Loading...
HomeMy WebLinkAboutSW8010420_HISTORICAL FILE_20041216STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 o 1042-6 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE IZIG Zoo4 YYYYMMDD State Stormwater Management Systems Permit No. SW8 010420 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commander Lawrence Readal, Public Works Officer, Marine Corps Base Tarawa Terrace 1, 11 and !ll Housing Replacement Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of 2 wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 16, 2014, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volumebf stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater controls Phase 1 D Pond and Phase III Pond have been designed to handle the runoff from 3,173,122 square feet and 755,001 square feet, respectively, of built - upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The permittee shall limit each drainage area to the maximum amount of built - upon area as indicated on page 3 of this permit, and per approved plans. 5. The Phase 1 D Pond and the Phase III Pond must each be operated with a 30' vegetated filter. 6. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the appropriate permitted stormwater control system. 2 k. State Stormwater Management Systems Permit No. SW8 010420 Modification The following design criteria have been approved for the proposed wet detention ponds, and must be maintained at design condition: Phase 1 D Drainage Area, acres: 151.43 Onsite, ft : 6,596,201 Offsite, ft2: 0 Total Impervious Surfaces, ft2: 3,173,122 Pond Design Depth, feet: 5.0 Permanent Pool (PP) Elevation, FMSL: 5.0 Provided Surface Area, @PP, ft2: 186,870 Temporary Storage Elevation, FMSL: 6.4 Provided Storage Volume, ft3: 277,930 Controlling Orifice: Time to draw down, days: Receiving Stream/River Basin: Index Number: I. Classification of'Water Body II. SCHEDULE OF COMPLIANCE 2 @5" 0 each 3.0 Phase III 43.12 1,878,243, 0 755,001 5.0 11.40 61,451 12.6 76,170 4" 0 2.5 White Oak 1 Northeast Creek 19-16-(3.5) "SC HQW NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. . e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 3 State Stormwater Management Systems Permit No. SW8 010420 Modification 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain draws its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. G. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in Phase 1A Pond is 113 horsepower, in Phase ID Pond is 3 horsepower, and Phase 11 Pond is 118 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 4 I e State Stormwater Management Systems Permit No. SW8 010420 Modification 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. State Stormwater Management Systems Permit No. SW8 010420 Modification 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 16th day of December 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission 7 December 14, 2004 Linda Lewis North Carolina Department of Environment and Natural Resources Division of Water Quality Express Permitting 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SWS 010420 Modification. Tarawa Terrace I Housing N62470-97-C-7111 Dear Linda: RiveRidge Engineering Company FECEIVEL) DEC 1 5 2004 BY: In response to your letter dated December 14, 2004, please find the attached the following information: - Items 1 & 2: We revised sheet I of the Wet Detention Basin Supplement to reflect the temporary pool elevation and storage volume at the 48" overflow elevation of 12.6. Included please find the following for your review: 1. Sheet 1 of the Wet Detention Basin Supplement. (2 each). 2. Supporting calculations. (2 each) Sincerely, RiveRidge Engineering Company Wendy Haustveit, P.E. Cc: Rick Marshall, HUNT Building Corp. David Byrd, HUNT Building Corp. Jim Lemon, Gile-Buck and Assoc. G:\04015102112MPFILFS\STORM WATER PERM ITTINGTH [H Stormwater permit Resubmittal cover letter 12-14-04.doc 405 W. Myrtle St. • Boise, ID 83702 208 344-1180 • Fax: 208 344-1182 W AMichael F. Easley, Governor r� OF TER QG William G. Ross, Jr., Secretary nF - rn 7 North Carolina Department of Environment and Natural Resources > D < Alan W. Klimek, P.E. Director Division of Water Quality FAX COVER SHEET Date: December 14, 2004 No. of Pages: 1 To: David Powell, P.E. From: Linda Lewis % Company: RiveRidge Engineering Water Quality Section - Stormwater FAX #: 208-344-1182 FAX # 910-350-2004 Phone # 910-395-3900 DWQ Stormwater Project Number: SW8 010420 Mod. Project Name: Tarawa Terrace MESSAGE: David: The Division received previously requested information regarding the subject project on December 9, 2004. The application is still incomplete. Please provide the following information prior to December 17, 2004, to complete the review: For the Phase III pond, you have calculated that the 1" volume will be stored at elevation 12.42, however, the 48" overflow pipe in the outlet structure is set at elevation 12.6. So, elevation 12.6 is the temporary storage elevation that should be reported on the supplement, not 12.42. The calculations are the place to determine the minimums required, and demonstrate how the pond has met those minimums. The supplement is where you report the elevations, areas and volumes that are PROVIDED in the pond, not the minimums necessary. r 2. The same logic applies to the temporary pool volume reported on the supplement. It should be the volume that is provided in the pond at elevation 12.6, supported by the calculations, which should show the surface area and volume provided in the pond at elevation 12.6. RSSlarl: S:IWQSISTORMWATIADDINF0120041010420.dec04 North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395-3900 Customer Servicel-877-623-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (919) 733.2496 Internet: h2o.enr.state.nc.us An Equal OpportunitylAffirma0ve Action Empioyer — 50% Recycled110%a Post Consumer Paper NorthCarolina Aaturally r 1 P. 1 ' COMMUNICATION RESULT REPORT ( DEC.14.2004 12:29PM ) TTI NCDENR WIRO FILE MODE. OPTION ADDRESS (GROUP) RESULT PAGE --------------------------------------------- ---------------------_--_------------------�------�---- 680 MEMORY TX 912083441182 ,'7 OK P. 1/1 . .fir...,..!.,. ' s REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER A ��q A� D Alan W. Klimek, P.E. Qlrector Division of Water Quality FAX COVER SHEET Date: December 14, 2004 To: David Powell, P.E. Company: RiveRidge Engineering FAX #: 208-344-1182 E-2) BUSY E-4) NO FACSIMILE CONNECTION Michael F, Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources No. of Pages: 1 From: Linda Lewis Water Quality Section , Stormwater FAX # 910r350-2004 Phone # 910-396-3900 DWQ Stormwater Project Number: SW8 010420 Mod. Project Name: Tarawa Terrace MESSAGE: David: The Division received previously requested information regarding the subject project on December 9, 2004. The application is still incomplete. Please provide the following information prior to December 17, 2004, to complete the review: ` 1. For the Phase III pond, you have calculated that the 1" volume will be stored at elevation 12.42, however, the 48" overflow pipe in the outlet structure is set at December 7, 2004 Linda Lewis North Carolina Department of Environment and Natural Resources Division of Water Quality Express Permitting 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SW8 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Linda: RiveRidge \431R\ EngineeringCompany R ,C PI :i .._ • _ .._ DEC 0aLm4 In response to your letter dated November 4, 2004, please find the attached the following information: * Item 1: A Site Feasibility Report was included with the Request for Proposal document for this project that stated there no wetlands on this site. However the Site Feasibility Rel2ort statement did not include the area along Bouganville or the area around the Phase III Pond. Parker & Associates arranged a wetlands specialist to stake wetlands in these areas. Wetlands were found at the location of the pond outfall. In order to keep all construction outside of the wetlands, we modified the outfall. In addition we modified the orifice and overflow elevations in order to avoid conflicting with an existing pressure sewer near the outfall. I have modified the drawings and calculations to reflect these changes. I added a note to sheet G-102 that states that wetlands will not be affected. • Item 2: Check orifice calculation — I checked the orifice and included the calculations in the attached Exhibit D of the Storm Drainage Engineering Report. Item 3: Revise orifice calculation — The orifice is now a 4" orifice, please see the revised drawings and attached Exhibit D of the Storm Drainage Engineering Report, Item 4: 1 revised the calculation sheets and Wet Detention Basin Supplement so all numbers are consistent. See attached Exhibit D of the Storm Drainage Engineering Report and revised sheet 1, 2 & 3 of the Wet Detention Basin Supplement, 405 W. Myrtle St. • Boise, ID 83702 208 344-1180 • Fax: 208 344-1182 Included please find the following for your review: 1. 2 copies of the revised drawings G-102, CS-125, CG-124, CG-125, CG-126, CG-128,C-503, C-505, C-510, C-511 & CS-503. As were previously submitted, I have included 1 set of 24"x36" drawings and 1 set of 11"x17" drawings. 2. Exhibit D of the Storm Drainage Engineering Report (2 each). 3. Sheets 1, 2 & 3 of the Wet Detention Basin Supplement. (2 each). If you have any questions please call me at (208) 344-1180. Sincerely, RiveRidge Engineering Company Wendy Haustveit, P.E. Cc: Rick Marshall, HUNT Building Corp. David Byrd, HUNT Building Corp. Jim Lemon, Gile-Buck and Assoc. Q: 040151021121WPFILESISTORM WATER PERMITTINGTHIII Stonnwater permit Resubmittal cover letter 12-07-04,doe Nflcncel F. Easlev, Governor ?,• r� V611iam G. Ross, Jr., Secretar Carolina De:)anmeni oi=nvironmen, and Natural Resources C " Alan W. Klimek, P.E. Direcior Division of Water Quality November 4, 2004 Commander Lawrence Readal, Public Works Officer Commanding General Marine Corps Base 1005 Michael Road Camp Lejeune, NC 28547-2521 Subject: Request for Additional Information Stormwater Project No. SW8 010420 Modification Tarawa Terrace Housing Replacement Onslow County Dear Cdr. Readal: The Wilmington Regional Office received an Express Stormwater Management Permit Application for Tarawa Terrace Housing Replacement on November 4, 2004, with a scheduled review date of November 4, 2004. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please either delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist. 2. Please check the 2-5" 0 orifices in the Phase 1 D pond to ensure that the new 1" design storm is not passing too quickly or too slowly. 3. Please revise the orifice calculation for the Phase III pond. The wrong area formula was used, resulting in an orifice that is too large and draws down the 1" volume in less than 5 days. The correct formula for the area of a circle is rr d214. The consultant has divided by 2. 4. There are discrepancies in the permanent pool surface area in the Phase 111 pond. The calculations indicate that 59,006 square feet has been provided, but the 1" volume calculation has been based on 60,097 square feet at elevation 11, and the supplement reports that 64,481 square feet has been provided. Please be consistent. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 11, 2004, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. North Carolina Division of Water Quality 127 Cardinal Drive Extension ?hone (910) 395-3900 Customer Servicei-877-623-6748 Wilmington Regional Office Wiiminaton, NC 28405.3845 FAX (919) 733-2490 Internet: h2o.enr,state.nc.us N- NorthCarolina An Equal Opportunity/Affirmative Action Employer- 50 % Recyciedil0%0 Post Consume: ?a per )Iatitrally Cdr. Readal November 4, 2004 Stormwater Application No. SW8 010420 Modification The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer RSSlarl: S:IWQSISTORMWATIADDINFO120041010420.nov04 cc: David Powell, P.E., RiveRidge Engineering Co., via fax 208-344-1182 Linda Lewis Page 2 of 2 M co v V � orQF) VJ _ 0 Q.% YYY+++111 U � Ca v x CIO •— N N krf —cj U O c a v W O fx y0 p O w 0 o 7rz VGA °'� v •Cd U C v o Z-VC ' O cis cz .. w U 5 CLi O O UrS, Q 0 N h M _O a P. 1 w 1 FILE MODE 884 MEMORY —TX COMMUNICATION RESULT REPORT ( NOV. 4.2004 OPTION ADDRESS(GROUP) ---_______-- i 91-2083441182 1 REASON FOR ERROR — ) No ANSWERR LINE FAIL State of North Carolina Departrc ent of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor t William G. Ross Ir., Secretary 1:25PM ) TTI NCDENR WIRO RESULT PAGE --------------- OK P. 3/3 E-2) BUSY E-4) NO FACSIMILE CONNECTION FAX COVER SHEEN' btu 0to¢20 Hot) Dat'e: 1 I —4 - ZCV 4- No. of pages: To: Davy PUW e — - From: Co. iV1ye. �rd0f= Co: 0wo FAX #: 20? - 3 i1 Z FAX#: 910-350-2004 - REMARKS: A I �f'n 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 Telephone (910) 395-3900 Paz (910) 350-2404 An Equal opportunity AM mxtive Action Employer MWHONT BUILDING COMPANY, LTD. 271 Tarawa Boulevard, Camp Lejeune, NC 28543 Tel: 910-219-4644 FAX: 910-2194646 TRANSMITTAL TO: Linda Lewis North Ca roll naDepartment of Environmental and Natural Resources 1005 Michael Road Camp Lejeune, NC 28547 are the following.FX Attached Shop Drawings TRANSMITTAL NO. DATE: REPLY TO: PROJECT, J900891.148 04-Nov-04 14 Amanda tone, Ice Manager 625 Family Housing Units Camp Lejeune, NC CONTRACT NO.: N62470-02-C-2052 HBC JOB NO.: 900891 Under separate cover via: [] Samples = Literature delivered via: hand delivery DESCRIPTION NO. OF COPIES OR CITY Tarawa Terrace Phase III, Housinq Replacement Construction Plans 1 roll One box containing the following: 2 - Stormwater Management Permit Application Form 2 - Wet detention Basin Supplement I - Tarawa Terrace Phase 111, Housing Replacement Construction Plans (Second set is the large rolled plans) 2 - Tarawa Terracc Housing Replacement Phase 11 & I[] Specifications 2 - Phase III Stormwater Drainage System Engineering Report 2 - Drawing titled Project Boundary Overall site plan, with enlarged site plans Basketball Court, Picnic Area and Tot Lot detail sheets Building footprints 2 sets of enlarged grading plans (3 sheets each) I- Narrative of Proposed Modifications to Stormwater Project No. SW8 010420 Modification Envelope containing the $4000.00 check These are transmitted as checked below: ❑ For signature and/or notary rx For your use ❑ As requested ❑ For review and comment REMARKS: Approved as submitted [� Approved as noted Returned for correction 0 Resubmit HUNT BU T.. 1 0 copies NOV 0 n- 2004 OMPANY Amanda-Storie, Office Manager r-1 r I rn If FINWI w...r�..��� l 3gg B1! ATLANTIC DMSION 161� bovY s�1 �1 o" MARINE COOPS BASE CAMP LEJEUNE, N.C. g vS�� 'L'• $ TARAWA TERRACE - PHASE III e h HOUSING REPLACEMENT !—STORM DRAIN LINE 1 COD PIPE & INLET REPORT Milli -VI D w4db,,N-l!:-: RIIIIIIIII[Ei t g ° ATLANTIC DIVISION MARINE COOPS BASE CAMP LEJEUNE, N.C. a ° a TARAWA TERRACE - PHASE III b @ HOUSING REPLACEMENT B STORM DRAIN LINES EXIST. TARAWA, 5 & 6 PIPE & INLET REPORT r w %J w GnG IA nn0 lyn 14j V) Q- F.. 0 IL w h J z W z D W i W J a Q U m rnrn2QOQEE EEQEEeE. EEEEEEEEEEEEEEEE@ EEEEEEEEErnrnrn m0cd m 0°. cd°°cccd m cd d d°cccc cc"cc°c"cccc"c° m c aN . ° w 2 ° ° ° ` c ` ` `° ``e` c c` `wwwwwwwwwwwww w w w www wwwww ww ww w w w w w w w w w w w w w www w N N N N N N N N N N N2 N N j j N N N N N N N N N N N N N N N N N N _ U U U U U U U U U U U U U U U U U U U U U U U U U U U U 0 U U H 1 U U U U U U U U U U U U U U U U U U w w w W w W W w w w w w W w w w w w w w w w w W W w W w a w w a pp w w w w w w w w w w w w w w w w w w 2 x x x x x x x 2 2 x x x x 2 x x x x 2 2 x x 2 2 2 2 x a x 2 a¢ 2 2 2 S S m x x 2 x 2 2 x 2 x x x 2 = y O Q^ N N W Nm (D N N O N 4C iD N 1� CJ (P (D e m v CJ r h N g r Ol V M V h A N C'I !� Q I� N W th O N N OO m 0 ImD h n o N m 0 N N tD t9 Oi Oi N N N m 3,0 ._C� 2 J � �� � = d c N N O) N OO Q Cp N m N N m Q M V N V 1p r r N rn rONI O•N O <D7 MOI 7Q! .NN . r � N Z lV (O o O 2 0 0 0 0 0 0 O O O O O M M M N N N N N M N N �o N N m N N N o E°� N a g 0 0 O ON O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �Uy... o 0 0 0 0 0 o c o 0 0 0 0 0 OE Q N o m o 0 o m o N m m o o Q N o Q m Q m m m M m o N r N o r Q r N N N m o m �n o N �c o M o a a n o Q n N Q m 0 cv v v rn �n rn M o �c o�or� ao of of oNo.6 moiN aiN oidoNNNn' Na o�rom ai of ai m ronNNerr�roNrn .. C �Mi -- T -- t2 � � .- 77 a s o a a s S a g a¢ S a a o a a a a a a a¢ a a r¢ a a a a o a a a a¢¢ a a a a¢ a a M a a a 0 C v z z z z z z z z z m z z z z z z z z z z z z z z z z z N z z z z z z z z z z z z z z z z N t2 M M¢ N¢ M¢ Q¢ Q g O m m¢ NQ ro N N A Moi i m Z lz z 2 Qj N Oj Oj Z O1 Z °1 Z Z �Z z Z Di uoi 0 Z ui b m 6 Z` z w Z� Z (c n of Doi z of N h h N M V M N (O WV ro I� Q N N r M Q N O 30 I NN Q N OQf ui Q mQ Q — N � �- M N rn m rn N M m N Q M N N M m m M O N LL x O oo0 N V MNNoOonOoNnMm0NN h ^ m O O N Q bvMNVNNN^bNNQV0m N 0 D, m n tO b NQo�� oNNNNNvNNNNNNNNc NNNNNN'o'"N w N N N N N N e- LL O Mv N V M N M rm N N Om O N N O ah0 M N m N P m M N d N m N °ni m 0 �toi voi < n tND 'm O °1 N .'- °rni N 0 V O uoi M r Q Q Q o6 N m M 6 i Q N m N M Q m rn M Q N N N m M M Q m Q N Q N N N N M N Q Q m Q N Q N Q M M N c rnN� G 0 0 0 0 0 0 0 0 0 S o 8 0 0 0 0 0 0 0 0 0 0 0 0 0 S o o 0 0 0 0 0 0 0 N O Q N $$ m N M O (p W, ol 10 a, O O O iD M W 0 0 0 0 0 0 8 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 vs $$$$SSSSSeSS$$S8$885888888588$$$$8$S$$Smo$$$$$$$$8mo$ ��� �mMn;������MM.��mm�OMmmMMmmmeMMmmmmmmN�eM�����mmmmMMm O O O O O O m$ O V O$ (O r r (D P N O O O M O O O O O O O O O O O N O O O O O O O N O O t0 0 0 0 0 0 3 N 03 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 o o o o o o o o o .- o o o 0 0 0 0 0 0 0 v oo oa8 9 N a IL = O O O O O O O O m 0 0 0 0 M O 0 0 0 0 0 0 N O O N 0 0 0 0 0 0 0 0 O O N m O Q m 0 0 0 m 0 0 rn O N O O O rn O Q M O M r O 0 t0 01 Oh .M- O O N Ip �� !� O N Q O O O O r M O m N 10 C o O N O o m o lh O N O O N O O O r O OI O N N O^ O O N Q m' N O m^ O N N N^' n O N O O O O O �- F c p O^ N Q mQ O0m0oM m N mmO mm OMhOO.MOrn V oD r Wmh N M 'T N NN mO 0M N F LL O .i H Q N N N M N O o M 0m Q m t') O O O O N O N r m O m ID O �D m O rn h M W N 00 m 1� om m o c W N N h W C� OD m m0 mo m m Q m Q m t0 r t� N Q N n m CD N V N Q N N fD N N N N N N N Q N N M h UJ N N< N O IN V N N IN N IA 'Q N C Om rn < C N YI O In Cl!N 'Q N i(1 N N N Q O M) IN F� •-• yy pp M h n M h V M M N ONi cm9 IN- n h n h 0 MM nm N N m tN^l ho M O tD (NV CONi N O.. O O. O O... O O o 0 0... 0 o N o N 0 0 0 0 0 0 M m 10 m 1. Q M 1. Ni�iD QmM rnn� �innnin c�mN �(D m�vn�oin�NoiDeveno�n�oa n mMnm 0 N U O O Q r 2 OQ S h m Oh N N M mN M m mM r m m Q r O Q m Om m n Q MQ mm r O N rn QQ n M Q m n h C. N �- m m rN M N N n N M m m N M M m r M m N m r N N N Q r M Q m n m N M m O O O O 0 N O O O O O O O O O O O G O O O G C O G G O G O G O C O C O 0 0 0 0 0 0 0 0 0,0 O O O O O O O F W Z m m m m m m m m m M M m m m M m m m m N m m M m m m . m m m m m m.. m X N X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N L U O O~~ 0 0 0 O C c0 ~~ O~ 0 0 0 0~ c c V- 1- C C C C r F C C C O O c 0 0 0~ O O O Dc c °c c c C c° a W .a ° W W 2 a a° W w>> a>> a>> W '> ° a a a W W ._ > J > J J y J �p jD J a J J > J J q ry g q jp jp J J J jp C C Z Z c c c c c c Z Z c Z c C c c Z C c Z Z c c c C Z Z c c c c c c c c c Z c c c c C c c c C Z Z c 8888808o888888888888 888888s888 88-008Uo 0000EE8EEE8E 88EEE E E E E E E E EE E E E E E E E E E E E E E 0`08E 6S �� c�0 cDcD cD(D���U���c� N m m m m m to m N m m m m N N m m N m m m N m m to O O S E O O S O O c c 0 c,c c c c c 0 O .E S O O O O c c c O 0 o E 0 0 0 5 5 0 0 5 0 0 G 0 0 5 5 0 m m N 07 D) .- M N N 7 7 7 �- � N r tQ � N v M N 7 N 7 N" > Y > N N N x M N N N N N 6IL %) N N N ry m m N= � i7 (7 ' U,Z N N 3 3 GQ n Q N Q N # # # # # # # # N N # N # # # # N # # # # # # N # # # # # # # N # # # # # # # # # # # # # # # # # N # # # # m m m m m m m m m m a1 m m m m m m m m ¢] m m m m m m m m m m m m m m m rn 0 U}} U U (: U U (.: }) U) U U U U } U U }} U U U U }} U :.: (: 1 0 0 0 0 U y 0 U 0 U 0 U 000} y U c 2 w� a8 x it :o: wog Z 'm a 0 t o wgm J � E O ¢ T O U U a � O P 6O r O IL w ui J Z ui z D W W IL Q <.i N L.e22PPPe2)E e212'2'2'2'2'02)e2'2'21eL-2- 2 C C C C O C C O C C O O C C C C C C C C C C C C C C C C C C C O C C O C C C C C � L W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W@ O W jp y N N N N N N N N N N N N N N N N .N N N N N N N N N N N N N N N N N N N N N N N _pJ J N 6 6 6 U 6 L) W W W w W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 2 2 S S S 2 2 2 x x x x x x x x x x 2 x 2 2 x 2 x x x x x x x x x 2 2 x x x x Q Q S U O uni o N m n n 0 e m ro ro o V N N m P m vni P m uPi c0'f a` IMV c0'� a N n N N m N, P P' ^ N .- = J U J N C OIMO N N O M^ V m' O M N V N l N M aOp N N N �- N N m t0 O O` t� .�O- .N- t� OI m N m P OI T h 1� Oi �'' V to ' cc1� N NN v� J x y g, 0 2 o> m U V)o o 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C o G 0 0 0 0 6 0 0 0 0 0 0 0 0 06 0 0 m M M l0 m N m N O O n N f0 O O P m 0) 0 0 h m N O 0 N i0 t0 l000 N N li m P g M N V M IQ h N W m M N m m O M tT m 1� ID m N P O I+) N N N CY th t0 tC OJ O N 1� m OI IG M 0 Gl tG tG O� 0 Ol O N P N N IC m I� H cli Q Q m Q (0 Q Q Q Q M Q Q Q Q Q Q Q n Q Q Q a Q a Q Q Q ,MP Q M Q Q Q Q Q Q Q Q Q c Z Z Z 6 Z Z Z Z of Z Z Z h Z Z Z Z m Z Z Z Z Z Z Z Z Z of Z c.i Z "i Z Z Z Z Z Z Z Z C Q N A a t0 a _a Pm Q Q m N Q ImD 10 a Pm .0O Q Q a Q Q Q Q O Q v0i IOi N a a a Q Q a Q 0 Z m o Z m m Z Z m m Z Z I.j M Z^ m Z m n m Z Z Z Z Z Z Z Z O N Z Z Z Z Z Z Z V Ifi ' 6N N m n O N N O m N P O m I� N Ol m m O P N N 0 m MO I < n m0 lM N O M I� to N m Ip P N N P N M M, N N N' C1 N m �- r M W O t+Mf 0 O ~ oa O N m m N MN M 1� ID No h 01 OJ N M Ot f0 N N m I� [� P h Ol V N N O I� O N Ol O N O � M P a tT N N N N M f0 I� O) O) 0) i( " 0 0�2 0.2 IC IG N N N 2 2 j C W .P- N N N m O m IO P O O m W 1 m M M 0 N 1� m P fri P m 0 (D m m m M (O m lh m Ol M O IO W h O �O P N h N O O M N O m c'i N I M i0 m 0D I(i vi N P �O P P P i0 1� N 10 Ip M P M M !� P P !� h' M P IO � M N v 0 9 y i O 0 0 0 0 0 O O o 0 0 00 0 0 0 0 0 0 0 0 0 0 0 o O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . m 0 0 0. . 0 0 0 r 0 i0 N m O V v VI 0 00 O N N i!1 O O O O J c J p 0 o N o o 0 8 0 0 0 0 0 0 0 00 00 0 00 O N O O PO 0 0 0 0 0 O o o O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 li o 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 .`y.. U J IO M m m 1p IO IO M m M tp t0 m m 10 IO 10 tp m O tp t0 t0 m m IO (0 (0 M IO O (O m t0 m M M IO IO M m m 0 0 o ro o 0 0 0 0 0 0 0 0 "' 0 0 0 0 0 0 0 o N o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 am o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 a 0 IL y N 76 O Q a N C O 0 n 0 m m o M 0 o ON n0i o m 0 0 0 0 N 0 0 0 0 N <0 O O O O m h n o m N' Om O M 0 0 0 O O N O O O m 6 q O M O O S C E OI O O P O M O O N N N 2 N O o c E F $ "' O1 m O W N N O m m m m GI p m P m m O OI m O N OPi GO h P [O ro 10 M W M N �D th O r tp h Cl! m OD f. . . . 0 10 O . t"i F =, W O N m D 0 0m m0 'a f� N N, M l ui NN O .V. V. . .I . Uf N N 'P N O C H O N< Ni O N V O M< 6 NOO 10 -N �v n IM0 N v' v' Iec o m uPi M r m i0 o v o C0 - y W Q N O O O O O N O O O N O O � O .- O O O N O .- O O O O O m N O N O O o rn o �n v o m P m N in m 0 rn m o Io m o m N M t0 N P �0 IO O M N O. lII O lD CN5 m iD O N 00 O O h I� P V M I� N !� h M V 10 O y 4 N . . N O O O O O N O O O t� 0 O � O �- •- O O O N O O O O O �- O of � N O N O O O M N 10 f0 0 N 00 10 N M O f0 M 10 P 10 N 0 0 m M N 0 0 0 0 m N 0 N i0 M 0 m P d U c 0 0 a 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c o 0 0 o c 0 0 0 0 0 0 0 H W J Z m m m m m O (0 IO 10 10 m O t0 tp t0 m O �D f0 m m m t0 IO tp x X x x x x X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N .m p c c c c c Z z �° Z.. N W iC N N N iC W N N N N N N N i0 Z m m m m m m z z c c 'ZC� c c_ c_ 5 c 'c 'a ,c n - a B a a a a a a n n - n a a 'a a a- a a EEp EEp rJ EEo E E E E E E E E E E E E E0 E E E E E Ep E E E ppE qqE ppE ((E}} ppE ppE qqE qqE ppE ppE ppE p o m m m v ry v v v v v v v v v v o v v v v v v v v v a s C a C O E rn12 2 2 2 2 L° E E 2 2 2 L° rn Ic 2 w O N rn E 0 2 2 2 2 0 m 2 E rn 0 rn U U O O C7 C7 U U' U(1 C7 U OOOOO U' U C� (� C� U' mU' A OOOO U' O - O J N UJ W tp N m m f�4 fq N N N O O O O s OC OG OG OC O O O O O O O O O s O O O E O Os O O OC O c c o 0 c c c w W M � > 3 � Q G Q 5 U M W F i� J m Y m N 7 W a N 7 IO g Q M N v M N Q' M m m m m# M N N U U U m m U 7 �' U_ f- H H N N N t0 tb ID tb m F U U U U �' a r d a H f 71- - uu` # is LI) uaa auuuuUuu ux=====acuuux mao. m TIb T. x 57 m m m L" m x m �(0) m m m m m m m m m m m m x x x x x m m m m m X"" X x" X X 1 Y 0 0 0 U U Y U W U U U U U U U U U U U U U a a LL a a U U U U U W Y) W W> W w E a W w W a E w z W J d Q U u o O N N tM�I N M m IO Q O N tO�I N I 0 0 0 (0 M Q n N 0 I. O tb0 N elf V N ih0 N M o N t0'1 0 (D N th W.M- O m m h v2 ' �- Oi o .- A a0 o e0 M O O �- Q. N � N� � N N N T� C CO' N � N N N N � � � N � � � N •- +- '- mC D�V�O N� NlON'm Cm'f O O h N II11NorooN Nof dN 0N oN �N 9i.(7 S �2 � E N e o ro m w M Q m o m N o QQ o o m o rn o 0 0 r M o ro h N M f0 N W O O W h h W O O e M O H W •- M O r- ON a �- O 0. Gp tD O N O N N(J !� M r N N N M N W m M W m N r M m r M N N M N N M d M d m O M d N N Q V M N N M N N N M M M M EVE rnIq m o m uo 8 m e o Ll! n v 8 rn Mr Iq M m c oIq m o MIQ N e 8 N O d N N M M r M W M O m W b M N N h M '- e M .- N M M M n W N N N e N M d P d N N N N N N E A N M N N o o o P N N M N vdi N Y cNn M o OOi voi A o a d V A Y N N o M o d m 0 N M M W� o N w O b i0 m c b I 0 0 0 0 O d O O N h N N` Q t0 oN e P d d d d t0 N d' S2 N d n N M O! N N M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o IS U W O E QQ M Om O N N ro O N O O O p p N N O h r N 0 0 0 0 Q N O O I N pp arO h h r M W N O N N N d m N N O o W O W Q v) 0 0 (O N N OO W t0 W M N Ol o t0 t0 .S Q> N N N N N N N N N N N N N N N N N N N N N N N �2 � N N N N N N N N N N N N N N N N N N 01 i� n M M OO W M N R th M V iD th N h N N M n h Q M M M e OI M tD W O N A W M N o O !� r fV M ui r Ul tt) tp M N N M YJ M O N lV lV N tD M M N fV N VI o m 6 P N< 0 h lV C M 1D P N v M M It) v h O o O m N M M Q r N V^ N W O N M M M M N h O Q N N N M ^ M M o? V N M O t06 a00 13?m Lp OMi SOD OMl P f0 r r Ny M M ro m' N N M P a > v d M r W N t0 q M m- N O M N O N O M N M O M N O M w P e M O O O O- O P r Q 0 a! h N N M N t0 W W N N M< �2 �2 W N O Odl O lM N Ot N Q � e O r pp O O O O O O A .- .- .- .- ' N O Gp ' m N Q' O !� t� !� A A b O N N N W N M r OO M W M I� ryNry v ll a O oW Of O O N O O r M N O N W 0 N N V W N h r N O N N th m _ IL 6U N M M O) d M Q fD Uoi N h N O1 O !� t0 r r 16 M o v) N` M 10 ID e N N h. N r M I M M d h v) N OI V M f0 N^ (D 0 0 r M M M v) M M M M N N N O N U E P N.M M A O�W d Q h 0 ND . t0 1 O M W t0 Nr CN r N O Pfl PQ O MON M0) NLL . . . M M r h 'M MY�C<ry too O VI0 ONi N am0 N OOi V n V N n r r n M Cl!rC m O n N d d IQ. o vmi b .e- M r M N V N N C m 0 0�' h O M M LL N o v F- M W d N O h P C V^ N N N YI M 0) O O N M Q N N O m p M ro N N0 N M M M M M O n N .- N YI N tG N A O o o 0 0^ O. ^ 0 0 O O OO O O o 0 o^ O^ 0 0 0 0 o O O O O 'v '�'C 'C 'C '� 'c 'C '� 'C 'C 'C 'C 'C 'C c 'C 'C 'C 'C '� '� 'c 'C 'C 'C 'c 'C G C C sssssssssssssssssss ssssssssssss F. ssss s s ss sss o o o o oo 0 o oo g o oo o o o o o$ g g oo 8 8 oo o o o o o o o o 8 o o$ o o o o g o o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o o o E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EEE .N.. �. .N.. �. �..U. N. .N.. N. S S S N .N. eM S N 2 e S S N. .N.. a �' d m N 2 S N. b � � .N. .N. .N. .N. .N.. wa w w w w w a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a U c o pp� pp� qq� ((�y}} pp ` 0N C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C G V) N O N O N M M M C M M M M M M M M ton ton M m M N a0 n) M C O d 0 0 .O- M M M M N N N ton i0 N O2 N N N M E 5 9 € Z W O N N q g M N 7 N 0 N r M # _ LQ # N M S S v v N N I N S S N N (� Ur Ur Ur Z N N N Ur 2 2 2 2 2 N 2� 2 N N N N N N N N N 2 N N N N N N M 2 2 N N # L # # # # # tt # N# # # # # N# N# N# # # # # # # . # # # # # cL # # N O W w U> > U U N U y U) U N Lo N In Y N U Y U} U U U U 0> Y} (u } U U N U) U U U U U U U U tow N N U U NNy �' 7 7 M a 3 N N N N0 0� f0 ## J N N N N O 2 x S x x o N 2 N N S S q N N �= N N N N N N Z x N QZ 7 # # N# N# N# # # # 7k # N# it it 3k N# # N# ik # # # # it N# # # # # ik # O O D U Y U U U U U N a U} y U U U U Y Y> U U U w Y Y) U U U U U U Y U U U U U T U U U U N C O Q •'Oh+ P N N O NO W Q O O M O O N O O O O O d 0 M O !� N M f0 m N N !� M A b O d M N tp O T ON r d O N r M M M O m ro . N b C . N N t0 N m t` n^' Q7 M d M of h N N M 00o N D! N M' N t0 t0 c4 M D! n7 ^^ O N N0 8 W E rnMdmmBoN'-o v>M : c � vvi � voi Li uoi m °� o rn � ro vvJ M o o� �N°�o I NoeoNv Moro 5 V x ' c y N M t6 ro o r m' o v rn o ry ro o o N ro of ai of N m N r r o N ry N t2 � � t° o ry o of o a2 ai e o vi j w M M M M M M M M M M m M M M M M M M M M M M M M M M M M M M M M M M M M M M M M O M M O O O o o o o 0 0 o 0 o o a 0 0 0 a o 0 0 0 0 o 0 0 0 0 o o o o o o o 0 0 0 0 o o 0 0 o 0 0 0 0 0 0 C c O O O O O C O O O O O O o 0 o o o o o o o o o o o o o o o o o o o o o o o o o o 0 0 0 o o o o 6 6 o o N (D pdp M tD r t01 t0 M �O O Of t0 N O O� O M t0 W N M M O N M N O e M M N N O N m O O N t0 M O C O O Odi d O N M t� M NO o o M M M N N M N Q O O N M P M h O O Q t0 l0 N V M m d M No d O O O O O O M M M O O O c II o 0 0 0 0 0 0 8 8 0 0 0 0 0 0 0 8 8 0 0 0 0 0 0 8 8 0 8 0 0 0 0 8 0 8 8 8 8 0 0 0 0 8 0 0 0 8 0 0 0 8 N o 0 0 0 0 o o o o o o 0 o C o o 0 o 0 o o o o o o o 0 0 o o o o o o o o 0 0 o o o 0 Q o o a 0 o o o 0 $ 0 8 8 8 0 0 0 8 8 8 8 8 b 8 8 8 0 0 0 8 0 8 8 8 8 0 0 8 8 8 8 0 8 8 8 0 0 0 8 8 0 0 0 0 o 0 0 0 0 00, o m� rn ep N M th+i O erM th ! N< N tNl h M C Y1 n M W W n M N ID N< A M N h A NO M W M N M I N A N M p� m N p_ � m f0 O N t0 OI Ol � m O W i0 M b N N r N W (0 O Co'1 O N h 2tp O N N O C O t0 H M N N n n O N M N Q t0 � t� e C OF ma y C c i N L0 P b O M M N m W tp v M fG V d M d N M< M M n M M N NO N O d O M N fV N N r N N N V M M Q � J O M r N d7 O e- N 7 O 7 7 T q m N N M 7 h tD g M N b 7 7 N 00 N IQ h N N N N N N N N N N NN U(� Nmap ONN NNNYh M mr NYNNNNry N N NNNZNNN N N N N N N N N N N N N J N N N N a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a d d d a a a a a a a a a a m 0 > 11 0 cUc 0 W Q a E 4 z u = y O .- '; W W o W N W m OO w yy d o N 0p V W O n N 01 O N W W W O t0 OI Ip N N N N V �W P M W O. OD N N . ID N h I� O iM0 N [O O N l0 W V h Qp M P N U) of r r of ro ai ai of o o N N r I r <d o i2 t9 pi V V V N N V Vi 2 �2 7 '2 of r id o ai � E�� x N N � � T N O = V W Q O O W Q W h W W O d W. M W N d-. W d W W N N O P r d N M d O r Q N N W h W W r W W ? O O W O O N tp Ip N M r 0 W O t0 th O (O 7 W d t7 W W Q N t0 A m r W O N 0) m O N N N h h Qt 7: .- vL�S 2 E m vWi N o m ie Ire N oWi o M M d ulOi vlgi N M� M _ro _M _m _o v N� ov m o o I a m w a w e N r o o ro N � n vO1i � N � o M N Q M Q N N N N N N N N N N N Q M N W N M 10 M N N N M M M M N N N M N th N N N N N W O E W o W W W W W o W W N o n o 0 .- n�v E W M Q O O r W d N d N d P r W W OI Q W W N r N r N N m .- W h O N N O O O IR d ttpp O ttDD m N QO m N M 'D m N (O 'D n g r M O QD O uO d G O n t0 q m th W .- d O RI M C a^ M N N N N N .�- O N N N M M N d` P P OI M O O O) W m 01 0) O N N N N n N cN N N Ol W W r Ip N M MI N O O E O 5 W ❑ E a c c a yy oW� N N tMv r N O O N 0 re CQ Q m N r M P M n uWi N n N Q V m uWY c0 .N- N r N b 0 M m Q O' PW OMi o c W w N W m a Qo m M e m S v ci Li v N � � � ZE 7 rn N N e- of p2 a, .- .- .- .- N N N N N N N N N N N N a O�W op „.-. p yy ID m M N W< O OI O M h 0 I� O W O n M N 0 0 Ip o r N N, N M N !� A O V N o< O O r r OI O 9 N<< N N N ui IP u) .- N 1V 6 0 0 r• Y N O V li Ih r N d d d P 6 M M lG n r V Iw ... W r m m.. lw o i .-. p pp 0 N Q m P O O N P O M W W m of r a) O Qe O N M W H W r W 0 '1 - N N' N IrM N^ Q r W N O V Ip O) d7 O W M N W fD aa{{ W N O O n 0 frN O r Z c� dMdle 'n vi lwwN--�nawwd Nan lnvaMN.-M.-d.-QMd<MMM W onnvi uievi lwrr W W IwaM O a O r W N W b W W M O) d r O W N N N P n n r M m N r M r W N ID M M r g W N N c) n 0 W V: W ' C Oi Iw 01 h O O r N Nw O V . a) O W . d O) d N d N tw O) . lV Cl . QO Iw M . OI (w w ' O wo m N fw r O tG W t0 n .II O M O1 n N W O) W W t0 M i r Ip O1 N =e 3 O LL rNON NVWoNrOo0N MWWIVNMb Nbdd VWW VW O ON O O n Ui N N M N - Uv y +� N P d N W W N' N W M N �- e N a N ^ o o uWi M tOO W N b Wi Uri WW N� W P W d d O O O d d W W W W O N W O? O 1- LL V 0 yy QQ Q r r n N N Of N^ O W M^' � O r V N d M N O M N N r W W d lw N M N U N fD W rO nO d O O O o P Q W W W O n 0 W W W W vv 0 Ip o O ID d d M O O N W U) fD d 0 O) !� N� o N W N W n O N P N d W O P 0 N M W N h W O. . fD . W M GI O H r N M O N r C fG fw Nw N O h Iw O tw N o tw fV N r QC b d W W P N M QQ N yy O O. o o O N N i O .-. o 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 .. o 0 0 0 .-. o O O^ 'C'C 'C 'C 'C 'C 'C 'C L 'C 'C 'C 'C 'C 'C C 'C ' C 'C 'C C 'C 'C N N o N O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 g o 0 0 0 0 o 0 0 0 0 o S 8 8 8 0 81 0 0 0 0 0 o o 0 0 0 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EZ '6'.' N N N N to fn N N In t/1 to N Ul N y m f7 N N N fn N N m N (n N N N (A N m Ul N N N W 4: 2 2 m O m m m fn m 41 fp m w w w W W W w W w W W W W W W w W W W W W W W W w W W w w t� t, t, b ts t$ W W w w W W pC CC C ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ ❑ ❑ ❑ ❑ U ❑ ❑ ❑ ❑ O ❑ ❑ O ❑ ❑ ❑ ❑ ❑ ❑ U❑ ❑ ❑ ❑ U x x xx xL. x x x x x x x x x x x x V2 S x x x x V'�C S S S S SS S x x x CC ULCU ULoU V'SC o m LVUCC LSU LU U r6 LU L rr3 r'6 r-5 {S rfrrL '6 -6 rr6 '6 'S {L S 6 '6 5 'O L '6 'S '5 -6 h C C C C C C C C C C C C C C C C c c C C c C C c C C C c C C C C C c C C C C C C C C C C C C C C c C C (A m W W N N n M N m N W N N N N Q t2 N V N 101 �2 �2 N �2 tWl �2 N �2 �2 N�2 �R �2 �2 N N V V O C O O? fW'1 N N N O # w F- WU N N F F S a in p W 2 2 2 2 2 2 2 2 2 2 2 2 2 N 2 2 2 S N SF Z I" a � a N N Y ❑ ❑ N ❑ ❑ ❑ b ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ x ❑ ❑ ❑ ❑ 4 ik # W# 4 4 I? N M W W n N W N n N g M N# q W W t0 N W W N (0 a W f0 f0 W U F- H S 2 = 2 •' h h h �I- m m X X 0 pN m m m m O O m 0# m m m ¢7 m X X m m X m m m m m m❑ m X X X X X X X X X X X X I� X x U W W W- U U U U} U W W U W> U U U U O D U w w U U w U U U U U U W U W W w w w W w w w W W W O W a E W Y ❑ ❑ 1 r ❑ ❑ ❑ ❑ ❑ o ❑ ❑ -- o ❑ ❑ <........ a W ll IY n m N N m# ej m M N 7 7 N N 7 N M M# 7 No U HV) o 1- F- Q Q 2 2 •- U h f- 2 H H F H H F H H H F H N h} u ^# `# # `# # # R # # # u at tq it #u # a _ ik it it ik W ## # ## # # W m N pl W N m w w N m w # _ m m X X m pN m m m__ m S O m O m m m m m '_° m m m m m a m m m❑ m m m m X X X X X X X X X X >C X m 2 U U W W U- U U U}} U a l0 U M U U U} U U} U U U U U U U U U W U U U U W W w W w W W W W W W W U a E L W W mr oNM W W P W N o N O 0W�W^e � O N M 0 . of dOW1dO OG QWO) MQCi 1Nw N< N O M o N N 6 N n w A Iw M W Iw (w (w Qw Iw ' V WQD SIp OCv C IL �o e- e2 tw �2 �- E O O Nd NPN ^ A WWN O N n W O N N Nnci hAMI+N HNO N e TN'NdO WUJ dN M N N N WP o Spd 7 W N O' r r W N W O O W O O W pI P W W ^ M tp ' N W W�: W 0f W U) W .12 7 V'' O O OI O W N d! p) N .c M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M O O O O O O O O O O O O O O O O O o 0 a 0 0 0 0 0 0 0 A 6 6 o 6 6 6 6 6 6 6 a 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6 o o o 6 6 6 6 W edi O Mr b^ N O M iz Wn N UWi N W O o 0 0 OO o 0 0 W M Iy+I O O N N N oOi O o N M W m r, .1 OI O' b N OrMi O N N •� N O W M, M N n P 'o V N N S N O M Q M N O no M M mo N d W CP'i 0 0 � CO'f P �- d N O O O O O O O O O O O O O O O O O O O O O O O O O O O O o 0 0 o o 0 0 0 v O O O O O O O O O O O o o O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Ste. O O O O O 0 o 0 0 0 o 0 0 0 o 0 0 0 o o o 0 0 o o o o o o o 0 0 0 0 0 0 0 0. o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O' O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0,.., N E N r tp N O ro M N^ V I n of M N W m O n N... W W N crl cQ9 O o 6 d OJ OWi O cP'Q UWi P m .- W N Cl N Oo � O1 W W O1 N m N m o ro n Ire N M N W m W e m W^ O tOe l M N M n0 M O V N Uf INO C h N r W.. m. C. . W' UWJ o'Q uui cii M N G>� U I N N M M M N N N N •- N N N N O N N M M N M .- M M M N N N M M M M N N N N N N N N N N N N M N N M Q Nn W r o J a s a a a a a a a p. a a a a a Sc O W ON 7 t- f- H I- F- ♦- F- t- Wt- W M w W N N N N X X W N N N M W W W X X X X X X X X X X X X X a a a a rL a a a a a a a a a a a a a a a a a a w w a a a a a a a a a a fL a w w w w w w w w w w w w w a 300 a°aQ � a O EL WN 0: W a E w z M w w J a Q U O 9 N N m 1 M O � M N N O N � N. 6J r N ry 0 T� C O> Oi I� n n ^ r N^ ' r` N O V W r r r 2 J O O O N x E v o 0 o m o r m r r m r m m m no n o s d �dr 0 o N 6N N w N � N N r r r r I �o M M M o N o 4 o w> � }s N N N r .- r N N N N N N N N n�v � NN QQ N O N N 00 C N N O n N 1 m o n t0 1 Q N O O O a^` O O N t2 ' t0 m N n r W o O E a, O M h N V IN h n r r o a m v0l < r N tO+f O N O O O - - - - N N ; - O - - - - - - - - N 6 O � W py� L N M m M N N M N n h I O - i0 W h o > V n OPi V M cM'1 O a 0 FN- Y V ro N a00 N M UO 1 yOy W? iO r O n N N< O N �O Cl I C2 R A U .. =o LL 3 LL .N- N O O M N (OO V rM N N O N V J N V LL M n Vf M (O O Co M N OI t0 n M N N N No M r M r V N� U E M O O M O N I� N m 400 O tD� h N N 0 O,2 N N V iD M r P M N N N N M r N N r O N O N n N N m o N N N p Or O H 00000000000000 o $3s$sssssss$$o o o o o o 0 o o o o o o E E E E E E E E E E E E E E E W W W W W W W W W W W W W W o W a a an.a.aa(Laaan.n.a CLC) o 0 o o❑ o 0 o o 0 0 0 0 0 0 o>> 2 2 2 2 2 2 x 2 2 S 2 2 2 2 U 2 a a u 5 H vM f0 _Ei _ _ _ _ F co o _ _ _ _ _ _ _ _ r M M M �2 wh E > ti ti N o o u u x x y x x x iioiio 700 0 o O f0 0 W M M N r N N N a fn N M Vl VJ t9rMM1-aadd EL r r-r-r r i * . 3k lA M D ik M d a w d d w u u 0 u U U u w w w U w u a uco co q y wZ Cl M 0 M m 0 r N .- N U 7 UUNUUN a# N-*LU N - Is aaaacmi cm7u V w��L)ww S-w E r o n N r 10 M O o N N 10 M N N (D N N N N O O IM tD r O O t0 S> O ; pj pp N t0 �D O r W - N N 0 0N M W N .- r -— C V — 41 o O W 0 E W = N n r m m uni o m na M ro n o Iq in, � R 0 O m N�rrr Sjj� n �_v � w m 10 (O t0 OI r N V Ol n mr rrrN O cc M M M M M O O O O O O O o 0 0 0 0 O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A y N f0 o 1 N N n 01 h N N h Of ' N OOi n p6� M M O M V N N N N O N M N O O N N O N O O O O O O n 0 0 O o 0 0 o r o 0 0 0 o 0 0 0 o a o 0 0 0 o o c o o o 0 0 0 0 0 0 0 0 0 0 0 5 c� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 n oicNrn�nNn��6v�nro aiNr .M- v o o m 1. n a _N N N o n r�� m Nd v v Ni V N N th N N N N N N r M M M VI a� 0 a v a a a J r N g N r M r N M N 7 'Q N M N O N UUUNad.daaaaxxc'x as a a a a.n.aaaaaaawwaw r W � a8 F- w I p yiD Y c 1 Q Op S H O O -N O o ° 0 o . o c oa � QYa �CD U i 5 D � p f y e g� a oonnv.n.oem.n.r. ATLANTIC DBASION+�•m...nomennnamnw.o' 99oi M 1 g f?kk ➢ o % MARINE CORPS BASE CAMP LEJEUNE, N.C. TARAWA TERRACE - PHASE III f i ° .( �r` /!\ n & HOUSING REPLACEMENT =� 9 STORM DRAIN LINE 3 & 4 PIPE & INLET REPORT "" d S - —^-- Y W %A �/ Q o O Z fL IL W C J U Z Q M W Z O p ui d W LU J z a J � O V C N V N . . . Q'e'e£'e' £'L"�'22'Erno,rn c m v c c 0 a w w W w W w W w W W W w w w w W O O O O O N N N N N N O O a N O O O O O O O O O O O N N N N N N N N N O N N m 2 Z S S S S S 2 S S S S S 2 2= 2 2 m 2 U U U U U Q y NQ tQq fQ0 U tQ� QN Na Na NQ QW (Qn N WN NQ tQo NQ U U U U U U U U U fQA w w 4 2 2 _ 9 O 1p W d n W IO N IO O W W d N W Q_ N Q W d W O O O) O M W O N N N N O Q Y1 !� N N tD INl) N Ol M O) OI 1� 1� M ID W O N N N N N V�n = J .- .- � � � � � � � .- .- N N N N N N� N N N N N N!2 N M N Q W IO W M W W �p e N N Oi W ' t0 tG m N N Oi Oi Oi (V 0N N 0 0N 0N 0N Oi 0 0 N N N N N •- N N N N N 2 �yyl^ N Gt 00 00 O 000000 O O O O O O O O N o o W N 0 o N o 0 0 O O O O O O of N`-' 0 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 5 O IOO A v 1I O r m N N 0 c'1 W N 1p �- O m 0 CJ O V 1.(O W I N O tD N n m h tC lG !� Ol 1� N OJ W Oi O Ol � M fM N N 6 6 6.- I� � N A - - - - - - - - - � .- N - - N - - - .- .- - N N N N N N � Q z z z `z z z `z `z 'z ZZ ZZ `Z ZZ `Z ZZ `Z z ZZ ZZ ZZ ZZ `z `z z z `z z `z z `z z z z Cc; M 0 N N O a a d N N N W M W M M M Q M W Q IO a N 0 Q Q M N N N a M Q 0) M Ol N O N W O! O M W N 10 N W O M O 0 W W uD W N 10 N Z Z Z Z Z Z d tD W W N N .N- "' IA N 2 ID N W m W O) Oi Ol N N N N O IO N W W 0 d .- N M N d N (O 0 n Q W N IO N W d M N O a d O a M N N N N m V O c4 'Ni N O tG W Yi N 5 L N 0 H � _ 6" oa O O N O O O O N O O O O O W 0 0 0 O IO W N tp N O O O N W O O O N Ni N N N M N N N N N N N N N N N N N M V N N N N N N IN cc>- 0 W N N N N N N N N N N N N N N N N N N N N N N N N N N N N `y N W th W N N IO M Q N N Ol f0 (0 O O N M O V W a O t`W'1 N N th N N O Ni LOV IN N Ci IIl Ci Ci Cl ri Oi IU tG lV Ol !� fV N ^ N ' lV IN IN M 0 10 M M Ci 66 IN W v ` N N N C c d o 0 0 0 o O 0 0 0 0 0 0 O N W W Ol N O W W W W W - 0 0 0 0 O O O O O O O 0o W 0 C G O O G o 0 0 0 0 0 .E p 0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �CIE C6 niO 66l6 6 of ri ni of vi M M'i ci N ri riMMoi 6of tiro 66 6 6 6of 6ai 6 J 'O d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OWi O O O O O O O O O O O O O O O O N O 3 rng �hv 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0;0� c 0 0 0 0 0 00 0 0 0 0 0 a N 0 0 ItOi N 0 0 0 O O m 0 0 0 0 0 On 0 0 0W t00 0 0 ' .- .M- M O O O �2 N �2 N �2 �2 � N ; C 3 C^ W Of W W W W W Ot d O Ol O O Q W W W Q A O W N O Cl h W 0 0) W 0 0 0 0 t7 O N N N O 0 W w O m 0 0- rOv M .- 0 N 0 0 0 0 W 0... V V of 0 N M N N N 0 0 0 0 0 0 N � �^ 0OM00d00 OOMMO0N+0O00m O M0000N0 O c C Ham:: •_ a0WOa0NWWWOd W N It) Q IO N It) M y W W IO Q Q Q N IO d Ill IO N. IO IO IO . IO Q 10 W IO N M d W W N N N IO O M 'V V' 10 O M O M N R V N W 0 N N V W 0 N N N t0 O O N d 0 0 0 � y � ¢¢^ O O O O O O 0 G Q O 0 0 .= � O O � O � O O 0 0 0 0 � 0 0 0 0 0 O G 0 0 0 Ip '/l N to W O W N d Q M N d M W N d •- O N N O N M 0 W M lN O N O W W 00 N O I(I O� Q Q ID V 1� V th IA W V O N 10 N O N l0 Q t0 0 N N 10 O O O 1 O O O O O O O O O O O O O O 1 O G N O M O N N W W N N W W N N N 0 N O N W N Q N W W N N M W N W W W M O h n W ITn W M N A N V C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w J z N N N N N N N N N N N N N N N N N N N o 0 0 0 0 0 0 ' o o 0 0 0 0 0 0 0 0 0 0 a 2 ,0 ,0 W W W W w W W W w w w w W W W>>- _. 0 W W� ,0 ,0 ,0 ,0 ,2 C C C C C C C Z Z Z Z C Z Z Z Z Z C Z Z Z Z Z Z C C C C C C M. C Z Z C C 'a 'a 'a 'a "a a a a a a E E E E E E E �i r3 E �_ �_ �_ �_ �_ E �_ rJ �_ �_ �_ E E E E E E E E E E U U U U U U U o 0 0 0 U 0 U o o a 0 0 U U U U U U U U a c U U C ;5 a a V V 9 a 0 a a V a e��e emmmmmm mmmmmmeeee�e� c . AAA . . . . o .���� to N W W N W W W W U1 VJ W W N W to ttW W W C C C C C C C C[ C C C W W J Os 0 0 0 0 O0 0 0 0 0 0 � j m J tq Ul 4 M N- m � M N � Wy q M N M M U U U (") `- 0 m W N UI a lh N N .- Mou # # # # # # fn M M M # M M M M {vy # M m m m yWy y # # # # # # # # # # # # m m m m m m U U U U U U W}}>> U} j j- y y U>}} y>} U U U U U U U U} y U U Z CD rn W F 0 z a a � CL a a M W r Z LU �WJ w a Z � J Q o U GD Nr (MD Nr (mr+ N O N cD QNM<. 2 `� 0 OOMrn. NG(NO . Oi m (O t0 O O Wr C CN N Or Sr Sr r r 1r+ N NN N NNm r r N N. N N N N N N N _ � J Svc '> vmw(oomo'�n ivp mM(c r N rnN N mmo rn N M O W G. 1. M LP V i N y r r .- r r r r N N N N N N N N N N N N N TCi S E m N N h m 0 d r 0 rn h m N rn rn n y N N m m m M O rn m M N O r o ❑ E G1 v O O� op pO �(pp QQ �p pp�� GGpp 0) OI V O n O cmS S M V N N N (OO Q M lO . (rnD . On N M S m O O n 0 0 (D b li W S 0 Onl (MD M N .tom' Q O ... 7 CUJ M d d M N M tC M M N N N- M M M N r N N N N M N O M N N Q M V tC O cC Q � G O h O O O O O O O O m m O O O !l (o N m N O O V N r m O N N h r N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N oo E V 00 rn (� O aa}} O Q p m O O O !� O m 0 N t` o N m r 0 O V V N to � CD O S N (O h Q O O 1 N 1� O OJ O W O N m 0 0 0 j p j N Ni N N N N N N N N N N N N N N N N N N N N N N N- N N N N N N N N N N N N N N N N N O�W... (� o O Qm O !� N d (O N N O I� O V C1 Ol (0 o Q N r M m m (OO M (p 1` m Om : C N O N N r O O m r M r M r N r M N N M M r M d M h N O M M M d ci V M V M Q d d v 0 0 C 6 1l Q N rn N o rn f� d 0 mm N i0 S r N. (N. 'o n a .Q- m' r N r h N O m m r m O A N rn N m 0 Q M N O r t[1 m m m m O r r N N Ni (O (O O M r M r N M N Q M M M d N d M Q M N M Q M Q M C M Q pp r Q y p Q M r m M Q W N o o m O O Q M N rn h Q Cl! Q rn m r m M Or (p N O (n M vmi M n S b N O r N 0 O O W N rn iOn umi O rn o O m m NN d m O ONi r .- N N N rn rn rn rn rn rn a r0 r r r r r r r r r 0 3� W 3 d 0 01 N m m V> O d M N m N m d O m O N r a Q S n N O h O O N m h N O h 0 (h N r� (O r h N m m 0 Il� w r w m M Q O O M N M M q D. r G. -.O U ^ N(G M eD O O M N M N f0 m N' O N M O N N O N N N` m' N' N^ �00 V V N C d 0 r r r O y U NLL�- VO GD m !� W !� N �D m N N Q N r O O. (p (0 Q((00 .!. n m d (00 p rr- N 4D m t�1 N O (� t� N N ul O O N Nl 6 r M CI N tN (G th u1 0 (G 0+ r (O O GO r O M N (h O (� ' r M M M CI M M O S I0 h N NM r fD M N C GQi rn N 0 m M rn^ m N r N< O O m M S u7 p M O M N m n (p r wm- N d r m m N N N O O rn m m m m V O w O m rn m O m r 0 N1 N N Q N d M V V V Y M N�N 88888 8 88 —8 8 8-8— `o `o `o `o `o o o o .o `o `o E E E E E o E `o E E o f `o E `o E `o E o o o o o 5 5 `o 'C`o 2.__ C C C C C C C_ W W W W W C W_ W W C W C W C_ W_ W C C C C c C C C C C w Do a a a a- a a s a a a a- $ $❑❑❑❑❑$❑$❑ O E❑ E❑ E E❑ E❑ E E E E E E E E E S E o 0 0 0 o x x x x x O I S S O x 2 0 o S O S 0 0 0 0 0 o o o 0 0 o 0 o 8 0 0 o g o 0 8 0 8 ppE o 0 0 0 0 o o 8 o o 0 o 0 o 0 V fv EEEEEE d 90 N W d N N N 4: o v (Eo "' o N v E= (o E tE E tE E E V tv1 N E m m m mg� m mgg m m m m m gm� a a a a a d a E a E a c nw. E C. o o o o x x° x° x x x x o= o 0 ❑ ❑ ❑ ❑ ❑ c� x x c c i ci ° ci x° i �2:0 7: � 2 2 � x x x x x x o N N 0 C vE f0 O m d d O O m m^ m O IN m m Op m m O m O m m t0 N m d O d m Q m Q NQ N N N N N N N M M r M M M r M M N M N M N N P d d d Q Q E m J' r >CF 0 3Z ❑ pp N N M N M g 0 0 (Q N N M ### r N M M n 0 M it 2 cUi U u 0 U M M m N m c? 2 2 2 U Y p U o v b o ❑mmmmmm" m##"'m❑❑❑ mm m m mm❑m❑o ❑ m U U U U U U O U> Y> Y}} N N u! }} U j} U U} U> U} U U V! U m y>} y) m 0 E 7 r m U v N O r _ U c' U U U U c' r N M U M # " N N M r i0 (S1 c? # r U `{ ❑ # # # # # # # ak # # # # # # # m ❑ m m m X m m m m m m ❑ O m m m m m m ❑ m ❑ ❑ U u7 U U U W U U U U>>� y} U> U m m U>} U Y y U> U Y U> U U m U m} -> >> m E rn O rn m m m M (O m 0 0 I I m N W � W m O h 1� 01 l7 O i(J Q lh S O GO I� h d h N N m I. m V N GD m f0 C o N �G d m Oi Qr Oi !2 rn Z O (G C O m h Ki O h M r r m N r� N � N N N N r r r r r r r r r r r r r >v 8=w E y Y a C 0 � W O O M O. l0 d rn rn M m rn rn N m Q m Q O 1� n I0 m m I. O M r O h m V N Q Q N r N m m r N S m (O M O O th N N W r rn N m Oi � C C M M M 0 0 0 0 0 0 0 0I I q R I0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 GI M O O O O rn m V N m 0 - M O O O O Q O m M rn r O O O (N'1 I� O m O r f0 N O( 10 j y p M M M M Cl N N N i�J O i'! N M rn (h rn N N N N O N M N M M M M N t7 N M N N N N N N N N N O 0 o 0 0 0 0 0 0 0 - o 0 0 0 00 O O O O O O p O S O0 0 S S S S S S S S S S S S S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O 6 O O O O O O O O G C G O O O O O O O O O O O O O O O O O O O O O O O O O O O O O rn5 p p S O S S S S S S S S O S S S O O O O O S S O O S O N d m O m rn rn rn Q N M M M O A N W O N t� N N cMD 0 t'1 N O O O m fV t� O N S r tD rn r M m r g m N h M Q m m O !� rn M r NN O W p N� r m M N h O O r V 0 QN m (h m (O V N O Q< N I� m Oi O mm O O I1 Q N N N m N (D 12 U,r dm d QMN I NN NNNNMNM NNN MNNMN hN(nMhoi M (n �n (n N Qa N a U W Z � o M" m m rn M M M M M X M M M M M M M Q M M d C Q a a a a a w a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a ti RiveRidge Engineering Company CONSULTING ENGINEERS AND PLANNERS 405 W. Myrtle St. BOISE, IDAHO 83702 208-344-1180 . FAX 208-344-1182 October 29, 2004 Linda Lewis North Carolina Department of Environment and Natural Resources Division of Water Quality Express Permitting 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SW 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Linda: RECEIVED NOV 0 4.2004 PROD # .>DJ *90 10420 Please find attached information required to update/revise the existing referenced permit. Please see the attached copy of the narrative sent on October 22, 2004 explaining the proposed changes to the permit. The Phase III modifications to the existing permit include the following: Please find the attached information for your review: 1. 2 - Stormwater Management Permit Application Form 2. 2 - Wet Detention Basin Supplement 3. 2 - Tarawa Terrace Phase III, Housing Replacement Construction Plans 4. 2 - Tarawa Terrace Housing Replacement Phase II & III Specifications 5. 2 - Phase III Stormwater Drainage System Engineering Report 6. 2 - Drawing titled Project Boundary 7. Basketball Court, Picnic Area and Tot Lot detail sheets 8. Building footprints 9. 2 sets of enlarged grading plans (3 sheets each) 10. 1- Narrative of Proposed Modifications to Stormwater Project No. SW8 010420 Modification, Tarawa Terrace I Housing, N62470-97-C-7111 11. $4000.00 check All stormwater descriptions and calculations are included in the document titled Storm Drainage System Engineering Report For Tarawa Terrace Housing Development, Phase III. If you have any questions please call me at (208) 344-1180. John Parker with Parker and Associates will be assisting me with this permit application. Sincerely, RiveRidge Engineering Company Wendy Haustveit, P.E. G:\04015\02112\WPFILES\STORM WATER PERM ITTINGIPHIII Stormwater permit cover letter 10-29-04.doc BOISE • COEUR d'ALENE 'lo400494 L4i1' 1: L i L 3008801: 063000 2 L 188,19 Re: [Fwd: Fe: FW: Tarawa Terrace Permit Narrative for Fast -track ,.. Subject: Re: [Fwd: Re: FW: Tarawa Terrace Permit Narrative for Fast -track Review] �(/?/� From: Linda Lewis <Linda.Lewis ncmai1.net> `� " y0 Date: Wed, 27 Oct 2004 17:17:36 -0400 V To: Cameron Weaver <Camcron.Wcaver@ncmai1.net> �j�� Cameron: Rick and I discussed this today and Rick told me to tell you not to accept it. The engineer, RiveRidge, is based out of Boise, Idaho and is not familiar with NC Stormwater regulations. If they want to hire a local consultant familiar with the reps to assist in putting together the stormwater application, then we will consider the permit for Express. Linda Cameron Weaver wrote: Fate being what it is, as soon as I mention something, it turns up .... Wendy just sent this to me to ask about Tarawa Terrace.... Cameron Subject: Re: FW: Tarawa Terrace Permit Narrative for Fast -track Review From: Cameron Weaver <Cameron.Weaver@ncmail.net> Date: Tue, 26 Oct 2004 15:36:40 •-0400 To: Wendy Haustveit <whaustveit@rvrdg.com> To: Wendy Haustveit <whaustveit@rvrdg.com> Hi Wendy. Sorry, I should have sent you a return receipt. Yes, I did receive that and Linda Lewis is reviewing the proposed changes to ensure that we can do it via the Express program. (If projects involve a great deal of engineering, they may not necessarily go into the Express program due to the complexity of the review required.) I will probably have your answer (and/or meeting time to discuss the project) tomorrow or Thurs. at the latest. Please let me know if I can be of further assistance. Cameron Wendy Haustveit wrote: Cameron, Just wanted to verify that you received this. Thanks - Wendy 1 of 2 10/28/2004 8:00 AM Re: (Fwd: Re: FW: Tarawa Terrace Permit Narrative for Fast -track ... *From:* Wendy Haustveit *Sent:* Friday, October 22, 2004 3:16 PM *To:* 'cameron.weaver@ncmail.net' *Subject:* Tarawa Terrace Permit Narrative for Fast -track Review Cameron, Per our conversation on the phone, please find attached, it pdf format, a narrative of the proposed changes to Stormwater Project No SW8 010420 Modification, Tarawa Terrace I Housing, N62470-97-C-7111. Please notify me of the date we should have our plans to you for review. If you have any questions you may call me at 208-344-1180. Sincerely, Wendy Haustveit, P.E. RiveRidge Engineering Co 2 of 2 10/28/2004 8:00 AM RiveRidge Engineering Company CONSULTING ENGINEERS AND PLANNERS 405 W. Myrtle St. BOISE, IDAHO 83702 208-344-1180 • FAX 208-344-1182 October 22, 2003 Cameron Weaver North Carolina Department of Environment and Natural Resources Division of Water Quality Express Permitting 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SW8 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Cameron: The purpose of this letter is to describe proposed modifications to the above referenced stormwater pernut. In addition we would like to be put on the fast -track list for review. In June of 2004, the permit was modified to include Phase II of the Tarawa Terrace Housing Replacement Project. We have now completed the design plans for Phase III of the Tarawa Terrace Housing Replacement Project and subsequently need to update the pen -nit again. A portion of the Phase III project drains to the existing "Phase ID Pond" at the southerly intersection of W. Peleliu Dr. and Tarawa Blvd. In addition we added a pond south of the intersection of Bougainville Dr. and Tarawa Blvd. referred to as the Phase M Pond to accommodate stormwater runoff from Bougainville and an area Bougainville and North of Inchon. The current permit shows a Iarge portion of the site north of Inchon routed to the Phase ID Pond which is currently piped through the Town Center parking lots. A new pipe was to be installed in Phase II to route the stormwater to the Phase ID Pond. The majority of this water is now routed to the Phase III Pond. The remaining stormwater not routed to the Phase III Pond is now piped along W. Peleliu to the Phase ID Pond. Thus the piping that was to be installed in Phase II from the Town Center Area to the Phase ID Pond will no longer be required. Please see attached sheets Exhibit SD-1 and Exhibit SD-2 for the Phase III Pre -Development Drainage Areas and Post -Development Drainage Areas and note that no stormwater from the Phase III area contributes to the existing areas labeled "Town Center Pond" or "Outlet to Northeast Creak". Currently within the Phase III area, there are existing :multi -family housing units and roadways that will be demolished. New homes and roadway systems will be constructed, in a new layout, within the Phase III area. An area known as the "24-Acre Site" which is located North of Inchon St., East of Iwo Jima Blvd. and West of W. Peleliu St. which was previously a wooded area and is currently being cleared and additional roadways and housing will also be placed in this area. I spoke with Linda Lewis on the phone and told her that during the evaluation of the "24-Acre Site" by the Geotechnical Engineer relatively high groundwater was encountered and it was determined that there was a possibility of perched ground water in the area. It was explained by the Geotechnical Engineer that after dewatering takes place during construction, that he could not determine if or when a perched water condition may return. If the condition did return his recommendation is to run french drain systems throughout the "24-Acre Site" to collect the water and to connect the french drains to the storm drain system. It was explained by the Geotechnical Engineer that the location of the french drain systems are best to determined during excavation and construction to determine the flow patterns of the perched water. Someone from his office will be on site on a regular basis and will make the determination if french drains are needed and if so where the drains will be installed. The stormwater from this area drains to both the "Phase ffi Pond" and the "Phase ID Pond". In order to size the pond to account for this additional water, Linda concurred that if we considered the entire "24- Acre Site" as impervious in the stormwater calculations that this would more that account for the additional ground water. Sincerely, RiveRidge Engineering Company Wendy Haustveit, P.E. G:1040151021121WPFIL.ESI.STORM WATER PERMITTINGIPHII1 Stormwater permit narrative letter 10-22-04.doe Il] M N — — - ,,,, L Lb$ Lall-0I� rm1N3W3�V1d3d `JNISf10N Y III 3SVHd • 30VMa31 VMVUVl 1 '3'N'3NnidMV3 3SVS—NO]3NIU" ''I IjPy �Py ...����.. I 4 'III v�����u...Oly=10 OLLNYIIY ��M , I d lr n 0 1 ci I m 1 Q o m e MM .• pOM MME � ' �. ']'F!• L°i l.. t•i' ..FSu: VP..:' 11L• r aI - �� e it • #+ • .:�'•` ♦ = - . ,rig .'�:.�. 0 9p - �A air,*♦ s• L�Ki r la � S; fir' R a �� • r w4 •�� 1` �f� �i � .pgp0 ��r rr�I I}f• i�+� �;6 ` ; �► s. r Pvd+6 ' ` t♦rf :•`. �'f •�# io s •O Ida• �:!�r @li�`' % O •fix � p:aq - �1►�y.. �►•/ a +�w„�,,�' r��� �� . ■ `� • *t ' f E� f �f /� trio Jw ♦� .# •- i'!..• w4 w•r �4PeM �'� ■ � : i0 4 ,d •d ;f. .t, � � �� ptr !f �,•`,w �t�tr }�4 is �a ♦+�a ems. p�:w� o . f 0 {'+.� .,ram,; � ,�♦� � •� ..,� +�., ��' 44 a� - .. ti4�' r�r; � � , t�� r;a�++� �� �a• �$ i;wq n♦ *•�f � 7� +. ' rRt., rq � -yfi+�s: • • ��� V4� •a atrC �4 I rp� , ��, ~1�q + � f ���.+ , ♦+ ,* ♦#o O> �`� 1; 1`J ,'-' •~ ' �',O r � d�• Hwy i +!i�a1,,., +• O♦ w-� a�i/,, a*0 -� tr ♦'a '. �v 4 t y, - . , ��°,� ♦�� ti �+`y. O�tr ,,, iw:, a'- - `qw !'a �� �� �4 - Ov+ . y '�1 • a0t V` �*c a ;�,i #�w a• '�� :iy ?' •` '� *�,0�' r. �.. 14 ac ,� r/Y• t� �� rl r O ` g"w` .' r.r • ., a+ •dip � ice, p��� ' C ♦ kuue I 11i1p� :�anq�►�� i . r■ ' �` �r ' -� ` l ` - Tarawa Terrace Permit Narrative for Fast -track Review Subject: Tarawa Terrace Permit Narrative for Fast -track Review From: "Wendy Haustveit" <whaustveit@rvrdg.com> Date: Fri, 22 Oct 2004 15:1 b:22 -0600 To: <cameron.weaver@ncmail.net> Cameron, Per our conversation on the phone, please find attached, it pdf format, a narrative of the proposed changes to Stormwater Project No SW8 010420 Modification, Tarawa Terrace I Housing, N62470-97-C-7111. Please notify me of the date we should have our plans to you for review. If you have any questions you may call me at 208-344-1180. Sincerely, Wendy Haustveit, P.E. 'tA RiveRidge Engineering Co. Content -Description: PH III NARRATIVE.pdf PH III NARRATIVE.pdfi Content -Type: application/octet-stream Content -Encoding: base64 1 of 1 10/25/2004 8:33 AM Stormwater Project No. SW8 010420 Modification - Tarawa Terrac... Subject: Stormwater Project No. SW8 010420 Modification - Tarawa Terrace Housing Replacement From: "Wendy Haustveit" <whaustvei@rvrdg.com> Date: Tue, 9 Nov 2004 14:12:40 -0700 To: <linda.lewis@ncmail.net> CC: "Rick Marshall" <rickm@huntbuilding.com>, "David Byrd" <DavidB@huntbuilding.com>, "Lynn Standish" <1tandish@g1le-buck.com> Linda, In regards to item (1) in the Request for Additional Information letter dated November 4, 2004 and per our phone conversation today I would like to request a 90 day extension to complete the wetlands study for the Stormwater Project No. SW8 010420 Modification - Tarawa Terrace Housing Replacement permit. This would place our resubmittal date on February 4, 2005. We understand that we may submit the additional information at a date earlier than February 4th if all modifications to the plans and permit are complete. In addition, per our conversation unless I hear that this request is not approved, the extension will be granted. Sincerely, Wendy Haustveit, P.E. RiveRidge Engineering Company 405 W. Myrtle St. Boise, Idaho 83702 Ph: (208) 344-1180 Fax: (208) 344-1182 1 of 1 11/9/2004 5:04 PM RiveRidge Engineering Company r, CONSULTING ENGINEERS AND PLANNERS 405 W. Myrtle St. BOISE, IDAHO 83702 11 208-344-1180 • FAX 206-344-1182 October 29, 2003 Cameron Weaver North Carolina Department of Environment and Natural Resources Division of Water Quality Express Permitting 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SW8 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Cameron: In regards to the email sent to me on October 28, 2004, that stated: "Unfortunately, unless you are able to work through a local engineering firm, DWQ is unable to accept this project into the Express program at this time. The project as proposed will require a large amount of correspondence and review and is not suitable for the Express process without a local contact who has had extensive experience in dealing with NC coastal stormwater regulations." I have the following questions: 1. If Parker and Associates, a local engineering and surveying firm, assists us with the permitting process can we submit through the Express program and if so will you please assign us a date? 2. You had mentioned that the Phase III Pond may need to be submitted as a separate permit. Can the Phase III Pond be incorporated into the existing permit Stormwater' Project No. SW8.010420 Modification, Tarawa Terrace I Housing, N62470-97-C-71 it or do we need to submit a separate Stormwater Management Permit Application Form_ for the Phase III Pond? Page 2 October 29, 2004 Thanks for your assistance. Sincerely, RiveRidge Engineering Company Wendy Haustveit, P.E. G:104015\021121WHILMSTORM WATER PERMITTINGIQUESTIONS TO NCDENR 10-29-04A. RiveRidge Engineering Company CONSULTING ENGINEERS AND PLANNERS 405 W. Myrtfe St. BOISE, IDAHO 83702 208-344-1180 • FAX 208-344-1182 October 21, 2003 Cameron Weaver North Carolina Department of Environment and Natural Resources Division of Water Quality Express Permitting 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SW8 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Cameron: The purpose of this letter is to describe proposed modifications to the above referenced stormwater permit. In .tune of 2004, the permit was modified to include Phase II of the Tarawa Terrace Housing Replacement Project. We have now completed the design plans for Phase III of the Tarawa Terrace Housing Replacement Project and subsequently need to update the permit again. The majority of the Phase III project drains to the existing "Phase ID Pond" at the southerly intersection of W. Peleliu Dr. and Tarawa Blvd. In addition we added a pond south of the intersection of Bougainville Dr. and Tarawa Blvd. referred to as the Phase III Pond. _ Currently_ within the Phase_Ill area,.there are existing multi -family housing units and roadways that will be demolished. New homes and roadway systems will be constructed, in a new layout, within the Phase Ill area. An area known as the "24-Acre Site" which is located North of Inchon St., East of Iwo .lima Blvd. and West of W. Peleliu St. which was previously a wooded area and is currently being cleared and additional roadways and housing will also be placed in this area. I spoke with Linda Lewis on the phone and told her that during the evaluation of the "24-Acre Site" by the Geotechnical Engineer relatively high groundwater was encountered and it was determined that there was a possibility of perched ground water in the area. It was explained by the Geotechnical Engineer that after dewatering takes place during construction, that he could not determine if or when a perched water condition may return. If the condition did return his recommendation is to run french drain systems throughout the "24-Acre Site" to collect the water and to connect the french drains to the storm drain system. It was explained by the Geotechnical Engineer that the location of the french drain systems are best to determined during excavation and construction to determine the flow patterns of the perched water. Someone from his office will be on site on a regular basis and will make the determination if french drains are needed and if so where the drains will be installed. The stormwater from this area drains to the "Phase III Pond". In order to size the pond to account for this additional water, Linda concurred that if we considered the entire "24-Acre Site" as impervious in the stormwater calculations that this would more that account for the additional ground water. I have attached a drawing titled "Post -Development Drainage Areas, Exhibit -SD 2" that shows the drainage areas to the Phase ID and Phase III Ponds. Please note no stormwater from the Phase III area contributes to the existing areas labeled "Town Center Pond" or Outlet to Northeast Creak. Sincerely, RiveRidge Engineering Company Wendy Haustveit, F.E. GA040151021121WHII.EWHilI 3tormwater permit cover letter 10-22-04,doc STORM DRAINAGE SYSTEM ENGINEERING REPORT FOR TARAWA TERRACE HOUSING DEVELOPMENT, PHASE III CAMP LEJEUNE JACKSONVILLE, NORTH CAROLINA FOR CONSTRUCTION RECEIVED NOV 0 4 2004 DWQ pRo� 042v H� Or) OWNER: UNITED STATES GOVERNMENT OCTOBER, 2004 CARol', 02 544 = ax GIN RiveRidge Engineering Co. 405 W. Myrtle St. Boise, ID 83702 (208) 344-1180 remised RECEIVED DEC 14 2004 wO PROJ # 2� GIG ¢Z zo ,% j I. Purpose: This Storm Drainage Design Report is being prepared in accordance with the Project RFP (State of North Carolina Department of Transportation, Division of Highways Guidelines for Drainage Studies and Hydraulic Desi . The design accounts for storm drain flows from the combined new housing units in Phases I, II and III. I1. Description: Existing Storm Drain System: Currently Tarawa Terrace Phase III contains 3 different drainage basins, see Exhibit SD-1 titled "Pre -development Drainage Areas." 1) The drainage area labeled "Phase 1 D Pond" drains to a detention pond that was constructed with the Phase I project. (NCDENR — Water Quality Section, DWQ Permit No. SW8 010420 Modification, Tarawa Terrace I Housing, N62470-97-C-7111) Prior to this pond construction all drainage was collected in inlets and piped to an existing ditch in the vicinity of the "Phase 1 D Pond" and then conveyed to Northeast Creek. This discharge was untreated and non -detained. 2) The area labeled "Area Town Center Pond" drains to an existing pond southeast of the intersection of Iwo lima and Inchon via overland flow, catch basins and piping. This pond is outside the construction limits. This pond has an overflow that is piped southerly to Northeast Creek. 3) The area labeled "Area to Existing Northeast Creek Outlet" currently drains to Northeast Creek. This discharge is untreated and non -detained. Proposed Storm Drain System: Tarawa Terrace Phase III storm drain design will modify the collection system to drain only to the Phase 1 D Pond and the new Phase III Pond (also referred to as the 13 Acre Site Pond). The drainage basin for the Town Center area will be reduced in size to the area outside of the Phase II and Phase III boundaries. This reduced basin piping, detention and discharge, which is outside of the project limits, will not be further modified. 1) The "Phase ID Pond" was designed in a previous phase of this project by others. The pond was sized to account for all increased stormwater collection and discharge included in Phase II and all of the Phase III area of this project that is located east of Iwo Jima. 2) The existing drainage area labeled "Town Center Pond" will be reduced in size by redirecting storm water from the Phase III area either to the Phase I Pond, or by redirecting flow to the new Phase Ill Pond. Both ponds have adequate capacity for this redirected runoff volume. 3) - The entire 13 Acre Site drainage area and a portion of the 24 Acre Site area that currently discharges to the Town Center drainage area will be directed to a new detention pond referred to as the "Phase Ill Pond or the 13-Acre Site Pond" which is located south of the intersection of Bougainville and Tarawa Boulevard. This pond has been sized to accommodate this revised drainage basin area. Pipe networks: In accordance with State of North Carolina Department of Transportation, Division of Highways Guidelines for Drainage Studies and Hydraulic Design: 1) The storm drain pipe network was designed based a 10 year storm. In roadway sag areas where relief by curb overflow is not provided, the flow into the pipe network was increased to a 50 year storm design. 2) The rational formula was used to determine the runoff flow in each drainage area. 3) A minimum time of concentration of 10 minutes was used when the computed time of concentration was less than 10 minutes. Storm drain pipes are designed to be smooth wall high density polyethylene pipe (HDPE) (n=0.013). Where shallow cover dictates, the pipes are designed to be reinforced concrete (n=0.013). Where separation between water mains dictates, the pipes are designed to be ductile iron (n=0.015). The storm drain piping system for both Phases II and III along W. Peleliu St. and Tarawa Boulevard were verified in this Phase of the design. All contributing areas are shown in Appendix A. The time of concentration for each area was determined using the program Land Development Desktop version 2000i and are also included in Appendix A. Pipe analysis was performed using STORMCADD version 5.2, see Appendix B. Gutter and Inlet Capacity In accordance with State of North Carolina Department of Transportation, Division of Highways Guidelines for Drainage Studies and Hydraulic Design: 1) Inlet spacing was based on limiting the spread to no more than half of a through lane. 2) Inlet capacity at sags was doubled to allow for clogging. 3) The curb opening of the combination inlet was neglected in the calculations. 4) The grate efficiency was assumed to be equal to a parallel bar grate. 5) Inlet efficiency of 100%. Inlet analysis is based on the use of combination grate and curb opening inlets with depressed gutters at the inlet. Inlet spacing is based on limiting the spread within roadways to half of a through lane (8 feet) during the design storm with the depth of the gutter not exceeding 5 inches. The existing main roadways, West Peleliu Street, Tarawa Boulevard, Inchon Street, Naha Street and Bougainville Drive currently have varying cross slopes, but generally range from 4% to 6%. Our design is based on a 5% cross slope. Analysis of the gutter/street capacity and catch basin/inlet capacity was performed using Flowmaster, version 6.1, by Haestad Methods, see Appendix C. Phase ID Pond Sizing: Per Briggs Engineering's design calculations dated Rev 11/17/03: • The Phase ID pond was size was based on a contributing area of 173.82 Acres of which 43% was impervious. • The volume of a 1-inch storm is 275,723 cubic feet. Based on the design of Phase II and Phase III the new contributing area to the Phase ID Pond is 151.43 Acres of which 48% is impervious and the volume of a 1-inch storm is 263,848 cubic feet. Therefore the pond is adequately sized for the revised contributing areas. See Appendix D for supporting calculations. Town Center Pond Sizing: The contributing area to the Town Center Pond was significantly reduced. Phase III Pond 13 Acre -Site Pond Sizing: The sizing of the Phase III pond was based on a contributing area of 43.12 Acres and impervious area of 17.33 Acres. Based on 90% TSS removal the minimums surface area required at the permanent pool elevation is 52,590 square feet and the 1-inch storm volume is 64,173 cubic feet. See Appendix D for pond sizing. EXHIBIT "D" 2�ZH CAR0"..,',,�,, 854 = p RECEIVED DEC 14 2004 DWQ PROJ # �SN E Q' U Project - O YO/ S.- RiveRidge Engineering Co. page of 3 Date Prepared by-- ��v ELT E- - z. Project o _ _ RiveRidge Engineering Co. Page Z- of 3 Date / LD - a - D Prepared by L'i }� P14A Sr- 1-4� ELEkn ,A-,l - D — - Q, .Y7 t A7LE A_ Z. fz D. z 3zz� o 4 Cod / , 3 ,a _ PL3.til� - Project p 4 D I RiveRidge Engineering Co. Page Date D - - o Prepared by �n Mr& W ErA - Z-i &A-Y� J 7 8, J 2 ��--jnRaFv- .zs,n Ac- /7,31 D 0 tS t ns3 3!Z rn cD co W ri rn or 00 v N to uo U LO to J m T 0 U U') M CCN OO LO v Cco co m OOi 0) " V CD CU Ch h r 00 a U') co 1- 00 O O C, T r w U LL1 laL o V cD ti 00 rn Kt CD T T r m w w O � lL w rn 00 IT IT 04 o � co 0)o ti v r N cfi CD N COD COO w r fO) M vA � � coI- -j LL [~V N U Y N ai v N � O � U W 00 LO LO O r0 Ccj Cf V CS! O LO .-. 0)rCl) a N M c') Cn Cl) CC7 Cl) CA Cl) v It CO v W UQ f!1 Ix W H (1) p LLI a n � o a > w z U) a = zLU IL (D ti 00 CA �t O T T T T o c0 N co LO O 0 N 0 J } °LLI a � m O O a lL a T W R, `-. Q � (D W U� lL 0� .. N W v N �+ NL-! O J O O IL CL 2 LU w a 0 Project .Q 4D S . RiveRidge Engineering Co. page of Z Date �D - $ - n 4 _ Prepared by L, 2d - - - E V 15 I T�IOL 2 `Z L PL-I' 7 fir, c " �n� Project D 1/01 Date U! //- ,o - a RiveRidge Engineering Co. Page 2- of Z Prepared by _ w �-} - Z 3Z,Z , 5 i D Culvert Calculator Report PHASE III POND (13-Acre Site Pond) EMERGENCY OVERFLOW - 1-48" Pipe Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation Computed Headwater Elow Inlet Control HW Elev. Outlet Control HW Elev. 17.00 ft 17.21 ft 17.00 ft 17,21 ft Headwater Depth/Height 1.15 Discharge 82.30 cis Tailwater Elevation 5.00 ft Control Type Entrance Control Grades Upstream Invert Length 12.60 ft 295.00 ft Downstream Invert Constructed Slope 10.95 ft 0.005593 fUft Hydraulic Profile Profile Slope Type Flow Regime Velocity Downstream S2 Sleep Supercritical 9.42 ftls Depth, Downstream Normal Depth Critical Depth Critical Slope 2.62 ft 2.62 ft 2.75 ft 0,004916 fUft Section Section Shape Circular SecQw A#1ta4HDPE (Smooth Interior) Section Size 48 inch Number Sections 1 Mannings Coefficient Span Rise 0.013 4.00 ft 4.00 ft Outlet Control Properties Outlet Control HW Elev. Ke 17.21 it 0.50 Upstream Velocity Head Entrance Loss 1.24 ft 0.62 ft Inlet Control Properties Inlet Control HW Elev. 17.00 ft Inlet Type Square edge wlheadwall K 0.00980 M 2.00000 C 0.03980 Y 0.67000 Flow Control Area Futi HDS 5 Chart HDS 5 Scale Equation Form N/A 12.6 ft' 1 1 1 Project Engineer: Property of g:1040151021121cybemeticamp lejeune.cvm RlveRidge Engineering Company CulvertMaster 0.0 [3.0003j 12/08/04 09:41:30 AM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 N w F- z a Ci W a 2 a = N 2 O a U E N N N O O) O O p o v C O � O � Q U O � N N N N U C O N Q U r o, N m U N O 3 U O m K co N N N= N N N M � N N z LL dj N (ND tOD M (O O) ONi V N HW>> ON LL d JZ W V N O D) M N Q D O ��� K ONO N N- Lo N O m Y QO �3� 00 r O�,m�mmmN 01 N N N N M LL W 09 m (1) 5(9 m Z F D- O N o N�: N 0 M M - N O (D OD W 'I V (D (D N N V co O N N N 0 V' M M V' M N N W = m m (n — Mco U' z 0 5 m �a o l� N i � W K O Cl) Cl) J ¢ m a M Z7 N r O 7 W �O a co O H z H Q U) N W H �i LLmu)O �O O M O Q �M N W (o co V O Fro - co N Co N �D M N J � ~ Q w N N LL a m � m o Z) O Z) Q Z W H u) W 2 J m Q O FD�N onr00 a O N N m 7 (O N V a N V Z O � Q Q m o o O O M MIli cl; = tii �[ Q , 0 O O ~ LL N u) a ¢ a ai uu)i o O M v N Cl) v N o O o v M W co N N ¢ OM N ooN (DN O NN ID (D OD o - W w G < N (O O (C O ¢ z o �rnrnv D W J 'O W ¢ `a a ¢ (n O > > = LL N 0> Z O O p o Q. a >O w Q ;Q > a N b, 5 n aIx Oz>. CL a 5 .; . IQ c�7 (n W Z H z Q a ¢ (W K Lu F 0 W Y� w J J W J J W 2 N Jaf p 2 F F ¢.'... ~ zmu~)an~ O O x .,0 O O O O r F- a ",F , e a a o x a N r �� LL 0 �LL LL M fA ry n 0 W °p v`Oi m H W F n N n r H W Q tL J WQ .C) _ Q C7 W�OWQ z ai LU ZQaao<n z zz = a0a ILI 0 0�0 w0 x m U `m L J J N U D O 0 d t U t0 N N >N U 6 E U N X C m m G E m D >00 N N t0 C O U C N M U m n l0 U N tV Y E� m N O N O O N a •- N �- ui U O E a Q� M m O M C U C A D O N � W N N cn M M ��-- z 2 LL p J N O N m N QQ 0 C (1)Q>ONMMm w�M V 0 r in LL Z O N O fp V N O W N J_ O:D F- ai Y QO a0 n m N N N N M r3mvrnmcornmrnN LL W 0 N N Moo MN Ra z n� n 0]CO RLQ N d m (7 m O <p W W N N O M CD a tii F 9Q 0 h m W rn � 00 (V N r r M J LU LU 3 zz� W 00F 0 ❑ Q N Q Q a N M N N V O� t0 M O W wh m rn vro 0 naom O N N ap O W J O. W Nn aNN(�O Q C. Q M a N y W O M 0 a 0 a O �. 2 C iN Y a w aL w a O' '> WzrzQ ..w.. co W W a a N Q Q 'd Z � r Q o� F r a -�- r Omen a cnp O Or a O O a Q U L m U` U o O a m N U) c 0 c U c 0 d d` U Y 3 0 5 U N a ui N N � U oUC U H U N DN N N t9 U m N � M U c0 m N U) U O N 0 co g U O N C J U c � H N N U cn 4 J J_ W N uS n N N � N Z z H W O Y r rn c o 0 Q 3 v v N N f 09 N tz OU000co��nomMin N Z pJ m m ri ci rn m n rn n n n^ `° v m o c�i coo ro co J N N V V H� m m m rn N rn c v m rn m dp z Z 9 -� mZon (0 (O N W 'n uoi N RR FON W J_ N 07 (n m U' m yN N O O ¢ �conou> o M F O o o O N O J QV M N 0 O 00000 �nvoom c W J m CO = o CL o co in O� N e0 M n O i 0 0 n m N z Z N � Q 70 m 0L 00 rr 00 Ww zzy Rom r M Ci W h z z Q W U) Q 2 a z z X W a r OF W A rFq o� QC- „ r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E.,Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality June 17, 2004 Commander B.D. Pina, Public Works Officer Command General, Marine Corps Base 1005 Michael Road Camp Lejeune, NC 28547-2521 Subject: Permit No. SW8 010420 Modification Tarawa Terrace I Housing Replacement High Density Stormwater Project Onslow County Dear Commander Pina: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Tarawa Terrace I Housing Replacement on June 17, 2004. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H:1000. We are forwarding Permit No. SW8 010420 Modification dated June 17, 2004, for the construction of Tarawa Terrace I Housing Replacement. This permit shall be effective from the date of issuance until June 17, 2014, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system iAill result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request Aithin thirty (30) days following receipt of this permit. This request must be in the form of a ,%N itten petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Laurie -Munn, or me at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSS/:Ism S:1VA'QSISTORMWATIPERMIT1010420MOD.jun04 cc: Wendy Haustveit Onslow County Building Inspections Laurie Munn I<�i'. i lmington.Regional_.Of eice Central Files N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 N—MEN—R State Stonnwater Management Systems Permit No. SW8 010420 Modificatirrn t � STATE OF NORTH CAROLINA DEPARTNIENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STOR IWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commander B.D. Pina, Public Works Officer, Marine Corps Base Tarawa Terrace 1 Housing Replacement Onslow Count) FOR THE construction, operation and maintenance of 3 wet detention ponds in compliance with the provisions of 15A NCAC 2H A 000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file x%ith and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 17, 2014, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater controls have been designed to handle the runoff from 304,048 for square feet for Phase I A Pond, 3,255,674 square feet of built -upon area for Phase 1D Pond, and 157,423 square feet of built -upon area for Phase 11 Pond. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The permittee shall limit each drainage area to the maximum amount of built -upon area as indicated on page 3 of this permit, and per approved plans. 5. Phase 1D Pond and Phase 11 Pond must be operated with a 30' vegetated filter. I 6. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the appropriate permitted stormwater control system. 2 State StormNvater Management Systems Permit No. SW8 010420 Modification DIVISION OF NA'ATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Tarawa Terrace I Housing (N62470-97-C-7111) Permit Number: SW8 010420 Modification Location: Onslow County Applicant: Commander B.D. Pina Public Works Officer Mailing Address: Marine Corps Base 1005 Michael Road Camp Lejeune, NC 28547-2521 Application Date: August 18, 2002 Modified November 18, 2003 Name of Receiving Stream/: White Oak / Northeast Creek Index Number: 19-16-(3.5) Classification of Water Body: "SC HQW NSW" Pond Number: Phase 1A Phase 1D Phase II Drainage Area, acres: 6.08 175.35 6.5 Offsite Area entering Ponds, #12: Total Impervious Surfaces, ft2: Pond Design Depth, feet: Permanent Pool (PP) Elevation, FMSL Provided Surface Area, @PP, fi`: Provided Storage Volume, ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: Time to draw down, days: none, per Engineer 304,048 3,2553-674 157,423 5 5 5 20 5 15.2 26,882 186,870 9,510 28,704 277,930 13,505 21 6.4 16.5 2.5"(D 2-5"(A 1.5" 2.7 3.1 3.2 I State Stormwater Management Systems Permit No. SNV8 010420 Mod]ficatiorr ' II. SCHEDULE OF COAIPLi:I1'CE The storniwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain draws its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in Phase I Pond is 1/3 horsepower, in Phase ID Pond is 3 horsepower, and Phase H Pond is 1/8 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: 4 A-. State Stormwater Management Systems Permit No. SNN'S 010420 Modification a. Any revision to any item shown on the approved plans, including the storrnwater management measures, built -upon area, details, etc. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a LAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the storrnwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 13. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The pemvttee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III, GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5 State Stormwater Management Systems Permit No. SW8 010420 Modificatio* In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit maybe modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. L 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 17th day of June 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION � : C T Alan W. Klune P.E-1 Direct r `-7 Division of Water Quality By Authority of the Environmental Management Commission I State Stonnw ater Management Systems Permit No. SW8 010420 Modification Tarawa Terrace I Housing (N1 62470-97-C-7111) Stornnvater Permit No. SNVS 010420 Modification Onslow County Designer's Certification as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 7 State Stormwater Management Systems Permit No. SW8 010420 Modification.. Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. ?. The drainage area to the system contains -no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. b. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. .8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdoxvn devices are correctly sized per the approved plans. 12. All required design depths are provided. 11. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Onslow County Building Inspector I OFF1CL USr. ONLY Dale 14"ceived {��yy Fee Paid ���/�{ j���ry[ llcrrndt Number W L4� � ,CE W y Q1V A&0 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be phntwcopirrd fnr use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Comanding General, Marine Corps. Base, Camp Lejeune 2. Print Owner/Sip,ning Official's name anc4 title (person legally responsible for facility and compliance): Comander B.D. Pina, Public Works Officer 3. Mailing; Address for person listed in item 2 above: Commanding Gereral., Marine Corps. Base, 1005 Michael Road City: Camp Lejeune State: NC Zip: 28547-2521 Telephotre Nt.1111ber: ( 910 ) 451-2581 4. Project. Name (subdivision, facility, or establishment name - should be consistent with project narne orr plans, specifications, letters, operation and rnairttenance ag;reernents, etc.): Tarawa Terrace Phase TI Housing,Replacement ri. Location of Project (street. address): Tarawa Terrace I City: Camp Lejeune, North Carolina County: Onslow 6. Directions to project (from nearest major intersection): From HWY. 24, enter Tarawa Terrace I Entrance; Proceed on Taraw Blvd. to 7. Latitude: 34044' Longitude: 770 22' 1 of project 8. Contact person who can answer questions about the project: Name: David Powell Telephonc Number: 20$ 344-1180 Fax: 208 344-1182 II. PERMIT INFORMATION: 1. Specify whether project is (check one): New l-orrn SWU-lilt Version 3.99 Page I of4 Renewal X Modific:ation 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8010420 N62470-97-C-7111 and its issue date (if known) _Aug. 23, 2003 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit X Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major X Sedimentation/Erosion Control �404/401 Permit �NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . Wet ponds will be used to capture the runoff form the 1-inch storm in order to settle out suspended solids. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Project Area: acres 4. Project Built Upon Area: 96 5. How many drainage areas does the project have?? 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Phase I D Pond Phase I I Pond : Basin Information -""Drain age Area 1 Drainage Receiving Stream Name NORTHEAST CREEK NORTHEAST CREEK Receiving Stream Class SC HQW NSW SC HOW NSW Drainage Area 60 SF 284,447 SF Existing Impervious* Area — -- Proposed Impervious` Area 2,555,204 SF 157,423 SF % Impervious` Area (total) 33% 55% Impervious *.Surface Area : Drainage Aiea 1 , :: Drainage'Aiea:2. On -site Buildings 403,753 SF 61,372 SF On -site Streets 423,990 SF 52,639 SF On -site Parking 161,693 SF 23,567 SF On -site Sidewalks 115,770 SF 16,037 SF Other on -site 38,583 SF 3,807 SF Off -site 1,411,415 SF N/A Total: 2,555,204 SF Total: 157,423 SF Impervious area is defined as the built upon area Including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Farm SWU-l01 Version 3.99 Page 2 of 4 7. How was the off -Site impervious area listed above derived? From Lowgraphi C' man_ IV, DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to he recorded for all subdivisions, autpar•cels and fc.1111M development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot nnrnbcr, size and the allowable built -upon area for each lot. must be provided as an attachment. 1. The. following commnts ar'C itItclIded to Cnsu1'e of1going compliance With State storm water lrlarlagernerlt permit nilrnber' as issuers by the Division of Water Quality. These covenants may not he changed ot• deleted without file consent Of' the State. Z. No more than square feet of any lot shall be covered by strurtlit'es ar impelvious materials. Irriper viotls InaterIals include asphalt, gravel, concrete, hl'irk, stone, slate or similar material but do not include wood decking or, the waler surf,re of swimming pools. 1 Swales shall not be filled in, piped, or altered except as necessaryt a provide. driveway crossings. 4, liailt-upon ama in excess of the pei'rnitted amount regrlires a stale storrllwater ulariagemeni permit. modification pI•ior t.o construction. 5. All permitted runofffi-orn outparcels or' futum development shall be directed into the permitted stor'nrtvater control system. These connect ions to tlir, slol•111water control system] shall be performed in a manner that maintains the, integrity and perfclrrrlarlre, of the systerrl as perrnit.ted. By your signature below, you certify that the recorded deed restrict€oils and protective covenants for this project. shall include all the applicable items required above, that the covenants wilt be, Minding on all parties and persons claiming under there, that they will run with the land, that t€te r'equircd covenants cannot Ire changed nr deleted wit hot it. concurrence front the State, acid that t[iey will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state storinwater Management permit supplenmmt. forin(s) listed below roust be submitted for each BM specified for this project. Contact tire Storrnwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Fornt SW I.)-102 Wet Detention Basin Supplement Forrn SWU-103 Infiltration Basin Supplement Form SWU-104 LOW Density Supplement Dorm SWIJ-105 Cttrb nutlet. System Supplement horin SWU-106 Off -Site System Supplement Form SWIJ-107 Underground Infillratiori`i'reru:h Supplement Form SWIJ-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWIJ-101 Version 3.99 Page 3 of 4 Vl. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the iten►s listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicalc thatyou have provided the following required information by initialing in the space provided next to each item. In''•f • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Forrn(s) for each BMP • Permit application processilig fee ofA sayable to NCDENR) • Detailed narrative description of story ,water• treatment/managen,er:I • 'fwo copies of plans and specifications, including: Development/Project name Engineer and firm - Legend North arrow Scale - Revision number & date ' Mean high water line Dimensioned property/project hOLIndary Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations Details of roads, drainage features, collection systems, and stormwaler control measures Wetlands delineated, or a ,tote on plans diat none exist. Existing drainage (including off -site), drainage easements, pipe sizes, r•iir,nff calculations Drainage areas delineated Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so dial they may provide information on your behalf, please complete this sect.;on. DC5ibrlaleCl agent. {inc.l;vidual c:>r f'irrn):�David G. Powell, RiverRidge Engineering Co. Maif;ng Address: 405 W. Myrtle Street City: Boise Phone: ( 208 ) 344-1180 state: ID Zip: 83702 I-ax: ( 208 ) 344-1182 VIII. APPLICANT'S CERTIFICATION I, (print or lypc name of'person listed if General lnforrrralion, itcrrt Z) Cofz 'B&, t h� certify that. I.he inforrmation included on this permit application form, is, to the best of my Knowledge, correct and that the project will be constructed in conformance; with the approved plans, that the required deed restrictions and protective covenants will he recorded, and that the proposed project complies with the requirements of 15A NCAC 21-1 .1000. r �.- c�2 �� e signature: , , c!1 j Form SWU-101 Versimi 3.99 Page 4 of 4 Permit No. _ 56oe0 Z0 ! tcd Ot, be provided hip DIVA) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PRO.IECT INFORMATION Project Name: CAMP LFJEUNE PHASE 1 A POND Contact Person: DEAN 13RIGGS Phone Number: ( 208 ) 344-9700 For projects with multiple basins, specify which basin this worksheet applies to: ^PgnCr(A elevations Basin Bottom Elevation 15.0 (AVG) ft. (floor ofthe basin) Permanent Pool Elevation 20.0 ft. (elevation of the orifice) Temporary Pool Elevation 21.0 ft. (elevation of'the discharge structure overflow) areas Permanent Pool Surface Area 26, 882 sq. ft. (water surface area at the orifice elevation) Drainage Area 16.08 ac. (on -site and off -site drainage to the basin) Impervious Area 6.98 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume Temporary Pool Volume l;orebay Volume Other parameters SAIDAI Diameter of Orifice Design Rainfall Design TSS Removal 2 71,178 cu. ft. (combined volume of main basin and fbrebav) 281703 cu. ft. (volume detained above the permanent pool) 13,780 . cu. ft. (approximately 20% of total volume) 3.01$ (surface area to drainage area ratio from DWQ table) 2.5 in. (2 to 5 day temporary pool draw -down required) 1.0 in. 90 % (minimum 85% required) Form SWU-102 Rev 3.99 Page I of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio liar permanent pool sizing should be computed based upon the actual impervious'%o and permanent pool depth. Linear interpolation should be employed to determine the correct value for rton- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter tnav be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 859%, TSS removal and 90% TSS removal. 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 21­1 .i008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials x a x 105 b x -- c x— d NA e. X J�B f. X dB g. X -- h. X t X_ 20 j. NA k The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3: 1. The basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6: l or less (show detail). Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for each basin including access to nearest right- of-way. x I. 1 f the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. x m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 'does not incorporate a vegetated filter at the outlet. This system (check one) 0 does (does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be, performed as follows: After every significant runoff producing rainfall event and at least monthly: a. inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 751/0 of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. 3.15 When the permanent pool depth reads feet in the main pond. the sediment shall be removed. 3.1 When the permanent pool depth reads _L-46" feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blank-,;) Permanent Pool Elevation 2d' O Sediment Re oval EL /Is�ZS i 75` aSediment Removal Elevation l6.ZS 75% Bottom Ele anon i5, a %---------------------------------------------i- FOREBAY 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 7. All components of the wet detention basin system shall be maintained in good working order. acknowledge and agree by my signature below that I am responsible for the pertormance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: STL-'vCA✓ Ir 5C41VG4if/ C CSC US Title: VV06K5 4`�--iellf Address: 1003 1441CHAC/- Rpgy G�IMi' L Ejz�VAIY" ,ve 2$ Sy Phone: 1/9- `/S/ -25;?6 X 2bb' Signature:_ %! Date: -',2 ,41.41( Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. - /L <2 - a Notary Public for the State of %' z County of Cr do hereby certify. that -AAA personally appeared before me this -_a ?/day of , 9J'L�� and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, 5 V�►��r. SEAL My commission expires Form SWU-l02 Rev3.99 Page 4of4 V r + Permit No. _ -S W 2 O 10 `40 tuxyo (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Tarawa Terrace Phase 11 - Housing Replacement Contact Person: Wendy Haustveit/David Powell Phone Number: ( 208) 344-1180 For projects with multiple basins, specify which basin this worksheet applies to: Phase II Pond elevations Basin Bottom Elevation 10.2 ft. (floor of the basin) Permanent Pool Elevation 15.2 ft. (elevation of the orifice) Temporary Pool Elevation 16.5 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 9,510 sq. ft. Drainage Area 6.53 ac. Impervious Area 3.6 ac. volumes (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) Permanent Pool Volume 21,313 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 13,505 cu. ft. (volume detained above the permanent pool) Forebay Volume 4,462 cu. ft. (approximately 20% of total volume) Other parameters SA/DA1 3.25 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1 1 /2 in. (2 to 5 day temporary pool draw -down required) Design Rainfall 1 in. Design TSS Removal 2 85. % (minimum 85% required) Form SWU-102 Rev 3.99 Page I of 4 Footnotes: t When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. NIA a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. NIA I. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. M. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) R does 0 does not incorporate a vegetated filter at the outlet. This system (check one) Q does A does not incorporate pretreatment other than a forebay. Form SWU-lot Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 11.5 When the permanent pool depth reads 12.2 feet in the main pond, the sediment shall be removed. feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 15.2 Sediment Re oval El. 12. 2 75 -------------- - Sediment Removal Elevation 1 1 .5 75% Bottom E!e ation 11.2 %--------------------------------------------- ---- Bottom Elevation 10.2 125% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-lot Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. 1 agree to notify DWQ ofany problems with the system or prior to any changes to the system or responsible party. Print name::— CPR T3e� -D. �Pi na Title: ,-,6 1 iL VJ0V (J FRIG{—{- Address:� 1!�VS 1M Phone: t G 1 o I `'f C� 1= Signature: t3{&-,L J_ Date: 3 1 1 0 Note: The legally responsible party should not he a homeowners association unless more than 501A of the lots have been sold and a resident ot' the subdivision has been named the president. I Gam'-r%7i� a Notary Public for the State of County of 0y do hereby certify thatlic 7, personally appeared before me this ��' day of �� , �Dy{/ . and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ��^dal` Dorm SWU-102 Rev 3.99 Page 4 of 4 DETENTION POND ANALYSIS FILENAME- G:IDATAIWPDATAIWQSIPOND1010420-D PROJECT M SW8 010420-D REVIEWER: L. Lewis 1114104 Modification PROJECT NAME: Tarawa Terrace Pond D DATE: 04-Nov-04 Receiving Stream: Northeast Creek Class: SC HQW NSW Drainage Basin: White Oak Index No. 19-16-(3.5) Site Area acres Allowed DA ;>#73 > acres Permitted DA 6596201 square feet Area = 151.43 acres IMPERVIOUS AREAS Rational C Acres Buildings 372097.00 square feet 1.00 Streets 443259.00 square feet 1.00 Parking 160246.00 square feet 1.00 SW 121885.00 square feet 1.00 Other 264099.00 square feet 1.00 Offsite 1811536,00 square feet 1.00 Permitted TOTAL :3122Oq; square feet Rational Cc= 14604.37 Allowed Maximum: 3255674.00 square feet SURFACE AREA CALCULATION % IMPERVIOUS 48.11 % SA/DA Ratio 2.59% Des. Depth 5 Req. SA 170599 sf TSS: 85 Prov. SA 18657€ < sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* Des. Storm Rv= B ottom Perm. Pool Design Pool Volume prov @6.4 Req. Volume Storage met at ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 0.60 ft 1.536 cfs 0.615 cfs weir HxW days FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= Elev Area 757358 151471.6 149854.00 Inc. Vol Acc. Vol 5 186870 0 0 6.00 201145 194008 194008.00 7.00 218468 209807 403814.0 Q2 Area = 59.52 sq. in. Q5 Area = 23.81 sq. in. Orifice Area 39.27 sq. in. Q= 1.014 cfs .. in x COMMENTS Surface Area, Volume and Orifice are within Design Guidelines. in DETENTION POND ANALYSIS FILE NAME: G:IDATAIWPDATAIWQSIPOND1010420-D PROJECT #: SW8 010420-D REVIEWER: L Munn PROJECT NAME: Tarawa Terrace Overall Pond DATE: 154Aag--m — ( ---� f 7,c`a �'j Receiving Stream: Northeast Creek Class: SC HQW NSW Drainage Basin: White Oak Index No. 19-16-(3.5) Site Area 189.90 acres Drainage Area i73$16bi square feet Area in Acre: 175.35 acres IMPERVIOUS AREAS Rational C Acres Buildings 1413086.00 square feet 32.44 Streets 976615.00 square feet 22.42 Parking 579348.00 square feet 13.30 SW 120661.00 square feet 2.77 Other 165964.00 square feet 3.81 square feet Total 74.74 TOTAL 7: >0 square feet Rational Cc= 0.11 SURFACE AREA CALCULATION % IMPERVIOUS 42.62% Des. Depth 5 TSS: 85 SAIDA Ratio 2.26% Req. SA 172426 sf Prov. SA $87D sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* Des. Storm Rv= Bottom Perm. Pool Design Pool Volume prov @6.4 Req. Volume Storage met at ',; inches 0.43 0 msl msl 6.4 msl 277930A cf ``Qf1 cf €€ €. msl ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 0.60 ft 1.597 cfs 0.639 cfs weir H x W Tl days FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= Elev Area 757358 151471.6 149854.00 Inc. Vol Acc. Vol 5 186870 0 0 6.00 201145 194008 194008.00 7.00 218468 209807 403814.0 Q2 Area = Q5 Area = Orifice Area Q= in COMMENTS Surface Area, Volume and Orifice are within Design Guidelines. 61.88 sq. in. 24.75 sq. in. 39.27 sq. in. 1.014 cfs x in - • - '� � • � � •' : - _���� _, �. =;•v:• �. ' "' � Wiz, . �Y-� �":s4�9rf�a �._.�s �`i ._ nz � \� � V `� M.»� n -tm ,n - �� c� • � r' ,. � �.�T'_i, `� •�; ��' ` � y ' - � � �' �� tit. � � '• � � �,�...�. ... .<:, frr ,. �� _ _ . �-� Y ���. �� {. I rye n�-. �. P�.,r � • i� ,'� �� . 0�1' _ � ..k nw l' ' S�� a r*' �� r� o � 4 � � � +*' :S trr �/f/+ '^"-mac.' _ ,-+� � ..,.-�, -.�.• :�'"�"ii .may` �� / Vr - � / rr 5 ���•�a�'�'�15 �� l���y..�+PwV'i�'�""��� •���� v�rr .. !1 � .. � �� L� .wWli ,_..r'y °1 � � . `�l�f;� 1, r • a1 j`i � � '* Cr: �ti�� r�f�. a e FM �.�1' _ ;� Spa• `�.. I June 14, 2003 Laurie Munn North Carolina Department of Environment and Natural Resources Division of Water Quality . 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE, Stormwater Project No. SW8 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Laurie: RiveRidge Engineering Company RECEIVED JUN 15 2004 DWQ Pa0d # Please recall that at the end of April we had several emails and phone conversations to finalize the Stormwater Permit for Tarawa Terrace - Phase II construction. We had resolved all items except for the areas draining to the Town Center Pond. I have finally received the topographic information to answer question 1 in your email sent on 4/28/2004. Your question was: "1. . . . Also, the Town Center Pond will need to be incorporated into the Project boundary and I will need to get some information on it. Please provide the volume of the Town Center Pond, outlet control structure information, pond elevations, and calculations showing that everything that drains to this pond will make it to the Phase I D pond and drawdown within 2- 5 days. In response to your email we requested additional topographical survey to verify the drainage boundary to the Town Center Pond. This resulted in a change of the boundary shown in Exhibit SD-2 and labeled "Area to Town Center Pond & Routed to Phase ID Pond." Originally we thought that all of the area that drains to the pipe network north of the Town Center pond reached the Town Center Pond. Actually the majority of the area north of the Town Center Pond is collected into the pipe network that bypasses the Town Center Pond. This pipe network connects to a manhole downstream of the Town Center Pond overflow structure and therefore never enters the Town Center Pond. In addition, it was discovered that an area west of Iwo lima is connected to the network that bypasses the Town Center Pond. This water is subsequently routed to the Phase ID Pond. On page 2 of the Stormwater Management Permit Application we revised the Phase ID Pond: Drainage Area to 7,638,160 SF, Proposed Impervious Area to 2,555,204 SF, % Impervious Area to , and the Offsite Impervious Surface Area to 1,411,415,SF, the % Impervious Area remained 33%. I have included calculations that show that the original 1" volume and permanent pond surface area are not exceed with these revisions, and that the pond will drawdown within 2 to 5 days. 405 W. Myrtle St. • Boise, ID 83702 208 344-1180 • Fax: 208 344-1182 June 14, 2004 Page 2 X I have attached 2 copies of each of the following; • Requested data for the Town Center Pond. • Revised Phase ID Pond calculations • Revised Page 2 of the Stormwater Management Permit Application Form • Revised Exhibit SD-2. • Revised drawings G-002, G-003, G-102, C-101, CG-122, CG-124A, CG-I25A & CG-210 Drawings G-002, G-003 & C-101 show the overall sheets and had not yet been updated. I revised a note. . on G-102 because it said "existing grade" instead of "finished grade". CG-122, CG-124A, CG-125A & CG-210 were revised because we could not locate the end of a pipe that was originally thought to empty into the Town Center Pond so we placed a new pipe and connected it to the manhole downstream of the Town Center Pond. If you have any questions please call me at (208) 344-1180. Sincerely, RiveRidge Engineering, Co. Wendy Haustveit, P.E. Cc: David Byrd Rick Marshall Jim Lemon GA040151021 121WPfilesTHII Stormwater permit response 2 6-1 1-04.doc STORM DRAINAGE SYSTEM ENGINEERING REPORT FOR TARAWA TERRACE HOUSING DEVELOPMENT, PHASE H CAMP LEJEUNE JACKSONVILLE, NORTH CAROLINA OWNER: UNITED STATES GOVERNMENT APRIL, 2004 CA RpZ'" .Q N 02 54 =, O FNCI N E.��. •��. RiveRidge Engineering Co. 405 W. Myrtle St. Boise, ID 83702 (208) 344-1I80 I. Purpose: This Storm Drainage Design Report is being prepared in accordance with the Project RFP (State of North Carolina Department of Transportation, Division of Highways Guidelines for Drainage Studies and Hydraulic Design.). The design accounts for storm drain flows from the combined new housing units in Phases I & II and existing housing units in Phase III. Stormwater runoff will be routed to both the Phase ID Pond, which is currently under construction and to the Phase II Pond. The existing storm drain system in E. Peleliu Street will be upgraded to to accommodate the 10-year storm (50-year storm in sag locations). All inlets along the Phase lI side of West Peleliu Street, Tarawa Boulevard and Matanikau Street will be removed and replaced with new inlets. Analysis of the existing mains along these streets will be completed with the Phase III design and upgraded if needed. II. Description: Existing Storm Drain System: Currently Tarawa Terrace I contains 4 different drainage basins, see Exhibit SD-1 titled "Pre -development Drainage Areas." 1) The drain area labeled "Phase I Pond" drains to a new detention pond within Phase I via overland flow, catch basins and piping. This pond contains an overflow to the wooded area east of East Peleliu Street. This pond was designed, approved and constructed in Phase I. No modifications are proposed for the collection system, detention pond, or discharge to Northeast Creek. 2) The area labeled "Wooded Area" drains to the woods. This area currently takes overland runoff and street runoff that is picked up in inlets and piped without treatment to the wooded areas. From the wooded areas the discharge infiltrates or runs overland to Northeast Creek. 3) The area labeled "Town Center Pond" drains to an existing detention pond south of the Youth Pavilion, north of the pool site, along the east side of Iwo Jima Boulevard via catch basins and piping. This pond has an overflow structure that pipes the discharge to a wetlands area and that drains to Northeast Creek. 4) The area labeled "Phase ID Pond" drains to a detention pond that is currently under construction. (NCDENR — Water Quality Section, DWQ Stormwater Project Number SW8010420 Modification Tarawa Terrace Housing Replacement, Phases 1 A, l B, 1 C & ID.) Prior to pond construction all drainage was collected in inlets and piped to an existing ditch in the vicinity of the "Phase ID Pond" and then conveyed to Northeast Creek. This discharge was untreated and non -detained. Proposed Storm Drain System: Tarawa Terrace I will continue to drain to these 4 different basin areas, but collection, conveyance, detention and discharge changes will be modified for the Phase II development. See Exhibit SD-2, titled "Post -development Drainage Areas." 1) The complete existing drainage system of the "Phase I Pond" will not changed with this design. 2) The majority of the "Wooded Area" drainage area will be modified by collecting runoff in inlets and catch basins and conveying runoff to the "Phase ID Pond". This pond was initially sized to accommodate this increased runoff volume. An analysis of the new system along East Peleliu Street was completed using the HYDRAIN program. 3) A portion of the "Northeast Creek" area in the vicinity of existing Glouchester Circle will be modified by colleting runoff in inlets and catch basins and conveying runoff to the "Phase II Pond". 4) The existing drainage area labeled "Town Center Pond" will remain the same. However a manhole will be placed over the existing outlet pipe from the Town Center Pond to route this water to the Phase ID pond. The future Phase III design is planned to reroute a portion of the drainage currently discharging to this pond to "Phase ID Pond." The Phase ID Pond was designed to accommodate this increased runoff volume. Phase 1D and Phase II Ponds: Pipe networks: In accordance with State of North Carolina Department of Transportation, Division of Highways Guidelines for Drainage Studies and Hydraulic Design: 1) The storm drain pipe network was designed based a 10 year storm, except in sag locations, without adequate curb -overtopping, the flow into the pipe network was increased to a 50 year storm design. 2) The rational formula was used to determine the runoff flow in each drainage area for inlet capacity. 3) A minimum time of concentration of 10 minutes was used when the computed time of concentration was less than 10 minutes. Storm drain pipes are designed to be corrugated smooth -wall high -density polyethylene pipe (n=0.013). Where shallow cover dictates, the pipes are designed to be reinforced concrete (n=0.013). Where separation between water mains dictates, the pipes are designed to be ductile iron (n=0.015). The storm drain piping system down E. Peleliu St. (Line D and branches), a portion of the line down Tarawa Blvd. (Line P and branches) and the piping system to the Phase II pond were the only pipe networks analyzed in this Phase of the design. Each area contributing to the Phase ID and Phase II Ponds are shown in Exhibit SD-3, titled "Minor Drainage Areas." The time of concentration for each area was determined using the program Land Development Desktop version 20001, see Appendix A. Pipe analysis was performed using HYDRAIN version 1.0 (Build 84), see Appendix B. The pipe system down Tarawa andW. Peleliu will be analyzed and upgraded as needed during the design of Phase III. These pipes will be analyzed at this stage of the development because roadway reconstruction and replacement of the curb, gutter and sidewalks for Tarawa Boulevard and West Peleliu will not be completed until Phase III construction. In addition the pipe network through to the Town Center Pond will be analyzed and upgraded with the Phase Ill plans, because the majority of the site upgrades will occur in Phase III. These pipe systems will be properly sized to account for the runoff generated from the new Phase III development. Gutter and Inlet Capacity: In accordance with State of North Carolina Department of Transportation, Division of Highways Guidelines for Drainage Studies and Hydraulic Design: 1) Inlet spacing was based on limiting the spread to no more than half of a through lane. 2) Inlet capacity at sags was doubled to allow for clogging. 3) The curb opening of the combination inlet was neglected in the calculations. 4) The grate efficiency was assumed to be equal to a parallel bar grate. 5) Inlet efficiency of 100%. Inlet analysis is based on the use of combination grate and curb opening inlets with depressed gutters at the inlet. Inlet spacing is based on limiting the spread within roadways to half of a through lane (8 feet) during the design storm with the depth of the gutter not exceeding 5 inches. The existing main roadways, East Peleliu Street, Tarawa Boulevard, Matanikau Street, West Peleliu Street and Inchon Street currently have varying cross slopes, but generally range from 4% to 6%. Our design is based on a 5% cross slope. Cul-de-sacs have cross slopes of 2%. Analysis of the gutter/street capacity and catch basin/inlet capacity was performed using Flowmaster, version 6.1, by Haestad Methods, see Appendix C. Phase ID Pond Sizing: Original analysis for the sizing of the Phase ID pond was based on a contributing area of 173.82 Acres, and a 40% impervious area. The pond was designed to accommodate a permanent pool volume 757,358 sf and a temporary pool volume of 277,930 cubic feet. Based on confirmed survey data the area contributing to the Phase ID is 173.23 Acres with an impervious area of 33%. Based on a 1-inch storm this results in temporary pool volume of 220,178 cubic feet. Therefore the pond is adequately sized at this time for all contributing areas. Routing Phase I Pond to Phase ID Pond: If the Phase I pond was to be routed to the Phase ID pond this would increase the contributing area to 134.72 Acres, and the C value would remain 0.47. Based on a 1-inch storm this results in a pond size of 200,504 cubic feet. Due to constraints in crossing existing utilities down E. Peleliu the runoff that would be routed from the Phase I pond to the Phase ID pond would have to be conveyed in it's own pipe network and could not be combined with "Line D". Phase It Pond Sizing: The Phase II pond was based on a contributing area of 6.53 Acres and a 1-inch storm. PHASE 2-10 YR RUNOFF.tXt File Name: G:\04015\02112\wPFILES\DESIGN ANALYSIS REPORTS\PHASE II STORM DRAIN\PHASE 2-10 YR RUNOFF.TXT Rational Method Given Input Data: Description ........ PHASE 2 - 10 YR STORM APRIL 2004 REVISIONS IDF Curve .......... G:\04015\02112\SDSKPR03\02112\hd-2\wILMINGTON COUNTY.idf Hydrology File Name. G:\04015\02112\SDSKPRO]\02112\hd-2\10 YR STORM -PH II REVS-APRIL 2004rat.rat Rainfall Frequency 10 year(s) Area Description ---------------------------------------------------- Area Coef Tc intensity Flow ac min in/hr cfs EXIST. CB#1 ----------------------------------------------------------- 0.0800 0.8500 10.0000 5.8000 0.3944 CB #EP-1 2.0800 0.4846 20.6100 4.2634 4.2975 CB #D-7 0.7400 0.7554 10.0000 5.8000 3.2422 YI #L-1 1.3600 0.3618 41.4700 3.0559 1.5035 YI #N-1 1.4200 0.3246 18.3400 4.5324 2.0894 CB #D-4 1.1200 0.6143 22.1200 4.1728 2.8709 CB #D-2 1.1100 0.7986 17.2600 4.6836 4.1520 CB #C-1 0.1900 0.9500 10.0000 5.8000 1.0469 CB #T-1 0.8900 0.4287 18.1100 4.5646 1.7414 CB #T-2 0.1700 0.9500 10.0000 5.8000 0.9367 CB #A-1 0.5600 0.8071 10.0000 5.8000 2.6216 CS #A-2 1.0300 0.6005 17.9300 4.5898 2.8388 CB #T-3 2.3380 0.3656 29.1600 3.7504 3.2055 CB #P-3 1.7030 0.6860 26.4909 3.9105 4.5685 CB #T-5 0.3800 0.5079 20.1900 4.2886 0.8277 CB #T-6 0.3900 0.4987 10,0000 5.8000 1.1281 CB #B-1 0.6500 0.9008 10.5500 5.7120 3.3444 CB #B-2 1.3300 0.7034 25.0400 3.9976 3.7398 CB #wP-1 2.0000 0.6420 19.6300 4.3518 5.5877 CB #WP-2 1.3300 0.6974 10.4200 5.7328, 5.3172 CB #wP-3 1.8300 0.4254 32.1900 3.5686 2.7782 CB #wP-4 0.7000 0.8129 10.0000 5.8000 3.3002 CB #wP-5 2.1400 0.5836 30.6100 3.6634 4.5756 YI #M-1 1.1600 0.3362 36.4500 3.3130 1.2921 YI #E-2 0.5300 0.3613 17.5100 4.6486 0.8902 YI #P-1 2.7638 0.3335 40.6147 3.0816 2.8400 CB #F-1 0.5600 0.6357 10.0000 5.8000 2.0648 CB #D-3 0.8900 0.6983' 13.6600 5.2144 3.2407 CB #D-6 1.2100 0.6393 26.2900 3.9226 3.0341 YI #A-3 0.7900 0.3019 16.8800 4.7368 1.1297 YI #P2-1 1.2100 0.3219 23.8900 4.0666 1.5839 YI #R-1 2.0800 0.2577 30.8000 3.6520 1.9575 EXIST.GRAHAM COURT 4.6300 0.6079 34.7500 3.4150 9.6115 CB #P1-1 1.4000 0.7443 22.9342 4.1239 4.2972 YI #P-2 0.3410 0.3330 22.2246 4.1665 0.4731 CB #P-2 0.1600 0.6000 10.0000 5.8000 0.5568 CB #U-1 0.5900 0.7195 10.0000 5.8000 2.4621 CB #U1-1 0.5100 0.4480 20.7108 4.2574 0.9728 CB #U-3 0.8000 0.6300 10.0000 5.8000 2.9232 MH #U4 1.0600 0.3613 15.4397 4.9384 1.8914 MH #U7 0.3600 0.5722 10.0000 5.8000 1.1948 CB #U-2 1.6100 0.7413 10.0000 5.8000 6.9223 CB #U2-1 1.0200 0.7618 10.0000 5.8000 4.5066 Support Data: Page 1 PHASE 2-10 YR RUNOFF.tXt ****** subarea Name: EXIST. CB#1, Row: 1 ******* sheet Flow Description ..................... GRASS AND PARKING manning's n ..................... 0.1500 Flow Length ..................... 63.7983 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ...................... 0.0200 ft/ft Computed Sheet flow time .......................> 5.9000 min shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 37.6105 ft watercourse Slope ............... 0.0100 ft/ft Velocity ....... 2.0300 fps computed shallow flow time .....................> 0.3100 min Total Time of Concentration ........................> 6.2100 min Composite Runoff Coefficient calculator Description Area (ac) coefficient GRASS 0.0100 0.1500 HARD 0.0700 0.9500 Total Area -----> 0.0800 0.8500 <----- Weighted coefficient ****** subarea Name: CB #EP-1, Row: 2 ******* Sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 145.8142 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ...................... 0.0200 ft/ft Computed sheet flow time .......................> 16.6080 min shallow concentrated Flow Description ..................... CHANNELED FLOW OVER GRASS surface ....................... Unpaved Flow Length .................. 89.4604 ft watercourse slope ............... 0.0100 ft/ft Velocity 1.6135 fps Computed shallow flow time ........> 0.9240 min shallow Concentrated Flow Description ..................... GUTTER Surface ...................... Paved Flow Length .................. 375.0561 ft watercourse slope ............... 0.0100 ft/ft Velocity 2.0328 fps Computed shallow flow time .....................> 3.0780 min Page 2 PHASE 2-10 YR RUNOFF.tXt Total Time of Concentration .........................> 20.61.00 min **************************** composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 1.2100 0.1500 HARD 0.8700 0.9500 Total Area -----> 2.0800 0.4846 <----- weighted Coefficient ****** Subarea Name: CB #D-7, Row: 3 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 85.0485 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope 0.0500 ft/ft Computed Sheet flow time .......................> 7.4800 min shallow Concentrated Flow ------------------------- Description ..................... Surface ...................... Flow Length .................. watercourse slope ............... velocity .. ....... Computed shallow GUTTER Paved 147.4399 ft 0.0200 ft/ft 2.8700 fps ..............> 0.8500 min Total Time of Concentration ........................> 8.3300 min Composite Runoff coefficient calculator Description Area (ac) Coefficient ------------- ----------- -------------- GRASS 0.1800 0.1500 HARD 0.5600 0.9500 Total Area -----> 0.7400 0.7554 <----- weighted Coefficient ****** Subarea Name: YI #L-1, Row: 4 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 300.0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope .... .. .......... 0.0100 ft/ft computed Sheet flow time .......................> 39.0300 min shallow Concentrated Flow Description ..................... CHANNELED FLOW OVER GRASS Surface ...................... unpaved Flow Length .................. 235.8648 ft watercourse Slope ............... 0.0100 ft/ft Page 3 PHASE 2-10 YR RUNOFF.tXt velocity ........ 1.6100 fps Computed shallow flow time .....................> 2.4400 min Total Time of Concentration ........................> 41.4700 min Composite Runoff coefficient Calculator Description Area (ac) Coefficient GRASS 1.0000 0.1500 HARD 0.3600 0.9500 Total Area -----> 1.3600 0.3618 <----- weighted coefficient ****** subarea Name: YI #N-1, Row: 5 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 185.4091 ft Two Yr, 24 hr Rainfall.......... 4.3200 in Land Slope ... .. 0.0400 ft/ft computed Sheet flow time .......................> 15.2500 min shallow concentrated Flow Description ..................... CHANNELED FLOW OVER GRASS surface ...................... Unpaved Flow Length ................... 298.8535 ft watercourse slope ............... 0.0100 ft/ft velocity .. ........ 1.6100 fps computed shallow flow time .....................> 3.0900 min Total Time of Concentration ........................> 18.3400 min Composite Runoff Coefficient Calculator Description Area (ac) Coefficient GRASS 1.1100 0.1500 HARD 0.3100 0.9500 Total Area -----> 1.4200 0.3246 <----- weighted coefficient ****** Subarea Name: CB #D-4, Row: 6 ******* Sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length .......... 185.5515 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ... .. .......... 0.0200 ft/ft Computed sheet flow time .......................> 20.1400 min shallow concentrated Flow ------------------------- Description ..................... GUTTER Page 4 PHASE 2-10 YR RUNOFF.txt Surface ...................... Paved Flow Length .................. 340.6749 ft watercourse slope ............... 0.0200 ft/ft velocity ... 2.8700 fps computed shallow flow time .....................> 1.9800 min Total Time of concentration ........................> 22.1200 min Composite Runoff Coefficient Calculator Description Area (ac) coefficient GRASS 0.4700 0.1500 HARD 0.6500 0.9500 Total Area -----> 1.1200 0.6143 <----- weighted coefficient ****** subarea Name: CB #D-2, Row: 7 ******* sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length .......... 89.7564 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .. .......... 0.0100 ft/ft Computed sheet flow time .......................> 14.8600 min shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 393.2901 ft watercourse slope ............... 0.0180 ft/ft velocity .. ........ 2.7300 fps computed Shallow flow time ........ ............. > 2.4000 min Total Time of concentration .........................> 17.2600 min **************************** composite Runoff Coefficient Calculator Description Area (ac) Coefficient ------------ ----------- -------------- GRASS 0.2100 0.1500 HARD 0.9000 0.9500 Total Area -----> 1.1100 0.7986 <----- weighted coefficient ****** Subarea Name: CB #C-1, Row: 8 ******* sheet Flow Description ..................... PAVEMENT Manning's n ..................... 0.0150 Flow Length ..................... 15.0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope .... .. .......... 0.0200 ft/ft Computed Sheet flow time .......................> 0.2900 min Page 5 PHASE 2-10 YR RUNOFF.tXt shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length ................... 409.3610 ft watercourse Slope ............... 0.0100 ft/ft velocity. .. .. 2.0300 fps Computed Shallow flow time .....................> 3.3500 min *************************** Total Time of concentration ........................> 3.6400 min composite Runoff coefficient Calculator Description Area (ac) coefficient HARD 0.1900 0.9500 Total Area -----> 0.1900 0.9500 <----- weighted coefficient ****** Subarea Name: CB #T-1, Row: 9 ****** Sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length. .......... 184.0393 ft Two Yr, 24 hrRainfall .......... 4.3200 in Land slope ... .. 0.0300 ft/ft computed sheet flow time .......................> 17.0100 min shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length ................... 225.0198 ft watercourse slope ............... 0.0280 ft/ft Velocity .. ........ 3.4000 fps Computed Shallow flow time .....................> 1.1000 min Total Time of Concentration ........................> 18.1100 min composite Runoff Coefficient Calculator Description Area (ac) coefficient GRASS 0.5800 0.1500 HARD 0.3100 0.9500 Total Area -----> 0.8900 0.4287 <----- weighted Coefficient ****** Subarea Name: C8 #T-2, Row: 10 ******* Sheet Flow Description ..................... PAVEMENT Manning's n ..................... 0.0110 Flow Length ..................... 14.3051 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ...................... 0.0200 ft/ft Page 6 PHASE 2-10 YR RUNOFF.tXt Computed sheet flow time .......................> 0.2200 min Shallow Concentrated Flow Description ..................... GUTTER Surface ...................... Paved Flow Length ..................... 343.1761 ft watercourse Slope ............... 0.0280 ft/ft velocity .. ... ........ 3.4000 fps Computed Shallow flow time .....................> 1.6800 min Total Time of Concentration .........................> 1.9000 min Composite Runoff coefficient calculator Description Area (ac) coefficient ------------ ----------- -------------- HARD 0.1700 0.9500 Total Area -----> 0.1700 0.9500 <----- weighted Coefficient ****** Subarea Name: CB #A-1, Row: 11 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 60.9339 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .. .......... 0.0330 ft/ft computed sheet flow time .......................> 6.7700 min shallow Concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 230.6189 ft watercourse slope ............... 0.0155 ft/ft Velocity .. ........ 2.5300 fps Computed Shallow flow time .....................> 1.5200 min Total Time of concentration .........................> 8.2900 min Composite Runoff coefficient calculator Description Area (ac) coefficient ------------ ----------- -------------- GRASS 0.1000 0.1500 HARD 0.4600 0.9500 Total Area -----> 0.5600 0.8071 <----- weighted Coefficient ****** Subarea Name: CB #A-2, Row: 12 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 176.9742 ft Page 7 - PHASE 2-10 YR RUNOFF.txt Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ... .. .......... 0.0360 ft/ft Computed sheet flow time .......................> 15.3300 min shallow Concentrated Flow Description ..................... CHANNELED FLOW OVER GRASS Surface ...................... Paved Flow Length .................. 179.8105 ft Watercourse Slope ............... 0.0050 ft/ft velocity . 1.4400 fps computed Shallow flow time .....................> 2.0800 min shallow Concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 62.6640 ft watercourse slope ............... 0.0100 ft/ft velocity ........ 2.0300 fps Computed shallow flow time .....................> 0.5200 min Total Time of Concentration ....> 17.9300 min composite Runoff coefficient Calculator Description Area (ac) coefficient GRASS 0.4500 0.1500 HARD 0.5800 0.9500 Total Area -----> 1.0300 0.6005 <----- weighted coefficient ****** subarea Name: CB #T-3, Row: 13**�* sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length ... .. .......... 300.0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .. .......... 0.0230 ft/ft Computed sheet flow time .......................> 27.9700 min Shallow Concentrated Flow ------------------------- Description ..................... CHANNEL FLOW OVER GRASS surface ...................... Unpaved Flow Length ................... 174.0000 ft Watercourse slope ............... 0.0230 ft/ft velocity .. ........ 2.4500 fps Computed Shallow flow time .....................> 1.1900 min Total Time of Concentration .........................> 29.1600 min Composite Runoff Coefficient calculator Description Area (ac) coefficient Page 8 PHASE 2-10 YR RUNOFF.tXt GRASS 1.7080 0.1500 HARD 0.6300 0.9500 Total Area 2.3380 0.3656 <----- weighted coefficient ****** Subarea Name: CB #P-3, Row: 14 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 154,0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ... .. .......... 0.0100 ft/ft Computed Sheet flow time .......................> 22.8925 min Shallow Concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 438.8916 ft watercourse Slope ............... 0.0100 ft/ft velocity 2.0300 fps Computed Shallow flow time .....................> 3.5984 min *************************** Total Time of Concentration .........................> 26.4909 min **************************** Composite Runoff Coefficient calculator Description Area (ac) Coefficient ------------ ----------- ------- ------ GRASS 0.5620 0.1500 HARD 1.1410 0.9500 Total Area -----> 1.7030 0.6860 <----- weighted Coefficient ***** Subarea Name' CB #T-5, Row: 15 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length .......... 167.1427 ft Two Yr, 24 hr Rainfall.......... 4.3200 in Land slope ... .......... 0.0180 ft/ft Computed Sheet flow time .......................> 19.3100 min Shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 107.2652 ft watercourse Slope ............... 0.0100 ft/ft velocity .. ........ 2.0300 fps Computed Shallow flow time .....................> 0.8800 min Total Time of Concentration ........................> 20.1900 min composite Runoff coefficient calculator Page 9 PHASE 2-10 YR RUNOFF.tXt Description Area (ac) coefficient GRASS 0.2100 0.1500 HARD 0.1700 0.9500 Total Area -----> 0.3800 0.5079 <----- weighted Coefficient ****** Subarea Name: CB #T-6, Row: 16 ******* sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length ..................... 46.6182 ft Two Yr, 24 hr Rainfall.......... 4.3200 in Land slope ... .. .......... 0.0100 ft/ft Computed Sheet flow time .......................> 8.8600 min Shallow Concentrated Flow Description ..................... GUTTER surface .......... Paved Flow Length 143.1891 ft Watercourse slope ............... 0.0350 ft/ft velocity .. ........ 3.8000 fps Computed Shallow flow time .....................> 0.6300 min Total Time of Concentration ........................> 9.4900 min Composite Runoff Coefficient Calculator Description Area (ac) Coefficient GRASS 0.2200 0.1500 HARD 0.1700 0.9500 Total Area -----> 0.3900 0.4987 <----- weighted Coefficient ****** Subarea Name: CB #B-1, Row: 17 ******* Sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length ..................... 43.1108 ft Two Yr, 24 hr Rainfall.......... 4.3200 in Land Slope ... 0.0100 ft/ft Computed sheet flow time .......................> 8.2700 min Shallow Concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length ..................... 277.9897 ft watercourse slope ............... 0.0100 ft/ft velocity .. 2.0300 fps Computed shallow flow time .....................> 2.2800 min *************************** Total Time of Concentration ......... ................ > 10.5500 min Page IO PHASE 2-10 YR RUNOFF.txt Composite Runoff Coefficient calculator Description Area (ac) coefficient ------------ ----------- --------------- GRASS 0.0400 0.1500 HARD 0.6100 0.9500 Total Area -----> 0.6500 0.9008 <----- weighted Coefficient ****** Subarea Name: CB #B-2, Row: 18 ******* Sheet Flow Description ..................... manning's n ..................... Flow Length ....... Two Yr, 24 hr Rainfall .......... Land slope ... .. .......... computed Sheet flow time ........ shallow concentrated Flow GRASS 0.2400 168.6916 ft 4.3200 in 0.0100 ft/ft ...............> 24.6600 min Description ..................... GUTTER surface .......................... Paved Flow Length .................. 64.8834 ft watercourse slope ............... 0.0200 ft/ft velocity .............. 2.8700 fps Computed Shallow flow time .....................> 0.3800 min Total Time of concentration ........................> 25.0400 min Composite Runoff Coefficient calculator Description Area (ac) coefficient ------------ ----------- -------------- GRASS 0.4100 0.1500 HARD 0.9200 0.9500 Total Area -----> 1.3300 0.7034 <----- weighted coefficient ****** Subarea Name: CB #wP-1, Row: 19 ******* Sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 160.6432 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ...................... 0.0280 ft/ft Computed Sheet flow time .......................> 15.6900 min Shallow Concentrated Flow Description ..................... GUTTER Surface ...................... Paved Flow Length .................. 607.1410 ft watercourse Slope ............... 0.0160 ft/ft velocity .............. 2.5700 fps Computed Shallow flow time .......> 3.9400 min Page 11 PHASE 2-10 YR RUNOFF.tXt *************************** Total Time of concentration ........................> 19.6300 min composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 0.7700 0.1500 HARD 1.2300 0.9500 Total Area -----> 2.0000 0.6420 <----- weighted coefficient ****** Subarea Name: CB #WP-2, Row: 20 ******* Sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 46.8435 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope .. .. .......... 0.0170 ft/ft Computed Sheet flow time .......................> 7.3200 min shallow Concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 492.7190 ft watercourse Slope ............... 0.0170 ft/ft velocity .. 2.6500 fps computed shallow flow time .....................> 3.1000 min *************************** Total Time of Concentration ........................> 10.4200 min composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 0.4200 0.1500 HARD 0.9100 0.9500 Total Area -----> 1.3300 0.6974 <----- weighted coefficient ****** Subarea Name: CB #WP-3, Row: 21 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length .......... 222.2902 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ...................... 0.0100 ft/ft computed sheet flow time .......................> 30.7100 min shallow Concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length ..................... 150.5734 ft Page 12 PHASE 2-10 YR RUNOFF.tXt watercourse Slope ............... 0.0070 ft/ft velocity .. ........ 1.7000 fps computed shallow flow time .....................> 1.4800 min Total Time of Concentration .........................> 32.1900 min Composite Runoff coefficient calculator Description Area (ac) Coefficient ------------ ----------- -------------- GRASS 1.2000 0.1500 HARD 0.6300 0.9500 Total Area -----> 1.8300 0.4254 <----- weighted coefficient ****** subarea Name: CB #wP-4, Row: 22****** sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 45.9833 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .......... 0.0200 ft/ft computed sheet flow time .......................> 6.6000 min shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 153.9116 ft watercourse slope ............... 0.0100 ft/ft velocity .. ........ 2.0300 fps Computed Shallow flow time ..... ..............> 1.2600 min *************************** Total Time of concentration .........................> 7.8600 min composite Runoff coefficient calculator Description Area (ac) coefficient ------------ ----------- -------------- GRASS 0.1200 0.1500 HARD 0.5800 0.9500 Total Area -----> 0.7000 0.8129 <----- weighted Coefficient ****** Subarea Name: CB #wP-5, Row: 23 ***=*** sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 255.1716 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .. .......... 0.0140 ft/ft Computed sheet flow time .......................> 29.9700 min shallow Concentrated Flow ------------------------- Page 13 PHASE 2-10 YR RUNOFF.tXt Description ..................... GUTTER surface ...................... Paved Flow Length .................. 78.6734 ft watercourse slope ............... 0.0100 ft/ft velocity ....... 2.0300 fps Computed shallow flow time .....................> 0.6400 min *************************** Total Time of Concentration ........................> 30.6100 min Composite Runoff coefficient calculator Description Area (ac) Coefficient GRASS 0.9800 0.1500 HARD 1.1600 0.9500 Total Area -----> 2.1400 0.5836 <----- weighted Coefficient ****** Subarea Name: YI #M-1, Row: 24 ******* Sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length .......... 300.0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope .... ................ 0.0130 ft/ft Computed Sheet flow time .......................> 35.1400 min shallow Concentrated Flow Description ..................... GRASS SWALE Surface ...................... Unpaved Flow Length .................. 144.3187 ft watercourse slope ............... 0.0130 ft/ft velocity .. ... ........ 1.8400 fps computed Shallow flow time .....................> 1.3100 min *************************** Total Time of Concentration ........................> 36.4500 min Composite Runoff Coefficient Calculator Description Area (ac) coefficient GRASS 0.8900 0.1500 HARD 0.2700 0.9500 Total Area -----> 1.1600 0.3362 <----- weighted Coefficient ****** Subarea Name: YI #E-2, Row: 25 ******* sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 185.4901 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ...................... 0.0320 ft/ft computed sheet flow time .......> 16.6800 min Page 14 PHASE 2-10 YR RUNOFF.txt shallow Concentrated Flow Description ..................... CHANNELED FLOW OVER GRASS Surface ...................... Paved Flow Length .................. 144.0000 ft watercourse slope ............... 0.0200 ft/ft velocity .............. 2.8700 fps Computed Shallow flow time .....................> 0.8300 min Total Time of Concentration .........................> 17.5100 min **************************** composite Runoff Coefficient calculator Description Area (ac) Coefficient ------------ ----------- -------------- GRASS 0.3900 0.1500 HARD 0.1400 0.9500 Total Area -----> 0.5300 0.3613 <----- weighted Coefficient ****** Subarea Name: YY #P-1, Row: 26 ******* Sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 300.0000 ft Two Yr, 24 hr Rainfall ........... 4.3200 in Land slope ...................... 0.0120 ft/ft Computed sheet flow time .......................> 36.2828 min shallow concentrated Flow ------------------------- Description CHANNELED FLOW OVER GRASS Surface ...................... Unpaved Flow Length .................. 41-9.3557 ft watercourse slope ............... 0.0100 ft/ft velocity ... 1.6100 fps Computed shallow flow time .....................> 4.3319 min Total Time of Concentration ........................> 40.6147 min composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 2.1300 0.1500 HARD 0.6338 0.9500 Total Area -----> 2.7638 0.3335 <----- weighted Coefficient ****** Subarea Name: CB #F-1, Row: 27 ******* Sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length ..................... 17.8043 ft Page 15 PHASE 2-10 YR RUNOFF.tXt Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope .. 0.0100 ft/ft Computed Sheet flow time .......................> 4.0700 min Shallow concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length ................... 261.0843 ft watercourse slope ............... 0.0078 ft/ft velocity 1.8200 fps Computed Shallow flow time .....................> 2.3900 min Total Time of Concentration .........................> 6.4600 min Composite Runoff Coefficient calculator Description Area (ac) coefficient GRASS 0.2200 0.1500 HARD 0.3400 0.9500 Total Area -----> 0.5600 0.6357 <----- weighted coefficient ** Subarea Name: CB #D-3, Row: 28 Sheet Flow Description ..................... GRASS manning's n 0.2400 Flow Length ..................... 132.4363 ft Two Yr, 24 hr Rainfall.......... 4.3200 in Land slope ... 0.0400 ft/ft Computed Sheet flow time .......................> 11.6500 min Shallow Concentrated Flow ------------------------- Description ..................... GUTTER Surface ...................... Paved Flow Length .................. 329.5339 ft Watercourse Slope ............... 0.0180 ft/ft velocity .. 2.7300 fps computed Shallow flow time .....................> 2.0100 min Total Time of concentration .........................> 13.6600 min Composite Runoff Coefficient Calculator Description Area (ac) coefficient GRASS 0.2800 0.1500 HARD 0.6100 0.9500 Total Area -----> 0.8900 0.6983 <----- weighted Coefficient ****** Subarea Name: CB #D-6, Row: 29 ******* Sheet Flow Page 16 PHASE 2-10 YR RUNOFF.txt Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 173.0277 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ... .. .......... 0.0100 ft/ft computed sheet flow time .......................> 25.1300 min shallow concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 173.1465 ft watercourse slope ............... 0.0150 ft/ft Velocity ... ...... 2.4900 fps Computed Shallow flow time .....................> 1.1600 min Total Time of Concentration .........................> 26.2900 min composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 0.4700 0.1500 HARD 0.7400 0.9500 Total Area -----> 1.2100 0.6393 <----- weighted coefficient ****** Subarea Name: YI #A-3, Row: 30 ******* sheet Flow Description GRASS manning's n ..................... 0.2400 Flow Length ..................... 149.2177 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope .. .......... 0.0250 ft/ft Computed Sheet flow time .......................> 15.4700 min shallow concentrated Flow Description ..................... CHANNELED FLOW OVER GRASS Surface ...................... Unpaved Flow Length .................. 166.8954 ft watercourse Slope ............... 0.0150 ft/ft velocity ... .... - 1.9800 fps computed Shallow flow time .....................> 1.4100 min Total Time of Concentration .........................> 16.8800 min **************************** Composite Runoff Coefficient Calculator Description Area (ac) Coefficient GRASS 0.6400 0.1500 HARD 0.1500 0.9500 Total Area -----> 0.7900 0.3019 <----- weighted coefficient ****** Subarea Name: YI #P2-1, Row: 31 ******* Page 17 PHASE 2-10 YR RUNOFF.txt sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 215.7736 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .. 0.0230 ft/ft computed Sheet flow time .......................> 21.4900 min shallow Concentrated Flow Description ..................... CHANNELED FLOW OVER GRASS surface ...................... Unpaved Flow Length .................. 265.4423 ft Watercourse slope ............... 0.0130 ft/ft Velocity .. ........ 1.8400 fps Computed Shailow flow time .....................> 2.4000 min Total Time of Concentration ........................> 23.8900 min Composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 0.9500 0.1500 HARD 0.2600 0.9500 Total Area -----> 1.2100 0.3219 <----- weighted coefficient ****** Subarea Name: YI #R-1, Row: 32 ******* sheet FLOW Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 300.0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .. .......... 0.0210 ft/ft computed sheet flow time .......................> 29.0100 min Shallow Concentrated Flow Description ..................... CHANNELED FLOW OVER GRASS Surface ......................... Unpaved Flow Length 197.6487 ft Watercourse slope ............... 0.0130 ft/ft Velocity .. ........ 1.8400 fps Computed shallow flow time .....................> 1.7900 min Total Time of Concentration .........................> 30.8000 min Composite Runoff Coefficient Calculator Description Area (ac) coefficient GRASS 1.8000 0.1500 HARD 0.2800 0.9500 Total Area -----> 2.0800 0.2577 <----- weighted Coefficient Page 18 PHASE 2-10 YR RUNOFF.tXt ****** Subarea Name: EXIST.GRAHAM COURT, Row: 33 ******* Sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length .... .. .......... 210.7615 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope .... ... .......... 0.0100 ft/ft Computed Sheet flow time .......................> 29.4200 min Shallow Concentrated Flow ------------------------- Description ..................... surface ...................... Flow Length .................. Watercourse Slope ............... velocity ... .. ............. computed shallow flow time ...... GUTTER Paved 411.2831 ft 0.0040 ft/ft 1.2900 fps ..............> 5.3300 min *************************** Total Time of Concentration ........................> 34.7500 min Composite Runoff Coefficient calculator Description Area (ac) coefficient GRASS 1.9800 0.1500 HARD 2.6500 0.9500 Total Area -----> 4.6300 0.6079 <----- weighted coefficient ****** Subarea Name: CB #P1-1, Row: 34 ******* Sheet Flow Description ..................... OVERLOT manning's n ..................... 0.2400 Flow Length ..................... 176.8734 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ...................... 0.0200 ft/ft computed sheet flow time .......................> 19.3815 min shallow concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length ..................... 433.3245 ft Watercourse Slope ............... 0.0100 ft/ft velocity .. ........ 2.0300 fps Computed shallow flow time .....................> 3.5527 min Total Time of Concentration ........................> 22.9342 min composite Runoff Coefficient calculator Description Area (ac) coefficient Page 19 PHASE 2-10 YR RUNOFF.tXt GRASS 0.3600 0.1500 HARD 1.0400 0.9500 Total Area -----> 1.4000 0.7443 <----- weighted coefficient ****** Subarea Name: YI #P-2, Row: 35 **** sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 209.3640 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ...................... 0.0240 ft/ft Computed Sheet flow time .......................> 20.6212 min shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 276.5668 ft Watercourse slope ............... 0.0200 ft/ft velocity .. 2.8748 fps Computed Shallow flow time .....................> 1.6034 min Total Time of Concentration ........................> 22.2246 min composite Runoff Coefficient Calculator Description . Area (ac) Coefficient - GRASS 0.2630 0.1500 HARD 0.0780 0.9500 Total Area -----> 0.3410 0.3330 <----- weighted coefficient ****** Subarea Name: CB #P-2, Row: 36 ***A*** Sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 56.1326 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ...................... 0.0800 ft/ft Computed sheet flow time .......................> 4.4444 min shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 61.2651 ft watercourse Slope ............... 0.0030 ft/ft velocity ........................ 1.1134 fps Computed shallow flow time .....................> 0.9171 min *************************** Total Time of Concentration .........................> 5.3615 min Composite Runoff coefficient Calculator Page 20 PHASE 2-10 YR RUNOFF.txt Description Area (ac) Coefficient ------------ ----------- -------------- GRASS 0.0700 0.1500 HARD 0.0900 0.9500 Total Area -----> 0.1600 0.6000 <----- weighted Coefficient ****** subarea Name: CB #U-1, Row: 37 ******* Sheet Flow Description ..................... Manning's n ..................... Flow Length ..................... Two Yr, 24 hr Rainfall .......... Land slope .... .. .......... Computed Sheet flow time ......... shallow Concentrated Flow GRASS 0.2400 29.4640 ft 4.3200 in 0.0200 ft/ft .............> 4.6206 min Description ..................... GUTTER surface ...................... Paved Flow Length ................... 274.0000 ft watercourse slope ............... 0.0020 ft/ft velocity ........ 0.9091 fps Computed Shallow flow time .....................> 5.0233 min *************************** Total Time of concentration .........................> 9.6439 min Composite Runoff coefficient Calculator Description Area (ac) coefficient GRASS 0.1700 0.1500 HARD 0.4200 0.9500 Total Area -----> 0.5900 0.71.95 <----- weighted Coefficient ****** Subarea Name: CB #U1-1, Row: 38 ******* Sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length ..................... 14.2071 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope .... .. .... 0.2000 ft/ft Computed Sheet flow time ..........> 1.0263 min Shallow concentrated Flow ------------------------- Description .......... ......... surface ...................... Flow Length .................. Watercourse Slope ............... velocity ......................... computed Shallow flow time ....... Sheet Flow GUTTER Paved 98.0000 ft 0.0020 ft/ft 0.9091 fps .............> 1.7966 min Page 21 PHASE 2--10 YR RUNOFF.tXt Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 160.0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope .. .. .......... 0.0200 ft/ft computed sheet flow time .......................> 17.8879 min Total Time of Concentration .........................> 20.7108 min Composite Runoff coefficient Calculator Description Area (ac) coefficient GRASS 0.3200 0.1500 HARD 0.1900 0.9500 Total Area -----> 0.5100 0.4480 <----- weighted Coefficient ****** Subarea Name: CB #U-3, Row: 39 ******* sheet Flow Description ..................... manning's n ..................... Flow Length .......... Two Yr, 24 hr Rainfall .......... Land slope ... .......... Computed sheet flow time .......... shallow concentrated Flow ------------------------- Description ..................... surface ...................... Flow Length .................. watercourse slope ............... velocity .. ........ computed Shallow flow time ...... sheet Flow GRASS 0.2400 50.0000 ft 4.3200 in 0.0200 ft/ft ............> 7.0541 min GRASS unpaved 159.8550 ft 0.0100 ft/ft 1.6135 fps ...............> 1.6513 min Description ..................... GRASS manning's n ..................... 0.0001 Flow Length ..................... 0.0001 ft Two Yr, 24 hr Rainfall .......... 0.0001 in Land slope .... ... .......... 0.0001 ft/ft computed Sheet flow time .......................> 0.0007 min shallow Concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 72.8378 ft watercourse Slope ............... 0.0050 ft/ft velocity .. .. ........ 1.4374 fps Computed shallow flow time .....................> 0.8445 min Total Time of concentration ........................> 9.5506 min composite Runoff Coefficient Calculator Page 22 PHASE 2-10 YR RUNOFF.tXt Description Area (ac) Coefficient GRASS 0.3200 0.1500 HARD 0.4800 0.9500 Total Area -----> 0.8000 0.6300 <----- weighted coefficient ****** Subarea Name: MH #U4, Row: 40 ******* Sheet Flow Description ..................... manning's n ..................... Flow Length .......... Two Yr, 24 hr Rainfall.......... Land slope ... .......... computed sheet flow time .......... Shallow Concentrated Flow GRASS 0.2400 120.0000 ft 4.3200 in 0.0200 ft/ft ............> 14.2105 min Description ..................... GRASS SWALE surface ...................... Unpaved Flow Length .................. 119.0000 ft Watercourse Slope ............... 0.0100 ft/ft Velocity .. 1.6135 fps Computed Shallow flow time .....................> 1.2292 min *************************** Total Time of Concentration .........................> 15.4397 min Composite Runoff coefficient Calculator Description Area (ac) Coefficient GRASS 0.7800 0.1500 HARD 0.2800 0.9500 Total Area -----> 1.0600 0.3613 <----- weighted coefficient ****** Subarea Name: MH #U7, Row: 41 ******* Sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length ..................... 37.0000 ft l Two Yr, 24 hr Rainfal.......... 4.3200 in Land Slope ... .. .......... 0.0200 ft/ft computed Sheet flow time .......................> 5.5440 min Shallow concentrated Flow Description ..................... GRASS SWALE surface ...................... Paved Flow Length .................. 145.0000 ft Watercourse Slope ............... 0.0100 ft/ft velocity ....... 2.0328 fps Computed Shallow flow time .....................> 1.1880 min *************************** Total Time of Concentration ......... ................ > 6.7320 min Page 23 PHASE 2-10 YR RUNOFF.tXt composite Runoff Coefficient calculator Description Area (ac) Coefficient GRASS 0.1700 0.1500 HARD 0.1900 0.9500 Total Area -----> 0.3600 0.5722 <----- weighted Coefficient ****** Subarea Name: CB #U-2, Row: 42 ******* sheet Flow Description ..................... GRASS manning's n 0.2400 Flow Length .......... 27.0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ... .. 0.0200 ft/ft Computed sheet flow time .......................> 4.3088 min shallow Concentrated Flow Description ..................... GUTTER Surface ...................... Paved Flow Length ............... 303.0000 ft Watercourse slope ............... 0.0030 ft/ft velocity ... 1.1134 fps Computed Shallow flow time .....................> 4.5356 min *************************** Total Time of Concentration .........................> 8.8444 min composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 0.4200 0.1500 HARD 1.1900 0.9500 Total Area -----> 1.6100 0.7413 <----- weighted coefficient ****** subarea Name: CB #U2-1, Row: 43 ******* sheet Flow Description ..................... GRASS manning's n ................ 0.2400 Flow Length ..................... 35.0000 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .. 0.0200 ft/ft Computed sheet flow time .......................> 5.3030 min Shallow concentrated Flow Description ..................... GUTTER Surface ...................... Paved Flow Length 330.0000 ft watercourse Slope ............... 0.0060 ft/ft velocity .. .. ........ 1.5746 fps computed shallow flow time ............ ........> 3.4929 min Page 24 PHASE 2-10 YR RUNOFF.tXt Total Time of concentration ........................> 8.7959 min Composite Runoff coefficient calculator Description Area (ac) Coefficient GRASS 0.2400 0.1500 HARD 0.7800 0.9500 Total Area -----> 1.0200 0.7618 <----- weighted Coefficient Page 25 PHASE 2 - 50 YR RUNOFF.txt Rational Method Given Input Data: Description ........ 50 YEAR STORM TARAWA TERRACE - PHASE 2 IDF Curve .......... G:\04015\02112\SDSKPR03\02112\hd-2\WILMINGTON COUNTY.idf Hydrology File name: G:\04015\02112\SDSKPRO]\02112\ HD-2\50 YR-PH II REV-APRIL 2004.RAT Rainfall Frequency 50 year(s) -------------------------------------------------------------------------------- Area Area Coef Tc Intensity Flow Description ac min in/hr cfs ------ CB -- -- #H-1 - 1.5500 0.6919 15.2700 6.4622 6.9307 CB # D-8 1.2900 0.6275 13.4500 6.7480 5.4625 CB #G-1 1.1200 0.6786 10.0000 7.3000 5.5480 CB #D-5 1.3000 0.5869 13.4200 6.7528 5.1524 CB #E-1 1.2700 0.7169 14.3400 6.6056 6.0144 CB #D-1 1.4700 0.6507 13.7200 6.7048 6.4131 EXIST. CB #2 1.0700 0.7556 10.6399 7.1976 5.8193 CB #C-2 1.4200 0.4317 16.1141 6.3440 3.8889 CB #0-1 0.1400 0.9500 10.0000 7.3000 0.9709 CB #0-2 0.7800 0.3449 20.9595 5.7136 1.5370 Support Data: ****** Subarea Name: CB #H-1, ROW: 1**** sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 25.6298 ft Two Yr, 24 hr Rainfall .......... 0.1800 in Land Slope ................ 0.0900 ft/ft computed sheet flow time .................. ...> 11.2200 min Shallow concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 493.5608 ft watercourse slope ............... 0.0100 ft/ft velocity .. ........ 2.0300 fps Computed shallow flow time .....................> 4.0500 min Total Time of concentration .........................> 15.2700 min Composite Runoff Coefficient Calculator Description Area (ac) Coefficient ------------ ----------- -------------- GRASS 0.5000 0.1500 HARD 1.0500 0.9500 Total Area -----> 1.5500 0.6919 <----- weighted coefficient ****** Subarea Name: CB # D-8, Row: 2 ******* Page 1 PHASE 2 - 50 YR RUNOFF.txt sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 177.1181 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land Slope ... .. .......... 0.0500 ft/ft Computed sheet flow time .......................> 13.4500 min *************************** Total Time of Concentration ........................> 13.4500 min Composite Runoff Coefficient Calculator Description Area (ac) Coefficient -- - -- -- -------------- GRASS 0.5200 0.1500 HARD 0.7700 0.9500 Total Area -----> 1.2900 0.6275 <----- weighted Coefficient ****** subarea Name: CB #G-1, Row: 3 ******* sheet Flow Description ..... GRASS manning's n .. 0.2400 Flow Length .......... 25.9072 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ... .. .......... 0.0200 ft/ft Computed sheet flow time .......................> 4.1800 min Shallow Concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 399.3600 ft Watercourse Slope ............... 0.0100 ft/ft velocity .. ........ 2.0300 fps Computed shallow flow time .....................> 3.2700 min *************************** Total Time of Concentration ........................> 7.4500 min Composite Runoff coefficient Calculator Description Area (ac) Coefficient GRASS 0.3800 0.1500 HARD 0.7400 0.9500 Total Area -----> 1.1200 0.6786 <----- weighted Coefficient ****** Subarea Name: CB #D-5, Row: 4 ******* sheet Flow Description ...................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 154.9637 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Page 2 PHASE 2 - 50 YR RUNOFF.txt Land Slope .. .......... 0.0400 ft/ft computed sheet flow time .......................> 13.2100 min Shallow concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 50.5419 ft watercourse slope ............... 0.0400 ft/ft Velocity .. 4.0700 fps Computed Shallow flow time ...........I.........> 0.2100 min *************************** Total Time of Concentration ........................> 13.4200 min Composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 0.5900 0.1500 HARD 0.7100 0.9500 Total Area -----> 1.3000 0.5869 <----- Weighted Coefficient ****** Subarea Name: CB #E-1, Row: 5 ******* Sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 47.0213 ft Two Yr, 24 hr Rainfall.......... 4.3200 in Land slope ... .. 0.0100 ft/ft computed sheet flow time .......................> 8.8600 min Shallow Concentrated Flow ------------------------- Description ..................... GUTTER surface ...................... Paved Flow Length .................. 366.1898 ft watercourse slope ............... 0.0030 ft/ft velocity ... 1.1100 fps computed Shallow flow time .....................> 5.4800 min *************************** Total Time of Concentration .........................> 14.3400 min Composite Runoff Coefficient Calculator Description Area (ac) Coefficient ------------ ----------- -------------- GRASS 0.3700 0.1500 HARD 0.9000 0.9500 Total Area -----> 1.2700 0.7169 <----- weighted coefficient ****** Subarea Name: CB #D-1, Row: 6 ******.* sheet Flow Description ..................... GRASS Page 3 PHASE 2 - 50 YR RUNOFF.tXt manning's n ..................... 0.2400 Flow Length ..................... 143.0783 ft Two Yr, 24 hr Rainfall .......... 4.2300 in Land slope .... .. 0.0380 ft/ft Computed sheet flow time .......................> 12.7900 min shallow concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 124.1366 ft watercourse slope ............... 0.0120 ft/ft velocity .. ........ 2.2300 fps Computed shallow flow time .....................> 0.9300 min Total Time of Concentration ........................> 13.7200 min composite Runoff Coefficient Calculator Description Area (ac) Coefficient GRASS 0.5500 0.1500 HARD 0.9200 0.9500 Total Area -----> 1.4700 0.6507 <----- weighted coefficient ****** Subarea Name: EXIST. CB #2, Row: 7 ******* Sheet Flow Description ..................... GRASS manning's n .............. 0.2400 Flow Length ..................... 74.3700 ft Two Yr, 24 hr Rainfall .......... 4.3200 in .and slope .. 0.0200 ft/ft computed sheet flow time .......................> 9.6913 min shallow Concentrated Flow ------------------------- Description ..................... surface ...................... Flow Length .................. watercourse slope ............... velocity ........ computed shallow flow time ....... GUTTER Paved 163.6300 ft 0.0200 ft/ft 2.8700 fps .............> 0.9486 min Total Time of Concentration ........................> 10.6399 min Composite Runoff coefficient calculator Description Area (ac) Coefficient GRASS 0.2600 0.1500 HARD 0.8100 0.9500 Total Area -- --> 1.0700 0.7556 <----- weighted coefficient ****** Subarea Name: CB #C-2, Row: 8 ******* Page 4 PHASE 2 - 50 YR RUNOFF.txt sheet Flow Description ..................... GRASS Manning's n ..................... 0.2400 Flow Length ..................... 163.3100 ft Two Yr, 24 hr Rainfall.......... 4.3200 in Land Slope .......... .......... 0.0300 ft/ft computed sheet flow time .......................> 15.4610 min shallow concentrated Flow Description ..................... GUTTER surface ...................... Paved Flow Length .................. 79.6600 ft watercourse slope ............... 0.0100 ft/ft velocity .. ........ 2.0300 fps Computed Shallow flow time .....................> 0.6531 min Total Time of Concentration ........................> 16.1141 min Composite Runoff coefficient calculator Description Area (ac) Coefficient ------------ ----------- -------------- GRASS 0.9200 0.1500 HARD 0.5000 0.9500 Total Area -----> 1.4200 0.4317 <----- weighted coefficient ****** Subarea Name: CB #0-1, Row: 9***** Sheet Flow Description ..................... PAVEMENT manning's n ..................... 0.0110 Flow Length ..................... 25.3500 ft Two Yr, 24 hr Rainfall.......... 4.3200 in Land Slope ... .. .......... 0.0200 ft/ft Computed sheet flow time .......................> 0.3478 min Shallow Concentrated Flow ------------------------- Description ..................... GUTTER Surface ...................... Paved Flow Length .................. 128.6200 ft watercourse slope ............... 0.0100 ft/ft velocity .. .. ........ 2.0300 fps computed shallow flow time .....................> 1.0545 min Total Time of Concentration .........................> 1.4023 min composite Runoff coefficient calculator Description Area (ac) coefficient HARD 0.1400 0.9500 Total Area -----> 0.1400 0.9500 <----- weighted Coefficient Page 5 PHASE 2 - 50 YR RUNOFF.tXt *= Subarea Name: CB #0-2, Row: 10 ***-*** sheet Flow Description ..................... GRASS manning's n ..................... 0.2400 Flow Length ..................... 236.6500 ft Two Yr, 24 hr Rainfall .......... 4.3200 in Land slope ... .. .......... 0.0300 ft/ft Computed Sheet flow time .......................> 20.8024 min Shallow Concentrated Flow ------------------------- Description ..................... surface ...................... Flow Length .................. watercourse Slope ............... velocity .. ........ Com uted Shallow flow time GUTTER Paved 19.1600 ft 0.0100 ft/ft 2.0300 fps p .....................> 0.157Z min *************************** Total Time of Concentration ........................> 20.9595 min composite Runoff coefficient calculator Description Area (ac) coefficient GRASS 0.5900 0.1500 HARD 0.1900 0.9500 Total Area -----> 0.7800 0.3449 <----- weighted coefficient Page 6 LINE-D.LST ****** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 1 Camp Lejeune - Rational Method with Hydraulic Gradeline -- LINE D t++ Commands Read From File G:\04015\02112\HYDRA\PHIIREV\LINE-D.HDA JOB SWI 2 REM 10 year storm from Wilmington IDF Curve REM RAI 5,6.9 10,5.8 15,5 20,4.4 30,3.7 40,3.1 60,2.5 120,1.8 180,1.3 240,1.1 600,0.5 1440,0.27 REM 50 YEAR STORM FROM WILMINGTON IDF, FOR CATCH BASINS IN SAGS REM RAI 5,9 10,7.3 15,6.5 20,5.8 30,4.9 40,4.2 60,3.3 120,2.2 180,1.8 360,1 REM 1440,0.35 TWE 6.4 PDA 0.013,15,3,2,2,0.001,48 PSZ 15,18,24,30,36,42,48 HGL 1 REM BEGIN WITH 10 YEAR STORM RAI 5,6.9 10,5.8 15,5 20,4.4 30,3.7 40,3.1 60,2.5 120,1.8 180,1.3 240,1.1 600,0.5 1440,0.27 IDF CURVE R 6.A u u u u u a 3 6 6 6 LI U 3 i * u u u u u 3 n 3 6 U U U ll 3 f * 6 t1 [1 ll ( 3 a 3 6 U G LI lJ 3 1 4.A* u u u u u A 1 3 V U U V tl 3 3* U 11 Ll G 11 3 i 3 * ll ll U V 3 n 3 lJ 4l V V V 3 3 * ll lJ lJ 11 U 3 i 2.A u u u u u A n 3 * 6 ll lJ LI U 3 / 3 * 6 11 LI lJ 3 h 3 *6 LI LI lJ l,l 3 r 3 U ll u LJ ll 3 3 u u * u u u * S. 250. 500. 750. 1000. 1250. 1440. Duration, t (min) ****** HYDRA ******* (Version 6.1) ***** Page 1 Date 04-13-2004 Page No 2 LINE-D.LST Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D PLOT -DATA (Time, t(min) vs. Intensity, i(in/h)) t i t i t i t i t i 5. 6.90 30. 3.70 180. 1.30 0. .00 0. .00 10. 5.80 40. 3.10 240. 1.10 0. .00 0. .00 15. 5.00 60. 2.50 600. .50 0. .00 0. .00 20. 4.40 120. 1.80 1440. .27 0. .00 0. .00 REM BEGIN LINE B ON MATANIKAU ST. NEW LINE B REM NODE 9 TO 10 STo 1.34,0.703,25.04 PIP 82,22.78,22.26 +++ Tc = 25.0 min .++ CA = .9 ... Link # 1, Flow depth = .81 ft, Critical depth = .79 ft PNC 9,10,4,177,0,0 REM NODE 10 TO 11 STO 0.65,0.901,10.55 PIP 68,22.26,22.6,18.81,18.12,-15 +t+ Tc = 25.3 min ... CA = 1.5 +++ Link # 2, Flow depth = .97 ft, Critical depth = 1.00 ft PNC 10,11,4,189,0,0 REM NODE 11 TO 12 PIP 397,22.6,17.44,18.02,13.14,-15 .++ Tc = 25.5 min .++ CA = 1.5 +++ Link # 3, Flow depth = .90 ft, critical depth = 1.00 ft PNC 11,12,4,180,0,0 REM NODE 12 TO 13 STo 2.08,0.485,20.7 Pip 6,17.44,17.5,13.14,13.02,-18 +++ Tc = 26.5 min +++ CA = 2.5 +++ Link # 4, Flow depth = .90 ft, Critical depth = 1.22 ft PNC 12,13,5,92,0,1 HOL 8 NEW LINE D REM ENTER EXISTING CB#2 AREA INTO SYSTEM, USE 50 YEAR STORM FOR SAG RAI 5,9 10,7.3 15,6.5 20,5.8 30,4.9 40,4.2 60,3.3 120,2.2 180,1.8 360,1 1440,0.35 **** HYDRA ******* (Version 6.1) ***** Date 04-13-2004 Page No 3 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D Page 2 LINE-D.LST IDF CURVE 9.* R 3 6 6 a 3 Ll 6 i 8.A u 6 6 6 6 A n 6 6 6 it 3 f 6 lJ a a 3 6 LI 6 1 6.A* 6 6 6 6 6 3 3 3 3 n 4.A 6 6 6 6 6 A 3 3 i 3 3 n 3 3 2.A 6 6 6 6 6 A h 3 6 6 6 6 U 3 r 3 6 3 0.* U 5. 250. 500. 750. 1000. 1250. 1440. Duration, t (min) PLOT -DATA (Time, t(min) vs. Intensity, i(in/h)) t i t i t i t i t i 5. 9.00 30. 4.90 180. 1.80 0. .00 0. .00 10. 7.30 40. 4.20 360. 1.00 0. .00 0. .00 15. 6.50 60. 3.30 1440. .35 0. .00 0. .00 20. 5.80 120. 2.20 0. .00 0. .00 0. .00 REM NODE 13 TO 15 STO 1.07,0.756,10.6 REC 8 PIP 118,17.5,16.62,12.20,11.44,-24 ... TC = 26.5 min +++ CA = 3.3 ... Link # 5, Flow depth = 1.58 ft, critical depth = 1.51 ft PNC 13,15,6,180,0,0 HOL 9 REM BEGIN LINE H USE 50 YEAR STORM FOR SAG NEW LINE H REM NODE 14 TO 15 0 HYDRA ******* (Version 6.1) Date 04-13-2004 Page No 4 Camp Lejeune - Rational method with Hydraulic Gradeline - LINE D Page 3 LINE-D.LST STO 1.55,0.69,15.27 PIP 25,16.62,16.62,13.62,13.44,-24 +++ Tc = 15.3 min +++ CA = 1.1 +++ Link # 6, Flow depth = .84 ft, Critical depth = .93 ft PNC 14,15,6,270,0,0 HOL 10 NEW LINE D REM NODE 15 TO 16 REC 9 REC 10 STO 1.29,0.628,16.38 PIP 199,16.62,18.82,8.98,7.98,-30 +++ Tc = 26.8 min +++ CA = 5.2 +++ Link # 7, Flow depth = 1.92 ft, critical depth = 1.77 ft PNC 15,16,7,180,0,0 REM RETURN TO 10 YEAR STORM REM 10 year storm from Wilmington IDF Curve RAI 5,6.9 10,5.8 15,5 20,4.4 30,3.7 40,3.1 60,2.5 120,1.8 180,1.3 240,1.1 600,0.5 1440,0.27 IDF CURVE R 6.A 6 6 6 6 6 a 3 6 6 6 6 6 3 i * 6 6 6 6 6 n 3 6 6 6 6 6 3 f * 6 6 6 6 6 3 a 3 6 6 6 6 6 3 1 4.A* 6 6 6 6 6 A 1 3 6 6 6 6 6 3 3 ie u {� u U 3 i n 3 U U U U U 3 i 2.A 6 6 6 6 6 A n 3 6 6 6 6 6 3 / 3 * 6 6 6 6 6 3 h 3 *G 6 6 6 6 3 r 3 6 6 6 6 6 3 3 6 6 * 6 6 6 0.* u 5. 250. 500. 750. 1000. 1250. 1440. Duration, t (min) ****** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 5 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D PLOT -DATA (Time, t(min) vs. Intensity, i(in/h)) Page 4 LINE-D.LST t i t i t i t i t i 5. 6.90 30. 3.70 180. 1.30 0. .00 0. .00 10. 5.80 40. 3.10 240. 1.10 0. .00 0. .00 15. 5.00 60. 2.50 600. .50 0. .00 0. .00 20. 4.40 120. 1.80 1440. .27 0. .00 0. .00 REM NODE 16 TO 18 STO 0.74,0.755,10 PIP 226,18.82,18.8,7.88,7.20,-30 +++ TC = 27.3 min +++ CA = 5.8 +++ Link # 8, Flow depth = 2.05 ft, Critical depth = 1.61 ft PNC 16,18,5,164,0,1 HOL 11 REM BEGIN LINE L NEW LINE L REM NODE 17 TO 18 STO 1.36,0.362,41.47 PIP 39,20,18.8 +++ TC = 41.5 min +++ CA = .5 +++ Link # 9, Flow depth = .31 ft, Critical depth = .49 ft PNC 17,18,7,135,0,0 HOL 12 NEW LINE D REM NODE 18 TO 19 REC 11 REC 12 PIP 66,18.8,17.39,7.10,6.90,-30 +++ Larger flow from subarea ---> TC = 28.1 min +++ Readjusting sum of C*A ---> unadjusted CA = 6.3 +++ CA = 6.1 +++ Link # 10, Flow depth = 2.50 ft, Critical depth = 2.50 ft PNC 18,19,7,179,0,0 REM LINE D AT CB #D-6 REM NODE 19 TO 20 STO 1.21,0.639,26.29 PIP 81,17.39,17,5.94,5.70,-36 +++ TC = 28.3 min +++ CA = 6.9 +++ Link # 11, Flow depth = 1.92 ft, critical depth = 1.66 ft PNC 19,20,7,161,0,0 REM NODE 20 TO 22 PIP 114,17,14.81,5.36,5.02,-36 Q ****** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 6 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D +++ TC = 28.5 min +++ CA = 6.9 Page 5 LINE-D.LST +++ Link # 12, Flow depth = 1.89 ft, critical depth = 1.65 ft PNC 20,22,5,175,0,1 HOL 13 REM BEGIN LINE G, USE 50 YEAR STORM FOR SAG REM 50 YEAR STORM FROM WILMINGTON IDF, FOR CATCH BASINS IN SAGS RAI 5,9 10,7.3 15,6.5 20,5.8 30,4.9 40,4.2 60,3.3 120,2.2 180,1.8 360,1 1440,0.35 IDF CURVE 9 *. AAAAWZ R 3 6 6 6 6 6 3 a 3 6 6 ll 6 6 3 i 8.A 6 6 6 6 6 A n * 6 6 6 6 6 3 f * 6 6 6 6 6 3 a 3 6 6 6 6 6 3 l 6.A* 6 6 6 6 6 A 3 6 3* 6 6 G 6 6 3 i 3* 3 n 4.A 6 6 6 6 6 A 3* 6 6 6 6 6 3 i 3 u u V u u 3 n 3 * V U V U U 3 / 2.A * 6 6 6 6 6 A h 3 3 r 3 6 * 6 6 6 6 3 3 6 6 6 6 6 S. 250. 500. 750. 1000. 1250. 1440. Duration, t (min) PLOT -DATA (Time, t(min) vs. Intensity, i(in/h)) t i t i t i t i t i 5. 9.00 30. 4.90 180. 1.80 0. .00 0. .00 10. 7.30 40. 4.20 360. 1.00 0. .00 0. .00 15. 6.50 60. 3.30 1440. .35 0. .00 0. .00 20. 5.80 120. 2.20 0. .00 0. .00 0. .00 C NEW LINE G REM NODE 21 TO 22 STO 1.12,0.68,10 ****** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 7 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D PIP 25,14.85,14.81,11.85,11.60,-15 ++f TC = 10.0 min Page 6 LINE-D.LST +++ CA = .8 +++ Link # 13, Flow depth = .90 ft, Critical depth = .96 ft PNC 21,22,7,268,0,0 HOL 14 NEW LINE D REM NODE 22 TO 23 REC. 13 REC 14 STO 1.30,0.587,13.42 Pip 85,14.81,15.6,4.92,4.75,-36 +++ TC = 28.9 min +++ CA = 8.4 +++ Link # 14, Flow depth = 3.00 ft, Critical depth = 3.00 ft PNC 22,23,7,169,0,0 REM NODE 23 TO 25 PIP 146,15.6,14.3,4.55,4.25,-36 +++ Tc = 29.1 min +++ CA = 8.4 +++ Link # 15, Flow depth = 3.00 ft, Critical depth = 3.00 ft PNC 23,25,5,177,0,1 HOL 15 REM RETURN TO 10 YEAR STORM REM 10 year storm from Wilmington IDF Curve RAI 5,6.9 10,5.8 15,5 20,4.4 30,3.7 40,3.1 60,2.5 120,1.8 180,1.3 240,1.1 600,0.5 1440,0.27 ****** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 8 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D IDF CURVE 7 . * .. 4 R 6.A 6 6 6 6 6 A a 3 3 i * 6 6 6 3 n 3 6 ll 6 6 3 f * 6 6 11 LI 6 3 a 3 6 6 11 3 1 4.A* 6 6 u u 6 A 1 3 6 6 6 6 6 3 3* 6 6 6 6 6 3 3 n 3 6 6 6 6 6 3 3 i 2.A u 6 6 6 6 A n 3 * 6 6 6 6 6 3 h 3 *6 6 6 6 6 3 r 3 6 6 6 6 6 3 3 6 6 * 6 6 6 0. *...................... ...................... .......... ....... 5. 250. 500. 750. 1000. 1250. 1440. Page 7 LINE-D.LST Duration, t (min) PLOT -DATA (Time, t(min) vs. Intensity, i(in/h)) t i t i t i t i t i 5. 6.90 30. 3.70 180. 1.30 0. .00 0. .00 10. 5.80 40. 3.10 240. 1.10 0. .00 0. .00 15. 5.00 60. 2.50 600. .50 0. .00 0. :00 20. 4.40 120. 1.80 1440. .27 0. .00 0. .00 REM BEGIN LINE N NEW LINE N REM NODE 24 TO 25 STO 1.42,0.325,18.34 PIP 23,15,14.3 +++ TC = 18.3 min +++ CA = .5 +++ Link # 16, Flow depth PNC 24,25,6,91,0,0 HOL 16 NEW LINE D REM NODE 25 TO 26 H .38 ft, Critical depth = .58 ft HYDRA ******* (version 6.1)**** Date 04-13-2004 Page No 9 camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D REC 15 REC 16 PIP 88,14.3,12.78,4.05,3.88,-36 +++ TC = 29.5 min +++ CA = 8.9 +++ Link # 17, Flow depth = 3.00 ft, Critical depth = 3.00 ft PNC 25,26,6,183,0,0 REM INLET CB #D-4 REM NODE 26 TO 28 STO 1.12,0.614,22.12 PIP 90,12.78,12.26,3.78,3.65,-36 +++ TC = 29.8 min +++ CA = 9.6 +++ Link # 18, Flow depth = 3.00 ft, Critical depth = 3.00 ft PNC 26,28,6,181,0,0 HOL 17 REM BEGIN LINE F NEW LINE F REM NODE 27 TO 28 STO 0.56,0.64,10 PIP 25,12.26,12.26 +++ TC = 10.0 min +++ CA = .4 +++ Link # 19, Flow depth = .60 ft, Critical depth = .57 ft PNC 27,28,6,267,0,0 Page 8 LINE-D.LST HOL 18 -- - NEW LINE D REM NODE 28 TO 30 REC 17 REC 18 STO 0.89,0.698,13.66 PIP 144,12.26,12.2,3.65,3.43,-36 +++ Tc = 30.1 min +++ CA = 10.5 +++ Link # 20, Flow depth = 3.00 ft, critical depth = PNC 28,30,5,176,0,1 HOL 19 REM BEGIN LINE M NEW LINE M REM NODE 29 TO 30 STO 1.16,0.336,36.45 PIP 20,12.5,12.2 +++ Tc = 36.5 min +++ CA = .4 +++ Link # 21, Flow depth = .35 ft, Critical depth = PNC 29,30,7,89,0,0 HOL 20 NEW LINE D REM NODE 30 TO 31 0 ****� HYDRA ******* (Version 6.1)*** 3.00 ft .45 ft Date 04-13-2004 Page No 10 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D REC 19 REC 20 PIP 73,12.2,11.61,2.83,2.76,-42 +++ Larger flow from subarea ---> Tc = 30.6 min +++ Readjusting sum of C*A ---> unadjusted CA = 10.9 +++ CA = 10.9 +++ Link # 22, Flow depth = 3.50 ft, Critical depth = 3.50 ft PNC 30,31,6,181,0,0 REM NODE 31 TO 34 STO 1.11,0.799,17.26 PIP 160,11.62,11.14,2.76,2.60,-42 +++ Tc = 30.9 min +++ CA = 11.8 +++ Link # 23, Flow depth = 3.50 ft, Critical depth = 3.50 ft PNC 31,34,6,172,0,0 HOL 21 REM BEGIN LINE E-2 NEW LINE E-2 REM NODE 32 TO 34 STO 0.53,0.361,17.51 PIP 19,12,11.14 +++ Tc = 17.5 min +++ CA = .2 +++ Link # 24, Flow depth = .23 ft, critical depth = .37 ft PNC 32,34,6,111,0,0 HOL 22 Page 9 R LINE-D.LST REM BEGIN LINE E-1, USE 50 YEAR STORM FOR SAG REM 50 YEAR STORM FROM WILMINGTON IDF, FOR CATCH BASINS IN SAGS RAI 5,9 10,7.3 15,6.5 20,5.8 30,4.9 40,4.2 60,3.3 120,2.2 180,1.8 360,1 1440,0.35 ****** HYDRA ******* (Version 6.1) Date 04-13-2004 Page No 11 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D IDF CURVE R 3 u u u u 3 a 3 u U U V V 3 i 8.A u u u u u A n * 11 1.1 U 6 3 f * u u u u u 3 a 3 u u u u u 3 1 6.A* u u u u u A l 3 U U u LI V 3 3* u U U l 3 U U U U U 3 n 4. A u it u u u A 3 * V 11 U U 6 3 i 3 LI U LJ lJ U 3 n 3 * LI V lJ V U 3 / 2.A * u u u u u A h 3 ll U 11 LJ U 3 r 3 u * u u u u 3 3 V U V U U 5. 250. 500. 750. 1000. 1250. 1440. Duration, t (min) PLOT -DATA (Time, t(min) vs. Intensity, i(in/h)) t i t i t i t i t i 5. 9.00 30. 4.90 180. 1.80 0. .00 0. .00 10. 7.30 40. 4.20 360. 1.00 0. .00 0. .00 15. 6.50 60. 3.30 1440. .35 0. .00 0. .00 20. 5.80 120. 2.20 0. .00 0. .00 0. .00 NEW LINE E-1 REM NODE 33 TO 34 STO 1.27,0.72,14.34 PIP 25,11.14,11.14,7.89,7.64,-15 +++ TC = 14.3 min +++ CA = .9 +++ Link # 25, Flow depth = .96 PNc 33,34,6,265,0,0 ft, critical depth = Page 10 .99 ft 0 LINE-D.LST HOL 23 NEW LINE D REM NODE 34 TO 35 REC 21 ****** HYDRA ******* (Version 6.1) Date 04-13-2004 Page No z12 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D REC 22 REC 23 STO 1.47,0.651,13.72 PIP 271,11.14,14.8,2.60,2.33,-48 +++ TC = 31.5 min .++ CA = 13.8 +++ Link # 26, Flow depth = 4'.00 ft, Critical depth PNC 34,35,5,167,0,0 REM NODE 35 TO 36 PIP 277,14.8,11.5,2.33,2.05,-48 +++ Tc = 32.3 min ... CA = 13.8 +*+ Link # 27, Flow depth = 4.00 ft, Critical depth = PNC 35,36,5,255,0,0 REM NODE 36 TO 37 PIP 52,11.5,11.5,2.05,2.0,-48 +++ TC = 33.2 min ++. CA = 13.8 +++ Link # 28, Flow depth = 4.00 ft, Critical depth = PNC 36,37,0,180,2 REM PFs 0,60,10,10,0,0,0,30,0.05 END END OF INPUT DATA. D ***** HYDRA ******* (version 6.1) ***** 4.00 ft 4.00 ft 4.00 ft Date 04-13-2004 Page No 13 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D *** LINE B Pipe Design Invert Depth Min. velocity --Flow-- Estimated Link Length Diam Up/Dn slope Up/Dn Cover Act/Full Act/Full Cost (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) ($) ------------------------------------------------------------------------------ Page 11 n LINE-D.LST 1 82 15 19.43 .00634 3.4 2.0 4.6 3.81 0. 18.91 3.4 4.2 5.14 -- ------ ------------- - ----------------------------------- Length = 82. ft Total length 82. ft Cost - 0. Total Cost W 0. *** LINE B Analysis of Existing Pipes Invert Depth Cover Velocity --Flow-- -solutions- Link Length Diam Up/Dn slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 2 68 15 18.81 .01015 3.5 2.1 6.0 6.15 95 18.12 4.5 3.1 5.3 6.51 3 397 15 18.02 .01229 4.6 3.2 6.6 6.13 86 13.14 4.3 2.9 5.8 7.16 4 6 18 13.14 .02000 4.3 2.7 9.0 10.00 67 13.02 4.5 2.9 8.4 14.86 --------------------_--------------------------------------------------------- Length 553. ft Total length = 553. ft ****** HYDRA ******* (Version 6.1) ***** Date 04-13-2004 Page No 14 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D *** LINE D Analysis of Existing Pipes Invert Depth cover Velocity --Flow-- -solutions- Link Length Diam Up/Dn slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) 5 118 24 12.20 .00644 5.3 3.1 6.6 17.43 96 11.44 5.2 3.0 5.8 18.16 --------- ----- - ----- ------ - ----- - -------------- ------ Length = 118. ft Total length = 671. ft *** LINE H Analysis of Existing Pipes Invert Depth cover Velocitx --Flow-- -solutions- Link Length Diam Up/Dn Slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam Page 12 LINE-D.LST (ft) (i n) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (i n) ------------------------------------------------------------------------------ 6 25 24 13.62 .00720 3.0 .8 5.6 6.91 36 13.44 3.2 1.0 6.1 19.20 ----- - _ - _-------------------------_-------------------- --- Length 25. ft Total length 25. ft *** LINE D Analysis of Existing Pipes Invert Depth Cover velocity --Flow-- -solutions- Link Length Diam Up/Dn slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 7 199 30 8.98 .00503 7.6 4.9 6.7 27.09 93 7.98 10.8 8.1 5.9 29.08 8 226 30 7.98 .00301 10.9 8.2 5.2 22.48 100 7.20 11.6 8.9 4.6 22.50 --------------------------------------------------------------------------------- Length = 425. ft Total length = 1121. ft - r - Length =425. ft Total length = 1121. ft 0 ****** HYDRA ******* (Version 6.1) ***** Date 04-13-2004 Page NO 15 camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D *** LINE"L Pipe Design Invert Depth Min. velocity --Flow-- Estimated Link Length Diam Up/Dn slope Up/Dn cover Act/Full Act/Full Cost (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) ($) ------------------------------------------------------------------------------ 9 39 15 16.65 .03077 3.4 2.0 6.4 1.50 0. 15.45 3.4 9.2 11.33 -------------------------------------------------------------------------------- Length = 39. ft Total length 39. ft Cost = 0. Total Cost = 0. *** LINE D Analysis Of Existing Pipes Invert Depth Cover velocity--FIOw-- -Solutions- Page 13 LINE-D.LST Link Length Diam Up/Dn Slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 10 66 30 7.10 .00303 11.7 9.0 4.8 23.46 104 .88 15 6.90 10.5 7.8 4.6 22.58 11 81 36 5.94 .00296 11.4 8.2 5.6 26.31 72 5.70 11.3 8.1 5.1 36.31 12 114 36 5.36 .00298 11.6 8.4 5.6 26.20 72 5.02 9.8 6.5 5.2 36.43 Length= - 261. ft Total length - = - 1421.ft ****** HYDRA ******* (version 6.1) Date 04-13-2004. Page No 16 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D *** LINE G Analysis of Existing Pipes Invert Depth Cover velocity --Flow-- -Solutions- Link Length Diam Up/Dn slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 13 25 15 11.85 .01000 3.0 1.6 5.9 5.56 86 11.60 3.2 1.9 5.3 6.46 ------------------- ---- ----- ----- - -- -------------- ------ --- Length = 25. ft Total length = 25. ft *** LINE D Analysis of Existing Pipes Invert Depth Cover velocity --Flow-- -Solutions- Link Length Diam Up/Dn slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 14 85 36 4.92 .00200 9.9 6.6 6.0 42.08 141 12.26 30 4.75 10.9 7.6 4.2 29.83 15 146 36 4.55 .00205 11.1 7.8 5.9 41.90 139 11.67 30 4.25 10.1 6.8 4.3 30.23 -- Length = 231. ft Total length = 1677. ft Page 14 LINE-D.LST ** LINE N Pipe Design Invert Depth Min. velocit --Plow-- Estimated Link Length Diam Up/Dn Slope Up/Dn Cover Act/Ful Act/Full cost (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) M ------------------------------------------------------------------------------ 16 23 15 11.65 .03043 3.4 2.0 7.0 2.12 0. 10.95 3.4 9.2 11.27 ------------------------------------------------------------------------------ Length = 23. ft Total length = 23. ft cost - 0. Total Cost 0. --------------------_------------------------------------ - Length = 23. ft Total length = 23. ft cost 0. Total Cost 0. 0 ****** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 17 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D *** LINE D Analysis of Existing Pipes Invert Depth Cover velocit --Flow-- -Solutions- Link Length Diam Up/Dn Slope Up/Dn Up/Dn Act/Ful Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------- 17 88 36 4.05 .00193 10.3 7.0 4.7 33.14 113 3.82 18 3.88 8.9 5.6 4.1 29.32 18 90 36 3.78 .00144 9.0 5.8 5.0 35.50 140 10.15 30 3.65 8.6 5.4 3.6 25.35 ------------------------------------------------------------------------------ Length = 178. ft Total length = 1878. ft *** LINE F Pipe Design Invert Depth Min. velocity --Flow-- Estimated Link Length Diam Up/Dn slope Up/Dn Cover Act/Full Act/Full Cost (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (S) ------------------------------------------------------------------------------ 19 25 15 8.91 .00500 3.4 2.0 3.6 2.08 0. 8.78 3.5 3.7 4.57 ------------------- --- ------ - - - Length - 25. ft Total length - 25. ft Page 15 LINE-D.LST cost - 0. Total Cost = 0. LINE D Analysis of Existing Pipes Invert Depth Cover Velocity --Flow-- -solutions- Link Length Diam Up/Dn slope Up/Dn Up/Dn Act/Ful` Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 20 144 36 3.65 .00153 8.6 5.4 5.5 38.93 149 12.86 30 3.43 8.8 5.5 3.7 26.07 ___ ---- ----------- ----- -- ---------_---------------- - ----- --- Length 144. ft Total length 2047. ft - Length = 144. ft Total length = 2047. ft * * ** HYDRA ******= (Version 6.1) Date 04-13-2004 Page No 18 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D ** LINE M Pipe Design Invert Depth Min. Velocity --Flow-- Estimated Link Length Diam Up/Dn Slope Up/Dn Cover Act/Full Act/Full cost (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) M ------------------------------------------------------------------------------ 21 20 15 9.15 .01500 3.4 2.0 4.7 1.29 0. 8.85 3.4 6.4 7.91 ---- - --- ---- -- - - -- Length = 20. ft Total length = 20. ft Cost - 0. Total Cost = 0. ** LINE D Analysis of Existing Pipes Invert Depth Cover Velocity --Flow-- -solutions- Link Length Diam Up/Dn Slope Up/Dn Up/Dn ACt/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 22 73 42 2.83 .00096 9.4 5.6 4.1 39.85 128 8.69 30 2.76 8.9 5.1 3.2 31.15 23 160 42 2.76 .00100 8.9 5.1 4.5 42.89 135 11.07 30 2.60 8.5 4.7 3.3 31.82. Page 16 0 LINE-D.LST R -Length = - 233. ft Total length = 2300. ft * LINE E-2 Pipe Design Invert Depth Min. velocity --Flow-- Estimated Link Length Diam Up/Dn Slope Up/Dn Cover ACt/Full Act/Full Cost (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) M ------------------------------------------------------------------------------ 24 19 15 8.65 .04526 3.4 2.0 6.3 .90 0. 7.79 3.4 11.2 13.74 ------------------------------------------------------------------------------- Length = 19. ft Total length = 19. ft Cost = 0. Total cost - 0. --------------------_------------------- -- - --- - ---- - Length 19. ft Total length 19. ft Cost = 0. Total Cost = 0. ***** HYDRA ******* (version 6.1)** Date 04-13-2004 Page No 19 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D LINE E-1 Analysis of Existing Pipes Invert Depth Cover velocitY --Flow-- -Solutions- Link Length Diam Up/Dn Slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 25 25 15 7.89 .01000 3.3 1.9 6.0 6.04 94 7.64 3.5 2.1 5.3 6.46 --------------------_--------------------------_------------ - ----- --- Length 25. ft Total length 25. ft *** LINE D Analysis of Existing Pipes Invert Depth cover velocit --Flow-- -Solutions- Link Length Diam Up/Dn slope Up/Dn Up/Dn ACt/Ful� Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) --------------------------------------------------------------------------------- 26 271 48 2.60 .00100 8.5 4.2 5.3 66.30 146 20.96 36 2.33 12.5 8.1 3.6 45.34 27 277 48 2.33 .00101 12.5 8.1 5.2 65.47 143 19.80 36 Page 17 LINE-D.LST 2.05 9.4 5.1 3.6 45.67 28 52 48 2.05 .00096 9.4 5.1 5.1 64.62 145 20.07 36 2.00 9.5 5.2 3.5 44.54 Length = 600. ft Total length = 2944. ft ****** HYDRA ******* (Version 6.1) ***** Date 04-13-2004 Page No 20 camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D Hydraulic Gradeline computations Down- Hydraulic Link stream Gradeline crown Possible Ground super- Manhole Loss # Node # Elevation Elev. surcharge. Elev. crit.? Depth coef ----------------------------------------------------------------------------- 1 10 20.56 20.16 Y 22.26 N 1.75 .71 2 11 19.12 19.37 N 22.60 Y 1.63 .12 3 12 14.14 14.39 N 17.44 Y 3.12 .93 4 13 14.24 14.52 N 17.50 Y 4.69 2.56 5 15 15.69 13.44 Y 16.62 N 6.71 1.00 6 15 14.37 15.44 N 16.62 Y 6.71 1.83 7 16 14.61 10.48 Y 18.82 N 6.73 .61 8 18 13.92 9.70 Y 18.80 N 6.79 .49 9 18 15.93 16.70 N 18.80 Y 6.79 .49 10 19 13.40 9.40 Y 17.39 N/A 7.46 .63 11 20 12.62 8.70 Y 17.00 N 7.26 .28 12 22 11.99 8.02 Y 14.81 N 7.05 .74 13 22 12.56 12.85 N 14.81 Y 7.05 .37 14 23 11.22 7.75 Y 15.60 N/A 6.67 .19 15 25 10.50 7.25 Y 14.30 N/A 6.46 .23 16 25 11.53 12.20 N 14.30 Y 6.46 .23 17 26 10.06 6.88 Y 12.78 N/A 6.28 .33 18 28 9.50 6.65 Y 12.26 N/A 5.89 .13 19 28 9.54 10.03 N 12.26 N 5.89 1.14 20 30 8.89 6.43 Y 12.20 N/A 6.09 .26 21 30 9.29 10.10 N 12.20 Y 6.09 .12 22 31 8.58 6.26 Y 11.62 N/A 5.82 .22 23 34 8.16 6.10 Y 11.14 N/A 5.61 .43 24 34 8.16 9.04 N 11.14 Y 5.61 1.07 25 34 8.63 8.89 N 11.14 Y 5.61 .06 26 35 7.61 6.33 Y 14.80 N/A 5.28 .13 27 36 7.05 6.05 Y 11.50 N/A 4.79 1.55 28 ----------------------------------------------------------------------------- 37 6.40 6.00 Y 11.50 N/A 4.40 .00 Terminal Hydraulic Gradeline Ground Loss Link # Node # Elevation Elevation coef. ----------------------------------------------------------- Page 18 I LINE-D.LST 1 9 21.15 22.78 1.50 6 14 15.26 16.62 1.50 9 17 17.92 20.00 1.50 13 21 13.57 14.85 1.50 16 24 13.17 15.00 1.50 19 27 9.89 12.26 1.50 **** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 21 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE D Terminal Hydraulic Gradeline Ground Loss Link # Node # Elevation Elevation coef. --------------------__-------------------------------------- 21 29 10.02 12.50 1.50 24 32 9.80 12.00 1.50 25 ----------------------------------------------------------- 33 9.69 11.14 1.50 NORMAL END OF HYDRA Page 19 LINE-U.LST ****** HYDRA ******* (version 6.1) Date 04-13-2004 Page No 1 Camp Lejeune - Rational Method with HydrauliC Gradeline - LINE U +++ Commands Read From File G:\04015\02112\HYDRA\PHIIREV\LINE-U.HDA JOB 5w2 2 REM 10 year storm from Wilmington IDF Curve REM RAI 5,6.9 10,5.8 15,5 20,4.4 30,3.7 40,3.1 60,2.5 120,1.8 180,1.3 240,1.1 600,0.5 1440,0.27 REM 50 YEAR STORM FROM WILMINGTON IDF, FOR CATCH BASINS IN SAGS WITH NO CURB REM RAI 5,9 10,7.3 15,6.5 20,5.8 30,4.9 40,4.2 60,3.3 120,2.2 180,1.8 360,1 REM 1440,0.35 REM 50 YEAR STORM NOT USED ALL SAGS HAVE CURB OVERFLOW TWE 15.2 CRI 1 PDA 0.013,15,2,2.5,2,0.002,18 PSz 15,18,24,30,36,42,48 HGL 1 REM BEGIN WITH 10 YEAR CURVE RAI 5,6.9 10,5.8 15,5 20,4.4 30,3.7 40,3.1 60,2.5 120,1.8 180,1.3 240,1.1 600 IDF CURVE 7.* u 4 R 6.A u u u u A a 3 U G u u u 3 i 3* a lJ l! u 3 n 3 u u u u LI 3 f 3* u u u U U 3 a 3 u u U 3 1 4.A * u u u u u A 1 3 u u u 6 u 3 3 * u u u lJ u 3 i 3 * U ll u U u 3 n 3 u u u u 3 3 * u V U u u 3 i 2.A u u u u u A n 3 u * u u u u 3 / 3 U u U u u 3 h 3 u u * u LI u 3 r 3 u u u U L! 3 3 u u u u u 3 S. 100. 200. 300. 400. 500. 600. Duration, t (min) ****** HYDRA ******* (Version 6.1) ***** Date 04-13-2004 Page 1 LINE-U.LST Page No 2 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE U PLOT -DATA (Time, t(min) vs. Intensity, i(in/h)) t 1 t 1 t 1 t l t i S. 6.90 30. 3.70 180. 1.30 0. .00 0. .00 10. 5.80 40. 3.10 240. 1.10 0. .00 0. .00 15. 5.00 60. 2.50 600. .00 0. .00 0. .00 20. 4.40 120. 1.80 0. .00 0. .00 0. .00 NEW LINE U1 REM NODE 109 TO 110 (AREA CB #U1-1) STO 0.59,0.72,10 PIP 30.17,23.81,24.34,19.55,19.40,-15 +++ TC = 10.0 min +++ CA = .4 +++ Link # 1, Flow depth = .66 ft, critical depth = .63 ft PNC 109,110,4,242,0,1 REM NODE 110 TO 101 PIP 176.32,23.81,23.25,19.30,18.40,-15 +++ TC = 10.1 min +++ CA = .4 +++ Link # 2, Flow depth = .65 ft, critical depth = .63 ft PNC 110,101,4,90,0,1 HOL 1 REM BEGIN LINE U-2 NEW LINE U-2 REM NODE III TO 102 (AREA CB #U2-1) STO 1.02,0.76,10 PIP 85.51,21.84,23.00,17.34,16.91,-18 +++ TC = 10.0 min +++ CA = .8 +++ Link # 3, Flow depth = .86 ft, Critical depth = .82 ft PNC 111,102,4,198,0,2 HOL 2 NEW LINE U REM NODE 108 TO 100 REM NODE 108 TO 107 (AREA CB #U-1) STO 0.59,0.72,10 Pip 39.16,29.43,28.85,24.8,24.61,-15 +++ TC = 10.0 min +++ CA = .4 +++ Link # 4, Flow depth = .66 ft, Critical depth = .63 ft PNC 108,107,4,256,0,1 REM NODE 107 TO 106 PIP 199.27,28.85,26.85,23.35,22.35,-15 +++ TC = 10.2 min +++ CA = .4 +++ Link # 5, Flow depth .66 ft, Critical depth = .63 ft 0 Page 2 LINE-U.LST ****** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 3 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE U PNC 107,106,4,116,0,1 REM NODE 106 TO 105 PIP 94.26,26.85,24.0,21.05,20.57,-15 +++ Tc = 11.0 min +++ CA = .4 +++ Link # 6, Flow depth = .65 ft, PNC 106,105,3,188,0,0 REM NODE 105 TO 104 (AREA CB #U-2) STO 1.61,0.74,10 PIP 60.19,24.0,25.40,20.32,19.81,-18 +++ Tc = 11.5 min +++ CA = 1.6 +++ Link # 7, Flow depth = 1.16 ft, PNC 105,104,4,120,0,1 REM NODE 104 TO 103 PIP 148.44,25.40,22.5,19.71,18.45,-18 +++ Tc = 11.6 min +++ CA = 1.6 +++ Link # 8, Flow depth = 1.14 ft, PNC 104,103,4,191,0,1 REM NODE 103 TO 112 (AREA MH #U4) STO 1.06,0.36,10 PIP 95.46,22.5,22.35,18.35,17.55,-18 +++ Tc = 12.0 min +++ CA = 2.0 +++ Link # 9, Flow depth = 1.50 ft, PNC 103,112,3,180,0,0 REM NODE 112 TO 102 (AREA CB #U-3) STO 0.80,0.63,10 PIP 77.50,22.35,23.00,17.05,16.66,-24 +++ Tc = 12.3 min +++ CA = 2.5 +++ Link # 10, Flow depth = 1.42 ft, PDA 0.013,15,2,2.5,2,0.002,24 PNC 112,102,4,94,0,1 REM NODE 102 TO 101 REC 2 PIP 56.13,23.00,23.25,16.56,16.28,-24 +++ Tc = 12.5 min +++ CA = 3.3 +++ Link # 11, Flow depth = 2.00 ft, PNC 102,101,4,270,0,1 REM NODE 101 TO 113 REC 1 PIP 131.95,23.6,21,16.18,15.52 +++ Tc = 12.7 min +++ CA = 3.7 +++ Link # 12, Flow depth = 1.64 ft, PNC 101,113,4,273,0,1 0 critical depth = .62 ft Critical depth = 1.16 ft Critical depth = 1.16 ft Critical depth = 1.50 ft Critical depth = 1.33 ft Critical depth = 2.00 ft Critical depth = 1.60 ft ****** HYDRA ******* (version 6.1)**** Date 04--13-2004 Page 3 LINE-U.LST Page No 4 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE U REM NODE 113 TO 114 (AREA MH #U7) STO 0.36,0.57,10 Pip 80.86,21,21.2,15.42,15.01,-24 +++ Tc = 13.0 min +++ CA = 3.9 +++ Link # 13, Flow depth = 2.00 ft, Critical depth = 2.00 ft PNC 113,114,4,90,1 REM NODE 114 TO 100 PIP 23.62,21.2,21,14.90,14.80 +++ Tc = 13.2 min +++ CA = 3.9 +++ Link # 14, Flow depth = 1.64 ft, Critical depth = 1.63 ft PNC 114,100,0,211,2 REM PFS 0,60,10,10,0,0,0,30,0.05 END END OF INPUT DATA. 0 ��*** HYDRA ******* (version 6.1) **** Date 04-13-2004 Page No 5 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE U ** LINE U1 Analysis of Existing Pipes Invert Depth cover velocit --Flow-- -solutions- Link Length Diam Up/Dn Slope Up/Dn Up/Dn ACt/Fuld Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 1 30 15 19.55 .00497 4.3 2.9 3.8 2.46 54 19.40 4.9 3.6 3.7 4.55 2 176 15 19.30 .00510 4.5 3.2 3.8 2.45 53 18.40 4.9 3.5 3.8 4.62 ------------------------------------------------------------------------------ Length = 206. ft Total length = 206. ft *** LINE U-2 Analysis of Existing Pipes Invert Depth cover velocity --Flow-- -Solutions- Link Length Diam Up/Dn slope Up/Dn Up/Dn Act/Full ACt/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ Page 4 LINE-U.LST 3 86 18 17.34 .00503 4.5 2.9 4.4 4.50 60 16.91 6.1 4.5 4.2 7.45 ------------------------------------------------------------------------------- Length = 86. ft Total length = 86. ft *** LINE U Analysis of Existing Pipes Invert Depth Cover velocit --Flow-- -Solutions- Link Length Diam Up/Dn Slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) --------------------------------------------------------------------_-___----- 4 39 15 24.80 .00485 4.6 3.3 3.7 2.46 55 24.61 4.2 2.9 3.7 4.50 -------------------------------------------------------------------------------- Length = 39. ft Total length = 39. ft 0 **** HYDRA ******* (version 6.1) *** Date 04-13-2004 Page No 6 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE U ** LINE U Analysis of Existing Pipes Invert Depth Cover velocity --Flow-- -solutions- Link Length Diam up/Dn Slope Up/Dn Up/Dn Act/Full ACt/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------- 5 199 15 23.35 .00502 5.5 4.1 3.8 2.45 54 22.35 4.5 3.1 3.7 4.58 6 94 15 21.05 .00509 5.8 4.4 3.8 2.39 52 20.57 3.4 2.1 3.8 4.61 7 60 18 20.32 .00847 3.7 2.1 6.2 9.00 93 19.81 5.6 4.0 5.5 9.67 8 148 18 19.71 .00849 5.7 4.1 6.2 8.95 93 18.45 4.1 2.4 5.5 9.68 9 95 18 18.35 .00838 4.2 2.5 6.2 10.94 114 1.32 15 17.55 4.8 3.2 5.4 9.62 10 78 24 17.05 .00503 5.3 3.1 5.7 13.60 85 16.66 6.3 4.2 5.1 16.05 11 56 24 16.56 .00499 6.4 4.3 5.6 17.69 Ill 1.71 15 Page 5 r LINE-U.LST 16.28 7.0 4.8 5.1 15.98 - ---- --- -- ---- ----- --- ----- - ---- - Length = 770. ft Total length = 856. ft *** LINE U Pipe Design Invert Depth Min. Velocity --Flow-- Estimated Link Length Diam Up/Dn slope Up/Dn Cover Act/Full Act/Full cost (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (ifs) ($) ------------------------------------------------------------------------------ 12 132 24 16.18 .00783 7.4 3.7 7.3 19.89 0. 15.15 5.9 6.4 20.02 -T _ Length= 902. ftTotal length =1194. ft �_ ___ Cost = 0. Total Cost = 0. T - -- -- Length = 902. ft Total length =1194. ft Cost = 0. Total Cost = 0. ***�* HYDRA ******* (Version 6.1) ***** Date 04-13-2004 Page No 7 Camp Lejeune - Rational Method with Hydraulic Gradeline - LINE U *** LINE U Analysis of Existing Pipes Invert Depth Cover Velocity --Flow-- -Solutions- Link Length Diam up/Dn Slope Up/Dn Up/Dn Act/Full Act/Full Load Remove Diam (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs) (%) (cfs) (in) ------------------------------------------------------------------------------ 13 81 24 15.42 .00507 5.6 3.4 6.6 20.80 129 4.69 18 15.01 6.2 4.0 5.1 16.11 ---- - ---- -- - -- ---- -- ---- ----- ---- ----- -- Length = 983. ft Total length = 1275. ft *** LINE U Pipe Design invert Depth Min. Velocity --Flow-- Estimated Link Length Diam Up/Dn Slope Up/Dn Cover Act/Full ACt/Full Cost (ft) (in) (ft) (ft/ft) (ft) (ft) (ft/s) (cfs)------------------------------------------------------------------------------ ($) 14 24 24 14.90 .00845 6.3 4.1 7.5 20.67 0. 14.70 6.3 6.6 20.80 Page 6 a LINE-U.LST ----------------------------------_---_----------------------------------------- Length = 1007. ft Total length 1299. ft cost - 0. Total cost W 0. ****** HYDRA ******* (version 6.1) ***** Date 04-13-2004 Page No 8 camp Lejeune - Rational Method with Hydraulic Gradeline - MINE U Hydraulic Gradeline computations Down- Hydraulic Link stream Gradeline Crown possible Ground Super- Manhole Loss # Node # Elevation Elev. Surcharge Elev. crit.? Depth Coef __--__-_----------------------------------------------------------------------- 1 110 20.18 20.65 N 23.81 N .88 .16 2 101 19.15 19.65 N 23.60 N 2.97 .44 3 102 19.71 18.41 Y 23.00 N 3.15 .31 4 107 25.27 25.86 N 28.85 N .89 .02 5 106 23.01 23.60 N 26.85 N 1.37 .03 6 105 22.11 21.82 Y 24.00 N 1.79 .24 7 104 20.97 21.31 N 25.40 Y 1.75 .22 8 103 19.61 19.95 N 22.50 Y 2.88 .32 9 112 20.34 19.05 Y 22.35 N/A 3.29 .17 10 102 19.71 18.66 Y 23.00 N 3.15 .63 11 101 19.15 18.28 Y 23.60 N/A 2.97 .60 12 113 18.03 17.15 Y 21.00 N 2.85 .71 13 114 17.44 17.01 Y 21.20 N/A 2.54 .46 14 .._..-------------------------------------------------------------------------- 100 16.34 16.70 N 21.00 N 1.64 .00 Terminal Hydraulic Gradeline Ground Loss Link # Node # Elevation Elevation Coef. ----------------------------------------------------------- 1 109 20.56 23.81 1.50 3 111 20.24 21.84 1.50 4 ----------------------------------------------------------- 108 25.79 29.43 1.50 NORMAL END OF HYDRA Page 7 Table Rating Table for Combination Inlet On Grade Project Description V1lorksheet 4.5' COMBO INLET RATING CURVE Type Combination Inlet On Grade Solve For Efficiency input Data Local Depression T T� 2,0 in Local Depression Width 4.50 ft Gutter Width 2.00 ft Gutter Cross Slope 0.107000 itlit Road Cross Slope 0.050000 ft/ft Mannings Coefficient 0.013 Curb Opening Length 4.50 ft Grate Width 2.00 ft Grate Length 4.50 ft Grate Type P-50 mm (P-1-718'1 Clogging 0.0 % Options Calculation Option Use Grate Inlet Only Grate Flow Option Exclude None Attribute - Minimum'Maximum. Increment Discharge (cfs) 0.00 4.00 -0.50. Slope (ftlft}, 0:001000 0.040000.0:002500.. Discharge Slope Efficiency Intercepted (cfs) (Rift) Flow (cfs) 0.00 0.00.1000 NIA NIA 0.50 0.00}000 1.00 0.50 1.00 0.001000 1.00 1.00 1.50 0.001000 1.00 1.50 2.00 0.001000 0.99 1.99 2.50 0.001000 0.99 2.48 3.00 0.001000 0.99 2.96 3.50 0.001000 0.98 3.44 4.00 0.001000 0.98 3.91 0.00 0.003500 NIA NIA 0.50 0.003500, 1.00 0.50 1.00 0.003500 1.00 1.00 1.50 0.003500 1.00 1.50 2.00 0.003500 1.00 2.00 2.50 0.003500 1.00 2.49 3.00 0.003500 0.99 2.98 3.50 0.003500 0.39 3.47 4.00 0.003500 0.99 3.94 0.00 0.006000 NIA NIA 0.50 0.006000 1.00 0.50 1.00 0.006000 1.00 1.00 1.50 0.006000 1.00 1.50 2.00 0.006000 1.00 2.00 2.50 0.006000 1,00 2.50 3.00 0.006000 1.00 2.99 . Project Engineer: Property of hAQ21121final sd camp I,tm2 Toothman-Orton Engineering Co. FiowMaster v6.1 [61401 03-0e-12 05:38:12 PM ) Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1ee6 Page 1,of 4 Table Rating Table for Combination Inlet On Grade Discharge (c{5} 9 ���� �ffodenCy Intercepted Flow (cfs) 3.50 0.006000 0.99 3.48 4.00 0.006000 0.99 0.00 0.008500 NIA 3.97 0.50 0.008500 1.00 NIA 1-00 0.008500 1.00 0.50 1.50. 0.006500 1.00 1.00 2.00 0.008500 1_00 1.50 2.50 0.008500 1.00 2.50 3.00 0.008500 1.00 2.50 3.50 0.008500 1.00 3.00 4.00 0.008500 1 3.49 0.00 0.011000 _DO ,k1A 0.50 0.011000 1.00 NIA 1.00 0.011000- 1.00 0,50 1.50 _ 0.011000 1.00 1.00 2.00 0.011000 1.00 .. 1.50 2.50 -0.011000 1.00 2.00 3.00 0.011000 1 2.50 ' 3.50 0.011000, .; 1.00 3.00 4.00 - 0.011000, 1.00 3.50 0.00 0.013500 NIA 0-50 0.0i 3500. 1.00 N/A 1.00 ' 0.013500; 1.00: 0.50, ,:. 1.50 0.013500 '-: 1.00 1-06 2.00 .. 0.013500'.' 1.00 1:5p 2.50..' 0.013500' 1.00 2.Da.: , .3.00 0.013500 1 00, 2:50' . 3.50 0.013500' 1.00 3.Oa 4.00 0.013500: 1,00 3.50:. . .0.00 0.016000 NIA 3.99• 0.50 0.016000 1.00 NIA 1.00 0.016000 1.00 0.50 1.50 0.016000 1.Da 1.00 2.00 0.016000 1.00 1.50 2.50 0.016000 2.00. 3.00 0.016000 .1.00 1.00 _ 250 3.50 0.016000 1.00 3.00 4.00 0.016000 1.00 3.50 0•00 0.018500 N/A 4.00 0.50 0.018500 1.00 N/A 1.00 0.018500 1,00 0.50 1-50 0.018500 1.00 1.00 2.00 0.0115500 1-00 1.50 2.50 0.018500 1.00 2.00 3.00 0.018500 1.00 2.50 3.50 0.018500 1.00 3.00 4.00 0.018500 1.00 3.50 0.00 0.021000 NIA 4,00 0.50 0.021000 1.00 NIA 0.50 1.00 0.021000 1.00 1.00 1.50 0.021000 1.00 1.50 2.00 0.021000 1.00 2.00 2.50 0.0210Da 1.00 2.50 h:1021121final s d camp I.fm2 Toothman-Orton Engineering Co. Project Engineer. Property of 03-08-12 05:35:12 PM ) Haestad Methods, Inc. 37 Brookside Road Waterbury,CT VSA FlowMasterve-1 (6140) (203) 755-1666 Page 2 of 4 Table Rating Table for Combination Inlet On Grade Discharge (cfs) Slope (eft, Efficiency Intercepted Flow (cfs) 3.00 3,50 4.00 0.00 0,50 1.00 1.50 2,00 2.50. 3-00 3.50 4 00 .0.00 0.50 1.00 1.50 2.00 2-50 3.00 3.50 4.00 0.00 0.50' 1.00 1.50 2.00. 2.50' 3.00. 3.50 4.00 0•00 0.50 1.00 1.50 2.00 2-50 3100 3.50 4,00 0.00 0.50 1.00 1.50 2.00 2.50 3-00 3.50 4.00 0.00 0.50 1.00 1.50 2.0010.036000 0.021000 0.021000 0:021000 0.023500 0.023500 O.D23500 0.023500 0.023500 0,023500 0.023500 0.023500 0.022500 0.026000 0.026000 0.026000 0.026000 0.026000 0.026000 0.025000 0.026000 0M6000 0,028500 0.0285001 0.028500, 0.028500` 0.028500'. ' 0.028500 0.028500 0.028500 0.028500 0.031000 0.03i000 0.D31000 0.031000 0.031000 0.031660 0.031000 0.031000 0.031000 0.033500 0.033500 0.033500 0.033500 0.033500 0.033500 0.033500 0.033500 0.033500 0.036000 0,036000 0.036000 0.036000 1.00 1.00 too NIA 1.00 100 1.00 1.00 1.00 1.00 1.00 'i.00 NIA 1.60 1.00 1.00 .1.00 100 1.00 1:00 1.00 N1A 1.00 ':. 1.00 1.00 1.00 1.00 1.00 1.00 1:00 NIA 1.00 1.00 1.00 1 M 1.00 1.00 1_00 1.00 NIA 1.00 1 00 1.00 1.00 1.00 100 1.00 1.00 NIA 1.00 1•D0 1.00 1,00 3-DO 3.50 4.00 NIA 0.50' 1.00 1.50 2.00 2.50 3.00 3.50 4.00 N/A 0.50 . ,-..-1,00 ].50 2.00 2.50 3.00 3.50 ' 4.00. fWA 0.50' 1:00. 1:50; -. 2.aa 2.50: - 3.00. '3.50. 4.00 NIA 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 NIA 0.50 1.00 1.50 2.00 2.50 3.00 3,50 4.00 NIA 0.50 1.00 1-50 2.00 h_102112Vinal stl camp 1.fm2 Project Engineer. Property. of Toothman-Orton Engineering Co. FlowMaster v6.1 [6140[ 03-08-12 05:38:12 PM ► Haestad Methods, Inc. 37 B=Kside Road Waterbury, CT 06708 USA (203) 755-1666 Page 3 of Table Rating Table for Combination inlet On Grade Discharge (cis) Slope (ftlft) Effdency Intercepted Flow (cfs) 2,50 0.036000 1.00 2.50 3A0 0.036000 100 3.00 3.50 0.036000 1.00 3.50 4.00 0.036000 1.00 4.00 0.00 0.038500 NIA NIA 0.50 0.038500 1.00 0.50 1.00 0.038500 1.00 1.00 1.50 0.038500 1.00 1.50 2.00 0,038500 1.00 2,00 2.50 0.038500 1.00 2.50 3.00 0.038500 1.00 3.00'- 3.50 0,038500 1.00 3.50 4:001 0,038500 1,00 4.00 Project Engineer. Property of ,. h,%021121TinaJ sd carnp l.fm2 Toothman-Orton Engineering Co. FlowMasterv6.1;814a} 03-08_1'2 05:38:12 PM j Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-'1666 Page 4 of 4 Table Rating Table for Cornbinatiori Inlet In Sag Project Description Worksheet 4.5' COMSO INLET IN SAG Type Combination Inlet In S ag Solve For Spread Input Data Local Depression 2.0 in Local Depression Width 4.50 ft Gutter Width 2-00 ft Gutter Cross Slope 0.107000 lt/ft Road Cross Slope 0.050000 tuft Curb Opening Length 4.50 ft Opening Height 0.42 ft Curb Throat Type Horizontal Grate Width 2.00 ft Grate -Length 4.50 ft -'Grate Type P-50 mni (P-1-7/8") Clogging 0.0 % Options . . - Calculation -Option"- Use Grate Inlet Only Attribute Mininnum-'. Maximum : lricrement `% Discharge (cfs) 0:00" 15.00 . 0.50i:.' Discharge. Spread Depth` (Cfs) (ft). (ft) 0.00 NIA WA' 0.50 0.50 -0.09 1.00 0.80 -0,05 1.50 1.05 -0.02 2.00 1.27 0.02 2.50 1.48 0.05 3.00 1.67 0.07 3.50 1.85 0.10 4.00 2.02 0.12 4.50 2.19 0.15 5-00 2.34 0.17 5.50 2_50 0.19 6.00 2.65 0.21 6.50 2.79 0,24 7.00 2.93 0.26 7.50 3.07 0.28 8.00 321 0,30 8.50 3.34 0.31 9.00 3.47 0,33 9.50 3.60 0.35 10.00 1.72 0.37 10.50 3.84 0.39 11,00 3.96 0.40 11.50 4.08 0.42 12.00 4.20 0.4d 12.50 4.32 0.45 Project Engineer_ Property Of h'\02112\Cinal s d camp l.fm2 Toothman-Orton Engineering Ca- FlowMaster v6,1 (61401 03-08-12 05:4224 PM ) Haestad Methods, Inc. 37 9roakside Road Waterbury, CT 06708 USA (203) 755-1666 page 1 of 2 Table Rating Table for Combination inlet In Sag Discharge (cfs) Spread (ft) Depth (ft) 13.00 4.43 0.47 13.50 7A7 0.49 14.00 7.80 0.50 14.50 8.11 0.52 15.00 8.43 0.54 Project Engineer. Property of h:1021121final s d camp I.fm2 Taothman-Orton Engineering Co. FEowMaster v6.1 f61401 03-08-12 05:42:24 PM ) Haestad Methods, Inc_ 37 Brookside Road Waterbury, C7 06708 USA (203) 755-1666 Page 2 of 2 Cross Section Cross Section for Ditch Inlet In Sag Project Description Worksheet Ditch inlet - 1 Type Ditch Inlet in S ag Solve For Spread Section Data Discharge 3.00 cis Spread 4.29 ft Left Side Slope 3.00 H : V Right Side Slope 3.00 H : V Bottom Width 3.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Local Depression 0.0 in Local Depression Width 0.00 it Grate Type P-SO mm (P=1-7l8") Clogging 0.0 % ON MOW V:1 Cam. H:1 N TS Project Engineer' Property Of h:10211211'inai sd camp I.im2 Toothman-Orton Engineering Co. FlowMaster v6.1 161401 03-Oa-12 05,26:17 PM ) Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06708 USA (203) 755-1666 page 1 of 1 Curve Plotted Curves for Gutter Section Project Description Worhsheet SLOPE VS DISCHARGE - 8' S PREAD T-6" Gutter 5% cross slope Type Gutter Section Solve For Discharge Input Data Gutter Width 1.50 ft Gutter Cross Slope 0,107000 ft/ft Road Cross Slope 0.050000 f tft Spread 8.00 ft Mann ings Coefficient 0.016 Attribute Minimum Maximum Increment Slope (fdft) 0.003000 0.050000 0,025600 Woricsheet- SLOPE VS DISCHARGE - 8' SPREAD V-6" Gutter 5% cross slope 140 ------ --Discharge vs- Slope -------------------- r t I t r ! I 1 13.0,--------- r------------- -------------------`------7-------------,--- ---- --- 12.Or------------- I-------------- ------------- i------------- --------- ............... -^------='� . t -- I t I --------- - `--t-- - ---- t--.-_.---'------i.�;r.':;. 1 I I � � f 't, :•� a0'0 ---- ---- 1------- --------=------- --- ---- ----- --- ------=------------- - - -- -- rn '' ---- -------I -------------------------- ---- ------------- :. 1Z. 9.0 ,--------- - ,..--_- _ ----�- �. ----- ------ ------1 -------------'- ! , I t I t ! 1 I I t t 1 i t 1 I 1 1 I 1 I I t 1 1 5.() -___-- ' ' ____----------------____-_-__- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ - - _ - - _ , 1 lf 1 I - _ _ - _ - - , 5.� --'--- -1--------------=------------s-------------r-------------I------ r t r r ! t 1 4.0 I-- 0.000 0.005 0.010 0.015 0,020 0.025 0,030 Slope () Project Engineer. Property of h:1021121ftnal'sd camp l.fm2 Toothman-Orton Engineering Co. FlowMasterv6.1 [61401 05-08-03 12:46:51 ) Haestad Methods, inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 Project: 04015/02112 Page 1 of 3 Date: 4106/04 Prepared by: W> PHASE II POND 4-06-04 PERMANENT POOL VOLUME: MAIN POND FOREBAY ELEV SURFACE VOL(CF) ELEV SURFACE VOL(CF) AREA (SF) AREA (SF) 15.2 7316 15.2 2194 715.40 207.45 15.10 6,992.00 15.10 1955 6,519.15 193.05 14.00 4,861.00 15,00 1,906.00 3,337.60 1.676.00 13.20 3,483.00 14.00 1,446.00 680.40 1,244.00 13.00 3,321.00 13.00 1,042.00 2,933.00 868.50 12.00 2,545.00 12.00 695.00 1,806.00 206.20 11.20 1,970.00 11.60 336.00 342.00 67.20 11.00 1,450.00 11.20 0.00 368.90 10.65 658.00 148.05 SUBTOTAL: 4,462.40 10.20 0.00 %= 0.21 SUBTOTAL: 16,850.50 CF TOTAL PERM. POOL VOL= 21,312.90 CF TEMPORARY POOL VOLUME: ELEV SURFACE VOL(CF) AREA (SF) 15.20 9,510.00 8,038.80 16.00 10,587.00 5,466.00 16.50 11, 277.00 TOTAL TEMP. POOL VOL.= 13,504.80 Project RiveRidge Engineering Co. Page 4 of .-:� Date l 3.1'oy Prepared by A--lW _T / r9 aJE% El YYJ1A)lF s S ,,Z FAE >49Jz � bt,>Tw , iammlm ZS .....,..x � _ S Fl � 3 �. � � • 5 3, �c . � 3, Sc� n � y �. 9 , Z � 5 �f Z ------ i _ Project RiveRidge Engineering Co. Page 3 of 3 Date _ J Prepared by IAyff i %Z i 02 LZ =rt 2 -. �. �1� Tt Z — " / ( cam• 1( ... //L // ` rr — D• %[� / Ot z) Z (13z. Z YAr z ') - D. O _S C.�� D(. ME d 3 D L 3 - d. 0c_-�� 3 U C, LMER OF TRANSM AL RIVERIDGE ENGINEERING COMPANY 405 W. MYRTLE ST. BOISE, IDAHO 83702 PHONE: (208) 344-1180 FAX: (208) 344-1182 TO: North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, N.C. 28405-3845 WE ARE SENDING Shop drawings Copy of letter NAttached Prints Change Date Job No. 6-17-04 04015 ATTENTION Laurie Munn RE: Permit No. SW8 010420 Modification Tarawa Terrace I Housing Replacement High Density Stormwater Project Onslow County Under separate cover Plans Samples the following ❑ Specifications COPIES DATE NO. I DESCRIPTION 1 Sealed Phase 11 Pond calculations 1 Sealed Phase ID and Town Center Pond calculations THESE ARE TRANSMITTED as checked below F]For approval Approved as submitted 11 For your use Approved as noted 0 As requested E Returned for corrections F7For review comment FOR BIDS DUE 20 ❑ Resubmit copies for approval Submit copies for distribution Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: 11ere are your original copies. Thanks for all your assistance! COPY TO SIGNED: - If enclosures are not as rrofed, kindly not fv us a7 onee. Project: 04015102112 Date: 4106104 PHASE II POND 4-06-04 PERMANENT POOL VOLUME: MAIN POND ELEV SURFACE VOL(CF) AREA (SF) 15.2 7316 715.40 15.10 6,992.00 6,519.15 14.00 4,861.00 3, 337.60 13.20 3,483.00 680.40 13.00 3,321.00 2,933.00 12.00 2,545.00 1,806.00 11.20 1,970.00 342.00 11.00 1,450.00 368.90 10.65 658.00 148.05 10.20 0.00 SUBTOTAL: 16,850.50 CF TOTAL PERM. POOL VOL= 21,312.90 CF TEMPORARY POOL VOLUME: ELEV SURFACE VOL(CF) AREA (SF) 15.20 9,510.00 8,038.80 16.00 10,587.00 5.466.00 16.50 11, 277.00 TOTAL TEMP. POOL VOL.= 13,504,80 Page 1 of 3 Prepared by: W F FOREBAY ELEV SURFACE VOL(CF) AREA (SF) 15.2 2194 207.45 15.10 1955 193.05 15.00 1,906.00 1,676.00 14.00 1.446.00 1,244.00 13.00 1,042.00 868.50 12.00 695.00 206.20 11.60 336.00 67.20 11.20 0.00 SUBTOTAL: 4,462.40 %= 0.21 Project O�[7/S o2riz Date / 3 RiveRidge Engineering Co. Page 7- °f Prepared by 1 � 3 S J ZS - Zs Cd. 53Ac� 131 5(oc)) , z -5 Proj6ct 0 0Zi I e Date Q RiveRidge Engineering Co. L z) -� Z ("'37. Page �� of 3 Prepared by tXW , 11111 I, rr1 • ; -� -JL11L � - -� • Ob27"54`f' / OL M� O 3 o S� �►� I 4)< c)o,, = /R SD S-Ft-3 _ U. 0=� 10 1 l,/_ 11 Project RiveRidge Engineering Co. Page Of Z Date Prepared by 2 o S 1 7 - 2 3 % T Gp % - o VDL C7 /� ' V J 2z Project D Y J r 5 RiveRidge Engineering Co. Page Z of Z Date DtoJ, Prepared by 111l l l l f, fl i H.CARO� vv� _ 54 Oz ' IN E iCE_ - — �- = 2-27.hRn t3 /7.9 cfS 0 3 - 0, :� 2— Project _L_401 S - RiveRidge Engineering Co. Page of z Date ` + 1 D Prepared by E 7T W 8 3 �.�c.u,� — J• _ a i ProjI ect ' O c/ D RiveRidge Engineering Co, Page of `z Date Prepared by _ ,,•`�N CAR0��N,, 54 02 sz Ob��r�t• �/0 RE: Camp Lejeune Phase 11 - Housing Replacement - Additional C... y Subject: RE: Camp Lejeune Phase 11 - Housing Replacement - Additional Comments From: "Wendy Haustveit" <whaustveit@rvrdg.com> Date: Fri, 30 Apr 2004 12:10:13 -0600 To: "'Laurie Munn"' <Laurie.Munn@ncmail.net> Laurie, How do these limits look? I showed the existing stormdrain pipe for your reference (I will remove them in the final drawing). I will also add the line and curve descriptions. Thanks -Wendy From: Laurie Munn [mailto:Laurie.Munn@ncmail.net] Sent: Friday, April 30, 2004 8:21 AM To: whaustveit@rvrdg,com Subject: Re: Camp Lejeune Phase II - Housing Replacement - Additional Comments I need to get the Town Center Pond brought into the project boundary. Can you revise the Overall Grading plan (most easily seen on the large sheets) to include the Town Center pond and the connections from Court 13, Court 14, A street and all associated impervious areas ( new construction - Phase II only) draining to the Town Center pond. Then show the connection from the Town Center pond to the Phase i D pond. Add a detail for the Town Center pond and give me some volumes in the calculations. The new project boundary acreage will be the previously submitted boundary acreage plus the area of the Town Center pond and the area where the storm pipes are that drain to this pond. All additional acreage draining to the Town Center pond will be off -site drainage, included in the drainage area, but excluded from the project boundary area. Laurie Wendy Haustveit wrote: Laurie, I included revised sheets G-102, CG-123, CG-124 & CG-210 separately from the construction plans sent. These sheets show how we will connect to the outlet pipe from the Town Center Pond and route it to the Phase ID pond. The stormdrain pipe that routes the water from Jabour and Gerst Courts is an existing pipe that begins at existing inlets in Jabour runs south down W. Peleliu, then west down Inchon St. and then South to the Town Center Pond. (The only new construction on this pipe network in Phase II is to replace the existing two inlets at the intersection of Jabour with new inlets.) Another pipe then carries the water from the Town Center Pond to a location south of Tarawa Blvd. where the pipe terminates. This is the pipe we connect to and route to the Phase ID Pond. Because the majority of the contributing area to the Town Center Pond is in Phase III, we will analyze the stormdrain network from Jabour Court to the Phase ID Pond in Phase III and upgrade it as necessary. I did a preliminary analysis to determine the 48" pipe size used to route the water to the Phase ID Pond. I can tell you that. in Phase III we are reducing the drainage area that currently drains to the Town Center Pond and routing down W. Peleliu Dr. directly into the Phase ID Pond. Preliminary analysis of the Phase ID Pond with the Phase III improvements results in: Total area: 175.2 Acres, Impervious area: 58.3 Acres, % Impervious: 39%. Compared with the original Permit: Total area: 173.82 Acres, Impervious area: 74.74 Acres, $ Impervious: 43%. of4 5/3/2004 7:17 AM RE: Camp Lejeune Phase 11 - Housing Replacement - Additional C... HUNT has a survey crew out today picking up additional data for the pond. I should have it this afternoon and will send it to you. Wendy Haustveit RiveRidge Engineering Company 405 W. Myrtle St. Boise, Idaho 83702 Phone:(208) 344-1180 Fax: (208) 344-1182 -----Original Message ----- From: Laurie Munn (mailto:Laurie.Munn@ncmail.net] Sent: Thursday, April 29, 2004 6:39 AM To: whaustveit@rvrdg.com Subject: Re: Camp Lejeune Phase IT - Housing Replacement - Additional Comments Hey Wendy I tried leaving a voicemail, but it didn't seem to go through. So, I will call you when I get back in today. This design will work, I just want to get a revised boundary that shows the Town Center Pond within the project boundary (so will will have some control over it - making sure they don't remove that pond before the area is rerouted) and the information showing how the new impervious surfaces drain to that pond. Everything that is existing and running to that pond will be considered off -site and does not need to be included. All storm piping that is used to drain the new impervious area to the Town Center Pond should be included within the project boundary, and if any existing impervious area is remaining in that area, then that will be considered onsite existing. Also, please provide me with some information on the Town Center Pond and the overflow elevations. Show how it connects to the Phase I D pond. If it is already included, let me know what page it is on because I cannot locate it. This should wrap it up. Thanks. I'll talk to you this afternoon. Laurie Wendy Haustveit wrote: >Laurie, > >It's 4:00 my time and I just received this and was just walking out the >door. Hopefully these quick responses will clear things up a little. I'll >call you tomorrow around 10:45 your time. >Please see the revised page 2 of the Stormwater Management Permit >Application form and pages 1-3 of the Wet Detention Basin Supplement I sent >for answers to your questions below. >Responses: >1. Page 2 of the Stormwater Management Permit Application shows all the >required areas. For the Phase ID pond I included everything that is within >the phase II boundary in the on -site rows, and everything outside of the >phase II boundary as Off -site. Maybe that is what is confusing. Also for >the Phase ID pond please see Exhibit SD-2 in the Stormdrainage System >Report. This shows two areas that will reach the Phase ID Pond. The first >is the area in "red" title Area to Phase ID Pond and the other is the area >in "yellow" labeled Area to Town Center Pond & Routed to Phase ID Pond. I >routed the overflow pipe from the Town Center Pond to the Phase ID Pond. So >both of these areas will now make it to the Phase ID Pond where the water >will be cleaned up. 2 of4 5/3/2004 7:17 AM RE: Camp Lejeune Phase II - Housing Replacement - Additional C... >2. The increase in built -upon area for Phase ID Pond is due to routing the >Town Center Pond to the Phase ID Pond. The in built -upon area for the Phase >II Pond is because we directed all of the rear half of the buildings and >portions of the yards to the pond. > >3 & 4. The impervious areas are stated on page IT of the Stormwater >Management Permit Application form. > >Wendy Haustveit >RiveRidge Engineering Company >405 W. Myrtle St. >Boise, Idaho 83702 >Phone:(208) 344-1180 >Fax: (208) 344-1182 >----- Original Message ----- >From: Laurie Munn [mailto:Laurie.Munn@ncmail.net] >Sent: Wednesday, April 28, 2004 9:45 AM >To: Wendy Haustveit >Subject: Camp Lejeune Phase IT - Housing Replacement - Additonal Comments > >Hi Wendy, >I got the resubmittal from Hunt Building Co., and I have a few >additional questions. >1. Are you now incorporating all of the impervious area and drainage >area currently going to the Town Center Ponca in the Phase I D pond >drainage area? This will have to be done if you want to direct the >runoff to the Town Center pond to the Phase 1 D Pond. Also, the Town >Center Pond will need to be incorporated into the project boundary and I >will need to get some information on it. Please provide the volume of >the Town Center Pond, outlet control structure information, pond >elevations, and calculations showing that everything that drains to this >pond will make it to the Phase I D pond and drawdown within 2-5 days. >It appears that the Phase 1 D pond can handle this runoff, but I need to >make sure that the impervious area going to the Town Center pond does >not exceed the permitted amount. I would like the Town Center pond to >be in the project boundary, then the amount of remaining impervious >surfaces to be constructed detailed and the rest would be considered >off -site drainage. >2. There is an increase in built -upon area. Is this increase for the >Phase 1D pond the town center pond area? What accounts for the increase >to the Phase IT pond? > >3. Please let me know the exact amount of impervious surfaces to be >constructed for each drainage area. Then provide information on >existing impervious draining to the pond, and the amount of future, if >any, draining to each pond. > >4. On p. 2, Section III, of the application, what is the total project >area and the project built -upon area %. >Please call me to discuss once you have had a chance to look these over. >Thanks, >Laurie 7 PROJECT LIMITS EXHIBIT SD-2 (1).pdf Content -Type: application/pdf, 3 of 4 5/3/2004 7:17 AM RE: Camp Lejeune Phase 11 - Housing Replacement - Additional C,,. Content -Encoding: base64 4 of 5/3/2004 7:17 AM 0 0 (n Q u aH.I.WIIh: AUVONnos invo dd f j �'• I iN3W30tlld3li °JNISf10H 113SVHd - 37tlHH31 tlMtliltll 1 1 ` '7N'3M3r3l dWV'J 36V9 Ydtl0]3NItlVN ` 9 nolswa ounnir ED ❑�LJ 4 V ry s 1S �a 0 �L,7, I C. 01 i RE: Camp Lejeune Phase it - Housing Replacement - Additional C... Subject: RE: Camp Lejeune Phase H - Housing Replacement - Additional Comments From: "Wendy Haustveit" <whaustveit@rvrdg.com> Date: Thu, 29 Apr 2004 11:07.27 -0600 To: "'Laurie Munn"' <Laurie.Munn@ncmail.net> Laurie, I included revised sheets G-102, CG-123, CG-124 & CG-210 separately from the construction plans sent. These sheets show how we will connect to the outlet pipe from the Town Center Pond and route it to the Phase ID pond. The stormdrain pipe that routes the water from Jabour and Gerst Courts is an existing pipe that begins at existing inlets in Jabour runs south down W. Peleliu, then west down Inchon St. and then South to the Town Center Pond. (The only new construction on this pipe network in Phase II is to replace the existing two inlets at the intersection of Jabour with new inlets.) Another pipe then carries the water from the Town Center Pond to a location south of Tarawa Blvd. where the pipe terminates. This is the pipe we connect to and route to the Phase ID Pond. Because the majority of the contributing area to the Town Center Pond is in Phase III, we will analyze the stormdrain network from Jabour Court to the Phase ID Pond in Phase III and upgrade it as necessary. I did a preliminary analysis to determine the 48" pipe size used to route the water to the Phase ID Pond. I can tell you that in Phase III we are reducing the drainage area that currently drains to the Town Center Pond and routing down W. Peleliu Dr. directly into the Phase ID Pond. Preliminary analysis of the Phase ID Pond with the Phase III improvements results in: Total area: 175.2 Acres, Impervious area: 68.3 Acres, % Impervious: 39%. Compared with the original Permit: Total area: 173.82 Acres, Impervious area: 74.74 Acres, % Impervious: 43%. HUNT has a survey crew out today picking up additional data for the pond. I should have it this afternoon and will send it to you. Wendy Haustveit RiveRidge Engineering Company 405 W. Myrtle St. Boise, Idaho 83702 Phone:(208) 344-1180 Fax: (208) 344-1182 -----Original Message ----- From: Laurie Munn [mailto:Laurie.Munn@ncmail.net] Sent: Thursday, April 29, 2004 6:39 AM To: whaustveit@rvrdg.com Subject: Re: Camp Lejeune Phase II - Housing Replacement - Additional Comments Hey Wendy I tried leaving a voicemail, but it didn't seem to go through. So, I will call you when I get back in today. This design will work, I just want to get a revised boundary that shows the Town Center Pond within the project boundary (so will will have some control over it - making sure they don't remove that pond before the area is rerouted) and the information showing how the new impervious surfaces drain to that pond. Everything that is existing and running to that pond will be considered off -site and does not need to be included. All storm piping that is used to drain the new impervious area to the Town Center Pond should be included within the project boundary, and if any existing impervious area is remaining in that area, then that will be considered onsite existing. Also, please provide me with some information on the Town Center Pond and the overflow elevations. Show how it connects to the Phase I D pond. If it is already included, let me know what page it is on because I cannot locate it. I of 3 4/30/2004 7:34 AM v RE: Camp Lejeune Phase lI - Mousing Replacement - Additional C... This should wrap it up. Thanks. I'll talk to you this afternoon. Laurie Wendy Haustveit wrote: >Laurie, > >It's 4:00 my time and I just received this and was just walking out the >door. Hopefully these quick responses will clear things up a little. I'll >call you tomorrow around 10:45 your time. > >Please see the revised page 2 of the Stormwater Management Permit >Application form and pages 1-3 of the Wet Detention Basin Supplement I sent >for answers to your questions below. >Responses: > >1. Page 2 of the Stormwater Management Permit Application shows all the >required areas. For the Phase ID pond I included everything that is within >the phase II boundary in the on -site rows, and everything outside of the >phase II boundary as'Off-site. Maybe that is what is confusing. Also for >the Phase ID pond please see Exhibit SD-2 in the Stormdrainage System >Report. This shows two areas that will reach the Phase ID Pond. The first >is the area in "red" title Area to Phase ID Pond and the other is the area >in "yellow" labeled Area to Town Center Pond & Routed to Phase ID Pond. I >routed the overflow pipe from the Town Center Pond to the Phase ID Pond. So >both of these areas will now make it to the Phase ID Pond where the water >will be cleaned up. > >2. The increase in built -upon area for Phase ID Pond is due to routing the >Town Center Pond to the Phase ID Pond. The in built -upon area for the Phase >II Pond is because we directed all of the rear half of the buildings and >portions of the yards to the pond. > >3 & 4. The impervious areas are stated on page II of the Stormwater >Management Permit Application form. >Wendy Haustveit >RiveRidge Engineering Company >405 W. Myrtle St. >Boise, Idaho 83702 >Phone:(208) 344-1180 >Fax: (208) 344-1182 > > >-----Original Message ----- >From: Laurie Munn [mailto:Laurie.Munn@ncmail.net] >Sent: Wednesday, April 28, 2004 9:45 AM >To: Wendy Haustveit >Subject: Camp Lejeune Phase II - Housing Replacement - Additonal Comments >Hi Wendy, > >I got the resubmittal from Hunt Building Co., and I have a few >additional questions. > >1. Are you now incorporating all of the impervious area and drainage >area currently going to the Town Center Pond in the Phase I D pond >drainage area? This will have to be done if you want to direct the >runoff to the Town Center pond to the Phase 1 D Pond. Also, the Town >Center Pond will need to be incorporated into the project boundary and I >will need to get some information on it. Please provide the volume of >the Town Center Pond, outlet control structure information, pond 2 of 3 4/30/2004 7:34 AM i , . 1;w RE: Camp Lejeune Phase 11 - Housing Replacement - Additional C... >elevations, and calculations showing that everything that drains to this >pond will make it to the Phase I D pond and drawdown within 2-5 days. >It appears that the Phase 1 D pond can handle this runoff, but I need to >make sure that the impervious area going to the Town Center pond does >not exceed the permitted amount. I would like the Town Center pond to >be in the project boundary, then the amount of remaining impervious >surfaces to be constructed detailed and the rest would be considered >off -site drainage. >2. There is an increase in built -upon area. Is this increase for the >Phase 1D pond the town center pond area? What accounts for the increase >to the Phase II pond? > >3. Please let me know the exact amount of impervious surfaces to be >constructed for each drainage area. Then provide information on >existing impervious draining to the pond, and the amount of future, if >any, draining to each pond. >4. On p. 2, Section TIT of the application, what is the total project >area and the project built -upon area �. >Please call me to discuss once you have had a chance to look these over. > >Thanks, >Laurie 3 of 3 4/30/2004 7:34 AM J R$: Cani� Lejeune Phase 11 - Housing Replacement - Additional C... 1� Subject: RE: Camp Lejeune Phase 11 - Housing Replacement - Additional Comments From: "Wendy Haustveit" <whaustveit@rvrdg.com> Date: Wed, 28 Apr 2004 16:02:13 -0600 To: "'Laurie Munn"' <Laurie.Munn@ncmail.net> Laurie, It's 4:00 my time and I just received this and was just walking out the door. Hopefully these quick responses will clear things up a little. I'll call you tomorrow around 10:45 your time. Please see the revised page 2 of the Application form and pages 1-3 of the for answers to your questions below. Responses: Stormwater Management Permit Wet Detention Basin Supplement I sent 1. Page 2 of the Stormwater Management Permit Application shows all the required areas. For the Phase ID pond I included everything that is within the phase II boundary in the on -site rows, and everything outside of the phase II boundary as Off --site. Maybe that is what is confusing. Also for the Phase ID pond please see Exhibit SD-2 in the Stormdrainage system Report. This shows two areas that will reach the Phase ID Pond. The first is the area in "red" title Area to Phase ID Pond and the other is the area in "yellow" labeled Area to Town Center Pond & Routed to Phase ID Pond. I routed the overflow pipe from the Town Center Pond to the Phase ID Pond. So both of these areas will now make it to the Phase ID Pond where the water will be cleaned up. 2. The increase in built -upon area for Phase ID Pond is due to routing the Town Center Pond to the Phase ID Pond. The in built -upon area for the Phase II Pond is because we directed all of the rear half of the buildings and portions of the yards to the pond. 3 & 4. The impervious areas are stated on page II of the Stormwater Management Permit Application form. Wendy Haustveit RiveRidge Engineering Company 405 W. Myrtle St. Boise, Idaho 83702 2hone:(208) 344-1180 Fax: (208) 344-1182 -----Original Message ----- From: Laurie Munn [mailto:Laurie.Munn@ncmail.net] Sent: Wednesday, April 28, 2004 9:45 AM To: Wendy Haustveit Subject: Camp Lejeune Phase II - Housing Replacement - Additonal Comments Hi Wendy, I got the resubmittal from Hunt Building Co., and I have a few additional questions. 1. Are you now incorporating all of the impervious area and drainage area currently going to the Town Center Pond in the Phase I D pond drainage area? This will have to be done if you want to direct the runoff to the Town Center pond to the Phase 1 D Pond. Also, the Town Center Pond will need to be incorporated into the project boundary and I will need to get some information on it. Please provide the volume of the Town Center Pond, outlet control structure information, pond elevations, and calculations showing that everything that drains to this 1 of 2 4/29/2004 7.45 AM ReS: Camp Lejeune Phase ] l - Housing Replacement - Additional C... pond will make it to the Phase I D pond and drawdown within 2-5 days. It appears that the Phase 1 D pond can handle this runoff, but I need to make sure that the impervious area going to the Town Center pond does not exceed the permitted amount. I would like the Town Center pond to be in the project boundary, then the amount of remaining impervious surfaces to be constructed detailed and the rest would be considered off -site drainage. 2. There is an increase in built -upon area. Is this increase for the Phase 1D pond the town center pond area? what accounts for the increase to the Phase IF pond? 3. Please let me know the exact amount of impervious surfaces to be constructed for each drainage area. Then provide information on existing impervious draining to the pond, and the amount of future, if any, draining to each pond. 4. On p. 2, Section III of the application, what is the total project area and the project built --upon area %. Please call me to discuss once you have had a chance to look these over. Thanks, Laurie 2 of 2 4/29/2004 7:45 AM HUNT BUILDING CORMPANY, LTD. 271 'Tarawa Boulevard, Camp Lejeune, NC 28543 Tel: 910-219-4644 FAX: 910-219-4646 TRANSMITTAL TO: Laurie Munn N. Carolina Dept. of Enviornment 8. Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 ATTENTION: are the following: ❑X Attached ❑ Shop Drawings TRANSMITTAL NO. DATE: REPLY TO: PROJECT: J900891.099 26-Apr-04 o Anne Evans, Office anager 675 Military Family Housing Units Camp Le'eune, NC CONTRACT NO.: N62470-02-C-2052 HBC JOB NO.: 900891 ❑ under separate cover via: ❑ Samples ❑ Literature DESCRIPTION NO. OF COPIES OR QTY ✓ 1. Cover Letter to Laurie Munn. 2. Page 2 of the Stormwater Management Permit Application Form. 1 3. Pages 1-3 of the Wet Detention Basin Supplement. ' 4. Phase II Stormwater Drainage System Engineering Report. 5. Drawing titled Flow Path. v' 6. Basketball Court, Picnic Area, and Tot Lot detail sheets. v 7. Building footprints. Y 8. 2 sets of enlarged grading plans (3 sheets each). 9. SH, CG 123, 124, 210, G 102. b a These are transmitted as checked below: ❑ For signature and/or notary ❑X For your use ❑ As requested ❑ For review and comment Action on this submittal is required on or before: REMARKS: ❑ Approved as submitted ❑ Approved as noted ❑ Returned for correction ❑ Resubmit 0 copies in order to maintain the scheduled progress of the project. HUNT BUILDING COMPANY, LTD. (Signature) David Byrd, General Superintendent (Printed Name) pf RiveRidge Engineering Company Consulting Engineers and Planners 405 W. Myrtle St. Boise, Idaho 83702 208-323-2288 9 FAX 208-323-2399 April 23, 2003 Laurie Munn North Carolina Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SW8 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Laurie: The following is in response to your letter dated March 22, 2004 subject: Request for Additional Information. In response to item 1: I have attached 2 sets (3 pages each) of enlarged grading plans that are at a scale of I "=100'. In response to item 2: I have included details of the basketball courts and picnic areas. In response to item 3: 1 have included unit footprints. In response to item 4: we revised the grading around the buildings that did not direct the roof runoff towards the ponds, and modified the note on sheet G-102. I have included revised sheet 2 of the Stormwater Management Permit Application and 2 sets of the revised construction plans and a copy of the revised Storm Drainage System Engineering Report. In response to item 5: we revised the layout of the pond. I have included revised sheets 1-3 of the Wet Detention Basin supplement and a drawing titled "Flow Path" that shows the flow path used to calculate the width of the pond. In response to item 6: Please look at Page 2 of the Stormwater Management Permit Application. The area labeled Drainage Area I is the Phase ID Pond area and the table shows the Phase II built upon areas. The row labeled as "off -site impervious surface area" represents all areas outside of Phase II that will drain to the Phase II pond. Per your sketch, all of the area outlined was permitted during the construction of Phase I. Please see Exhibits SD-1 and SD-2 in the Storm Drainage System Engineering Report for pre - development and post -development drainage areas. i April 19, 2004 Page 2 Please note that we routed the Town Center Pond outflow pipe to the Phase ID pond. Therefore all of the Phase 11 impervious runoff will be routed either to the Phase ID Pond or the Phase II Pond and a variance will not be required. I have included revised sheets G-102, CG-123, CG-124 & CG-210 that show this pipe network. In addition we have included: Two sets of revised construction plans. Pages 1-3 of the Wet Detention Basin Supplement for Phase II Pond Page2 of the Stormwater Management Permit Application If you have any questions please call me at (208) 344-1180. Sincerely, TOOTHMAN-ORTON ENGINEERING COMPANY Wendy Haustveit, P.E. GA04015W21121WPfi1es\PHH Stormwater permit response.doc OF W A TF9 Michael F. Easley, Governor f �} William G. Ross Jr., Secretary ,� Gy North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E.,Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality FAX COVER SHEET Date: March 16, 2004 No. of Pages: 2 To: Ms. Jo Anne Evans From: Laurie Munn Company: Hunt Building Co., Ltd. Water Quality Section - Stormwater FAX #: 910-219-4646 FAX # 910-350-2004 Phone # 910-395-3900 DWQ Stormwater Project Number: SW8 010420 Modification Project Name: Tarawa Terrace Housing Replacement MESSAGE: Ms. Evans, I received your application for the Stormwater Express Program. It is necessary for you to contact us prior to the submittal of your application. You should request acceptance into the program by faxing a request for an express application to Cameron Weaver, Express Permitting Coordinator. In your fax, please include your contact information, type of BMP used, and vicinity map. You will then be contacted with a date to submit your project. I have included a copy of the Stormwater Express Timeline. It is necessary for you to submit the application through this process to avoid too many projects being submitted on the same day. Once you are accepted into the program, I will contact you with a review date. You must submit the fee and application by this date. If I do not schedule the submittals, I will receive too many applications on one day and not be able to meet my 2 day review time. I have accepted the project into the program without you going through the process described above. I have scheduled the review date for Friday, March 19, 2004. If time allows, the project will be reviewed prior to this date. For further projects, please be aware of the required submittal steps. Let me know if you have any questions. S:IWQSISTORMWATIADDI NF0120041010420MOD.mar04 N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service* Wilmington Regional Office Wilmington, NC 29405 (910) 350-2004 Fax 1 800 623-7748 NT 0 P. 1 ' h COMMUNICATION RESULT REPORT ( MAR.16.2004 12*09PM ) FILE MODE OPTION — 995 MEMORY T REASON FORERROR E-1) HANG UP OR LINE FAIL E-8) NO ANSWER ADDRESS (GROUP) -- -- 89102194646 TTI NCDENR WIRO RESULT PAGE ------------------------ OK P. 2/2 E-2) BUSY E-4) NO FACSIMILE CONNECTION O� �NAr1R Michael F. Easley, Govemor Q William G, Ross Jr.. Secretary 0 North Carolina Department of Environment and Natural Resources ?y Alan W. Klimek, P.E=„Director Division of Water Quality Caleen H. Sullins, Deputy Director Dlvlslon of Water Quality FAX COVER SHEET Date: March 16, 2004 No. of Pages: 2 To: Ms. Jo Anne Evans From: Laurie Munn Company: Hunt Building Co., Ltd. Water Quality Section - Stormwater FAX #: 910.219-4646 FAX # 910-350-2004 Phone # 910-395-3900 DWQ Stormwater Project Number: SW8 010420 Modification Project Name: Tarawa Terrace Housing Replacement MESSAGE: Ms: Evans, I received your application for the Stormwater Express Program, It is necessary for you to contact us prior to the submittal of your application, You should request acceptance into the program by faxing a request for an express application to Cameron Weaver, Express Permitting Coordinator. In your fax, please include your contact information, type of BMP used, and vicinity map. You will then be contacted with a date to submit your project. 04/14/2004 16:15 9102194646 HUNT CAMP LE=JEUNE {■ PAUt n1lai 4401 North Mena • El Paso, Texas 79902.1107 • P.O. Box 12920 • E1 Paso, Texas 7"13.0220 - 915 53a•1122 • FAX 915 545-2631 Zoo 4 NHUNT BUILDING CIONSPluN,1.M. Memorandum Date: April 14, 2004 To: North Carolina Division of Water Quality Attention: Cameron Weaver From: David Byrd, General Superintendent Subject: 675 Military Family Replacement Housing Units Camp Lejeune, North Carolina Contract No. N62470-02-R 2052 Reference: DWQ Stormwater Project Number SW8 01.0420 Modification Please accept this writing as a request for a date to resubmit the express storm water permit application for the project as referenced above. 1 may be reached a t 910-219-4644 (office) or by email @ davidb(a)huntbuildin .com if you have any questions. Thank you. cc: Rick Marshall Sr. Vicc President; Project Manager Project File Tarawa Terrace - Phase I I I Subject: Tarawa Terrace - Phase If] From: "Wendy Haustveit" <whaustveit@rvrdg.com> Date: Wed, 31 Mar 2004 09:50:28 -0700 To: "Laurie Munn" <Laurie.Munn@ncmail.net> Laurie, I have a couple of questions. • In the northwest portion of the Phase III site, the groundwater is currently 12 to 18 inches below existing ground. We are looking at two different options for collecting and disposing of the stormwater from this area. First would be filling the site and routing the stormwater to the Phase ID pond. The second is to grade the area such that the stormwater would drain to a new pond in this area. This pond would require a lift station to pump the temporary pool and any overflow water. The water would be pumped to either an existing drain ditch that runs along the north boundary line, or to a system that would carry it to the Phase ID pond. If we were to create this additional pond what would be the requirements for depth to groundwater? Could the pond be lined if we do not meet the separation requirements? When using a lift station are there different design requirements for sizing of the pond, overflow re uirements, etc.? ould it be O.K. to discharge the overflow into the drain ditch?P9'yl�� mwwyo • If we could prove that the new built upon area in Phase II that drains to the Town Center pond does not exceed the current built upon area could that be a temporary solution for not permitting the Town Center Pond in Phase II? If the above option does not work, could we remove the Phase II area that will drain to the Town Center Pond as shown on Exhibit SD-2, and include it in the Phase III stormwater permit? We will be submitting for the Phase III permit within the next couple of months. if we include this area in the PH III permit, would we be able to build these improvements prior to the approval of the PH III permit? Any information you can provide me is appreciated, for some reason I cannot view the administrative codes over the internet and I only have hard copies of portions of the stormwater section. Thanks - Wendy I of 1 411 /2004 7:24 AM O� NJ A 7-E9 Michael F. Easley, Governor Q William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E.,Director 0 .r Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality FAX COVER SHEET Date: March 29, 2004 No. of Pages: 1 To: Wendy Haustveit From: Laurie Munn Company: RiverRidge Water Quality Section - Stormwater FAX #: 208-344-1182 FAX # 910-350-2004 .Phone # 910-395-3900 DWQ Stormwater Project Number: SW8 010420 Modification Project Name: Tarawa Terrace Housing Replacement MESSAGE: Wendy, I received your request for an extension for resubmittal of the above project. The extension is granted. The remaining drainage issues to be addressed are directing the roof drainage to the pond or providing additional treatment for this area and providing treatment for the area currently proposed to be directed to the Town Center Pond. As I mentioned in our phone conversation last week, the Town Center Pond is not a permitted stormwater pond. This area must be directed to a permitted system. Please feel free to contact me if you have any questions. S:\WQS\STORMWAT\ADDINFO\2004\ 010420MOD. mar04 Cc: Rick Marshall 915-545-2631 N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 MCDEMR Camp Lejeune Subject: Camp Lejeune From: "Wendy Haustveit" <whaustveit@rvrdg.eom> Date: Thu, 25 Mar 2004 13:02:11 -0700 To: laurie.munn@ncmail.net CC: dpowell@rvrdg.com Laurie, Per the message I left you yesterday, I would like to talk to you about alternate treatment for the roof -runoff that currently is not directed to the storm drain system. Attached please find two pdf drawings. The buildings that are "clouded" are the buildings we are having grading problems with. The existing perimeter roadways are remaining in place and will be resurfaced. In addition the curb, gutter and sidewalk will be replaced. The maximum design driveway grade is 12%. Currently all adjoining units in the multi -family buildings share a common finished floor elevation. Due to the length of the 4-plexes, usually the downhill unit will have a 12% driveway grade and the uphill will have a 2% driveway grade. The 4-plex buildings have roof drains at each corner of the building and two more near the center of the building. Most of the "problem" buildings line E. Peleliu Dr., which is an existing roadway. These buildings are replacing buildings that were just recently removed. The yards directly behind the buildings slope at approximately a 3:1 down to a marshy area and are currently only 10 feet deep. Inmost cases the current design represents approximately 10' of grassed yard and 65' or more of wooded area that would treat the runoff prior to it discharging into the marshy area. I will call you to discuss options. Thanks for your help in this matter. Sincerely, Wendy Haustveit, P.E. RiveRidge Engineering Co. Boise, ID 83702 PH: (208) 344-1180 Fax: (208) 344-1182 ........................ ............. ..... ...... .... ......._-.............._.._-.--__.- -._... -------------------------- - _— _ m—._—_ _��— GRADING TO MUNN LAYOUT 1pdf Content -Type: applicationlpdf Content Encoding: base64 -------------------.. --... - - ---- ------------ - --- -- - - - - -- ----------- -- df GRADING TO MUNN-LAYOUT 2.pdf Content -Type: application/p Content-Encoding: base64 l of 1 3/26/2004 1:45 PM RE:, Camp Lejeune Subject: RE: Camp Lejeune From: "Wendy Haustveit" <whaustveit@rvrdg.com> Date: Fri, 26 Mar 2004 10:29:17 -0700 To: "'Laurie Munn"' <Laurie.Munn@ncmail.net> Laurie, Please look at the attached drawing. I'd like to talk to you about permitting the area shown as a low density area. The overall drainage area shown is approximately 24.9 Acres and the built upon area is only 0.7 acres. This is a density of 3%. These are the roofs that currently do not make it to the storm drain system. If it is determined we can permit this area as a low density area, I would like to do the same for the few houses on Arsenault and Evans Courts, where the roofs currently do not make it into the storm drain system. Thanks - Wendy From: Laurie Munn [mailto:Laurie.Munn@ncmail.net] Sent: Friday, March 26, 2004 5:51 AM To: whaustveit@rvrdg.com Subject: Re: Camp Lejeune Wendy, The definitition of SA waters is : waters suitable for commercial shellfishing and all other tidal saltwater uses. Projects draining to these waters are more protected. The Camp Lejeune project does not drain to SA waters. 1 have included a link to the definition of the water classes. http-Hh2o,enr.state.iic.us/adm1n/rules/rbO4Ol 03.df I will get back to you today about the drawings you attached with your email. Laurie Wendy Haustveit wrote: Laurie, Per the message I left you yesterday, I would like to talk to you about alternate treatment for the roof -runoff that currently is not directed to the storm drain system. Attached please find two pdf drawings. The buildings that are "clouded" are the buildings we are having grading problems with. The existing perimeter roadways are remaining in place and will be resurfaced. In addition the curb, gutter and sidewalk will be replaced. The maximum design driveway grade is 12%. Currently all adjoining units in the multi -family buildings share a common finished floor elevation. Due to the length of the 4-plexes, usually the downhill unit will have a 12% driveway grade and the uphill will have a 2% driveway grade. The 4-plex buildings have roof drains at each corner of the building and two more near the center of the building. Most of the "problem" buildings line E. Peleliu Dr., which is an existing roadway. These buildings are replacing buildings that were just recently removed. The yards directly behind the buildings slope at approximately a 3:1 down to a marshy area and are currently only 10 feet deep. In most cases the current design represents approximately 10' of grassed yard and 65' or more of wooded area that would treat the runoff prior to it discharging into the marshy area. 1 of 3/26/2004 1:45 PM RE! Camp Lejeune I will call you to discuss options. Thanks for your help in this matter. Sincerely, Wendy Haustveit, P.E. RiveRidge Engineering Co. Boise, ID 83702 PH: (208) 344-1180 Fax: (208) 344-1182 ......... . . .. .. .. . . 1 Content -Type: application/pdf [GRADING TO MUNN-LAYOUT 3.pdf j 1 Content -Encoding: base64 2 of 2 3/26/2004 3 :45 PM O� IN A rr--9 Michael F. Easley, Governor O� pG William G. Ross Jr., Secretary - 9 North Carolina Department of Environment and Natural Resources r ? Alan W. Klimek, P.E.,Director 0 Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality March 22, 2004 Commander Ben Pina Camp Lejeune Marine Corp Base 1005 Michael Road Camp Lejeune, NC 28547-2521 Subject: REQUEST FOR ADDITIONAL INFORNIATION Stormwater Project No. SW8 010420 Modification Tarawa Terrace Housing Replacement Onslow County Dear Commander Pina: The Wilmington Regional Office received a Stormwater Management Permit Application for Tarawa Terrace Housing Replacement on March 15, 2004. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stortnwater review: The site plan and grading plan are currently shown on 23 separate -sheets. Please provide a drawing with the overall site plan and- grading plan. If this area is too large to be shown on 1 sheet, you may show it over more sheets, but the submitted plans should be at least 24" x 30". There may be additional comments upon review of the overall plans. 2. Please dimension the basketball courts and picnic areas. All impervious surfaces on site must be dimensioned. Please provide a unit footprint for the housing units. Also, please dimension the interior sidewalks. 4. Sheet G-102 of the plans states that all roof drainage should be directed towards the pond, except for buildings located on the perimeter of the phase boundary. All roof drainage on the project must enter the pond. Also, all impervious areas must enter the forebay first. It appears that units 4038 -- 4041 may drain directly into the main pond area. Please provide a 3:1 L: W flow path ratio in the pond. o 6. Please provide a breakdown of the built -upon area currently permitted to Phase ID Pond and the additional built -upon area to be taken to that pond. I have included a sketch of the information that I need. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to March 27, 2004, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 NDENR ..ti, ;�O Commander Ben Pina Page 2 March 22, 2004 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, ,'_0 , Laurie Munn Environmental Engineer RSS/:Ism S:IWQSISTORNIWAT\ADDINT- 0\2004\010420MOD-Mar04.doc cc: Laurie Munn Wendy Haustveit Enclosure ADD' ED ;{ �r� /�' /� \\,i` � � � `•� \IBC r: i.p ✓may :., ,� � �--� ' 67 , _a��'�,b,a, i Lf^] ��l O / \\i� f%�`�� SS`� � + �� ^p;��i� lw-�--� i •,�i `� Z ���7•� � 9�1i � ��� Y � � Lai - ell � �"' � Jy/..• �. 'bpi � 41,, -ram � D ;✓� ��„ � �� 47' 1� c � D �1 `•: �, i / ; (�P /�/a�'�� � O UU �• o (LLZ c: J -79 L.19 D L-17 L•sa v ✓ L y L mu r HUNT TRANSMITTAL NO.: BUILDING COMPANY, LTD. DATE: 271 Tarawa Boulevard, Camp Lejeune, NC 28543 REPLY TO: Tel: 910-219-4644 FAX: 910-219-4646 PROJECT: TRANSMITTAL TO: North Carolina Department of Environment & Natural Resources Division of Water Quality CONTRACT NO.: 127 Cardinal Drive Extension HBC JOB NO.: Wilmington, NC 28405 ATTENTION: Laurie Munn are the following:[!] Attached Shop Drawings Under separate cover via: Samples n Literature J900891.073 15-Mar-04 o Anne Evans, Office Manager 317 Family Housing Units Camp Lejeune, NC N62470-02-C-2052 900891 VIA: Hand delivered DESCRIPTION NO. OF COPIES OR QTY Letter dated March 9, 2004 to Laurie Munn from Wendv Haustveit of Toothman-Orton Enqineerinq 2 1 Original Stormwater Permit Application Form and one copy 2 1 Original Wet Dention Basin Supplement and one copy 2 22" X 34" color copies of the Wetlands Exhibit 2 Tarawa Terrace Phase II, Housing Replacement Construction Plans (with revisions to Arsenault and Evi 2 Courts incorporated) Tarawa Terrace Phase II, Housing Replacement Specifications 2 Phase II Stormwater Drainage System Engineering Report (with revisions to Arsenault and Evans Court 2 incorporated) Drawing titled Project Boundary 2 Check number 40040554 in the amount of $4,000.00 1 These are transmitted as checked below: For signature and/or notary QX For your use As requested �] For review and comment REMARKS: Approved as submitted Approved as noted Returned for correction Resubmit 0 copies T BUILDING COMPANY (Signature) Jo Anne Evans, Office Manager (Printed Name) yE�r� fife fyv• ,� !a .CD si'C). ly f ,o o �r `!3"�`�y!� �^ 1 v OS•� O 7�' 3a R#F'iF y.���'''''W C 3 rf t9 1y � f •�k`1Y�''�afi,��y'+t1f�j 1r HY" 'tJ !t%.1'ix I Y '+•.,:�U+ r`'RSF4JiV fix$ �Y �'„f,;s '3f p eraa iS4r � I . � � s J�. r• " rtr i .� �.:�fa� 1a 4V Aw 1 'Fi.r 'itl •�' s �Y; ��Gf �t Y'- It3'''-T,+�t4 s�' g�•��yy t i{, �I ' � at Il_� �y�°+'� jr�•Ci2'�3 'S��4t: �� br1i1XF'i} e� x ail �.�,•1rri �. J%l ��,":A'�{� Gy lE pit. w�4 V rr ryYJ J+iS' �x4 YA f r14A•!G Q 2 �s"•w aa•J�`1 47 1f fJj -�r �i et il,'', me.UA eo- Ii'(rrA 6jn X ji kl q y,,•� '1 j y� ^l f I r d0 f t •:1 :�;•ay.t'l. Y,'x.M-..^z?riTk ,rY.edJ.,.eti" s r `ice �; _-J�yI�a Mt LU V ? `kX.�My�4lY` �Y a'J {g5 �2f 11'{4ki.'ixc,Cn •i-�3�r 'J :a0 m' 5 } y J '�'"• f 1• Y •5 } g � >�•Itb j I¢ Air -Jf �t• f,.(�e, ��11ti �- }+���[}/'i:; 7�•Ar�4t��'� I • rIA �. �f i �[�•1 �i��! ",�C ✓<q - 1yA. +.•4� fl ".1 .;.i ��iY 'f�1�1�"Y74• ����e.9rF� i'Jl �i tf 3 j i • nt+ } �� � xZI�.✓ �I � ��jjj �•i y3�s" '#[ � c,ese�a:cnFl�r�c�enss�s5'�erses9'on ua3iad':,• n a 4 FN � 0� J r f j �I Nr � O ; o TOOTHMAN-ORTON ENGINEERING COMPANY CONSU)JING ENGINEERS, SURVEYORS AND PLANNERS 9777 CHINDEN BOULEVARD BOISE, IDAHO 83714-2008 208-323-2288 • FAX 208-323-2399 March 9, 2003 Laurie Munn North Carolina Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SW8 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Laurie: The purpose of this letter is to inform you that revisions have been made to the permitted area referenced above. A portion of the area permitted is currently in the design/build phase for redevelopment under the project name `'Tarawa 'Terrace - Phase II Housing Replacement." The Phase II modifications to the existing permit include the following: 1.) The drainage area to the Phase 1D has been modified to show the actual area that will drain to the Phase ID pond. I have included a drawing titled "Post Development Drainage Areas - Exhibit 2" that shows the drainage areas contributing to the Phase 1D pond for the Phase II design. Please notice that a portion of the area under the current permit actually drains to an existing detention pond on the west edge of the project, refered to as the "Existing Town Center Pond". 2.) A second pond, refered to as the Phase 11 Pond, was added in the northeast portion of the site. Please find the attached information for your review: 1. Stormwater Management Permit Application Form 2. Wet Detention Basin Supplement 3. 2 — Tarawa Terrace Phase 11, Housing Replacement Construction Plans 4. 2 - Tarawa Terrace Phase II, Housing Replacement Specifications 5. 2 - Phase II Stormwater Drainage System Engineering Report 6. 2 — Drawing titled Project Boundary 7. 2 -- 22" x 34" color copies of the Wetlands Exhibit BOISE • COEUR d'ALENE March 9, 2004 Page 2 I have included the revised Stormwater Management Permit Application form, and all data required on page 4, and the Wet Detention Basin Supplement for the Phase II pond. All stormwater descriptions and calculations are included in the document titled Storm Draina+(e System_ Engineering Report For "Tarawa Terrace Housing Development, Phase 11. In addition I have enclosed two copies of a drawing that shows the wetland limits near the Phase II pond. This drawing was overlaid onto the construction plans and used to show the limits of the wetlands around the Phase II pond. All other construction areas are outside the limits of the wetlands, as noted on sheet G- 102. As discussed on the phone, "Tarawa Terrace - Phase III Housing Replacement" is also in the design phase and we will soon be submitting a Stormwater Management Permit Application, and accompanying data for Phase III. I have enclosed a drawing titled PH. Ill POST -DEVELOPMENT DRAINAGE AREAS, EXHIBIT SD-2B. This drawing shows the proposed Phase III post -development drainage areas that will drain to the Phase 1D pond, to the existing "Town Center Pond" and another proposed pond south of the intersection of Bougainville and Tarawa Blvd. `Fite drawing also shows the phase boundaries for Phase III. However, due to ongoing discussions with the military and HUNT Building Corp., who is the design/build Contractor, it is possible that the Phase 111 boundary may be revised. If you have any questions please call me at (208) 323-2288. After March 12, 2004 1 will be employed with RiveRidge Engineering Co. and can be reached at (208) 344-1 180. Sincerely, TOOTHMAN-ORTON ENGINEERING COMPANY Wendy Haustveit, P.E. I1V21 121WPfiles\PH11 Revisions 5lormwater letter.dm BOISE • COEUR TALENE 11.0018 - SNVId 311SOdWOO 1N3W30V'IdSH ONISEIOH III v 11 S3SVHd - 30tl81:131 vmvuvi } �•U~ahy Yfe !! p y� ' •J'N'3Nfl3T dWtlJ SSY■ SdHOJ 3NItltlW NOISdua OUNvuv U z c .s,s z y W � a tm c N Ul O N� ash o 0 g Q j --tea . �i U U RUN ° innynn } 4 g C 333 cc O ` $ O LL J 91 cFr DC cli c'fl • s r- w ■_— uu�mm� oP r'+'r=► ��; ti \■... nununnn 0 U O] C L 3dAl'oais - SNVId 311SOdWOO a Ig 1N3W30V1d3H ONisnoH W + 't Po i�i11 III 111S3SVHd-30Vad31VMVWVl 00�^„ �Co I J � � � � 'O'N `dNll3fi'IdWY.1 36tlB 6dtl073NItltlW a ' � �+ry � Z U m LO C Fcc _0 4� 33 a. � 0 N q O � v Li �5 ��� WW �� @ FFo �¢¢ e-{ 3 u"i R m Z 3$0 ;3�i � J Q o .0�44 a o� 9 z v a zr t9 N i cc y - O a w r M O e 6 N o C htd e�, r r1 �� 14111111111� ��+ I^�All, m U In e E tl t E UAl'JOIB - SNVId 311SOdWOO Zq 1N3W30`dld3tl'JNISf10H �� III v11S3SVHd-33VUU31VMVHVI t ' dWrp i8r9 taNOp 3NINVW Z NOISWO OUNVUV m I t tl i i 4 O cc c� ¢ z m 'g y - r cC CC o �< a o Y cc d3 rn� - Z rn q ENoli N 5 2 N $ U 0. IL cc ha 10 Z w - m W W r r 0. ----------- cc ul - - CL CL O . - 04 W W W C--_--___ ___ ___ i oil C - �1I p - '�+ • pAE N m sz Q N Y a � 0 Y O J n n m e y o 1 1 v 3dAlSNVId 311SOdWO3 f I LN3Wg3Vld3H DNisnOH Ow 0 III'811 S3SVHd - 33Vaa31 VMVHV.L yob I I N'RNnamdwvo BGVQ SdMOO7N111" a d ! !+pQ yW�fIJ=Ifl NOISING OI1NY'LLY ,p,�„a, i 3 e i � �9 i� �o Y LL LO Ccc IF N Sgga d jy/ t p¢, 0. §� al 7- z d g N �§ • t HEQ��� N 2 $ J pa a g 0 VI F ;�0 ��iY7 nnmlai'1"l� 0 nnulnum o 11 �►. iE� c '���_� IU1111111111',IO i r.■.v.■ 111111111111 �l •s� IM 11��1°�a"' ]Pin idIIIIiniiY'i �MICi a C m a 9 3dA1'OO'19 • SNVId 311SOdWO3 9 A 1N3W3OVld3H'JNIsnoH III V 11 S3SVHd • 33VEIH31 VMVHVI 'O'N `dN arm dwvo VSV9 SdWOO Ml..w 1 m 1 1 I� I! I �.,�...... :osino lwvuvsLU v as I i! a LO El a �a a IM 0 � N L;MI Q __ o ¢ Z a W. 5. o m a I II Cv7 s C r- I� �:` V uC:_C."�a imunnma nnnunnr l k1; .��IE.I , LJ. - u�w 0 LL a od Q m V r a 0 m 1 4 L3dA1''JOl9 SNtf1d 311SOdW00 i8 `a 1N3W30V1d3tl ONISf10H � � � III'8 II S3SVHd - 30VUH31 VMdtltll 1 a i �' Q �� VNswum dwva _ ' Gera sda0.'1 aNLUV C tl O oNewa auHvuv �. m I i e ! 6i I I AR 0 z 9cc y 5 g 1 g .9-,9 F- '° o El LU 0 Cc CO Z$ Z RC � �z � 3s� tSLD a. d T �;FjN s U_ Fag ga mO � z K g g3E02 gui33�� �1? z IL 0 :1N C��iii 1111111111111.0 J�-':r' IIWL�111114 .■ nnununn IRJi iril`113f�10 Ss � I ® anN.un.nnnununnnrr s:::+:::� Iral� ' IG: 441, _ I• - � �wnmenRRTrn 1111Girrl c v m a 3d,U'DOl9 - SNVld 311SOdWOO 1N3WEIDYM H ONIS(IOH III v 11 S3SVHd - BOVUH31 vmvuvi a � •rw'awmmdwvo asyssdUOOawiwvw a a s {R'+�a O NOisuia oiuNvuv U 7 Icc- o U �{ y� 2 Y m O , } Y qa �d0LLI gg y a �S 9 z ad W Zy a� a 4n LLI d L 4 v a U) Z c gff� io 8� FFFg b 3 2 ��i o U U aiO�i Qg'S�o oA4�o 1 7j µ! Z 2 v/ Z v 'a M r��'.�1 O ' •iiiiiiiiiiii••'I a�•1 a�11- ui ...,,... . nowo.m;uoiiu\\Gi'�! Cl) r 0 1 U I m 4 0 U m e 7 rip :::: nunluull. ir�.c: numumu �FG oil li� �: ilo == llllllillllll' 1 O 01 L� �' id O sl 6 UAL SNvld 311SOdWOO im i I I 1N3MOV IdMf ONisnoH I VHd - 33VUH 9 III'8 11 S3S31 vmvuvl f •'J•N'aNnarn awva asve sauna aN�uvw a ! a ! n ! . Q z i� NOISING� O�vue I 7 b � F- 0 Qz U @ G o m o e 0 CL K .9-a L N ❑ a Q1 LLJ H 9 c� o z OV a 2 U w � U o- 99 m� a a O 9 LL 2 W J ■© EM .0 0 U 0o Q I 1 1 OL 3dA1VO 18 SNVId 311SOdW00 a I� LN3W30V 7d3H tJNIS(lOH � is III B II S3SVHd' 30VUU31 VMVdVl B o a ° 36Y38dtl0'J 3NItlYW i / !i Q Z NOISIAIO 711Ntllltl i l P. 4 0 U 7 u O: >� z 0 g IYesQ a $ o Y o EL Z � NO W rn c -lu 'a w a 33 w W m $ U O e g�ss� 8 mm v c V) N O O IIIIIIIIIIIItl li3 1wil"Mc Flu : --rI i 111111111111! N1111111116.� . '��� oll �I© E U m Q n () to C IIUAL DaI9 - SNV1d 311SOdWOO 9 �� }t € I I 1N3MOV1dU ONisnOH F r ax Ill v II S3SVHd 33VUU31 VMVHVI t � o � ; ° 'o•x'narat ive awvo rsanw oo anvw o - 1 w Q ZO Noislnia Oru+vuv I 1rc r U rc sss222 i $a o z gg Z aj m a o gg �, > cc a� sF. �a F gM820 0 H �W ° IL ul O 2 ■ < °C U w Z (7 �g�y�Ej 'a g�}q�{o��y1 ,(��5y ���y �1}.� N GG�77EEH 75FFF3OPi3UUNHH (N g " .99 c = m v/ in .o rr a Q f II I© 6 . Q Fob, Alm� IIIIItl11111D ��� I�numnulrl m.. =r�=rtli_r� � ■r, o i■Irr..G 1\\ _ IIIIIIIIIIIID � o mill, - o li i1L L r. IM IIQ■ ro Q U 3dA1'9OIS - SNV'ld 311SOdWOO 9 r 9Q r 9� I 1 1 1NEIMOVld31:1 DNisnOH III V 11 S3SVHd • 33VHH91 VMtlFltll T T '�'N']N1]BidWtl� ]eve BdNO�]NIBtlW a a<� Q 2 .....Ala OILNeUe 1 °s a 9 1 i c a r V C u 0 z w a LLI a .! — z o E- 9 I U o 0 N 9� mm UM 31 o nnnnnn '11111111It11N ,I O �I�� I! iv In ..I ., I m I Q U m I Q SNOISIA38 ®� SllV130 / SNVld NOI1V3LJOBLl me ,aawmmrc 'ON 1N3W30Vid321 10V2J 31 '3Nn3f3l dKY3 SNisnOH VMVbVl 3SV0 SdHOO 3NIMYw — :�6 — SYi1TYY lENOw s 7 oo °jy fie° p p n xoussmn xrvwr NOISWO OIINYLLV o N a O r zz N d RS q O I -o—i► I Q H p \— O LLI — A —£' o G dA1 F p .o-a> � � 4 0. a u e ry0 W ❑ �� /A �FC/y'7 > d6O4 Salmi � y W1. C) ° N y a a V maa PW O i a Ni o Po � I 1 z F F1.4az�' F F < C ZOY� 'E�C \i y W PO — •' Ci .� ° W 3h H H o z I Hill.,' m $ ' a s.aanlOv3nNvw — z z o — w m vn u h gg dgg33� — a 'ulwNlw u o[30 "� i -3 �C'x az� is •E w w ":W p*R F" CC :8 r z m Sm $ d `�.I _ -- z mo� -_zo gC 1p _.3 �;::._ �':...- -.5 O0 -°o Fp7 - m —Z uo3 e s .v�ea F,. .aI �Zu , s v 9 e 4 o- t SlIV130 / SNVld N0I1V3803H d 1N3W30V1d3H EJNisnOH III 18 II S3SVHd - 30VHH31 VMVHVl c '0'N'3NN3M3l dWtl0 3SVS Sdtl003NIU NOISIAIO OI1Ntl UV z g � s I 894 1 N M = y w w LLI c� N Q m N w u1 c° �2No v; m i= 33° yNo ziz Eg o$ _ H �oE•' o .. �gIi i�5�'0 LL 5h C y W11,1Z a a M O V J J Q m � F' w w Yj CA ma n o r g � I— is, OR aQ U J m I w o w M Or N a T z No o zaoNw�� o m 0� �=�0�Sao �m�" ��< "ay �. $� 90, �< LL �oo� = ogp°° ¢$- w - �� ON g o �� yy iS m_w — Zla _ ma a w� P r Y N Q m SNOIIVON311W0O38 S3UrLOV3fWVW J r 4'a 0 G Z 2 LLI N ~ 1 7 J 1 U 0 U O M m 0 Z U 3 0 l/Q/ l MC MI IC