Loading...
HomeMy WebLinkAboutSW5200602_Plan (Notes)_20201020z:5 CIVIL ABBREVIATIONS A F 0 ABC AGGREGATE BASE COURSE FC FACE OF CURB O.C. ON CENTER ABS AIR BREAK SWITCH F.D. FLOOR DRAIN O.D. OUTSIDE DIAMETER A.C. ASBESTOS CEMENT F.D.C. FIRE DEPARTMENT CONNECTION OH OVERHEAD A/C AIR CONDITIONING F.E.S. FLARED END SECTION OHE OVERHEAD ELECTRIC A.D. AREA DRAIN F.F.E. FINISHED FLOOR ELEVATION ONUS. OLD NORTH UTILITY SERVICE A.F.F. ABOVE FINISHED FLOOR FG FINISHED GRADE ALT. ALTERNATE FH FIRE HYDRANT OVH OVERHANG ALUM. ALUMINUM FIN. FINISH P AMP., A. AMPERES FL. FLOOR P/A PARKING AREA A.O. ACCESS OPENING FM FORCE MAIN PC POINT OF CURVATURE APPROX. APPROXIMATELY FOC FACE OF CURB PCC POINT OF COMPOUND CURVATURE ARCH. ARCHITECTURAL FT. FOOT, FEET PED PEDESTAL ASPH. ASPHALT FTG. FOOTING PER. PERIMETER A.T.F.P. ANTI -TERRORISM FORCE PGL PROPOSED GRADE LINE PROTECTION G PI POINT OF INTERSECTION A.W.G. AMERICAN WIRE GAGE GA. GAGE PINC POINT OF INTERSECTION ON CURVE A.W.W.A. AMERICAN WATER WORKS GAL. GALLON PIV POST INDICATOR VALVE ASSOCIATION GALV. GALVANIZED PIV ELEV POINT OF VERTICAL B GC GENERAL CONTRACTOR INTERSECTION ELEVATION BLDG. BUILDING G.F.E. GOVERNMENT FURNISHED PLT PLATE BM. BENCH MARK EQUIPMENT PSF POUNDS PER SQUARE FOOT BOC BACK OF CURB GL GAS LINE PSF POUNDS/SQUARE FOOT BOL BOLLARD GM GAS METER PSI POUNDS/SQUARE INCH BRG. BEARING G.P.H. GALLONS/HOUR PIV STA POINT OF VERTICAL BVC BEGIN VERTICAL CURVE G.P.M. GALLONS/MINUTE INTERSECTION STATION BVCE BEGIN VERTICAL CURVE ELEVATION GND. GROUND PT POINT BVCS BEGIN VERTICAL CURVE STATION GOV'T GOVERNMENT PVMT PAVEMENT GV GATE VALVE C GW GUY WIRE R C&G CURB AND GUTTER R / RAID. RADIUS CATV CABLE TELEVISION H RCP REINFORCED CONCRETE PIPE CAP. CAPACITY HC HANDICAP REINF. REINFORCING C.B. CATCH BASIN HCP HANDICAP PARKING REQ. REQUIRED CBL CABLE HCR HANDICAP RAMP REV REVISED CEM. CEMENT HDW HEADWALL R.P.Z. REDUCED PRESSURE ZONE CER. CERAMIC HP HIGH POINT RT RIGHT C.F.M. CUBIC FEET/MINUTE HSS HIGH STRENGTH STEEL R/W RIGHT OF WAY C.F.S. CUBIC FEET/SECOND HT HEIGHT RWM RIGHT OF WAY MONUMENT C.I. CURB INLET HYD HYDRANT C.I.P. CAST IRON PIPE S CIRC. CIRCULATING I SAN SANITARY SEWER C.J. CONSTRUCTION JOINT/ ID. INSIDE DIAMETER SB SOIL BORING CONTRACTION JOINT INTX. INTERSECTION SCH SCHEDULE CK'D CHECKERED INV. INVERT SET SETBACK CKT. CIRCUIT ISL ISLAND SF SQUARE FEET q CENTER LINE ITL. INDEPENDENT TESTING SHT SHEET C.M. CONCRETE MONUMENT LABORATORY SIA SIAMESE CONNECTION C.M.P. CONCRETE METAL PIPE SIG SIGNAL C.M.U. CONCRETE MASONRY UNIT J SOTF SECURITY OPERATIONS C.O. CLEAN OUT J.B. JUNCTION BOX TRAINING FACILITY COL. COLUMN JCT. JUNCTION SP SIGNAL POLE CONC. CONCRETE JT. JOINT SPECS SPECIFICATIONS COND. CONDENSATE SQ. FT. SQUARE FEET CONN. CONNECTION SR STATE ROAD CONST. CONSTRUCTION SS SANITARY SEWER CONT. CONTINUOUS K STA. STATION COR CONTRACTING OFFICERS K K VALVE STD. STANDARD REPRESENTATIVE KVA KILOVOLT AMPERE STM STORM C. TO C. CENTER TO CENTER KW KILOWATT STL STEEL C.Y. CUBIC YARD SUS. SANDHILLS UTILITY SERVICE L S/W SIDEWALK D L LENGTH SWM. STORMWATER MANAGEMENT DET. DETAIL LF LINEAR FEET DI DROP INLET LGT LIGHT T DIA. DIAMETER LP LIGHT POLE T TANGENT DIFF. DIFFUSER LT LEFT TBM TEMPORARY BENCHMARK DIM. DIMENSION TERR TERRA COTTA PIPE D.I.P. DUCTILE IRON PIPE M TEL TELEPHONE DISC. DISCONNECT MAX MAXIMUM TOB TOP OF BANK D.J. DUMMY JOINT MED MEDIAN T/C TOP OF CURB DN. DOWN MH MANHOLE TOE TOE OF SLOPE DR. DRAIN MIN MINIMUM TOP TOP OF SLOPE D.S. DOWN SPOUT MJ MECHANICAL JOINT TOW TOP OF WALL DW DOMESTIC WATER MON MONUMENT TP TELEPHONE POLE DWG.(S) DRAWING(S) MTL METAL TRANS TRANSFORMER MW MONITOR WELL TYP. TYPICAL E M.U.T.C.D MANUAL ON UNIFORM EA. EACH TRAFFIC CONTROL U E.F. EXHAUST FAN DEVICES U/C UNDER CONSTRUCTION EG. EXISTING GRADE N U/G UNDERGROUND E.I.P. EXISTING IRON PIPE N/A NOT APPLICABLE UNO UNLESS NOTED OTHERWISE E.J. EXPANSION JOINT NOTE: NORTH AMERICAN DATUM 1927 UP UTILITY POLE ELEC. ELECTRIC NAD 83 NORTH AMERICAN DATUM 1983 EL. ELEVATION NBL NORTH BOUND LINE V E.M. ELECTRIC METER NC NORMAL CROWN VC VERTICAL CURVE EOP EDGE OF PAVEMENT NCDEQ NORTH CAROLINA DEPARTMENT VCP VITRIFIED CLAY PIPE EQUIP. EQUIPMENT OF ENVIRONMENTAL QUALITY EVC END VERTICAL CURVE NC DOT NORTH CAROLINA DEPARTMENT VV EVCE END VERTICAL CURVE ELEVATION OF TRANSPORTATION WL WATER LINE EVCS END VERTICAL CURVE STATION NEMA NATIONAL ELECTRICAL WM WATER METER EXH. EXHAUST MANUFACTURES ASSOCIATION WSEL WATER SURFACE ELEVATION EXP. JT. EXPANSION JOINT NIC NOT IN CONTRACT WV WATER VALVE EXT. EXTERIOR NIP NEW IRON PIPE WTR WATER EX. / EXIST. EXISTING N.T.S. NOT TO SCALE WWF WIRE WELD FABRIC GENERAL EROSION CONTROL NOTES 1. AS REQUIRED BY THE NPDES GENERAL PERMIT NCGO10000, ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. GROUND STABILIZATION TIMEFRAME EXEMPTIONS CAN BE FOUND IN THE NPDES GENERAL PERMIT NCGO10000 UNDER SECTION 2.13. GROUND STABILIZATION. 2. NO LAND DISTURBING ACTIVITY, EXCEPT THAT WHICH IS REQUIRED TO INSTALL EROSION CONTROL MEASURES, MAY COMMENCE PRIOR TO APPROVAL BY THE ENGINEERING DIRECTOR OF CERTIFICATION FORM 1-01. 3. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BASED UPON SPECIFIC SITE CONDITIONS. 4. CONTACT THE TOWN OF YOUNGSVILLE PLANNING & ZONING DEPARTMENT, AT 919-925-3401, FOR A PRE -CONSTRUCTION MEETING PRIOR TO ANY LAND DISTURBING ACTIVITY. 5. REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AND STRUCTURES ONLY AFTER SITE IS FULLY STABILIZED AND APPROVAL HAS BEEN OBTAINED FROM THE TOWN OF YOUNGSVILLE. 6. ALL EROSION CONTROL DESIGNS SHALL BE IN ACCORDANCE WITH THE NCDEQ EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL, LATEST EDITION. 7. FOR PHASED EROSION CONTROL PLANS, THE CONTRACTOR SHALL MEET WITH THE EROSION CONTROL SPECIALIST PRIOR TO COMMENCING EACH PHASE OF EROSION CONTROL MEASURES. 8. SITE GRADING IS TO BE COVERED UNDER THE GENERAL STORMWATER PERMIT NCGO10000. ANY LAND DISTURBING ACTIVITY > 1 ACRE REQUIRES COMPLIANCE WITH ALL CONDITIONS OF THIS GENERAL PERMIT UNDER THE NPDES. ANY NONCOMPLIANCE IS A VIOLATION OF THE CLEAN WATER ACT AND MAY REQUIRE ENFORCEMENT BY NCDEQ. 9. THE PROFESSIONAL ENGINEER REGISTERED WITH THE STATE OF NORTH CAROLINA WHO PREPARED THE EROSION CONTROL PLAN IS SOLELY RESPONSIBLE FOR IDENTIFICATION AND LOCATION OF ALL ENVIRONMENTAL WETLANDS, PERENNIAL AND INTERMITTENT STREAMS AND BUFFERS SHOWN ON THE PLANS. 10. SILT SACKS WILL BE PLACED IN BASINS/INLETS ALONG ROADWAYS AFTER INITIAL ASPHALT SURFACE WORK IS COMPLETED. 11. THE FINANCIALLY RESPONSIBLE PARTY/AGENT OR THE LANDOWNER/AGENT OF A LAND DISTURBING ACTIVITY > ONE ACRE IS REQUIRED TO SELF -INSPECT THE PROJECT. A SELF INSPECTION, AS WELL AS DOCUMENTATION OF A PROJECT AFTER EACH PHASE OF THE PROJECT, IS REQUIRED. OWNER TO BE RESPONSIBLE FOR MAINTAINING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES DURING AND AFTER CONSTRUCTION. CONTACT CHRIS WRIGHT PHONE NUMBER 919-863-6385. GENERAL STORMWATER NOTES 1. ALL ROADWAY CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES, LATEST EDITION EXCEPT WHEN OTHERWISE NOTED. 2. ALL STORM DRAIN PIPES SHALL BE PLACED TO PROPER GRADE AND ALIGNMENT PER APPROVED PLANS. 3. NO CRACKED OR BROKEN PIPES SHALL BE PLACED OR ACCEPTED IN CONSTRUCTION OF THE PROJECT. 4. ALL CATCH BASINS 3'-6" DEEP OR MORE SHALL HAVE STEPS PLACED AT V-2" ON CENTER. 5. EROSION CONTROL MEASURES SHALL BE PLACED AROUND DRAINAGE INLETS AND CATCH BASINS. 6. ALL PIPES IN STORM DRAINAGE STRUCTURES SHALL BE CUT OFF FLUSH WITH THE INSIDE WALL. 7. ALL STRUCTURES SHALL BE SMOOTH INSIDE AND OUTSIDE OF THE STRUCTURE USING MORTAR MIXED TO MANUFACTURER'S SPECIFICATIONS TO AVOID DEBRIS BUILD-UP OBSTRUCTING FLOW. 8. ALL TAIL DITCHES SHALL HAVE POSITIVE DRAINAGE WITH A MINIMUM 1.0% SLOPE. 9. THE DEVELOPER SHALL OBTAIN ANY OFF -SITE DRAINAGE EASEMENT FROM ADJACENT PROPERTY OWNERS REQUIRED TO COMPLETE THE IMPROVEMENTS OR PROVIDE POSITIVE DRAINAGE FLOW PRIOR TO CONSTRUCTION PLAN APPROVAL. 10. ALL CONCRETE FOR DRAINAGE STRUCTURES SHALL BE A MINIMUM OF 3,600 PSI EXCEPT WHERE OTHERWISE NOTED OR REQUIRED. 11. IF THE DEVELOPER WISHES TO USE ANY PRE -CAST STORM DRAINAGE STRUCTURES WITHIN A PROPOSED STREET RIGHT-OF-WAY, THEY MUST SUBMIT A PROFESSIONAL ENGINEER CERTIFICATION FOR THE STRUCTURE. ALL STRUCTURES MUST BE CERTIFIED TO ADEQUATELY CARRY H2O LOADING. PRIOR APPROVAL FROM THE ENGINEERING DIRECTOR SHALL BE OBTAINED IN ORDER TO INCORPORATE ANY PRE -CAST STORM DRAINAGE STRUCTURES IN A PROPOSED STREET RIGHT-OF-WAY. 12. UNDER NO CIRCUMSTANCES SHALL A PRE -CAST STORM DRAINAGE STRUCTURE BE CUT OR ALTERED WITHOUT A PROFESSIONAL ENGINEER'S CERTIFICATION OF ADEQUATE LOAD BEARING STRENGTH FOLLOWING THE ALTERATION OF THE STRUCTURE, EXCEPT WHERE DESIGNATED "KNOCK -OUT" PANELS ARE PROVIDED. 13. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. 14. THE LAYING OF PIPE IN THE FINISHED TRENCH SHALL BE STARTED AT THE LOWEST POINT AND LAID UPGRADE. THE BELL SHALL BE LAID UPGRADE. 15. SURVEY STAKING AND PROPOSED GRADES SHALL BE CONSISTENT WITH PLANS AND FIELD CONDITIONS 16. NO CONSTRUCTION ACTIVITIES ARE ALLOWED TO TAKE PLACE BEYOND THE FLOODPLAIN LINE OR THE STREAM BUFFER LINE, WHICHEVER IS GREATER, WITHOUT A PERMIT ISSUED BY THE U.S. ARMY CORPS OF ENGINEERS, THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, AND ANSON COUNTY. GENERAL CIVILfSITE JOB DESCRIPTION THIS JOB CONSISTS OF OFFICE, WAREHOUSE, STORAGE AND VEHICLE MAINTENANCE SPACE FOR WAKE ELECTRIC. CONSTRUCTION CONSISTS OF CLEARING AND GRUBBING, SITE GRADING, EROSION CONTROL MEASURES, SEEDING, DRAINAGE AND UTILITY DESIGN, PAVING AND OTHER WORK AS DESIGNATED. SCHEDULING NOTES 1. TEMPORARY AND PERMANENT EROSION CONTROL MEASURES SHALL BE PROVIDED FOR ALL LAND DISTURBING WORK IN ACCORDANCE WITH AN EROSION CONTROL PLAN REVIEWED AND APPROVED BY NCDEQ. 2. EROSION CONTROL MEASURES SHALL BE INSTALLED BY THE DEVELOPER AND INSPECTED BY ANSON COUNTY FOR COMPLIANCE PRIOR TO ANY LAND DISTURBING ACTIVITY. 3. ALL PERMANENT EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE WORK AT THE EARLIEST PRACTICAL TIME. 4. ALL TEMPORARY MEASURES SHALL BE MAINTAINED UNTIL THE PERMANENT MEASURES HAVE TAKEN EFFECT OR ARE APPROVED FOR REMOVAL BY THE CITY OF MONROE ENGINEERING DEPARTMENT. 5. TEMPORARY AND PERMANENT MEASURES SHALL BE COORDINATED TO PROVIDE EFFECTIVE AND CONTINUOUS EROSION CONTROL THROUGHOUT THE CONSTRUCTION AND POST -CONSTRUCTION PERIOD TO MINIMIZE SILTATION OF STREAMS, LAKES, RESERVOIRS, AND OTHER IMPOUNDMENTS, GROUND SURFACES, AND OTHER PROPERTY. SOIL TYPE Map Unit Smbind magp unk"Imame Acres inj,N Ot Perck-nUaIA0111 Ca,IE Ce,61 sandy I an7t, 2 to 5 percent 5Mgpes 13.6 36L�,zl car Cecil sandy II1carmm, 5 to 110 percent slid es 3.0 &011 FuC Pa olet:-Urban land c mmmPlex„ 2 1a 10 percent ebpes 20.E Totals fbr Area Df Interest 3 .2° 1081 RESOURCE: USDA WEB SOIL SURVEY SITE NOTES 1. GEOTECHNICAL REPORT WAS PROVIDED BY TERRACON CONSULTING ON FEBRUARY 12, 2020. THE REPORT PROVIDES THE FINDINGS OF THE SUBSURFACE EXPLORATION AND PROVIDES GEOTECHNICAL RECOMMENDATIONS CONCERNING EARTHWORK AND THE DESIGN CONSTRICTION OF FOUNDATIONS, FLOOR SLABS AND PAVEMENT FOR PROPOSED PROJECT. SOIL BORING LOCATIONS, FINDINGS OF SUBSURFACE MATERIALS, AND GEOTECHNICAL RECOMMENDATIONS. 2. SUBGRADE & BUILDING PAD PREPARATION SHALL BE IN ACCORDANCE WITH THE GEOTECHNICAL REPORT. 3. PROOF -ROLLING OF SITE SHALL CONSIST OF A FULLY LOADED, TANDEM -AXLE DUMP TRUCK WEIGHING AT LEAST 25-TONS AND PERFORMED IN ACCORDANCE WITH RECOMMENDATIONS IN REPORT. 3.A. MITIGATION OF WEAK OR YIELDING SOILS MAY REQUIRE AREAS TO BE UNDERCUT AND REPLACED WITH SATISFACTORY SOIL MATERIALS AND RE -COMPACTED TO 95% PER ASTM D1557, CHEMICAL TREATMENT, GEOGRID OR DRYING BY NATURAL MEANS. 4. SATISFACTORY SOILS FOR SELECT FILL: CLEAN, NON -EXPANSIVE FILL MATERIAL, FREE FROM DEBRIS, ROOTS AND ORGANIC CONTENT. MATERIALS SHOULD CONSIST OF LEAN CLAYS (CL), CLAYEY SAND (SC) OR SILTY SAND (SM) WITH A PLASTICITY INDEX (PI) BETWEEN 5 AND 20 AND LIQUID LIMIT (LL) LESS THAN 35. THE MATERIAL SHOULD BE CLASSIFIED IN ACCORDANCE WITH THE UNITED SOIL CLASSIFICATION SYSTEM (USCS) 4.A. ON -SITE SOILS, MEETING THE REQUIREMENTS ABOVE MAY BE USED AS DIRECTED BY GEOTECHINCAL ENGINEER. 5. AGGREGATE SURFACE MATERIAL: CLEAN, MIXTURE OF COARSE AND FINE GRADED CRUSHED STONE MEETING THE FOLLOWING GRADING REQUIREMENTS: US SIEVE PERCENT % PASSING 1 Y2INCHES 100 %INCHES 50-100 NO. 4 35 - 65 NO.40 0-32 NO. 200* 3 - 15 LIQUID LIMIT 25 PLASTICITY INDEX 4 5.A. MATERIAL SHALL BE FREE OF VEGETATION, METAL AND OTHER DELETERIOUS MATERIAL. 5.13. RECYCLED OR CRUSHED CONCRETE IS NOT ACCEPTABLE. 5.C. PLACE MATERIALS IN LAYERS NOT MORE THAN 8 INCHES IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT. COMPACT AT OPTIMUM MOISTURE CONTENT TO REQUIRED GRADES, LINES, CROSS SECTIONS, AND THICKNESS TO NOT LESS THAN 100 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 698. 6. CHEMICAL TREATMENT OF SUBGRADE, IF REQUIRED, SHALL CONSIST OF LIME OR CEMENT MIXED INTO SUBGRADE IN ACCORDANCE WITH NCDOT SPECIFICATIONS AND REFERENCED SECTIONS. PERCENTAGE OF MATERIAL REQUIRED SHALL BE DETERMINED BY TESTING SUBGRADES PRIOR TO CONSTRUCTION. 7. GEOGRID IN CONJUNCTION WITH AN AGGREGATE SURFACE SHOULD BE USED TO STABILIZE THE SUBGRADE SOILS FOR THE GRAVEL YARD. THE TOP 81NCHES OF THE SUBGRADE SHOULD BE ADJUSTED TO WITHIN 2 PERCENT OF THE MATERIAL'S OPTIMUM MOISTURE CONTENT AND BE COMPACTED TO AT LEAST 100 PERCENT OF THE MATERIAL'S MAXIMUM MODIFIED PROCTOR DRY DENSITY PRIOR TO GEOGRID PLACEMENT 8. MOISTURE CONTENT OF SELECT FILL AND ON -SITE SOIL SHALL NOT EXCEED OPTIMUM MOISTURE CONTENT BY 0 PERCENTAGE POINTS BELOW AND TO 3 PERCENTAGE POINTS ABOVE THE OPTIMUM MOISTURE CONTENT VALUE OR IS TOO WET TO COMPACT TO SPECIFIED DRY UNIT. LEGEND EXISTING: SURVEY CONTROL POINT MAJOR GROUND CONTOUR 31 MINOR GROUND CONTOUR Vrr+ VV WATER LINE 1P<11 WATER VALVE FIRE LINE FIRE HYDRANT SANITARY SEWER STORM DRAINAGE ELECTRICAL LINE G J G UNDERGROUND ELECTRICAL LINE POWER POLE l STREET LIGHT c , GAS LINE C 0[10 C 0[10 TELECOMMUNICATIONS LINE FENCE LINE �. Y" Y. Y Y...Y. ,Y". Y, . TREE LINE CHERRY PINE OAK TREES I\_ 0 .o G RAVE L CONCRETE ASPHALT °I' ELECTRICAL TRANSFORMER EXISTING BUILDING TO REMAIN GENERAL NOTES 1. PROTECT ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL OF THE OWNER'S FACILITIES. SHOULD DAMAGES OCCUR, CONTRACTOR SHALL REPAIR IMMEDIATELY AS DIRECTED BY THE OWNER OR ENGINEER. 2. CONTRACTOR SHALL HOLD HARMLESS THE OWNER AND THE ENGINEER FOR DAMAGES, INJURIES OR OTHER ACCIDENTS WHICH OCCUR DURING THESE CONSTRUCTION ACTIVITIES. 3. TREES AND EXISTING LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION. 4. CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGES DURING CONSTRUCTION INCLUDING DAMAGES TO OTHER CONTRACTORS & CONSULTANTS WORK AND SHALL MAKE REPAIRS OR HAVE REPAIRS MADE BY OTHERS AT HIS EXPENSE. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION ADJUSTMENTS OF ALL EXISTING VAULTS (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES ETC. TO MATCH FINISHED GRADES AND SITE PLAN. ALL SUCH WORK SHALL BE COORDINATED WITH THE ENGINEER AND OWNER. 6. UTILIZE SIGNS, BARRICADES, ETC. TO ENSURE THE SAFETY OF THE GENERAL PUBLIC. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING LAYOUT OF ALL WORK AS ILLUSTRATED ON PLANS. IF EXISTING CONDITIONS DIFFER FROM THOSE ILLUSTRATED ON PLANS, NOTIFY ENGINEER AND OWNER PRIOR TO CONSTRUCTION. 8. BOUNDARY SURVEY WAS PREPARED BY STANTEC CONSULTING SERVICES, INC. THE BASIS OF BEARING IS NC GRID (NAD 83). 9. THE DRAWING ON SHEET C100, REPRESENTS THE EXISTING CONDITIONS AS OF JANUARY 27, 2020. 10. VERIFY ALL DIMENSIONS AND GRADES AT THE JOB SITE. IF DIFFERENCES ARE FOUND, NOTIFY ENGINEER SO THAT MODIFICATIONS TO THESE DRAWINGS CAN BE MADE. 11. ALL SIGNAGE AND PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". 12. ANY LAND -DISTURBING ACTIVITY >1 ACRE REQUIRES COMPLIANCE WITH ALL CONDITIONS OF THE GENERAL PERMIT TO DISCHARGE STORM WATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (PERMIT No. NCGO10000). ANY PERMIT NONCOMPLIANCE IS A VIOLATION OF THE CLEAN WATER ACT AND MAY REQUIRE ENFORCEMENT ACTION BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES. 13. ALL SUBSURFACE DRAINAGE PIPE SHALL BE HDPE UNLESS OTHERWISE NOTED. 14. THERE ARE NO WETLANDS IDENTIFIED ON THIS SITE BASED ON NATIONAL WETLAND INVENTORY AND VISUAL INSPECTION BY STANTEC CONSULTING SERVICES, INC. LEGEND PROPOSED: 22^ MAJOR CONTOUR 219 MINOR CONTOUR 255.7 X SPOT ELEVATION 255.7T X SPOT ELEVATION TOP OF CURB SD SD STORM DRAIN LINE STORM DRAIN SERVICE LINE O STORM WATER FLOW DIRECTION ARROW CO STORM DRAIN MANHOLE .�� STORM DRAIN CLEAN OUT DRAINAGE CHANNEL - SF - SF SEDIMENT FENCE - TP - TP TREE PROTECTION - x - x SITE FENCE E E ELECTRIC LINE ss SANITARY SEWER LINE w w WATER LINE CURB AND GUTTER - - LIMITS OF CONSTRUCTION TREE LINE SOIL ROAD ' ' • '' ' ' LIGHT DUTY CONCRETE PAVEMENT HEAVY DUTY CONCRETE PAVEMENT K*_,AVkC_ GRAVEL PAVEMENT DEMOLISH SF : SF - SEDIMENT FENCE OUTLET STORM DRAIN FLARED END SECTION FIRE HYDRANT STRUCTURE TEMPORARY SKIMMER SEDIMENT BASIN CHECK DAM WITH A WEIR TEMPORARY CONCRETE WASHOUT AREA W 70 m .E a) n CONSULTANTS: Civil: Stantec 801 Jones Franklin Road, Suite 300 Raleigh, NC 27606 MEP/FP: SSC Engineering, Inc. 18207 Edison Ave. Chesterfield, MO 63005 z O Q O O U rn � ti = U CN � Z LLI J m J G > LLI U) Z U 0::D U LU LLI > J Q LLI �e LLI N ..,;COOPERATIVE BUILDING SOLUTIONS F I, ` i uw L I I C..d 11C.. L... E kU� ail %'llA "2 % 7 %..iN./,ul? 0,ul2 %..iN PROFESSIONAL RECORD A 08 08/14/202 DATE 07-10-2020 PROJECT NUMBER 19.025 TITLE ABBREVIATIONS AND LEGEND SHEET 001