LETTER OF APPROVAL WITH MODIFICATIONS
Barnhill Contracting Company
Attn: Ms. Shannon K. Douglas, Vice President
841 Sun Gro Drive
Elizabeth City, NC 27909
RE: Project Name: Manning Stockpile Area
Project 1D: Marti-2021-003
County: Martin
City: Williamston
Address: Jones Road
River Basin: Roanoke
Date Received by LQS: October 29, 2020
Submitted By: Barnhill Contracting Company
Plan Type: New / Express
Dear Madam,
Acres Approved: 6.0
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must
be posted at the job site. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is requited by Title 15A NCAC
4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOI form to Annette Lucas at Annette. lucas ncdenr. gov or Paul Clark
at Paul.clark ncdenr. ov. If the owner/operator of this project changes in the future, the new
responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
D �Q7>
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land itesources
Washington Rrgional Office l 943 Washington Square Mall I Washington, North Carolina 27689
tiA
fir^+^ ���^^ 252.94b.b481
I • The approved E&SC
2, The NCGOI plan as well asand the COC, any approved deviation.
I Records of inspections made during
it is received.
g the previous 3O
Also quidays.
this letter gives the notice re
to ensure compliance with the a red by G.S, 113A-6I.1 a
pproved plan, i) of our right of periodic inspection
North CaroIina's Sedimentation Pollution
Protection of existing natural resources and adjoining trol Act is Performance -Oriented,
Of this project, the erosion and sedimentation control P llOwin the coed, requiring
g Properties. If, following the commencement
Of the Sedimentation Pollution Control Act of 1973
control
plan is inadequate to meet the requirements
through bb), this office may require revisions to the plan and imaz Ieina me atiteral Statute I I3A-5I
insure compliance with the Act. P on of the revisions to
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project.
Sincerely,
zz
�,-
Samir Dumpor, PE
Regional Engineer
cc w/o enc: Dustin Faulkner, Barnhill Contracting Company (email)
WaRO Division of Water Resources (email)
PROJECT INFORMATION SHEET
APPROVAL DATE: November 2, 2020
RESPONSIBLE PARTY: Barnhill Contracting Cam an
PROJECT NAME
COUNTY:
OFF -SITE BORROW
AND/OR DISPOSAL SITE:
START-UP DATE:
CONTRACTOR:
ON -SITE CONTACT:
ON -SITE PHONE NO.:
OFFICE PHONE NO.:
Manning Stockpile Area
Martin NO.: Marti-2021-003
NO.:
COMPLETE & RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: James Edwards
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
james.edwards@ncdenr.gov
1. The developer is responsible for the control of sediment
the ldeveloperapproved
mu t takethoseerosion and sedimentation control measures prove CGS 113A-57(3)).
additional steps necessary to stop sediment from leaving this site (N
Each sediment storage device must be inspected after each storm event (NCGS 113A-
54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50%capacity.
All sediment storage measures will remain on site and functional until all grading and final
landscaping of the project is complete (I5A NCA
2. The developer is responsible for obtaining all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity.
This could include our agency's Stormwater regulations and the Division of Water
Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S.
Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division
of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Corps of Engineers jurisdiction of the Clean Water Act, local County or
Municipalities' ordinances, or others that may be required. This approval cannot supersede
any other permit or approval.
3. Adequate and appropriate measures must be properly installed downstream, within the
limits of disturbance, of any land disturbing activity to prevent sediment from leaving the
limits of disturbance, entering existing drainage systems, impacting an on -site natural
watercourse or adjoining property. (NCGS 113A-57)
w
I A I