Loading...
HomeMy WebLinkAboutNCC204816_ESC Approval Submitted_20201027Gaston County Soil Erosion and Sedimentation Control Program www.castongoucom /departments /Natural -Resources CONTACT: Gaston Natural Resources Department 1303 Cherryville Hwy Dallas, NC 28034 Telephone: 704-922-4181 Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Dellview Gastonia High Shoals Kings Mountain Lowell McAdenville Mount Holly Ranlo Spencer Mountain Stanley Mission Statement 'To provide leadership and conservation assistance to the people of Gaston County to improve and sustain their soil, water, air, plant and wildlife resources." GASTON COUNTY Gaston Natural Resources Department Soil Erosion & Sedimentation Control RE: Letter Of Approval Date: 10/23/2020 Project Name Spencer Mountain Phase 4 Permit #: 3685 Responsible Party D.R. Horton, Inc. (Bart Carroll) Address 8001 Arrowridge Blvd City, State, zip Charlotte NC 28273 Location Eastway St. Submitted By D.R. Horton, Inc. Date Received: 10/20/20 1x❑ New Submittal I ❑ Revision Watershed Long Creek I Disturbed Acreage: 20.00 Bart Carroll The Erosion and Sedimentation Control Plan submitted for the above project has been reviewed and is approved. Please be advised that the Ordinance (Section 18 (c) and Title 15 NCAC 0413.0127(b) requires that a copy of the approved Soil Erosion & Sedimentation Control Plan be on file at the job site. This letter is also Notice required by the Ordinance (Section 21) and G.S. 11 3A-61.1 of our right of periodic inspection to insure compliance with the approved plan. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form and additional information regarding this permitting process may be accessed at deg.nc.gov1NCG01. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinaces or rules may also apply to this land -disturbing activity. This approval does not supercede any other permit or approval. Enclosed is your Certificate of Approved Plan that must be posted on the primary entrance of the job site before construction begins and until establishment of permanent groundcover. After commencement of this project, if it is determined that the Soil Erosion & Sedimentation Control Plan is inadequate to meet the requirements of the Ordinance (Section 18 (c)(f) and G.S. 113A-51 through 66), this office may require revisions to the Plan and implementation of the revisions to insure compliance. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form which you have provided. You are requested to file an amended form if there are any changes in the information included on the form. Please notify our office (704-922-4181) at least 48 hours before commencement of the land -disturbing activity (Ordinance Section 8 (e)). Sincerely, GASTON CO TY NATURAL SOURCES /PR ENT Jonathan Boerger: Conservationist jonathan.boerger@gastongov.com Gaston County Erosion & Sedimentation Control Program CC1: CC2: �ac�z°no� G&STO O. 3O�o�� n �+ m CL �° n A) cn �b G w C1 rf -p O Aj = 3 'O r * „�� A Q Z �00 0(DZ m°•a°a ID v R° -n c o °" v; z rn �— M �• �, Z r•r m cu A w Q- S(D C ti o D m s w �'�•����Sn 'N 0 o r -I (AO Q ° CD ° r c w ° ° r+ -; ter) >m � s 0 e fD n O c r* ►1 s cD N o OCR �' ° e� u,�.^;�� n>00ty 3�w Z (ALA °a(A— 'a° � Z S� Z ° cD a'" ° � .�. N 3 O fD � W rat• Q N (D — = r+ �) 0 �. •� n c -a D�°S3^f°°� o o '+ m ° o a a ° fD o ° a r7 ` ^ n pi O v m p 3 °a s A: c z Z o w w Z (A = o^�fD s1 r) �.< �`^.e+ cD So0O 2