Loading...
HomeMy WebLinkAboutNCC205089_NOI Application_20201109Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/5/2020 3:22:55 PM (NCG01 NOI Submission) Approve by Meloy, Michael 11/6/2020 9:15:17 AM (Review- Construction NOI 35228) • Morman, Alaina reassigned the task to Meloy, Michael 11/5/2020 3:44 PM • The task was assigned to Morman, Alaina by round robin distribution 11/5/2020 3:23 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 9, 2020 5:00 PM 11/5/2020 3:23 PM Submit by Selkane, Aziza 11/9/2020 8:07:39 AM (Payment Verification for NCC205089) * Joseph Hoglund • Selkane, Aziza assigned the task to Selkane, Aziza 11/9/2020 8:06 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 18, 2020 5:00 PM 11/6/2020 9:15 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 35215 NOI No. Prior Reviewer Michael Meloy Name 1a. Project Name * WMC Temporary Staging 1 b. Specific Lot This field may be used to list specffc lot numbers. Numbers 2. County* Watauga 3. Highway or Street 134 Deerfield Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Boone 5. State * NC 6. Zip Code * 28607 7. Latitude * Enter the latitude in decirral degrees 36.1958 8. Longitude* Enter the longitude in decir al degrees (M. ST be negative) -81.6510 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/09/2020 Estinated Construction Project Start Date 10. Date to End* 11/11/2022 Estimated Construction Project End Cute 11. SIC (Primary) * Other (9999) Standard Industrial Classification for Ceveloprrent 12. Acres to be 2.75 disturbed* (including off -site borrow and waste areas) 13. Total site area 18.58 (acres) * 14. Post- 0.00 construction (Estimated) impervious area (acres) * NCC Project NCC-WATAU-2020-WMC Temporary Staging Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Middle Fork South Fork New River Wate rbody* %rre of waterbody into which stormwater runoff will discharge 15b. Waterbody 10-1-2-(14) Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Watauga Medical Center Inc. It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Maran IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Sigmon It Corporation, enter F;bgistered Agent Last %rre 3b. Title Vice President 4. Permitee E-mail msigmon@apprhs.org Address* 5. Permittee 8282624177 Telephone No.* 6. Permittee Mailing Street Address Address* 336 Deerfield Road Address Line 2 City State / Frovince / Fbgion Boone NC Fbstal / Zip Code Country 28607 USA Check box if the F Yes street address the same as mailing address 7. Permittee Street Street Address Address* 336 Deerfield Road Address Line 2 City State / Frovince / Region Boone NC Fbstal / Zip Code Country 28607 USA 8. Type of Non -Government Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Rob Contact - First Name * 2. Primary Site Trotter Contact - Last Name * 3. Title Superintendent 4. Site Contact E- rob.trotter@jrvannoy.com mail Address* 5. Site Contact 7046076019 Telephone No. 6. Organization Vannoy Construction Name 7. Site Contact Street Address Mailing Address* 4024 Barringer Drive Address Line 2 City Charlotte Fbstal / Zip Code 28217 8. Consultant Name (Optional) James Peltier First and Last nacre 9. Consultant E-mail jpeltier@emht.com This person will be copied on all correspondence. 10. Consultant 7043539949 Telephone No. State / Rovince / Region NC Country USA D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/03/2020 Approved * 2. E&SC Plan Project Z04217-091620 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Town of Boone Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Zoning Permit_Z04217- Approval letter or 292.88KB 091620_WMCTe mpStag i ng_11032020. pdf Grading Permit Mist be RDFforrrat 6. Site Location Map Helpful for linear project review (Optional) Mast be FDFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification 2020-11-04 - WMC - Job Trailers - NCDEQ eNO1 - Form 86.48KB signed.pdf Mast be FDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Maran Sigmon Title Vice President Organization Legally Ibsponsible Entity Watauga Medical Center Inc. Date * 11 /05/2020 F. Tracking and COC Info NOI Tracking No. 35228 NC Reference No. NCG01-2020-5089 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205089 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5089 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205089-2020 Invoice Due Date 12/6/2020 Initial Fee $ 100.00 Invoice Status OPEN