Loading...
HomeMy WebLinkAboutSW1200501_Calcs (Stage-storage) (1)_20201109 Stage Storage Calculations Project #:19.00154 Project Name:Fairview Elementary Car Rider Road Date:8/6/2020 By:N Sawyer Basin Name:Bio Retention Cell #1 Contour ElevationContour Area (sf)Depth (ft)Incremental Volume (cf)Cumulative Volume (cf) 23061463.65N/AN/AN/A 23072021.5411742.601742.60 23082635.9712328.764071.35 Minimum Volume Required for Design Storm of 1" = 572 cu.ft. or 33% of the actual volume at 12" of ponding. 12" x 33% = 3.96" or .33' Elevation of the 1" design storm = 2306.33 Buncombe Co. Pre vs Post 1 yr, 24 hour event, Volume to be treated = 1099 cu.ft. or 63% of the actual volume at 12" of ponding. 12" x 63% = 7.56" or .63' Elevation of the treated volume = 2306.63