Loading...
HomeMy WebLinkAboutSWA000080_Add Info Request_20201124ROY COOPER - a Governor y a2 MICHAEL S. REGAN �.�xi *�`Q�^'^0"'* Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality November 24, 2020 Jim Hills, President J&A Land Development II, LLC 415 Belvoir Highway Greenville, NC 27834 Subject: Request for Additional Information Stormwater Permit No. SWA000080 Hills Machinery & Lease Buildings Henderson County Dear Mr. Hills: The Division of Energy, Mineral and Land Resources (DEMLR) received a Stormwater Management Permit Application for the subject project on October 23, 2020. A preliminary review of the application has determined that additional information is needed to meet the requirements of 15A NCAC 02H .1000 and continue the stormwater permit review. Failure to provide the following additional information to DEMLR by December 24, 2020 will result in the application being returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. 1. Please provide documentation from the North Carolina Secretary of State showing that the LLC is an active corporation in good standing with State of North Carolina [ 15A NCAC 02H .1045(2)(b)(i)]. 2. Please provide documentation from the NC Secretary of State or other official documentation showing the titles and positions held by person that signed the application [ 15A NCAC 02H .1045(2)(b)(ii)]. 3. The individual signing Part G: Certification of Applicant/Financially Responsible Party must print their name on the first line. 4. The Design Professional's Certification section was not filled out. This is required to issue the permit [15A NCAC 02H .1043(3)(d)]. Please note that Fast -Track Projects are not reviewed for technical compliance before issuing the Authorization to Construct Permit. A licensed professional who is responsible for ensuring that the project complies with the MDC must always be kept on file and oversee the project. The project will be reviewed for technical compliance upon completion of the project. The financially responsible party will be responsible for making any changes or facing disciplinary action if necessary. If you have any questions concerning this matter please feel free to contact me at Corey.Anen(&ncdenr.gov or (919) 707-3649. Sincerely, Corey Anen, PE Environmental Engineer D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA - Depanmem ai Envlloameotal Duality 919.707.9200 Stormwater Program Cc: Asheville Regional Office SWA000080 File