Loading...
HomeMy WebLinkAboutSW6201102_Calcs_20210202 Narrative ProjectDescription ThisprojectisfortheconstructionofanewminimartandgasstationlocatedonToraBoraBlvdinFt. BraggMilitaryBase.CurrentlythesiteisvacantwithadecreasingslopeheadingSouthtoNorthand partiallywooded.Therearenowetlandslocatedwithintheprojectlimits.Improvementsto thesitewill betheconstructionofanewbuilding,gaspumpsandparkingarea.Thesitewillhavetwoconnection pointstoToraBoraBLVD.Thetotalprojectisapproximately3.01acreswith1.89acresbeingtreatedin aNCDEQStormwaterBMP. Stormwaterfromthesitewillbecollectedviacatchbasinsandtrenchgratesandconveyedtoasand filterdesignedtohandletherainfallevent.ThesandfilterisdesignedperchapterC6ofNCDEQ StormwaterDesignManual.Thefilterwillhaveaminimumofofsandfrombottomofbasinand minimumofofsandabovethe3underdrainpipeswithinthefilter.Stormwaterfromthesitewill draintoStewartsCreek(C,18312454)locatedintheCapeFearRiverBasin. PROJECT DATA: Existing Site Data:(within Project Limits) Existing wetlands 0.0 sf (0.0 acres) Existing uplands 130,930 sf (3.01 acres) Total proposed project area130,930 sf (3.01 acres) Proposed Site Data: (within Project Limits) Proposed building 6,510 sf (0.15 acres) Proposed roads59,847 sf (1.37acres) Proposed sidewalk 6,105 sf (0.14 acres) Proposed pump station 600 sf (0.01 acres) Total proposed impervious area73,062 sf (1.68 acres) Existing Site Data:(within Sand Filter Drainage Delineation) Existing wetlands 0.0 sf (0.0 acres) Existing uplands 82,340 sf (1.89 acres) Total proposed project area82,340sf(1.89acres) Proposed Site Data: (within Sand Filter Drainage Delineation) Proposed building 6,510 sf (0.15 acres) Proposed roads56,579 sf (1.30 acres) Proposed sidewalk 5,593 sf (0.13acres) Total proposed impervious area68,682 sf (1.58 acres) Soil Types Within Project Limits: Abbreviation Type and Description Hydrologic Group Area FaB Faceville Loamy SandB 3.01 ac (See attached soils map) SANDFILTERYARBOROUGHCOMPLEX 1.0"VOLUMEDETERMINATION: DETERMINEIMPERVIOUSPERCENTAGETOSANDFILTER areatobasin=82,340sf =1.89acres ImperviouswithinDrainage ImperviousforwholesiteevenifnotdrainingtoSandFilterAreatoSandfilter buildings/driveways=6,510sf6,510sf pavedarea=59,847sf56,579sf pumpstation=600sfsf sidewalk=6,105sf5,593sf totalimp.surface=73,062sf68,682sf percentimp.=88.7%83.4% DETERMINERUNOFFCOEFFICIENT(Rv) I=88.7percentimpervious Rv=?(runoffcoefficient,inchesperinch) Rv=0.05+0.009(I) Rv=0.85in/in DETERMINEVOLUME designstorm=1inch Rv=0.85in/in drainagearea=1.89acres volume=? volume=(designstorm)(Rv)(drainagearea) volume=0.13acreft 1.0"volume=5,832cfofrequiredstoragevolume AdjustedWaterQualityVolume=4,374cfthatmustbecontainedbetweenthe (ADJWQV)sedimentationchamberandthe sandfilter(abovethesand) MINIMUMSANDFILTERBASINSURFACEAREA SA=ADJWQV/PondingDepth PondingDepth=2 ft SA=2,187sf STAGESTORAGEFORSANDFILTER STORAGETABLE: SedimentChamberINCREMENTAL ELEVATIONAREAVOLUMESTORAGE (ft)(sf)(cf)(cf) 261486Sed.StorageNotusedincalcs 262975 2631,5701,2731,273 2642,2701,920 3,193 SandChamber INCREMENTAL ELEVATIONAREAVOLUMESTORAGE (ft)(sf)(cf)(cf) 260456BottomofSandNotusedincalcs 261829Notusedincalcs 2621,252TopofSand 2631,7241,4881,488 2642,2441,984 3,472 TotalWaterQualityStorage=6,665cf CALIBRE ENGINEERING PO BOX 4041 WILMINGTON, NC 28406 SedimentChamber,SandChamberandforebayberm INCREMENTAL ELEVATIONAREAVOLUMESTORAGE (ft)(sf)(cf)(cf) 2644,623 2656,0215,322 5,322 DETERMINEDRAWDOWN Orificesize=6in Orificecoefficient(C)=0.60 Averagehead(h)=(264262)/30.66ft Orificecrosssectionalarea(A)=pixr^2=3.14x(r/12)^2=0.20sf Accelerationduetogravity(g)=32.2ft/s^2 Q=CA(2gh)^1/2=0.6x0.20x(2x32.2x0.66)^1/2=0.78cfs 4,374/0.78=5,608seconds=1.56Hours UNDERDRAINCALCULATION mediaflowrate=2in/hr linearinfiltrationrate=2in/hr =0.000046ft/sec bottomoffilterarea=456sf 3drate=0.021cfs factorofsafety=10 0.21cfs D=16{(Qxn)/S^0.5}^0.375 D=diameterofsinglepipe n=0.011roughnessfactor S=0.005slope Q=0.21cfs D=4.4352 fromNCDENRManualchapterA5ifD<9.11 Then36"underdrainpipesrequired. CALIBRE ENGINEERING PO BOX 4041 WILMINGTON, NC 28406 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd.HydrographPeakTimeTime toHyd.InflowMaximumTotalHydrograph No.typeflowintervalPeakvolumehyd(s)elevationstrge usedDescription (origin)(cfs)(min)(min)(cuft)(ft)(cuft) 1SCS Runoff0.14527401,375------------------Pre-Dev 2SCS Runoff4.674272414,326------------------Post-Dev 3Reservoir2.408273014,3262262.731,978Routed Sand_filter.gpwReturn Period: 1 YearTuesday, 01 / 26 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020Tuesday, 01 / 26 / 2021 Hyd. No. 1 Pre-Dev Hydrograph type= SCS RunoffPeak discharge= 0.145 cfs Storm frequency= 1 yrsTime to peak= 12.33 hrs Time interval= 2 minHyd. volume= 1,375 cuft Drainage area= 1.890 acCurve number= 55 Basin Slope= 0.0 %Hydraulic length= 0 ft Tc method= UserTime of conc. (Tc)= 5.00 min Total precip.= 3.07 inDistribution= Type III Storm duration= 24 hrsShape factor= 484 Pre-Dev Q (cfs)Q (cfs) Hyd. No. 1 -- 1 Year 0.500.50 0.450.45 0.400.40 0.350.35 0.300.30 0.250.25 0.200.20 0.150.15 0.100.10 0.050.05 0.000.00 02468101214161820222426 Time (hrs) Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020Tuesday, 01 / 26 / 2021 Hyd. No. 2 Post-Dev Hydrograph type= SCS RunoffPeak discharge= 4.674 cfs Storm frequency= 1 yrsTime to peak= 12.07 hrs Time interval= 2 minHyd. volume= 14,326 cuft Drainage area= 1.890 acCurve number= 92 Basin Slope= 0.0 %Hydraulic length= 0 ft Tc method= UserTime of conc. (Tc)= 5.00 min Total precip.= 3.07 inDistribution= Type III Storm duration= 24 hrsShape factor= 484 Post-Dev Q (cfs)Q (cfs) Hyd. No. 2 -- 1 Year 5.005.00 4.004.00 3.003.00 2.002.00 1.001.00 0.000.00 024681012141618202224 Time (hrs) Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020Tuesday, 01 / 26 / 2021 Hyd. No. 3 Routed Hydrograph type= ReservoirPeak discharge= 2.408 cfs Storm frequency= 1 yrsTime to peak= 12.17 hrs Time interval= 2 minHyd. volume= 14,326 cuft Inflow hyd. No.= 2 - Post-DevMax. Elevation= 262.73 ft Reservoir name= Sand FilterMax. Storage= 1,978 cuft Storage Indication method used. Routed Q (cfs)Q (cfs) Hyd. No. 3 -- 1 Year 5.005.00 4.004.00 3.003.00 2.002.00 1.001.00 0.000.00 02468101214161820222426 Time (hrs) Hyd No. 3Hyd No. 2Total storage used = 1,978 cuft Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd.HydrographPeakTimeTime toHyd.InflowMaximumTotalHydrograph No.typeflowintervalPeakvolumehyd(s)elevationstrge usedDescription (origin)(cfs)(min)(min)(cuft)(ft)(cuft) 1SCS Runoff4.274272413,660------------------Pre-Dev 2SCS Runoff12.01272438,944------------------Post-Dev 3Reservoir4.312273838,9432264.197,708Routed Sand_filter.gpwReturn Period: 10 YearTuesday, 01 / 26 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020Tuesday, 01 / 26 / 2021 Hyd. No. 1 Pre-Dev Hydrograph type= SCS RunoffPeak discharge= 4.274 cfs Storm frequency= 10 yrsTime to peak= 12.07 hrs Time interval= 2 minHyd. volume= 13,660 cuft Drainage area= 1.890 acCurve number= 55 Basin Slope= 0.0 %Hydraulic length= 0 ft Tc method= UserTime of conc. (Tc)= 5.00 min Total precip.= 7.00 inDistribution= Type III Storm duration= 24 hrsShape factor= 484 Pre-Dev Q (cfs)Q (cfs) Hyd. No. 1 -- 10 Year 5.005.00 4.004.00 3.003.00 2.002.00 1.001.00 0.000.00 02468101214161820222426 Time (hrs) Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020Tuesday, 01 / 26 / 2021 Hyd. No. 2 Post-Dev Hydrograph type= SCS RunoffPeak discharge= 12.01 cfs Storm frequency= 10 yrsTime to peak= 12.07 hrs Time interval= 2 minHyd. volume= 38,944 cuft Drainage area= 1.890 acCurve number= 92 Basin Slope= 0.0 %Hydraulic length= 0 ft Tc method= UserTime of conc. (Tc)= 5.00 min Total precip.= 7.00 inDistribution= Type III Storm duration= 24 hrsShape factor= 484 Post-Dev Q (cfs)Q (cfs) Hyd. No. 2 -- 10 Year 14.0014.00 12.0012.00 10.0010.00 8.008.00 6.006.00 4.004.00 2.002.00 0.000.00 024681012141618202224 Time (hrs) Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020Tuesday, 01 / 26 / 2021 Hyd. No. 3 Routed Hydrograph type= ReservoirPeak discharge= 4.312 cfs Storm frequency= 10 yrsTime to peak= 12.30 hrs Time interval= 2 minHyd. volume= 38,943 cuft Inflow hyd. No.= 2 - Post-DevMax. Elevation= 264.19 ft Reservoir name= Sand FilterMax. Storage= 7,708 cuft Storage Indication method used. Routed Q (cfs)Q (cfs) Hyd. No. 3 -- 10 Year 14.0014.00 12.0012.00 10.0010.00 8.008.00 6.006.00 4.004.00 2.002.00 0.000.00 02468101214161820222426 Time (hrs) Hyd No. 3Hyd No. 2Total storage used = 7,708 cuft Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020Tuesday, 01 / 26 / 2021 Pond No. 1 - Sand Filter Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 262.00 ft Stage / Storage Table Stage (ft)Elevation (ft)Contour area (sqft)Incr. Storage (cuft)Total storage (cuft) 0.00262.002,22700 1.00263.003,2942,7432,743 2.00264.004,6233,9396,682 3.00265.006,0215,30611,988 Culvert / Orifice StructuresWeir Structures \[A\]\[B\]\[C\]\[PrfRsr\]\[A\]\[B\]\[C\]\[D\] Rise (in)= 12.006.000.000.00 Crest Len (ft)= 2.000.0010.000.00 = 12.006.000.000.00= 264.000.00264.500.00 Span (in)Crest El. (ft) = 1300= 3.333.332.603.33 No. BarrelsWeir Coeff. Invert El. (ft)= 260.00260.000.000.00 Weir Type= 1---Broad--- Length (ft)= 60.003.000.000.00 Multi-Stage= YesNoNoNo = 0.200.000.00n/a Slope (%) = .013.013.013n/a N-Value Orifice Coeff.= 0.600.600.600.60 Exfil.(in/hr)= 0.000(by Contour) = n/aYesNoNo= 0.00 Multi-StageTW Elev. (ft) Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Stage (ft) Elev (ft) 3.00265.00 2.00264.00 1.00263.00 0.00262.00 0.002.004.006.008.0010.0012.0014.0016.00 Discharge (cfs) Total Q VELOCITY CONTROL FOR PIPE OUTFALL: Sandfilter Outfall - 12" PIPE OUTFALL: Qpeak = 4.48cfs from 12" pipe (see sheet C504) Q = VAV = Q / A =4.48/0.79 =5.7ft/sec From chart 8.06b, Q =4.48cfs d =12" d50 =0.20ft or2.4", use 4" La =9ft 3d =3.0ft W = d + 0.4La =4.6ft dmax = 1.5 x d50 =6" apron thickness = 1.5 x dmax =9" apron dimensions: min. stone size =4inches min. apron thickness =9inches apron length =9ft width of apron at pipe outlet =3ft width of apron at end of apron =4.6ft Outfall from CB1 - 18" PIPE OUTFALL: Qpeak = 6.68cfs from 18" pipe (see sheet C120) Q = VAV = Q / A =6.68/1.77 =3.8ft/sec From chart 8.06b, Q =6.68cfs d =18" d50 =0.20ft or2.4", use 4" La =9ft 3d =4.5ft W = d + 0.4La =5.1ft dmax = 1.5 x d50 =6" apron thickness = 1.5 x dmax =9" apron dimensions: min. stone size =4inches min. apron thickness =9inches apron length =9ft width of apron at pipe outlet =5ft width of apron at end of apron =5.1ft CALIBRE PO BOX 4041 WILMINGTON, NC 28406 Outfall from CB5 - 18" PIPE OUTFALL: Qpeak = 2.55cfs from 18" pipe (see sheet C120) Q = VAV = Q / A =2.55/1.77 =1.4ft/sec From chart 8.06b, Q =2.55cfs d =18" d50 =0.20ft or2.4", use 4" La =9ft 3d =4.5ft W = d + 0.4La =5.1ft dmax = 1.5 x d50 =6" apron thickness = 1.5 x dmax =9" apron dimensions: min. stone size =4inches min. apron thickness =9inches apron length =9ft width of apron at pipe outlet =5ft width of apron at end of apron =5.1ft Outfall from CB8 - 18" PIPE OUTFALL: Qpeak = 2.85cfs from 18" pipe (see sheet C120) Q = VAV = Q / A =2.85/1.77 =1.6ft/sec From chart 8.06b, Q =2.85cfs d =18" d50 =0.20ft or2.4", use 4" La =9ft 3d =4.5ft W = d + 0.4La =5.1ft dmax = 1.5 x d50 =6" apron thickness = 1.5 x dmax =9" apron dimensions: min. stone size =4inches min. apron thickness =9inches apron length =9ft width of apron at pipe outlet =5ft width of apron at end of apron =5.1ft CALIBRE PO BOX 4041 WILMINGTON, NC 28406 Sed. Basin 2 - 4" PIPE OUTFALL: Qpeak = 1.96cfs from 4" pipe (see sheet C-120) Q = VAV = Q / A =1.96/0.09 =22.5ft/sec From chart 8.06b, Q =1.96cfs d =4" d50 =0.10ft or1.2", use 4" La =4ft 3d =1.0ft W = d + 0.4La =1.9333ft dmax = 1.5 x d50 =6" apron thickness = 1.5 x dmax =9" apron dimensions: min. stone size =4inches min. apron thickness =9inches apron length =4ft width of apron at pipe outlet =1ft width of apron at end of apron =1.93ft CALIBRE PO BOX 4041 WILMINGTON, NC 28406 610 Spring Branch Road Dunn, NC 28334 Ph: (910) 292-2085 www.BuildingAndEarth.com January 20, 2021 Marshall-Waters-Woody Associates, Inc. 1736 East Sunshine Street Springfield, MO 65804 Attention: Mr. Mark Cummins, Project Architect Subject: Report of SHWT at Additional Locations Yarborough Express Mart Tora Bora Boulevard, North Carolina Proposal Number: RD180486 Ladies and Gentlemen: Building & Earth Sciences, LLP is pleased to submit this report of Seasonal High-Water Table (SHWT) for the above stated project site. The purpose of our work included having a NC licensed Soil Scientist visit the project site and determine the depth to observed SHWT and three locations determined by the design team of Marshall-Waters- Woody Associates and Calibre. Mr. Mike Eaker of Southeastern Soil and Environmental Associates, under contract with Building & Earth Sciences, visited the site to determine the depth of SHWT. A copy of ched to this cover letter. We appreciate the opportunity to provide these services, and look forward to working with you on this project. If you have any questions regarding this proposal, please contact me at your convenience. Respectfully Submitted, BUILDING & EARTH SCIENCES, LLP Kurt A. Miller, PE Branch Manager Attachment: SHWT Observations by Southeastern Soil and Environmental Associates Birmingham, AL Auburn, AL Huntsville, AL Montgomery, AL Columbus, GA Louisville, KY New Orleans, LA Raleigh, NC Springdale, AR Little Rock, AR Tulsa, OK