . The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety -and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f Debris removal and unclogging of bypass structure, vegetated filter, catch basins and piping: g. - Access to the basin and bypass structure must be available at all times. 4. Records of maintenance activities must -be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing.the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation.of this permitted facility, a certification must be received from 'an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must -be noted on the Certification..A modification may be.required for those deviations. 8. If the stormwatersystem was used as an Erosion Control device, it must be restored to design condition_prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. 'The .permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any.modification to the approved plans., including, -but notlim'ited to, .those listed below: a. Any revision to any.itern shown on the approved -plans, including the stormwater management measures, built -upon. area, details,.etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area.or to the drainage area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a'CAMA Major permit was sought. f. Filling in, altering,. or piping of any vegetative conveyance. shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans; prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the:permit must be submitted and approved prior to construction. 4 State Stormwater Management Systems Permit No. SW$ 011117 11. A cop), of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 13. Prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 14. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the permitted built -upon area is directed into the permitted system. 15. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet the minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. Responsibility for compliance with all permit conditions remains with the Permittee until such time as the Division approves the formal permit.request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute '143-215.6A to 143-215.6C. 3. The.issuance ofthis permit does not preclude the Permittee from complying with any and all statutes, rules, regulations,.or ordinances which may be imposed.by other government agencies (loedl, state, and federal) which have jurisdiction. 4. In the event.that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the-construction•of additional or replacement stormwater management systems. 5. The permittee ;grants DENR-.Staffto enter the.property during normaYbusiness hours for:the purpose of inspecting -all comp6nents of the permitted stormwater management -facility, 6. The permit may be modified, revoked -and reissued or terminated for cause. The -filing of.a-request for a permit -modification, revocation and reissuance or termination does not stay any permit condition. 7.. Unless specified elsewhere, permanent seeding- requirements for.the stormwater -control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Permit issued this the 9th day of May, 2002. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Gregory.J. Thorpe, Ph.D., Acting Director Division of Water -Quality By Authority of.the Environmental Management Commission 5 State Stormwater Management Systems Permit No. SWS 011117 Free Will Baptist Church Stormwater Permit No. SWS 011117 New Hanover County Designer's Certification 1 as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date State Stormwater Management Systems Permit'No. SW8 011117 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4.. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions -of the system, as shown on the approved plans, .are provided. cc: NCDENR-DWQ Regional -Office New Hanover County Building Inspections 7 U171.1C 1:.U51,,()Nl Y? f late Received fee Paid 1'ernit Number State of North'Cirolina Dep1rtinent of Environment ind-Natural Resources Division of Waicr Quality STORMWATER MANAGEMENTTERMIT APPLICATION FORM This form maybe photocopied for use as an original 1. GENERAL INFORMATION 1. Applicants naive (specify the name of the corporation, individLial, etc. who owns the project): Free Will Baptist Church - 2. Print Owner/Sigriing Official's name and title (personjlegally responsible for facility and compliance): Pat Hal I, Pasror _ 3. Mailing Address for person listed in item 2 above: 913_Dickens Dri tiP,___ City: Wi 1mti,___n�nn State: N(- Zip:J2$AL5 _ Telephone Number: ( 910 } 793-6005 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and rnai n tenn lice agreements, etc.): Free Will S. Location of Project (street address): Hnl13r TrP City: Wilmington _ County: Npw 14nnnvar 6. Directions to project (from nearest rrlajor intersection) 7. 1_atitude: 34011' 45" N Longitude: 7705211711 W of project S. Contact person who can ansiver questions about the project: Name: James H.-Fentress, Jr. P.F.- Telephone Number: 11. PERMI`1` INFORMATION: 1. Specify wlletiler project is (check one): X _ New Renewal ^ Modification Form SWU-101 Version 3.99 Pca,e 1 0r4 2. If this 1p1)liCaLiO11 is being submitted a:: the result of a renewal or modification to all exiS irlg perariit, fist the existing; permit number _ and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density _Redevelop General Permit Other 4. Additioml Project Requirements (check applicable Blanks): _CAMA Major X S&Iilnentation/) rosion Control. :.__ __404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. M. PROJECT INFORMATION 1. In the space provided below, summarize how ,torrnwmor will be treated. Also attach a detailed narrative (one to two pages) describing stormwater aiwuigement for the project. stormwnver will ha en11 ertPd in on of 6 dx enti n._n - and for releaSp_ 2. Stormwater runoff from this project drains to the Cape Fear_-.__ River basin. 3. Total Project Area: 2.81 acres 5. 1low many drainage areas does the project have?_ A.. Project Built Upon Area: • 34.0 11/1) G. Complete the following; information for each drainage area. If there are more than two drainage areas in the, project, attach an additional sheet with the information for each area provided in the Same format as below. I3asrn InlorrtiltrgLr' I?i�ina �3A, c"I 1 .. �:.+.wx..o .r r3uAsn £# llraril,L c Ari .--4.. H°x.,?&r:.; .,.•ea Receiving; Strearn Name Hewl(Atts Creek I.eceiving; Stream Class SA Drainage Area Existing laipervloLls Area 0 Proposed Impervious'Area 'X) IlnpervlOLlsw Area (total) 34.0 Imiervtous Suiface Area W ` Diaullg;e,;11Lc�a 1 , x 'y£ Iarasn�I;e Area L On -site Buildings 7075 sf On -site Streets On -site Parking On -site Sidewalks 3855 sf Other on -site recreation Off -site Total: 1 sf Total: Iurpei-viousarea is defined ns the built upofr area, irrclirdhf,�,.brr1 Not linrited to, buildings, roads, parking areas, sidewalks, ;ravel arcns, etc. Dorm SWU-101 version 199 Page 2 oC4 7. , flow was the off -site impervious arca listed above derived? IV. DEED RESTRUC1'IONS AND PROTECTIVE COVENANTS The following italicized deed-Testrictlons and protective covenantS are required to be recorded for all subdivisions, outparcels and future development prior to thc'sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. I. The follorvinS covenants are intenrlet I I ensure ongoing conipiliarrce with slate storrmvalei, rnanagmenI po-rtrit nrrrnber as issued'by [lie Division of Water• Quafily. These covenants may not be changed or deleled Tvithout lire cwl5orl of the Slate. 2. No uror'e than square feet of any lot shall be covered by structures or irtrpervions materials. Irnp'r-vious tnalerurls include n.splralt, gavel, concrele, brick, -stone, slate or srrrrIlar nin fer iol but do not include wood decking or the Tvalcr• surface of sTvirnrrring pools. 1 Swales shall nol be filled in, piped, or altered except as necessary to provide driveway crossings. Built -upon area in excess of the perrnifled atnorrnt requires a slate storrmoater rrranay>emeni pertnil rnorfrficalion prior to construction. S. All permitled runoff frorn out parcels or frtlfire development shall be directed inlo the perurif led slortn-wier conlrol system. These connections !a the storrtrwater cotrtrol system sfrall be per farmed irT a rnarurer that manTtaitrs the integrity and perforurance of the system as permitfed. By your sigi)ature below, you certify that the recorded de ed-restrictions and protective covenants for this project s11a11 include all the applicable items required above, that Lite covenants will be binding on all parties and persons claiming under them, that they will run with the ]and, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of ;any lot. V. SUITLI'ME:NT F0ItMS The applicable state storsnwaler managernent permit supplement forms) IrstCd MOW ia11FSt be. submitted for each I3MP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5053 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration BZISin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 NeUSe River Basin Supplement Form SWU-109 Innovative Bcst Management Practice Supplement Form SWU-101 Version 3.99 pige 3`or4 VI.;,UI;A'1111,�I.i,i1l_Jt_lii.1.C.;i-,,\I:) Only culnl.rlele appl;cat;o11 p:lck wes will be accepted and revs:�sved by llic Division of W,11cr QLI:Ilily (DWQ). A complete p;lckago includes all of (he items listed hr�im� . The complete application package should be submitted to the appropriate D14VQ Regional Office. Please hldirtle that you hLive provided the followill; retluircd illfornl,_ll;on by initialing in the space provicled next to each ito'rn. InitiMs • Original and one copy of the Storrrlwaler Mallaf,ement PLrmit Application form CNS • One copy of the Supplcment.Form(s) for each BNIP • Permit application processing fee of {G420 (payable to NCIDENR) • Detailed nnrrntive description of storrnwater treatment/managerzlent _ CAS _ • TWO copies of plans and spec;f;cal-ions, incluclirls;: C� - Development/Project name - Engineer and firm - Legend - North arrow - Scale Revision number & date - Mean high water line Dimensioned property/project boLrrl(l U%1 - Locntion map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor clevntions - Dotn;ls of roads, drainage features, collection .yr teim, and storrnwater control measures. - Wetlands delilleated, or a note on plans lh,lt:lone exist - Existing drainage (including off -site), drairlilge easernents, pipe sixes, runoff calculations - Driiiniige areas delineated - Veretatcd buffers (-xhere required) VII. AGr'NT'AU'iHORIZATION If you wi�.h to desij;'Mlte "rtlthor ity to,'mother illdividunl or firm so that they may provide information on your behalf, please complete this section, _. Designated agent (individual or firm): ------ S_trou�) --- Mniling Address:_ Ia2 D C'inen_— City:�__-- P110ne:.L_210____ _)_ — _ VIII. APPI_1CA)`1T'S Cf:RTII=ICATION 1�nx: Lqt n ____)_.-__gi 5-0 -3 — 1, (p)-int or l ypc Jrrrrlrc of j 'r au ldsint in Gi-itnv! hif n-mitt iort, ilcra 2) ___.Pat Hall certify lhilt Lhe irllorrnilLi011 included 011 this: permit appliptiolt brill is, to the best of rn, knowledge, correct and that the project will be constructed in conforinnnce with the approved plans, that the requii-ed deed restrictions and protective covenants will be � orded, and thin the proposed project complies with the requirements of '15A NCAC 21-1 .-1000. Signatilre: roan (-,WU-101 Version 199 11:1t'e .1 of=1 0 w Permit No. (to be provided by DNVQ) State of North Carolina Department or Environment'and Natural Resources Division of Watcr,Quality STORMWATER MANAGEMENT PERMIT APPLICATION CORM INFILTRATION BASIN SUPPLEMENT This form may he photneopit!.d far rise ns an original DWQ Stormwatcr Management flan Review: A cornplete stormwater management plan submittal includes a stori-nwatcr management permitapplication, an infiltration basin Supplcmcnt for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. 1. PIZOJrCT-INFORMATION Project Name ; FREE WILL BAPTIST CHURCH ContactPcrson: JAMES H. FENTRESS, JR„ P.E. .Phone Number: 910 815-0 7 This worksltcet applies to: Basin No. ' in Drainage Area (usrilenlrJrerlurrplrurs) (frnnrt'urur.ti'W1J•tfllJ IL DESIGN INFORMATION - Attach Supporting calculations/(locumerttation. The soils report must be based upon an actual field investigation and soil bpri,ngs. County soil maps are not an acceptable source of'soils information. All elevations sliall be in feet mean sca level {fmsl). Soils Report Summary Soil Type KALMIA Infiltration Rate 6.0 in/hr or ci/hi/sf' (circle appropriate routs) Si-wr IJlcvation 7.0 fmsl (Svei.v'yho'i High FKatcr Table elevation) Basin Design I'.11'a111eters Design Storm I,_ inch (1.5 lnrh event,%ar SA waters, 1 inch even! fur others) Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation ros'rrr'swu-103 Rev 3.99 5449 c.1" 0.122 clays 102 11. X 67 _ ft. =371,9 sq. ft.', (bounnr dimensions) 15301 c.t: 10.0 fmsl 11.25_ 1'111sl 13.0 !'n1sl Parp1of",' Il 1. RhQuiim) 1'n-i mS ClmCl(us'r The following checklist outlines design requirements per tll-c Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 21-1 .1008. Initial in the space provided to I11dictttC that the following design requirements leave been met 011d supporting clocumCntation is attaChCd, if the applicant has dcslgnatc(1. an agent in the Stormwater Management Permit A'Pplication Form, the,ngent may initial below. Attach justification if a requirement has not been met. Applicants Initials ' fl. b. c� d. c. N4 on j. k System is located 50 feet from class SNwaters and 30 feet from other surface waters. System is located at least 100 feet from:water supply wells. Bottom of system is at least 2 feet aboVc the seasonal high water table. Bottom of the system is 3 feet above any Ucdrock or impervious soil liorizon. System is not sited on or in [ill inaterial-or DWQ approval has been obtained. System is located in a recorded drainage casement for the p111'posCs of operation and maintenance and has recorded access casements to the nearest public right -of' -way. Drainage irca for the device is less tlla11`5 acres, Soils have a minii11uib hydraulic concliictivity of 0.52 inches per hour ant] soils report is attached. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ), Design volume and infiltration calculations attached. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces c11•aining to the system, inckudiiig any off -site drainage. Calculations attached. All side slopes stabilize([ with vegetate(] cover are no steeper than 3: I (I-l:V). A pretreatment device such as a catch';basin, grease trap, filter strip, grassed swale or sediment trap is provided. In, Bottom of the device Is covcrccl with-,i layer ofelean sand to an average depth of'd inches or dense vegetative cover is provicicd. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribut'sott mecliatlisnl within the basin is provided. S p. A benchmark is provide(] to determine fhc sediment accumulation iEl thc-p,retrcatmcnt (levicc. q. Runoff in Cxccss of tl1C design vohimc bypasses off -lint systems (bypass cletail provided). r. System is designed to draw clown the design storage volume to the proposed bottom_ Clcvation Under Seasonal Vigil water conditions within five clays. A'soEls report and all pertinent draw -down calculations are.attached. s. Plans ensure that the installed systetn'wiil meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 oC. 3' IV. INF11aTRA110N BASIN OPERATION AND Wi I.N'1'rNANCE AG21mMr-N r 1. Alter every runoff prOdLlCltlg rainfall event and at least monthly inspect the infiltration system for erosion, tl'aSl1 aCCU11111latloll, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessaiy to; maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every l-1,11101Tpraducing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any;blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment sllall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment uiiit. The benchmark will C10cument the original design depth so that accurate sediment accumulation i.eadings can be taken. The measuring device used to determine the depth at the benchmark shall be such that•it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads 2.25 feet in the ptetreatment unit, the sediment shall be removed 1'rom both the pretreatment unit and thc'infillration basin. 5. lithe Division (Ietel-Illilles that the systern is failing, tlic,systcm will immediately be repaired to original design specifications, lithe system cannot be repaired! to perform its design {unction, other stormwater control devices as allowed by NCAC 21-1 .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that l am i'csponsible for the performance ol'the five maintenance procedures listed above. I agree to notify DWQ of tiny problems with the system or prior to any changes to the system or responsible party. Print Name and Title: PAT HALL, PASTOR Address Phone Signat 913 DICKENS DRIVE, WILMINGTON .e Nine: The let;rrll, rca'porr.cible puny slrnulrl nn! he u homcnts here uc.cociafinn Itnless more rlrurr 50%_af the lnl.+ lrrrnc been sulr! unrl u ru.61(mf ql the Rttbrlivision hos been named the president. � )+ r t„nM/� , :, Nouary Public Ibr the Stale or - �Connty of N9 u MoVa/L , do hereby ccrt'sfy that. (� JK personally apkarcd before me this 3 day or o=, and acknowledge the dne Ck'e ution of the forgoing infiltration basin m: intminee regtiircments. Witness my har"i,nd�l�'(j�nl�Iggl�'l1lry/��j� SiAI_ �r APRIL *' 24 ' � •:� 2005 �* corm S W U-103 , ?YEa-co �V My eonimission expires Page 3 or-3