Loading...
HomeMy WebLinkAboutSWA000083_DEC_CR Letter_Submittal 2_2020.12.21_20201221526 S. Church St. EC08Q Charlotte, NC 28202 o: 704.373.8514 c: 704.530.7772 December 21, 2020 Mr. Corey Anen NCDENR – DEMLR 1612 Mail Service Center 512 North Salisbury Street Raleigh, NC 27699 Subject: Ferncliff Ret – Additional Information Request Dear Mr. Anen, Thank you for taking the time to conduct a review of the plans and calculations for the above project and provide comments on the submittal package. Below is a list of the comments with responses to each comment as to how the plans were changed to meet the State standards. Please use this document as an aid in your review and I hope that we have adequately satisfied all concerns and addressed all comments. Post-Construction Stormwater 1. Please provide official documentation showing the title and position held by the person who signed the application to verify that they have authority to apply on behalf of the LLC. This can be official documentation from the NC Secretary of State, other official company documentation, or a signed letter from an official listed by the NC Secretary of State confirming that this person is authorized to apply for the permit [15A NCAC 02H .1043(3)(b)(ii)]. a. Michael Robinson is Manager over Duke Energy Substation Engineering. I have provided a letter for delegation from the Transmission Vice President stating the authority of the manager to sign for permitting documents as it relates to a project. Ben Harrison is the author of the letter and I have highlighted his name in the NCSOS printout attached. Please let me know if there is anything else specific that you may need for this. 2. Please show all streams, wetlands, and buffers on the plan or add a note that none exist [15A NCAC 02H .1043(3)(f)]. a. Internal department provided additional information on an NRA completed for the site and a PJD completed for the site as part of the NRA. The perennial and intermittent streams identified in the attached PJD have been shown and labeled on the plans. I am submitting revised site plans & grading plans to you for the submittal package. There are not wetlands located onsite as defined by the PJD. b. 3171999SDV01 – Cover Sheet. i. LOD updated in the site data block to 21.85 acres to mitigate all stream impacts. ii. Orange protection fence listed in the bill of material for all protection areas c. 3171999SDV03 – Overall Site Plan i. Stream and stream buffers provided according to the PJD locations and state requirement for the intermittent and perennial streams at this location. No trout buffer required for Class B streams and watercourses. ii. Note 3 added to general notes iii. Legend updated with stream buffer hatching block iv. Revised the 70’ proposed distribution corridor along Old Fanning Bridge Road to remove from all streams and buffer areas. d. 3171999GRA01. i. Streams and buffer areas shown on plan. Please feel free to contact me via phone at (704) 530-7772 or by email at Joshua.Peeler@duke- energy.com should you have any questions. Sincerely, Joshua Peeler, PE Senior Engineer