Loading...
HomeMy WebLinkAboutNCC192691_Modification Review (LEG RESP CHANGE)_20201206Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 12/3/2020 11:42:17 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 12/6/2020 1:38:42 PM (Construction COC ADD TO FILE Review- NCC192691) • The task was assigned to Georgoulias, Bethany. The due date is: December 8, 2020 5:00 PM 12/3/2020 11:42 AM Y. , NORTH CAPOLINA EnYlrenmemf& Qnalay Certificate of NCC192691 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name F35B Vertical Lift Fan Test Facility Address HWY 101 (FRCE), Cherry Point, NC County Craven Latitude 34.8860 Longitude -76.8933 Permittee Listed MCAS Cherry Point Legally Responsible Charles Schulz Individual NC Reference No. NCG01-2019-2691 E&SC Plan ID Crave-2020-001 Original NOI 18168 Tracking No.* Date COC Issued* 11/12/2019 Prior Rescission This field will populate only if COChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * a Additional Lots/Outparcels Approved - E&SC Revised O Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed F Multiple Reasons (List) Legally Responsible Individual Has Changed Addional IVbre information if needed (e.g., new Site Contact details can be included here) Explanation You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised E&SCApproval, (lose -Out Doc, etc.) Documentation F35B Vertical Lift Fan Test Facility.pdf 97.6KB Mast be FDFfon-rat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowinglyrenders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto e)ceed ten thousand dollars ($10,000). rJ I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Anthony A. Ference Title * Deputies Facilities Director By direction of the Commanding Officer Organization* MCAS Cherry Point Date * 12/03/2020 Email Address* anthony.ference@usmc.mil Errail for confirmation Telephone Number* 252-466-3807 Contact nurrber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email nathan.arnett@usmc.mil (Optional) Additional errail for confirmation Original Permittee charles.e.schulz@usmc.mil Email Original Site Contact nathan.arnett@usmc.mil Email Review Date 12/06/2020 Rescinded Since Submitted? Request Date 20201203 Formatted Review Date 20201206 Formatted