Loading...
HomeMy WebLinkAboutSW4190902_O&M Agreement_20191105Operation 8r Maintenance Agreement Circle K - R&R 2723188 Rural Hall, NC FORSYTH County Prepared By: Rick Baker, PE, Timmons Group Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: Soil Amendments Present: O&M tables will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): under Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. " Responsible Party: Will Rice Jr Title & Organization: Vice President, Circle K Stores, Inc Street address: 1000 Situs Court, Ste 100 City, state, zip: Raleigh, NC 27606 Phone number(s): Email: Signature: Date: '�+y '/5"-/1 I, �i n F Ahrynd a Notary Public for the State of M!:��J ii C.//G1.i oby1Cv County of (A{ cr,&ge'- do hearby certify that /Me ed;-M A). R/ceoy- personally appeared before me this 5 day of /CgI'r,(Q,I"1L/ oZ 0/9 and acknowledge the due execution of the Opgrationcand Mwtenzw Agreement. Witness my hand and official seal, V.J/"444 // / , _ Johnstoh Coi North Caroll Comm colon Explm Seal 23.2023 My commission expires �jDI'i� p13 �043 STORM-EZ 2/8/2019 Version 14 O&M Manual Page 1 of 2 Proprietary System Maintenance Requirements How many devices are ADS BAYFILTERS? Important operation and maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the BAYFILTER. - The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. The BAYFILTER system will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: Adjacent pavement (if applicable) Trash/debris is present. Remove the trash/debris. Flow diversion structure Sediment is present on the pavement surface. Sweep or vacuum the sediment as soon as possible. StormFilter Cartridges The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage have occurred at the outlet. Contact the 401 Oversight Unit at 919-733-1786. All other operation and maintenance activities should be in accordance with ADS'S BAYFILTER Inspection and Maintenance Procedures document. Any problems that are found shall be repaired immediately. The responsible party shall have received and understand ADS'S BAYFILTER Inspection and Maintenance Procedures document. STORM-EZ 2/19/2019 Version 1.4 O&M Manual Page 2 of 2