Loading...
HomeMy WebLinkAboutSW8010918_COMPLIANCE_20011204STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION ire DOC DATE a?�lollf�-1 YYYYMMDD DETENTION POND ANALYSIS FILE NAME- S:\WQS\POND\ 010918.WK1 PROJECT#: SW8 010918 REVIEWER- nml PROJECT NAME: Shallotte Microtel DATE: 04-Dec-2001 Receiving Stream: ut Shallotte River Class. C Sw HQW Chlorides: n/a Drainage Basin: Index No. Site Area 1.90 acres Drainage Area square feet Area in Acres 1.90 IMPERVIOUS AREAS Rational C Buildings 8156.00 square feet Parking 33019.00 square feet Sidewalks 1882.00 square feet square feet square feet square feet TOTAL L square feet Rational Cc= 0.10 SURFACE AREA CALCULATION % IMPERVIOUS 52.02% SA/DA Ratio 2.00% Des. Depth 7 Req. SA 1656 sf TSS: 90 Prov, SA VOLUME CALCULATION * place a "'I" in the box if Rational is used I Rational ?* Des. Storm inches Rv= 0.52 Bottom 21 msI Perm. Pool ]msI Design Pool 30 msl Design SA 6807 sf Req. Volume •cf Prov. Volume 856': cf ORIFICE CALCULATION FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= SA @ Elevation-- 13984 2796.8 2817.00 ..i�20.-.1�%�` Avg. Head = 0.98 ft Q2 Area = 0.62 in 2 Flow Q2, cfs 0 ' '021 cfs Q5 Area = 0.25 in 2 Flow Q5, cfs 0.008 cfs Orifice Area 0.44 in' No. of Orifices 0.015 cfs Diameter, inches or weir H x W in x Drawdown = 2-8':days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines,ok - �J119101 Shallotte Microtel CDC Stormwater Calculations 01094 Total Drainage Area s , ft. acres 82,764 1.90 Impervious Area Land Use sq.ft. acres buildings 8.156 0.19 parkingiasphalt 1,882 0,04 sidewalk 33,019 0.76 Total 43,057 0.99 Stormwater Calculations: Time of Concentration Hydraulic Length (L) - 1.300 ft. change in Height (H) = 4.5 ft. Tc = (Ls I H)-�'" 1 128 17.29 min. Flow for 10 year, 6 hour Storm (Qio): QPRE _ (CPRE) X (110) x (Area) 2,99 cfs QPoS _ (CPon) x 010) x (Area) 7.42 cfs Soil Storage Capacity for 10 year Storm: CN = (98)(% imp.) + (45)(1-% imp.) 73 P - 4.82 in_ forl0yr, 6 hr storm S = 10001CN - 10 3,70 Depth (D)= [P-(0.2)(S)]21 jP+(0.8)(3)] - 2.14 in, Time to Peak Flaw: Tp = [(43.5)(D)(Area)] I O2,Posr 23.84 min. Detention Pond Design: Pond Size: Elevation ft. Surface Area (sq. ft. Normal Pool 28.00 5,049 Flood Pool 30.00 6,807 Top of Bank 31.00 7,770 Bottom of Pool 21.00 36 % impervious = 0.520 = 52.0% saX 52.0% CPRE = 0.25 CposT = (% imp.)(.95)+(1-% imp.)(.25) 0.62 l�o = 6.30 inlhf 12s = 7.13 in/hr Flow for 25 year, 6 hour Storm (Q25): QPRE _ (CPRE) x (I25) x (Area) 3.39 cfs Qpos _ (Cps) x (125) x (Area) 8.40 cfs Soil Storage Cmacq for. 25 xear, Storm: CN = (98)(% imp.) + (45)(1-% imp.) 73 P = 5.71 in. for 25 yr, 6 hr storm S = 1000/CN - 10 3.70 Depth (D)= [P-(0.2)(S)121 [P+(0.8)(S)j 2.85 in. Time to Peak Flow: Tp = [(43.5)(D)(Area)1 I QjgPosT 28,04 min. ,ytate 7urwe Area Keguirement at normal pooi: Pond side slopes = 3 :1 Depth below N.P. = 7 ft. SAMA = 0.0200 (Chart for 90% TSS Removal for Wet Detention Provided Storage Volume: Required SA = (SAIDA) x (Total Drainage Area) Vol. _ [(Normal pool SA + Flood Pool SA) ! 2] = 1. 55 sq. ft. x (F.P. elev. - N.P. elev.) 11.856 cu. ft. State Volume R uired for Storage of first 1' of runoff: Vol. = j(1112) x (DA) x (% imp.)] + J/7i [(1/12) x (DA) x (1-% imp.) x C] `�`��.��.�� CARplii, C = 0.2 2Q5 SI 9 4,250 cu. ft. 17374 Q GR�Gp� ���//l111I I k 111111��\\ Ise �, t�• \ 01094POND 1 of 2 9119/01 Shallotte Microtel CDC Stormwater Calculations Pond Volume: Bottom SA = 36 sq. It, Normal Pool SA = 5,049 sq, ft. Vol. _ [(N.P. SA + Bottom SA) 1 2] x (N.P. el. - Bottom el.) 13,984 cu.ft. Forebay: Required Volume Vol. 20% of total permenant storage volume 2,797 cu. ft. Outlet Structure Design: Flow for 2-day drawdown: for ist 1' of stormwater, Q = Required Vol. 1 172,800 sec. (2-days) = 0.025 cfs Required Area of Pipe for 2-day drawdown: A= Q 1(Cd x SQRT(2 x g x h)) Cd = 0.6 g = 32.2 fl.ls2 In = (F.P. elev.- N.P. elev.) 12 A = 0,0051 SCI.ft, Diameter of Pipe for 2-dav drawdown DIA. = SQRT[(A x 4) 1 pi] — 0.0806 fl. 0.97 in. 'Use: 0,75 in diameter pipe Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1-% imp.)(.25) a 0.62 1 = 7.13 in. for a 25 yr. Storm A = 1.90 Acres = 8.40 cfs Q= Cwx Lx H1.5 H= [01(CwxQfm Cw = 3 Peak elevation = flood pool elevation + H = 30.31 ft, Provided Volume Bottom SA = 560 sq. ft. Normal Pool SA = 1,318 sq. ft. Vol. _ [(N.P. SA + Bottom SA) / 21 x (N.P. el. - Bottom el.) 2,817 cu.ft. depth = 3 ft. Flow for 5-day drawdown: for 1st 1' of stormwater, Q = Required Vol. 1432.000 sec. (5-days) = 0.010 cis Required Area of Pipe for 5-day drawdown: A= Q I ICd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft.1s2 h = (F.P. elev. - N.P. elev.)12 1 ft. A= 0,0020 . ft. Diameter of Pipe for 5-day drawdown: DIA. = SQRT[(A x 4)1 pij 0,0510 ft, 0.61 in. r rr•M 01094PON D 2of2