Loading...
HomeMy WebLinkAboutNCC205305_ESC Approval Submitted_20201202E SSTAIr ROT 'DOPER Governor MICHAEL S-RF.GAN Secretary S. DANIELSMITH Director NORTH CAROLINA Enviromwnral quality October 30, 2020 LETTER OF APPROVAL WITH MODIFICATIONS City of Greensboro ATTN: John Fersner, PE, Chief Design Engineer PO Box 3136 Greensboro, NC 27402 RE: Project Name: Contract 2018-051A, Davie Street Streetscape Improvements Acres Approved: 3.4 ProjectID: GUILF-2021-003 County: Guilford City: Greensboro Address: Davie St. River Basin: Cape Fear Stream Classification: WS-V, NSW Submitted By: Kimley-Horn & Associates, Inc. Date Received by LQS: October 23, 2020 Plan Type: New Dear Mr. Fersner, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage [COC] under the NCG010000 Construction Stormwater General Permit. 160FIh Carala'o Department of En.4ronme tal QuatitY I Dh Wan ofEru W. Ssntral and Land ftesour"S W,nsmn-Salrm Aegforwl Office 1 450 Hanes MI Road SuXe 300' Wms*w)•Sakm 4o ih Catotn ITFD3 oww 3367T6.4800 Letter of Approval with Modifications City of Greensboro October 30, 2020 Page 2 of 4 This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The: NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucasOncdenr.eov or Paul Clark at Paul.clark ncdent•. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1 (a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance - oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Letter of Approval with Modifications City of Greensboro October 30, 2020 Page 3 of 4 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jack Dalton Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG07 Fact Sheet Modifications Required for Approval cc: Kimley-Horn & Associates, Inc. ATTN: Jeffrey W. Moore, PE 421 Fayetteville St., Suite 600 Raleigh, NC 27601 WSRO file Letter of Approval with Modifications City of Greensboro October 30, 2020 Page 4of4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Contract 2018-051A, Davie Street Streetscape Improvements Project ID: GUILF-2021-003 County: Guilford 1. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 2. Be advised the 7/14-day soil stabilization requirements apply to any section of the project where land -disturbing activities have temporarily or permanently ceased. A single-phase continuous work project is responsible for the entire construction area throughout construction until the site is closed. [15A NCAC 04B .0106(a)(2)] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities