Loading...
HomeMy WebLinkAboutSW8010420_HISTORICAL FILE_20040315STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 o I o 4 -2-D DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 bc>#e-515 YYYYMMDD RE: Tarawa Terrace I - Stormwater Management Permit I } Subject: RE: Tarawa Terrace I - Stormwater Management Permit Farom: "Dean Briggs" <deanb briggs-engineering.com> �..;, Date: Tue, 25 May 2004 08.53:19 -0600 To: "'Linda Lewis <Li nda.Lewis@ncmai 1. net>, "'Dean Briggs"' <dcanb@briggs-engineering.com> `w CC: "'Sholar GS14 Anthony"' <Sho1arAG@1ejeune.usmc.m11> Linda: I was reminded by McKenney today that I still owed z you a response to an email you sent in November of 2003. I thought we had handled that issue, however apparently not. I am sorry if this has caused any confusion. Attached is the modified sheet one of the 'Wet Detention Basin Supplement' form for phase 10 of the Lejeune project we designed. Please include this in the permit package as it reflects the modifications you requested below. If there is anything further we can do for you on this project, please let me know. Thank You, Dean Briggs BRIGGS ENGINEERING. Inc. 1800 West Overland Road Boise, Idaho 83705 (208) 344-9700 Cell 871-0200 FAX 345-2950 deanb@briggs-engineering.com www.briggs-engineering.com -----Original Message ----- From: Linda Lewis [mailto:Linda. Lewis@ncmail.net) Sent: Monday, November 24, 2003 7:43 AM To: Dean Briggs Cc: Sholar GS14 Anthony Subject: Tarawa Terrace Dear Dean and Tony: I received the revised calculations and page I of the supplement form on November 18. Unfortunately, the supplement form is an old one and has an incorrect temporary pool elevation and temporary pool volume. Please correct the supplement to reflect the permitted temporary pool elevation of 6.4, and the temporary pool volume of 277,930 cubic feet, and return it. Thanks, Linda Content -Type: application/pdf Permit Submittal.11-2003.1.pdf Content -Encoding: base64 . 1 of 1 5/25/2004 11:39 AM Tarawa Terrace i Subject: Tarawa Terrace From: Linda Lewis <Linda.Lewis@ncmail.net> Date: Mon, 24 Nov 2003 09:42:51 -0500 To: Dean Briggs <deanb@briggs-engineering.com> CC: Sholar GS14 Anthony <SholarAG@lejeune.usmc.mil> Dear Dean and Tony: Y received the revised calculations and page 1 of the supplement form on November 18. Unfortunately, the supplement form is an old one and has an incorrect temporary pool elevation and temporary pool volume. Please correct the supplement to reflect the permitted temporary pool elevation of 6.4, and the temporary pool volume of 277,930 cubic feet, and return it. Thanks, Linda 1 of 1 11/24/2003 9:43 AM Permit No. _� 00 ¢Zo State of North Carolina Department of Envirurtrrrent and Natural Resources Division of Water Quality S'l0KrvIWA'TER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPP(.'.F.MENT "llrts ibrm may be photocopied lbi• use as an urgklaI QKQ Stormwater Management Plan Review: A conipleLe stonnwuler managerneot plait submiltal includes an application form, a wet detentionbasin supplement for each basin,, design calculations, and plans and specifications shoving all basin and outlet structure details. 1. PROJECT INFORMATION Project Name CAKP %F_.TP;C KE PHASE 1 D POND t_"ontkt Person: DEAN BRIGGS Nbont; Nilmbt:r: 2f 08 ) 344-9700 For projects with inultiple basins, specify which basin this workshcet applies, to: i D elevations H IS'1il Rultuni Elevatiun I}., 0.._. Pernmnent Pool Elevation 5.0 ft. Temporary, Pool Elevation R. arRas Permanent Pool Surface Area l'£3t;', s7o sq. Ft. Drainage Area 173.82 ac. Impervious Area 74.74 ac. (floor of lilt: basin) (elevation of the orifice) (elevarion of the dikhar•de structure ovetflow) (water surface area at the orijice elevation) (on -site and off -.sire drainage to the basin) (on-sWe and ojj-site drainage to the basin) vrrlumr:.e Permanent Pool Volume 757.358 _ cu. ft. (conr8ined. volunre of main basin andfotehay) Temporary Pool Volume 2.35, 969 cu. ft. (volume detained above the permanent pool) l=orcbav Volume 149,854 cu. ft. (approximatel)120% of total volume.) 01her ptrrurne lers SAIDAI Diameter of Orifice Design Rainfall Design TSS Removal 2 2, 01 2 Z _5..- in. 1.0 in. 86.3 (surface area to drainage area ratio fr•am DWQ tahle) (2 to S daY temporary pool draly-down required) (minimum 8 r' required) t'OM SWU-102 Rev 3.99 Pnge t of 4 State Stormwater Management Systems Permit No. SW8 010420 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: Tarawa Terrace I Housing (N62470-97-C-7111) Permit Number: SW8 010420 Modification Location: Onslow County Applicant: Commander B.D. Pina Public Works Officer Mailing Address: Marine Corps Base 1005 Michael Road Camp Lejeune, NC 28547-2521 Application Date: August 18, 2002 Modified November 18, 2003 Name of Receiving Stream/: White Oak 1 Northeast Creek Index Number: 19-16-(3.5) Classification of Water Body: "SC HQW NSW" Pond Number: 1A D Drainage Area, acres: 16.08 173.82 Offsite Area entering Ponds, ft2: none, per Engineer, both ponds Total Impervious Surfaces, ft2: 304,048 3,255,674 Pond Design Depth, feet: 5 5 Permanent Pool (PP) Elevation, FMSL: 20 5 Provided Surface Area, @PP, ft2: 26,882 186,870 Provided Storage Volume, W: 28,704 277,930 Temporary Storage Elevation, FMSL: 21 6.4 Controlling Orifice: 2.5" (D pipe 2 @5" 0 pipes Time to draw down, days: 2.7 3.1 3of7 i ► Permit No. State of North Carolina Department of Environment and Natural Resources Division of Water Quality vc18.c w400 Mai). (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may he photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: G�F LEJELNE PH%M I F= Contact Person: EEAV HUQM Phone Number: L( 08 For projects with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation 0'� ft. (floor of the basin) Permanent Pool Elevation 5.0 ft. (elevation of the orifice) Temporary Pool Elevation 6.4 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 186,870 sq. ft. (water surface area at the orifice elevation) Drainage Area 173.82 ac. (on -site and off -site drainage to the basin) Impervious Area 74.74 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 757,358 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume ZT7►930 cu. ft. (volume detained above the permanent pool) Forebay Volume 149,854 cu. ft. (approximately .20% of total volume) Other parameters SA/DA I 2.47% (surface area to drainage area ratio from DWQ table) Diameter of Orifice 7.0 in. (2 to 5 day temporary pool draw -down required) Design Rainfall 1.0 in. Design TSS Removal 2 86.3 % (minimum 85% required) Form SWU-lot Rev 3.99 Page 1 of 4 DETENTION POND ANALYSIS FILENAME- G:IDATAIWPDATAIWQSIPOND1010420-D PROJECT #: SW8 010420-D REVIEWER: L. Lewis PROJECT NAME: Tarawa Terrace Overall Pond Zfj_acr-03 DATE: -� Receiving Stream: Northeast Creek Class: SC HQW NSW Drainage Basin: White Oak Index No, 19-16-(3.5) Site Area 189.90 acres Drainage Area >757:1:500 O:i square feet Area in Acre: 173.82 acres IMPERVIOUS AREAS Rational C Acres Buildings 1413086.00 square feet 32.44 Streets 976615.00 square feet 22.42 Parking 579348.00 square feet 13.30 SW 120661.00 square feet 2.77 Other 165964.00 square feet 3.81 square feet Total 74.74 TOTAL 3 : 5674'QO�square feet Rational Cc= 0.11 SURFACE AREA CALCULATION % IMPERVIOUS 43.00% Des. Depth 5 TSS: 85 SA/DA Ratio 2.28% Req. SA 172626 sf Prov. SA 1>8687€ sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* Des. Storm Rv= Bottom Perm. Pool Design Pool Volume prov @6.4 Req. Volume Storage met at ORIFICE CALCULATION FOREBAY Perm. Pool Volume Req. Forebay Volume= Provided Volume= Percent= Elev Area 757358 151471.6 149854.00 Inc. Vol Acc. Vol 5 186870 0 0 6.00 201145 194008 194008.00 7.00 218468 209807 403814.0 Avg. Head = 0.60 ft Q2 Area = 61.82 sq. in. Flow Q2, cfs 1,596 cfs Q5 Area = 24.73 sq. in. Flow Q5, cfs 0.638 cfs Orifice Area 39.27 sq. in. No. of Orifices 2 Q= 1.014 cfs Diameter, inches 5OC7; weir HxW ;........'.. in x in Drawdown = 3 1 days COMMENTS Surface Area, Volume and Orifice are within Design Guidelines. • ' Two Phase DesignIBuild Replacement of Family Housing Units Tarawa Terrace Housing, marine Corps Base Camp Lejeune, North Carolina RECEIVED NOV 1112003 nwQ / Pxoa # �(,c1 ?DUI U420 /�9v ���tjs�{�rrrrr, 2 +�rp!!++S •r. Any EXTENDED WET DETENSION BASIN SUPPLEMENT -1D rev, -sec( c21GS For If- ?4-U3 Grr• &e- ch2r7c o ib 2- -Sit P�Pes Fc• /q//1 D, 3/1 J/20a2 Stormwater Managernont Plan 8 - 13 P om- , Vo c-bMfe RV &,65- + r). o07 (4-5) 0. 437 '112 Fr, IIN 1-)'e'l Fr. vie S, 00 eC -M, Poo L 067�,QT10AJ _r?!/b} E fll s �� '-�� )SEC. Al P :7.51 `3 0 0.64., 4 1, ,d F7-2-, .r. F'1 Pfojeut _NMP Job No. AM- 7 Sheet ., by - -- Date +) D� Ok d Clatr. BRIGGS ENGINEERING, INC. - 18bQ W. Oveiland Hoad - Boise, Idaho 83705 flF— ' �6l f7 U3 b /8&j 070 o �a f �¢ i�; �41008 TO 43)814- 1 Q V Imo. V Q t-V V. I I {.. "� � 7 ✓) � 1.J � Y U. s, U(.e " . 6, 40 14-2,(95 6571040 -3,.0 15�) i01h -"r'14-j 0 40 4,0 /70j 77 !;_ �5_76J 5 3(t:, 5-t0 106j 070 7 7j 35S 0,10 /7 5- 4-41 33�— 73/ 607 c 671 q 17 lam) q4,1 a 4- 900 f 411) 54-- ploject (""AMP LFlGf Job No, M07 Sheet 2- ore ID O/J. v -_ _ ____ Date' 511ffloL Ok'd rule V- ( 2 � BRIGGS ENGINEERING, INC. - 1800 W. Overland Road • Boise, Idaho.83705 lrf� �AJE f0 t (Zoo D. 6-7 . d, /T "'c W 0e'4.n" . a45- J, 36 5F _49'�'0S5_S 0 4 -5-1 l0 1, ?,345ep d �d 1- HP_ l� c DVr2tT oAJ STDP--k, cf 7 af WRVS(5w-r oaf 93 WffE �4 -r�,� f)(A W 72 r�+ uewN (' � " D 1fq , ram, -ro L)( X,/-/ 91�'�4f— O N e. iuj��l-(1 h3 Jab No. d Sheet. 3 l}i" L2 PM_ By 42) Date _.. Uk'ci Date � BRIGGS ENGINEERING, INC. - 1800 W. Overland Road 1, Boise, Idaho 8j'105 I / 4,1 (2A �IX YP, 4 12-) 01 6 (Og/pc'-t� 6 1::�' Do 3� /0' PIP6 Piojubl (q.NPI( �J-QAJC Job No. �v .._ Sheet.._? PE& � �' G L.IJ 1 1i1 By Date- C!k'sl Date BRIGGS ENGINEERING, INC. * 18(JO W, Overland Road, Boise, Idaho 83705 @ T 0 2 2003: UNITED STATES MARINE CORPS PUBLIC WORKS DIVISION Marine Corps Base PSC Box 20004 Camp Lejeune, North Carolina 28542-0004 5000 PWO 25 Sep 03 Ms. Linda Lewis NCDENR Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extention Wilmington, NC 28405 Dear Ms. Lewis: Subject: TARAWA TERRACE REGIONAL STORMWATER POND, CAMP LEJEUNE PROJECT N62470-97-C-7111 LX-tZ :Zzzt4 During construction of the subject regional stormwater detention pond, unforeseen underground utilities were encountered. These utilities caused a conflict with the proposed sanitary sewer relocation route around the north side of the new stormwater Pond. The sewer was going to pass through two 48" diameter RCP stormwater mains. A new sewer relocation route has been designed to take the sewer around the outside southern perimeter of the new stormwater pond. A conflict with the new riser barrel necessitated the design of a concrete spillway so the sewer can pass under the pond discharge point. Please find the calculations and plans for the new spillway structure enclosed. With the exception of the discharge structure, the pond remains unchanged from the original project submission. Should a permit modification be necessary, please forward the modification to our office. Your point of contact at Camp Lejeune is Alex Wood, PE, at (910) 451-3238 ext 252. nSincerely, U &K� A.G. Sholar Enclosures: (1) Calculation Sheets (C101D, C102D, C502D, & C503D "Tarawa Terrace Housing Replacement") (2) Drawings for N62470-97-C-7111 (2 copies) Foree GS06 Tammy L From: Loggins GS09 Sandra E Sent: Tuesday, September 30, 2003 3:05 PM To: Enterprises Coastal (E-mail) Cc: Foxworth, Lori A. (Civ); Loggins GS09 Sandra E, Mobley, Debora K. (Civ); Case GS11 Kevin J; Johnson GS12 Gold S Jr; Williams GS12 Jerry T; Baker GS13 Carl H; Betsch GS06 Lisbeth A; Bill Bogue (E-mail); Bonnette GS09 Alice A; Brant GS13 William L; Cone GM15 Frederick E; Couser LtCol Robert A; Foree GS06 Tammy L; Horne GS14 Gary R; John E. Peters (E-mail); Linebarger GS13 Phil V; Loconto GS11 Stephen A; Oakes GS11 Frances A; Pina CDR Ben D; Seamon Maj Timothy B; Sholar GS14 Anthony; Slates Capt Kevin R Subject: FW: AWARD NOTICE: 03-D-1704, Custodial Services at the Naval Hospital, Marine Corps Base, Camp Lejeune, NC Signed By: logginsse@lejeune.efdlant.navfac.navy.mil Security Label: Signed - Invalid signature am Ri t 1704Awa r. pdf Award notice for subject project - 031704 1. Award Date: 9/29/03 2. Completion Date: 9/30/04 3. Award Amount: $1,351,373.56 (subject to availability of funds, FY04) 4. Contractor: Coastal Enterprises of Jacksonville, Inc. Award instrument attached. -----Original message ----- From: loggins [mailto:loggins] Sent: Tuesday, September 30, 2003 1:50 PM To: LOGGZNS SANDY Subject: 1704Award Please open the attached document. This document was sent to you using an HP Digital Sender. Digital Sender Model: HP 9100C Digital Sender Name: 155-252-26-167.efdlant.navfac.navy.mil Document type: B/W Document Number of pages: 6 Sent by: aloggins> Attachment File Format: Adobe PDF To view this document you need to use the Adobe Acrobat Reader. For more information on the HP Digital Sender, Adobe Circulate, or a free copy of the Acrobat reader please visit: http://www.digitalsender.hp.com/reader-en 1 REQUEST FOR CONTRACTURAL PROCUREMENT DOCUMENT NUMBER: M6700103RC23930 (Local Form in Lieu of NAVCOMPT 2276) AMENDMENT NO.: NEW' DATE REQUESTED: 08/15/2003 FUNDS EXPIRE ON: 09/30/2003 FROM: Commanding General FOR DETAILS CONTACT: FIN: Barbara Haynes (910) Marine Corps Base 451-2602; TECH. Greg Camp Lejeune, NC 28542-0004 Shoemaker 451-5794 TO: Officer in Charge of Construction MAIL INVOICES TO:OICC/ROICC Marine Corps Base 1005 Michael Road Camp Lejeune, NC Camp Lejeune, NC 28542-0004 28547-2521 ACRN ACCOUNTING DATA TO BE CITED ON RESULTING CONTRACTS AMOUNT AA 1731jjD_6 27AO 000 67001 0 067443 2D 000000 13233RCAA930 $ 268,278.00 AB 1731106 27AO 000 67001 0 067443 2D 000000 13233RCAB930 $ 268,278.00 AC 1731106 27AO 000 67001 0 067443 2D 000000 13233RCAC930 $ 268,278.00 AD 1731106 27AO 000 67001 0 067443 2D 000000 13233RCAD936- $ 268,278.00 AE 1731106 27AO 000 67001--0 067443 2D 000000 13233RCAES30 $ 268,278.00 TYPE OF FUNDS TOTAL FROM ATTACHED PAGE: $ 268,280.00 M2 TOTAL THIS DOCUMENT: $ 1,609,670.00 CUMULATIVE TOTAL: $ 1,609,670.00 AMOUNTS WILL NOT BE EXCEEDED.IN THE OBLIGATION DOCUMENT WITHOUT PRIOR WRITTEN APPROVAL FROM THE ISSUER DESCR: INT/EXT RPRS TC1064 PROD 4LE0310M TC1064-AA1TC1065-ABITC1066/-ACITC1067-AD/TC1068-AEITC1069-AF Construction Contract Number N62470-01C2102 AA M2 S701 M6700123M2AD2514S701 AB M2 S701 M6700123M2AD2514S701 AC M2 S701 M6700123M2AD2514S701 AD M2 S701 M6700123M2AD2514S701 AE M2 S701 M6700123M2AD2514S701 SEE ATTACHED FOR DELIVERY SCHEDULES, GRAND TOTAL PRESERVATION AND PACKAGING INSTRUCTIONS, SHIPPING INSTRUTIONS AND INSTRUCTIONS FOR DISTRIBUTION OF CONTRACT AND RELATED DOCUMENTS I CERTIFY THAT THE FUNDS CITED ARE PROPERLY CHARGEABLE FOR ITEMS REQUESTED THIS REQUEST IS ACCEPTED AND THE ITEMS WILL BE PROVIDED IN ACCORDANCE HEREWITH RIZINrQ OFF $ 1,609,670.00 DATE: CEPTINGOFFICIAL: fDATE: CONTINUATION OF APPROPRIATION DATA DOCUMENT NUMBER: M6700103RC23930 AMENDMENT NO_: NEW ACRN ACCOUNTING DATA TO BE CITED ON RESULTING CONTRACTS AMOUNT AF 1731106 27AO 000 67001 0 067443 2D 000000 13233RCAF930 $ 268,280.00 TOTAL FOR THIS PAGE $ 268,280.00 ACRN, SFC, CAC, AND FIP: AF M2 S701 M6700123M2AD2514S701 RE: Tarawa Terrace Regional Pond 010420 Subject: RE: Tarawa Terrace Regional Pond 010420 From: Sholar GS 14 Anthony <SholarAG@lejeune.usmc.mil> Date: Thu, 23 Oct 2003 15:02:15 -0400 To: "'Linda Lewis"' <Linda.Lewis@ncmail.net> CC: Wood GS 12 Alex R <WoodAR@lejeune.usmc.mil> Linda, We have directed Dean Briggs to submit supporting calculations (sealed) for the orifice and pond draw down time. In addition, he will need to fill out a new wet Pond Supplement Form. Thanks for your e-mail and please let me know if you need any additional information. Tony -----Original Message ----- From: Linda Lewis [mailto:Linda.Lewis@ncmail.net] Sent: Monday, October 20, 2003 1:00 PM To: Sholar GS14 Anthony Cc: Dean Briggs Subject: Tarawa Terrace Regional Pond 010420 Dear Tony: I received the revised plans for the outlet structure modifications. I cannot approve them because they call for two 5" orifices instead of the one 7" orifice that was approved on August 23, 2002. The calculations submitted by Dean Briggs do not address this proposed change. If you want 2-5" orifices, please submit a modification (i.e, a revised wet pond supplement) and supporting calculations that the 1" volume will be drawn down in 2-5 days with the double 5" orifices in a tee. Otherwise, please revise the outlet detail back to the 1-7" drilled cap over an 8" pipe that was previously approved. Linda 1 of 2 10/23/2003 3:14 PM Tarawa Terrace Regional Pond 010420 Subject: Tarawa Terrace Regional Pond 010420 From: Linda Lewis <Linda.Lewis@ncmail.net> Date: Mon, 20 Oct 2003 12:59:50 -0400 To: Sholar GS14 Anthony <SholarAG@lejeune.usmc.mil> CC: Dean Briggs <deanb@briggs-engineering.com> Dear Tony: I received the revised plans for the outlet structure modifications. I cannot approve them because they call for two 5" orifices instead of the one 7" orifice that was approved on August 23, 2002. The calculations submitted by Dean Briggs do not address this proposed change. If you want 2-5" orifices, please submit a modification (i.e, a revised wet pond supplement) and supporting calculations that the 1" volume will be drawn down in 2--5 days with the double 5" orifices in a tee. Otherwise, please revise the outlet detail back to the 1-71, drilled cap over an 8" pipe that was previously approved. Linda 1 of 1 10/20/2003 1:00 PM B,RIGGS:ENCrINE,ERING,-,In&. 83705; ADDENDA C2A. L. C. U-L4.TIOX,3 LEJEUNE MILITARY"B."A, SE% ON-BASE:17TO USING.:-- 7fl. -Phase, i . D�—:-S . toTra"brimage Pond. .ST.OR.M DRAIN.AGf.:C.A.LCULA.TI,QN.S ��.K�: VAW� T OE: �SMALL CANAL STRUCTURES:, .AN ci. tn: ;constant valpe -.c;f: K over the.: liength of. the .:curve and is generally. used., A. Ta. parabolic. :trajectory may! be d6ieriiiihed from, the IollowRig:e'quation: (tan �9. tan: 0 X1 'Y ='X'tdn.V . : .0 ILT M where'.: X­:Horii6ntal , disiance.frorn the. qrigip.t' zi'oin.t.on the P . -trajectory origin to point ---?.(,on:thq trajectory,, L-r ='-HoriiontblJerigth,ffo0- the. 'ofigizi-16 th&-.ehd:6f-th& trajectory;;: :ff- The angle bf-iriclihati6n�OT th, :ch6te-cifian n'e;fa-flfh6- orl 1islid . Ps t. e­ . �j�Oc:�ry a- n:. d L' ­7,Th&,.a]nkle`of fficlinati6n';:6fthe' 'th6i6 `channel'a"(the- e-hd-.bt the Oaje6to,i y'. A k'ngth of. 'tr'ajecio-ry. .(Ir) can'b.e° selected i. �vhch, `!�heh..'-,sObstftuied into 6q . i.ori.(4),, vill I result . r -lin­-a' .0 or, . Iess. T . he. length .'iWis thev used. inAhe computatio'nbf~y using -e quatibn':(S). The -trajectory ;'should. �end at . Or upstream from the intersection. ' I of "the - ch',uteL'sec . tion--walls wii� i6-.:�tiliijn 0( 1 is. A loh&adiu$' -si; g:'P.ro. �durve slightly- flatter'. than the coinput6d , tiaiecto*., may ..be used:, :If practicable the -trajector'y should coincide With any. -tran'sitibn:..fequiied The. -vui9bI6§:-'6f; fl6w­ '6nAe fiaje6ioi.y: �Q. ttie ._steep section :COMPUtea Irl the. ..same way as �,th 1 osei.in the es ction..An:elevation. fOr'.- . th : e: . tioor.'. o . f .'t . he-st . i 11 . ing-poo I frnd' ris-assuI c and. the a.ne Ta"d-ien"t-"at.-theiuhctionio . f the . . chute . . section.- and: the -pool floor'is:compuied. The' ho'.W.,;.Yaria.bles -.at'this p6iht :are u'kd-. asthe: variables :ahead -,of hydraulic Jump in. the. design:,of-..the stfllirigmp . ool-. (6)'. Stilling P661, -stflli�g p6o]'th6 waterflo . Ws down''the steep, slo pe 06 sieiction:it aye'lociti' ', j;i,e61'er than the CntCa. I '.VeloCI . ty- The,abrupt- change in :s,lopq where :,the flat, grade;qf the Stilling pool floor meefs�the steep slope -section, forcesth .ces e water into :a :hydra-Lffic . jump' ah& SMALL CANAL :STRUCTURES energy.. is"dissipated..'+in'tthe�:;resulting turbulence. The; stilling: pool -is p,roportio,hed,10 contain the -jump.- For' a.'-stillih&1obf :to operate prop6ilv'.1 "V :the� Fro­ude number'' F .-. where the: -water- enters ..the stifling % ..pool'. shouldbe.: between 4. r 5 and 15. SpecW�.studies,-or model Aest ing. are required for structures with'-Fr6ude: murribefs outside. this rahge;.. the.Trdu& si huhiber-is lessIh6n, aboUv4.:5 a stAble fiydraulic° jump. may -not­occui.­ if the Vfoude num'b6 ... r'. is te....atet- than 'about 'O'.a stilling,.&61 M'qy.not% e,: best.choiceof energy Oiss pato Stilling'. pools :,requiie., tailwater to: force.,.. the jump t . 6; the :turbulence, Can r:be �coritaihed- ,Stilli.ng'pools.usuilly have a:rectaiig4a'tcross :seCtOhj:.parall6l walls;: and-. a::,IeveVfld6i;'The. I6IIo*ing"eOki6h§ to. determine pool: . :-.W'id&. :�afi'd �vate� depth after":the apply ,to this, �_ . depth r .. - - ' of- 0661. ;Flared:pools are somatimes used: and P. require F sp��cial - ponsiderWon. -or, discharges up to 1:00 cfs', the. equation.:,' 3 . 60,rq :Q+.351G. whe're: w'-idth,.o[V96i..in,,f.ee I and Q= discharge: in ct's. used to de6rm i ne. the width of a:pbo I Tor the ..initial , calcui,alions.. The. water .after the .'hydraulic :jump -.may :be; computed: frotn: the -fo.rMula- (9) where. d =%l?Ppth before:.the jump; .V., =..V.61dcitY.'bef6re thbju - rnp, _.be.pth%aftthe jumper. h :a nd g,=-kccelerati6h-of. gravity For structures where 'the vertical drop ;is less: than 5. feet. the water 'dep.th, after the jump.: may be ..obtained 'from figure' 2,37..,Th&: .dlevatioh -of� the energy gradient dft�T. th6. . — . 1 . .. .. ... 1,08 hydraulic, :jump should . be: -balanced by -the.-. energy `gradifrft,`ih the: channel downstreani of: the structure:..: If thet'adierits d6 not:balanc6,,` new elevation f&, the:,Pcidl floor or azriew- P661. width should -be amiffied 'all d'-tlw:. e recomputed. Tfj'a'k.:,a;-e7Jepeated tin fil. a -balance. iobtained: I The -6'1evations;:selaqied should be, reviewed.,. .to. insure that: the.- stilling pool will operate effectively at,partial.%.rlow..,Desi.gnsare . %normally checked at-:one4hifd.1h6 design flow or curves� May ;be drawn as,,ori. figure: 2-38.; If. the:revie -�indi6ttis,- it: to %.be necessary, the p601 :-flbof sh'Guld'.be, [Owered or" a'. differek '.:.pb41 width- qssumed and; -the- design procedtife. repe'W The-:mmtmum.,;poq1 length:(L: - on fig. 2.313).. for structures lased .onl canals- is .,normally. 4. times:d2.. For structures on Wasteways or dr'ains-:.whr,re:,th,e:jib w, will d: . of short - duratibn-jh� mihirnurn lehgt4,iriaV-be. -about 3::-.tirn6s.d,:.Jhl recairiit ended ffddbo'atd'- for .-stilli,g, ina,k. -be determined from figure '-2.33 Fi-66bo&d .-is-measured aboV -qe� ma,xiinurn d,ownstream--.ene.rgy,graoi.en.-t. W, he . A tale stilling I i I ling pool discharges. . intermittently'' .' .-or: discharges into ;a natural or .. other uncontrolled chan.nel, convo,l should' :be built into :the" outlet pool to prov.ide the necessary 'tailwaten Th& CH66al 'depth at "Ahe c:6ntrbl:s6dtibh ::shbdld: be used to.- d6terinibe:- the d6W'n§tteaiTf e'fipirgy, .9r'4diPn,1:1 Wheri :the W]Ung pool Als'c".11drges into -a--. controlled chah.nel; the ac-pth'in' the channel sh6U1d be cumputdd:,with the n Vaifu'e--o :the. chahfidl 4ed4ced m 6y"6_b-.perceht;-alpd dop;h� used, , . ­` to- determine :the -:downstream. .. en . ergy gradient :111 a.: flared po oll:is.used, -the-. - d efieq t i on� angle, of the sidew"alls should,. not exceed'.% azlg.1e,-%Pcrrn.jtte.- .d.in. the: chute Weep h*5� .Withgravel';pockets (fig, 2=39.),,rriay'be.'-used to relieve l .levydrostatic �Piessiure on the fl6ot acid wal ls 'of tffe stilling "pool -,-and 6iitlet -trarisifi6h'- Chilt6-�'and4lo'dr -blocks:'iie� ptkde'� tobreak 4 j 6 t.. o . v a : nd to,s-i�bilii6-.'ih'6:hy.'d"raulib'j'ump.'. .ilIe,lqcation, .spacing, the"bl.ocks . ;, and,6ia'iis-of ar.e.-shown..on figure. 2-33... 2 concrete' outlet -transition is not, provid ed., : a. solid. end. sill is. r'eq W, red -,(.fig i:-240)1.;- Th ',upstiearb side -of have a 2­tO"- .1 slope and'the downstream side, should %be. . . 1P verti'6a], The elevation.,, of. the top- of- the sill: SMALL -.'CANAL STPUC'T'URE1 should . be, get' "to..- provide: taikvaie'r for .the': hyd 'raulicjUmp. A:'Siillirig-,:poOi and..ouilet transition built, to: the. dimensions recommended: .may not completely contain the; spray caused us .. ed by :the. turbulent: -water 'but :the-. :structure should. contain :enough of the tur'bul6hce to p reven erosion -daihagd 'downstream -of the -stftictur,-_ WOP6 Fbirniandr.,W ayes; in, .a chute .sLt.#cture :are-��tiona.bl.q ':because they. may,: overtop .. th _chute .'-wil1 s:. a nd theyi cause:surgin' in , th , e...-energy dissipator.. A. stilli4gpbbl Mot :be !an 'effeciive'eftrgy di§sipaitor"With; thii: typ , 'a;-bf .116w. Udad§e a:. stable hydraulic, jump c6uld: 'ha- form ffig. AA unstable Puliatihg type of f16W.:.kn"w­­ o'n :as sir g flour ai 'fbil .waves may pe.vejop. 3p.- long, steep -chute-. struciuie�s,digs . 2-42' and 243�):. These waves- o7m dw gen -.ra.1y. 'f ch.UT.C. -chan..n,e-. ...1th.a.t-. °ars: longer- than: about 200 :f-.e.t :and have bottom .grade. slopes�jlqtter othan.about:� 20 f 9) - The'.' that a t cn..-,be- expectd�.:.. maximum �Wave.. 'height Is: t the normal depth ..for Ihe.:..Mope`and IhO, :maximum momentary !slug -flow'., capacity is' twice:: the: normal. capatity, Transverse e flow. 'or, cross waves may :also waves;:are.:cai4ed bY Y. Abrupt transitions --:from: Cne:-,ch6n'ii61 :seciion to - An6 the'r (2):- Uni's"y" mi m" q fr­ ic"a' I , 's t'6'A 6tu id s',- . a h .(3)- C, . i . i.v6s'-.-of-:anDes in: the alinement -,of the chute: The -:probability -.of these: -waves -b,e.ing, generated in 1he:.structure may. be..reduced the . recommendkio'n's cbricerhih'g'" deffe'cO.onn". angles -and 'sym' niet'ry':-'mad6 : in the dis.cussjons.: ;pertaining.W transitions and by av6idliis� changes -in direG.tion rn 41�-..siructure.. Some chute .sections .are. more ..likely 'to sustain -waves than' others. :Shallow ' dished sdeiions'�-apppr.l.td:bd,.particularly,:.sU3ceotibl6: to. transverse eep narrcw. �sec ions; flow - -Whii�-.d .resist both transverse. and slug -.fla'W. Chute. sections` that �'the'o're'tt'czil'y"sh'ould':'p.reveni'l.the formation" 6£' waves 'developed. f91T1.1-j,. A theor&6cally, waveless" chute. section -is shown: on:figum12-4-4. wbrkshe.et for. TrapezoidaL,Channel". Flow El6iieht Trai0emidal Chainnel meth5d Ma'nn1ng'9'F6rniul'a ;input Data` M iii : n 15 !Slope 0'.250000 fun 4.'00 H"; V Right Sldes Slope' .1.00 H V B6(tam:,WldIh :45-60 It 2BZ.00 CfS Depth, ft Flow AMD. 1.3.z It! Wetted Perlmetu %46129 ft; . Top k . -�Oth. 46:1.6 ft: 1...05 -1t: .C.r,1I1.rA.1.Pepth Crifta.I.SlOM fff, Yetodtyi4e"a'd' ft: sp!6rfc Energy 7:42 It, Froude-Mumber 17.07 Flow Tjrpe SuperciitltiE V6 V F0 5l 5 5 OrDjiia' LEnJjln ver'.1 a rr y '8= 0 a U Ahaesia6fmmAi6jouno , fm2 BFRIGGS ENGiNEERING, Inc; Fib wMmistervS.:1 (OUnj Phi: rD E6 de oad"' rW atoth'u'ry,,C 08706,USA :(203) 7 SS!mes: O�mOoi- 63:42-.22'. Z Haa.stad: Methods, 16c.. 37 B.'�C"k i'' , T Om Workdliek -Wo rkgh.eat --fo r. Recta ng . ular Channel' hannel' F16W EWme'6t -Rktifi guilar Chan'nial Solve: For-Ch6nriel Depth I n6ut cibtn' . m ii nihos co,aicii6hl "01,615. slope., 0'.005000 ftm Bbttc6WdtK '45.00 ft: Resulls .0,95 m ft'. Flow AresC 142,8 ft'. Watted Pertmeter .46.90 ft. 4400 A: Crittral Depth: -1.07 A. Critical' slope- 0.003.4112. Atft VeloGty 6;56 - fu 0.67 ft Fraudo:Number Flow..Type. :6,ppercriliba I Pr6j' a Efiginek. 6irry Brznjtiajj C.lhme"cftnmV jeunfl ?012' BRIGGS ENGINER . R I ING Inc, 67 IiWOS� ;-, - - . ... .. . . . . Id'' k ' � V�'.: FlqrwMastar vr,:1 Mllpl: .11:04:15AM.: OHpestadMethdds.Anc.. 3713roOm e: os aterbury, CT.=708 USA :(203).755-106 Page 7 bfl' RiveRidge Engineering Company CONSULTING ENGINEERS AND PLANNERS 405 W. Myde St. BOISE, IDAHO 83702 208-344-1180 • FAX 208-344-1182 October 29, 2003 Cameron Weaver North Carolina Department of Environment and Natural Resources Division of Water Quality Express Permitting 127 Cardinal Drive Extension Wilmington, N.C. 28405 RE: Stormwater Project No. SW8 010420 Modification Tarawa Terrace I Housing N62470-97-C-7111 Dear Cameron: In regards to the email sent to me on October 28, 2004, that stated: "Unfortunately, unless you are able to work through a local engineering farm, DWQ is unable to accept this project into the Express -program at this time. The project as proposed will require a large amount of correspondence and review and is not suitable for the Express process without a local contact who has had extensive experience in dealing with NC coastal stormwater regulations." I have the following questions: 1. If Parker and Associates, a local engineering and surveying firm, assists us with the permitting process can we submit through the Express program and if so will you please assign us a date? 2. You had mentioned that the Phase III Pond may need to be submitted as a separate permit. Can the Phase III Pond be incorporated into the existing permit Stormwater Project No. SW8 010420 Modification, Tarawa Terrace I Housing, N62470-97-C-7111 or do we need to submit a separate Stormwater Management Permit Application Form for the Phase III Pond? Page 2 October 29, 2004 Thanks for your assistance. Sincerely, RiveRidge Engineering Company Wendy Haustveit, P.E. G:1040151021121WPFILESIST0RM WATER PERMITTINGIQUESTIONS TO NCDENR 10-29-04.doe Page 2 October 29, 2004 Thanks for your assistance. Sincerely, RiveRidge Engineering Company Wendy Haustveit, P.E. G:1040151021121WPFILMSTORM WATER PERM ITTINGIQUESTIONS TO NCDENR 10-29-04.doc