Loading...
HomeMy WebLinkAboutNCC210499_NOI Application_20210128Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 1/27/2021 11:16:53 AM (NCG01 NOI Submission) Approve by Garcia, Lauren V 1/27/2021 1:25:20 PM (Review- Construction NOI 41940) • The task was assigned to Garcia, Lauren V by round robin distribution 1/27/2021 11:17 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: January 29, 2021 5:00 PM 1/27/2021 11:17 AM Submit by Selkane, Aziza 1/28/2021 9:03:36 AM (Payment Verification for NCC210499) * Public Works 1 • Selkane, Aziza assigned the task to Selkane, Aziza 1/28/2021 8:58 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 10, 2021 5:00 PM 1/27/2021 1:25 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting F No an NOI that was r Yes rejected before? 1a. Project Name * Yadkin Regional Water Supply Project 1 b. Specific Lot This field rray be used to list specifc lot nunbers. Numbers 1 c. Parcel ID List all RNIs associated w ith this project. Number(s) (PIN) 655301096797 655301198504 655403309847 655403403228 655403407468 655403407468 655404508592 655404603783 655404606409 655404608695 655404701699 655404716684 655404815386 655404819238 655404911333 655404914523 655404916546 655404919310 656403012081 656403004991 656403026051 656403016271 656403110241 656403112256 656403114200 656403116172 656403119223 656403210420 656403211419 656403335435 656403212295 656403323289 656403328932 656403440174 656403444410 656403435371 656403439373 656404532219 656404534618 656404539051 656404732414 656404822157 657403022453 656404902885 657403110117 657403110086 657403111221 657403112138 657403112662 2. County* Union 3. Highway or Street 465 Bay Shore Drive Address * Street narre only is acceptable if no address nun ber assigned yet 4. City or Township* Norwood 5. State * NC 6. Zip Code* 28128 7. Latitude* Enter the latitude in decimal degrees 35.2339 8. Longitude* Enter the longitude in decimal degrees (M-ST be negative) -80.0984 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/01/2021 Estimated Construction Project Start Rate 10. Date to End* 11 /22/2023 Estimated Construction Project End Cate 11. SIC (Primary) * Other (9999) Standard Industrial aassification for Development 12. Acres to be 40.90 disturbed* (including off -site borrow and waste areas) 13. Total site area 40.90 (acres) * 14. Post- 0.43 construction (Estimated) impervious area (acres) * NCC Project NCC-UNION-2021-Yadkin Regional Water Supply Project Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving PEE DEE RIVER (including Lake Tillery Waterbody* below normal operating levels) I brre of waterbody into w hich stormwater runoff w ill discharge 15b. Waterbody 13-(1) Index No.* NCWaterbody Index Number Stormwater r No discharges will flow Pf Yes to additional wate rs * 15c. Additional Cedar Creek Receiving Waterbody name Waterbody 15d. Waterbody 13-12-(1) Index No. NCWaterbody Index Number 15e. Additional Waterbody nacre Receiving Waterbody 15f. Waterbody Index No. NC Waterbody Index N.irrber 16a. Is this project subject to the NC Sediment Pollution Control Act?* r Yes r No, not subject to NC SPCA B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Union County It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * John If Corporation, enter Faegistered Agent First %rre 3. Last Name* Shutak It Corporation, enter Pbegistered Agent Last %rre 3b. Title Engineering Division Director 4. Permitee E-mail john.shutak@unioncountync.gov Address* 5. Permittee 704-283-3651 Telephone No.* 6. Permittee Mailing Street Address Address* 500 N Main St Address Line 2 Suite 600 aty Monroe Check box if the street address the same as mailing address 7. Permittee Street Address* Fbstal / Zip Code 28112-4728 V Yes Street Address 500 N Main St Address Line 2 Suite 600 city Monroe Fbstal / Zip Code 28112-4728 State / Ffovince / Fbgion NC Country US State / Ftovince / Region NC Country US 8. Type of Ownership is only individual if an individual is naned in B.1. above. Ownership* Government - County C. Site Contact Information Part C. Roject Site Contact Inforrration ........................................................................................................................................................................................................................................................................... 1. Primary Site Kyle Contact - First Name * 2. Primary Site Anderson Contact - Last Name * 3. Title Project Manager 4. Site Contact E- kanderson@garney.com mail Address* 5. Site Contact 316-833-6632 Telephone No.* 6. Organization Garney Companies, Inc. Name 7. Site Contact Street Address Mailing Address* 620 Allenton Street Address Line 2 City State / Rovince / Region Norwood NC Fbstal / Zip Code Country 28128 us 8. Consultant Name (Optional) Jay Jackson First and Last nacre 9. Consultant E-mail jjackson@hazenandsawyer.com This person will be copied on all correspondence. 10. Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) john.shutak@unioncountync.gov Default is legally responsible person a-rrail (older NOIs rray not populate) 12. Billing (For Annual Fee correspondence) Telephone 704-283-3651 Default is legally responsible person telephone (older NOLs rray not populate) D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/26/2021 Approved * 2. E&SC Plan Project UNION-2021-006 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan Yadkin Regional Water Supply Project (UNION Approval letter or 344.28KB 2021-006) approval w mods.pdf Grading Permit Mast be FDFfon-rat 6. Site Location Map Mist be RDFforrret (lint 201VB) Figure 1-Vicinity Map First 5 Miles.pdf 598.87KB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies if necessary. 8. NOI Certification 20210127_eNO1_CertificationForm_Union2021- Form 1.81 MB 006_Executed.pdf Mast be FCFfon-rat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* IT The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature J)& 1l kw Type Name * John Shutak Title Engineering Division Director Organization Legally Responsible Entity Union County Date * 01 /27/2021 F. Tracking and COC Info NOI Tracking No. 41940 NC Reference No. NCG01-2021-0499 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC210499 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 499 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC210499-2021 Invoice Due Date 2/26/2021 Initial Fee $ 100.00 Invoice Status OPEN