Loading...
HomeMy WebLinkAboutSW8120318_COMPLIANCE_20140730STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE �p�,��73D YYYYMMDD Compliance Inspection Report Permit SW8120318 Effective 05101/12 Project 7976 Market Street Owner Daniel L D'Alessandro County New Hanover Region Wilmington Expiration 05/01/20 Adress 7976 Market St CItylStatelZlp Wilmington NC 28411 Contact Person Daniel Dalessandro Title Phone 910-616-7335 Directions to Project Travel approx 5 miles NE along Hwy 17 from int of Eastwood & Market to Marsh Oaks Dr , from Marsh Oaks Dr travel approx 330 If NE along Market site on right Type of Project State Stormwater - HD - Infiltration Drain Areas 1 - 2- On-Site Representative(s) Related Permits Inspection Date 07/03/2014 EntryTime 10 00AM Primary Inspector Christopher Baker Secondary Inspector(s) Reason for Inspection Complaint Permit Inspection Type Slate Stormwater Facility Status ❑ Compliant ❑ Not Compliant Question Areas N State Stormwater (See attachment summary) Exit Time 10 30AM Phone Inspection Type Compliance Evaluation page 1 Permit $W8120318 Owner Project Daniel L D'Alessandro Inspection pate 0710312014 Inspection Type Compliance Evaluation Reason for Visit Complaint File Review Yes No NA NE Is the permit active? 0 ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ 0 ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? 0 ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ Comment Need Engineers Certification Built Upon ALea X,ss No NA NE Is the site BUA constructed as per the permit and approval plans? E ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? E ❑ ❑ ❑ Comment SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? E ❑ ❑ ❑ Comment Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? M ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment page 2 Compliance Inspection Report Permit SW8120318 Effective 05/01/12 Expiration 05/01/20 Project 7976 Market Street Owner Daniel L D'Alessandro County New Hanover Adress 7976 Market St Region Wilmington City/State/Zip Wilmington NC 28411 Contact Person Daniel Dalessandro Title Phone 910-616-7335 Directions to Project Travel approx 5 miles NE along Hwy 17 from int of Eastwood & Markel to Marsh Oaks Dr, from Marsh Oaks Dr travel approx 330 If NE along Market site on right Type of Project State Stormwater - HD - Infiltration Drain Areas 1 - 2- On-Site Representative(s) Related Permits Inspection Date 07/03/2014 EntryTime 10 00AM Primary Inspector Christopher Baker Secondary Inspector(s) Reason for Inspection Complaint Permit Inspection Type State Stormwater Facility Status ■ Compliant ❑ Not Compliant Question Areas State Stormwater (See attachment summary) Exit Time 10 30AM Phone Inspection Type Compliance Evaluation page 1 i Permit SW6120318 Owner- Project Daniel L D'Alessandro Inspection Date 07103/2014 Inspection Type Compliance Evaluation Reason for Visit Complaint File Review Yes No NA NE Is the permit active? E ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? 0 ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? N ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ Comment Need Engineer's Certification Received Engineer's Certification 9/2/2014 13stllt oon Area Yee No NA NE Is the site BUA constructed as per the permit and approval plans? N ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? 0 ❑ ❑ ❑ Comment 5W Measure Are the SW measures constructed as per the approved plans? N ❑ ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? 0 ❑ ❑ ❑ Comment Oneration and Maintenance Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ 0 ❑ DWQ upon request? Comment page 2 Permit No 911. (to be provided by DINO) AWmAl Daof W p TE9�G STORMWATER MANAGEMENT PERMIT APPLICATION FORM p NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out printed and submitted The Required Items Checklist (Part 110 must be printed, filled out and submitted along with all of the required information I. PROJECT INFORMATION " - rt";" •v '" " A r" l , .` l , °" ,,'" « , "i ' Project Name 7976 Market Street Contact Person Charles Cozier, P E Phone Number (910) 409 3667 Date 6-Jan 12 Drainage Area Number 2 Ill, DESIGN INFORMATION i ° �r ua .. � i•�i�� �� w " a 'ut� � �,� ' ' � `a '! i,.' j z t"<, Site Characteristics Drainage area Impervious area Percent Impervious Design rainfall depth Peak Flow Calculations 1 yr, 24 hr rainfall depth 1 yr, 24 hr intensity Pre development 1 yr, 24 hf discharge Post -development f yr, 24 hr discharge Pre/Post 1 yr, 24 hr peak flow control Storage Volume Non -SA Waters Minimum design volume required Design volume provided Storage Volume SA Waters 1 5" runon volume Pre -development 1 yr, 24-hr runoff volume Post development 1 yr, 24 hr runoff volume Minimum required volume Volume provided Solis Report Summary Sod type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area ' 34,90000 n2 I 18,157 00 ` ft2 5203 % 150 —in I in i inter E fOlsec ns/sec ft3/sec 2,28100 ff3 5,70600 n' n3 OK for non SA waters Grz.,J-w TjIIti,n 2 5 �'✓neS /yl n pr�S,gn VO Sandy 220 1 in/hr Ur e-A 1/0- 2183 fmsl 0 23 days OK i 3 00 1 OK ' 23 83 , fmsl OK 2510 Imsl 5,02900 ft2 - 2525 fmsl £ 8600 n 4610 n t 3,96400 ft2 RECETVAD JAN 2 5 2012 BY Form SW401 Witration Basin Rev 5 1 Mpr2o11 Parts I & 11 Oe&gn Summary Page 1 of 2 Permit No • (to be provided by DWQ) A dltionat Information Maximum runoff to each inlet to the basing 062 ac in OK Length of vegetative filter for overflow j ' N/A ft OK Distance to structure 18500 ft OK Distance from surface waters ?50 It OK Distance from water supply well(s) —179 00 ft OK Separation from impervious soil layer ' NIA' ft OK Naturally occuring soil above shwt 200 ft OK Bottom covered with 4 in of clean sand9 ` ,Y s (Y or N) OK Proposed drainage easement provided? Y _ (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK_ Pretreatment device provided Gravel Filter Strip - CEIV,E, JAN 2 5 2012 BY Form SW401 infiltration Basin Rev 5 11Apr2011 Parts I & II Design Summary Page 2 of 2 Permit No (to be provided by DWQ) Ill REQUIRED ITEMS CHECKLIST Please Indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will result in a request for additional Information This will delay final review and approval of the project Initial in the space provided to Indicate the following design requirements have been met If the applicant has designated an agent, the agent may Initial below If a requirement has not been met, attach justification Pagel Plan Initials Sheet No 4_�_ 445, Gy Plans (t' - 50' or larger) of the entire site showing Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, - Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement Partial plan (1' = 30' or larger) and details for the infiltration basin showing - Bypass structure, - Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, - Vegetated filter, and Pretreatment device 1}_ 3 Section view of the infiltration basin (1" = 20' or larger) showing Pretreatment and treatment areas, and - Inlet and outlet structures � 4'5 4 A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided AV A 5 A soils report that is based upon an actual field investigation, soil borings, and infiltration tests The results of the soils report must be verified in the field by DWQ, by completing & submitting the sods investigation request form County soil maps are not an acceptable source of soils information 6 A construction sequence that shows how the infrtration basin will be protected from sediment until the entire drainage area is stabilized 7 The supporting calculations 8 A copy of the signed and notarized operation and maintenance (0&M) agreement 9 A copy of the deed restrictions (if required) � E �'._ ?� JAN 2 5 Z01Z BY Form 5W401-Infiltration Basin Rev 4 Page 1 of 1 Part III Required Items Checklist Page 1 of 1 y Permit No (to be provided by D WQ) i� � �E WRrERoy STORMWATER MANAGEMENT PERMIT APPLICATION FORM Y NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted The Required Items Checklist (Pail 111) must be printed, filled out and submitted along with all of the required information I,x PROJECT, INFORMATION Protect Name �7976 Market Street Contact Person Charles Cazier,'P E Phone Number (910) 409 3567 Dale Drainage Area Number II: , DESIGN INFORMATION Jt r� Paz rs w �l i! ary Site Characteristics Drainage area Impervious area Percent Impervious Design rainfall depth Peak Flow Calculations 1 yr, 24 hr rainfall depth 1 yr, 24 hr intensity Pre -development 1 yr, 24 hr discharge Post development 1-yr, 24 hr discharge PfelPo5l I yr, 24 hr peak flow control Storage Volume Non -SA Waters Minimum design volume required Design volume provided Storage Volume SA Waters 1 5" runoff volume Pre development 1 yr, 24 hr runoff volume Post development 1-yr, 24 hr runoff volume Minimum required volume Volume provided Soils Report Summary 6011 type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 25,152 00 ' 13,615 00 ftz 5413 % i -�l 50 - in in inlhr ft3lsec s, ft'/sec ft3/sec 1,669 E0 ft3 4,60800 ft3 OK for non $A waters Gre,-,,� j76n Z S 4- rmeS M,n 1b. es-�rl Vd E White Fine Sand � - m 540 in/hr (�Se.J IL 1r1�r 1� cr���Or1 ILo�i Q. ' 24 83 ". fmsl 0 09 Lt days OK a ,Y 300r ' ;` 1 OK i -2 7 50,r Imsl OK u 2910 fmsl 3,415 00 � ^ ft2 Iu , 29 30 ' fmsl 9iW- It RECEIVE20 12 00 � ft E 1,193'00 fie JAN 2 5 2012 BY. Form SW401 Infiltration Basin Rev 5 1 Mpr2011 Parts i & n Design Summary Page 1 of 2 Permit No {fo be provided by DWO) Additfonat information Maximum runoff to each Inlet to the basin? 047 ac In OK Length of vegetative filter for overflow NIA ft OK Distance to structure 3000, ft OK Distance from surface waters Greater than 50 ft OK Distance from water supply well(s) 12600 it OK Separation from impervious sal layer NIA It OK Naturally occunng sod above shwl 267 ft OK Bottom covered with 4 In of clean sand? _ Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? A, '- (Y or N) fl_ K Pretreatment device provided Gravel Filter Strom RECEdVED JAN 2 5 2012 BY Form SW401 Infiltration Basin -Rev 5 11Ap2011 Parts I & 11 Design Summary Page 2 of 2 Permit Number (to be provided by DWQ) Drainage Area Number Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on tlus BMP This maintenance record will be kept in a log in a known set location Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMW Important maintenance procedures — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks) — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation — The vegetation in and around the basin will be maintained at a height of approximately six inches After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 10 inches (or 15 inches if in a Coastal County) Records of operation and maintenance will be kept in a known set location and will be available upon request Inspection activities shall be performed as follows Any problems that are found shall be repaired inimediately BMP element Potential problem How I will remediate the problem The entire BMP Trash/debris is present Remove the trash/debris The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed remove the gully, and then plant a ground cover and water until it is established Provide lime and a one-time fertilizer application The inlet device pipe or The pipe is clogged (if Unclog the pipe Ihspose of the swale applicable) sediment off -site The pipe is cracked or Replace the pipe otherwise damaged (if applicable) Erosion is occurring in the Regrade the swale if necessary to swale (if applicable) smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion 3AN 2 5 2012 Form SW401-Infiltration Basin O&M -Rev 3 1 of 3 BMP element Potential rroblem How I will remediate the problem The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP Erosion has occurred or Provide additional erosion riprap is displaced protection such as reinforced turf matting or riprap if needed to prevent future erosion problems Weeds are present Remove the weeds, preferably by hand If pesticides are used, wipe them on the plants rather than s ra m The main treatment area A visible layer of sediment Search for the source of the has accumulated sediment and remedy the problem if possible Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP Replace any media that was removed in the process Revegetate disturbed areas ummediatel Water is standing more than Replace the top few inches of filter 5 days after a storm event media and see if this corrects the standing water problem If so, rvegetate unmediately If not, consult an appropriate professional for a more extensive re air Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area spray) The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment immediate) An annual inspection by an Make all needed repairs appropriate professional shows that the embankment needs repair The outlet device Clogging has occurred Clean out the outlet device Dispose of the sediment off -site The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet 733-1786 DECEIVED JAN 2 5 20i2 Form SW40I-Infiltration Basin O&M -Rev 3 $�"j� Page 2 of 3 1 Permit Number (!o be provided by DTVQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Project name 2226 Matket Street BMP drainage area number _J,,2 Pnnt name Daniel D'Alessandra lr ! ' .r� u_t M, I : .I !a . A I lt_t -I 1.1` Phone l - 1 - 5 Signature Date / / e, / - Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, "t-1(_,A,_h/U k/ `Q 1 Uk (AAW 0 In , a Notary Public for the State of N HIII O ttiq)tIVIA. , Countyof Q,W do hereby certify that .414% l l)A� SsLknj U�personally appeared before me this f � �pTAR�s0�, °{ Z m� �Alr I B COO* 1j�111111111111111111/N�r SEAL My commission expires 3� 1 A� 15 Form SW401-infiltration Bann O&M -Rev 3 fZffC_EIVED JAN 2 5 2012 BY �fi1n day of t YI0, U 11, Page 5 of 5 c r� Z990 d �gwnN ocwOrl uwa 8uu�ulBuOVycvOOsyui�a�l.sq� Imru3 t- m x L9G£ 60V 016 200gd 60VSZ 9MIOnD RUON a0180rwpM w pvOa 7ulOd UWITDA 16 � `�►,� �'I'Id `` J�•l�TIV�TiJK� I I I S •]OO 'yI NI s j rr OM `A.LN1110��0r�'W� aAOI�" MaM T W Fl �1ul F..J .LHXUVW9L6L HOA IOULNOO Moisoin' N V Z .4 �� Q 0I1-D12 HI � � 0 " �14 VJMN z < W I I rfofJ h1� I + I I I I I I I d ^ O04 U U a � fp1 Upo {pUp� I1� a=_ao5i~a��Oso ! e � ! I n I! I I! ! I I! rumor ivumi.ei (to be provided by D WO) fir +!V A Tt � #O ,un NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information I. PROJECT INFORMATION Project name 7976 Market Street Contact name Charles Caner, P E Phone number (910) 409 3567 Date October26 2011 Drainage area number 1 II DESIGN INFORMATION Site Characteristics Drainage area 25,152 ft2 Impervious area 13,615 ftz Percent impervious 541% % Design rainfall depth 15 inch Peak Flow Calculations Is pre/post control of the 1 yr, 24 hr peak flow required? 1 yr, 24-hr runoff depth 1 yr, 24 hr Intensity Pre -development 1 yr, 24-hr peak flow Post development 1 yr, 24-hr peak flow Pre/Post 1 yr, 24 hr peak control Storage Volume Non -SA Waters Minimum volume required Volume provided Storage Volume SA Waters Y (Y or N) 3 81 in 016 mlhr 0 044 ft3/sec 0 060 ft3/sec 0 016 ft3/sec ft3 MA ff3 N 1 5' runoff volume 1,689 ft3 Pre -development 1 yr, 24-hr runoff 399 ft3 Post -development 1-yr, 24-hr runoff 4,290 It3 Minimum volume required 3,891 ff3 Volume provided 3,929 ft3 OK Cell Dimensions Ponding depth of water Ponding depth of water Surface area of the top of the bioretention cell Length Width or- Radius Media and Soils Summary Drawdown time, ponded volume Drawdown time, to 24 inches below surface Drawdown time, total In situ soil Soil permeability Planting media soil Soil permeability Soil composition • Sand (by volume) • Fines (by volume) 12 Inches 100 ft 3,929 0 ft2 158 it 25 it h 1 1 hr 22 hr 33 hr 1080 in/hr 01nth r NA NA OK OK OK OK OK OK NOV 0 Form SW401 Bioretention Rev 8 June 25 2010 Parts I and 11 Design Summary Page 1 of 3 C111' 1Vu111 (to be provided by OWO) % Organic (by volume) N ^00 Phosphorus Index (P Index) of media WA-A Total 0% M_ (umtless) Form SW401 Sioretenhon Rev 8 June 25 2010 Parts 1 and 11 Design Summary Page 2 of 3 rennn irw nuc (10 be provided by DWQ) Basin Elevations Temporary pool elevation Type of btoretention cOl (answer "Y" to only one of the two following questions) Is this a grassed cell? Is this a cell with trees/shrubs? Planting efevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media sod Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12 3 B) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design Include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP Iocaled at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3 1 ? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%7 Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used wsth an "X" in the shaded cell) Gravel and grass (8`mches gravel followed by 3 5 it of grass) Grassed Swale Forebay Other 2900 fmsl Y (Y or N) Insufficient media depth jam] (Y or N) :201) fmsl Inches bik—imsi 0 it NX—ft tri WV �Il� N (Y or N) NA NA 0 it N1 0 imsl 24 83 imst 2483 it IPA N (Y or N) fmsl 0 it rya r Y (Y or N) OK N (Y or N) Excess volume must pass through filter if �A N (Y or N) Show how flow is evenly distributed Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK p, jv I ftlsec N (Y or N) OK N (Y or N) OK Y (Y or N) OK 6 NOV 0 f 2011 X t i OK _ Form SW401 Bioretention Rev e June 25 2010 Parts I and 11 Design Summary Page 3 of 3 Permit Number (to be provided by DWp) ` �� ot'r vuArF 6 \s MWGr—f NCDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out printed and submitted The Required Items Checklist (Part 111) must be printed, filled out and submitted along wdh all of the required information I. PROJECT INFORMATION Project name 7976 Market Street Contact name Charles Cazier P E Phone number (910) 409 3567 Date October 26, 2011 Drainage area number 2 IL DESIGN INFORMATION7-7 Site Characteristics Drainage area 20,660 fiZ Impervious area 10,990 fiZ Percent Impervious 53 2% % Design rainfall depth 15 inch Peak Flow Calculations Is prelpost control of the 1-yr, 24 hr peak flow requiredl 1 yr, 24 hr runoff depth 1 yr, 24 hr intensity Pre -development 1-yr, 24 hr peak flow Post -development 1-yr, 24 hr peak flow Pre/Post 1-yr, 24 hr peak control Storage Volume Non -SA Waters Minimum volume required Volume provided Storage Volume SA Waters Y (Y or N) 3 81 in 0 16 in/hr 0 019 f t3lsec 0 049 ft3lsec 0 030 ft3lsec Its NA It NA 1 5" runoff volume 1,366 f13 Pre -development 1 yr, 24 hr runoff 328 ft3 Posl-development 1 yr, 24-hr runoff 3,469 f13 Minimum volume required 3141 it3 Volume provided 3,229 tt3 OK Cell Dimensions Ponding depth of water 12 Inches OK Ponding depth of water 100 ft Surface area of the top of the bioretention cell 3,229 0 ftZ OK Length 100 It OK Width 33 it OK or Radius It Media and Soils Summary Drawdown time, ponded volume 0 57 hr OK Drawdown time, to 24 inches below surface 1 14 hr OK Drawdown time, total 171 hrIn situ soil Soil permeability 21 10 inlhr OK 1 NOV ? 01 Planting media soil Soil permeability A in/hr Soil composition * Sand (by volume) Al A Fines (by volume) 1Q A Form SW401 Biorafention Rev 8 June 25 2010 Parts I and 11 Design Summary Page 1 of 3 4 % Organic (by volume) Al A r ci i,%vU, „uC, (to be provided by fJ WO) Phosphorus Index (P Index) of media Total 0% j\1 - (umtless) t NOV 0 1 2011 f Form SW401 Bioretentfon Rev 8 June 25 2010 Parts I and 11 Design Summary Page 2 of 3 Permit Number (to be provided by D WQj f#asm Elevations Temporary pool elevation 29 00 fmsl Type of bioretention cell (answer "Y" to only one of the two following questions) Is this a grassed cell? (Y or N) Is this a cell with trees/shrubs? Y (Y or N) Insufficient media depth Planting elevation (top of the mulch or grass sod layer) Z8, J fmsl Depth of mulch N!j Inches Bottom of the planting media soil N f fmsl Planting media depth 0 it Depth of washed sand below planting media soil NA fi Are underdrais being installed? N (Y or N) How many clean out pipes are being installed? A) A What factor of safety is used for sizing the underdrams? (See BMP Manual Section 12 3 6) Additional distance between the bottom of the planting media and 0 it the bottom of the cell to account for underdrams Bottom of the cell required 0 fmsl SHWT elevation 25 fmsl Distance from bottom to SHWT -25 it fflsuffieieaMnee4e SHWT— Internal Water Storage Zone (IWS) Does the design include IWS Y (Y or N) Elevation of the top of the upturned elbow imsl Separation of IWS and Surface 0 it Planting Plan Number of tree species NA Number of shrub species r Number of herbaceous groundcover species 0 (ti`) f� #VALUE' Additional Information Does volume in excess of the design volume bypass the Y (Y or N ) OK bioretention celh Does volume in excess of the design volume flow evenly distributed N (Y or N) Excess volume must pass through filter through a vegetated filter? What is the length of the vegetated filter? f1 O A Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed Is the BMP located at least 30 feet from surface waters (50 feet if Y (Y or N) OK SA waters)? Is the BMP Iocaled at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 319 Y (Y or N) OK Is the BMP located in a proposed drainage easement with access Y (Y of N) OK to a public Right of Way (ROW)? Inlet velocity (from treatment system) 0 932 ftlsec OK Is the area surrounding the cell likely to undergo development in the N (Y or N) OK future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell Gravel and grass NOV (84inches gravel followed by 3 5 it of grass) X f ' Grassed swale OK !_� Forebay Other rJ Form 5W401 Bioretention Rev 8 June 25 2010 Paris i and 11 Design Summary Page 3 of 3 NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT Permit Number (to be provided by DWQ} O�0 A rg9oG a Q Y This form must be filled out, printed and submitted The Requtred Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information 1 PROJECT INFORMATION Project name 7976 Market Street Contact name Charles Cazier, P E Phone number (910)409 3567 Date October 26, 2011 Drainage area number 3 11. DESIGN INFORMATION Site Characteristics Drainage area 16,550 it Impervious area 9,500 ftp Percent Impervious 57 4% % Design rainfall depth 15 Inch Peak Flow Calculations Is pre/post control of the 1-yr, 24 hr peak flow required' 1 yr, 24 hr runoff depth 1 yr 24 hr intensity Pre -development 1 yr, 24 hr peak flow Post -development 1 yr, 24 hr peak flow Pre/Post 1 yr, 24 hr peak control Storage Volume Non -SA Waters Minimum volume required Volume provided Storage Volume SA Waters �w1J; 381 in 016 irdhr 0 015 113/sec 0 040 ft3/sec 0 025 ft3lsec it O A ft3 NA 1 5' runoff volume 1,173 fl3 Pre -development 1-yr, 24 hr runoff 263 it Post -development 1 yr, 24-hr runoff 2,980 it Minimum volume required 2,717 It' Volume provided 3,410 ft3 OK Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 100 it Surface area of the top of the bforetention cell 3,410 0 itz OK Length 77 it OK Width 44 it OK or Radius it Media and Soils Summary Drawdown time, ponded volume 2 727 hr OK Drawdown time, to 24 inches below surface 5 454 hr OK Drawdown time, total 8181 hr 1n situ sal Soil permeability 4 40 mlhr OK Planting media soil Soil permeability NA in/hr Soil composition % Sand (by volume) N �;fll'llr,r � rw ''•�' 161Sl0 NOV P 1 2011 % Fines (by volume) Form SW401-Sioretention Rev 8 June 25 2010 Paris I and 11 Design Summary Page 1 of 3 rerinn}IV u!"I Der (to be provided by MV6) ti % Organic (by volume) r � Phoophorus Index (P Index) of media NR Total n3 (unitless) Form SW401 Bioretention Rev 8 June 25 2010 Parts I and II Desrgn Summary Page 2 of 3 Y err711, Nurneer (to be provided by DWQ) Basin Elevations Temporary pool elevation Type of biorelention cell (answer "Y" to only one of the two following questions) Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety,is used for sizing the underdrains? (See BMP Manual Section 12 3 6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located a1 least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 311 Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (B'mches gravel followed by 3 5 ft of grass) Grassed swale Forebay Other 25 00 Im51 !J (Y or N) Y (Y or N) Insufficient media depth 2- L fmsl f,}(a Inches fmsl 0 ft f� ft N (Y or N) NA NA Ott N A 0 fmsl 25 fmsl 25 ft Y (Y or N) fmsl 0 f1 f�A N l� 0 Insufficient distance to SHWT lw • 5:�,.. `5c� 1 Y (Y or N) OK EP/1�rl:1il N (Y or N) Excess volume must pass through filter ft N P\ N (Y or N) Show how flow is evenly distributed Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 0 932 fYsec OK N (Y or N) OK N (Y or N) OK Y (Y or N) OK i X I i NOV OK iY I Form SW401 Bioretention Rev 8 June 26 2010 Parts I and 11 Design Summary Page 3 of 3 1 Permit Number (to be provided by DIVQ) Drainage Area Number Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP This maintenance record will be kept in a log in a known set location Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP Important operation and maintenance procedures — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks) -- Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell — Heavy equipment will NEVER be driven over the bloretention cell — Special care will be taken to prevent sediment from entering the bioretention cell — Once a year, a soil test of the soil media will be conducted After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 10 inches (or 15 inches if in a Coastal County) Records of operation and maintenance will be kept in a known set location and will be available upon request Inspection activities shall be performed as follows Any problems that are found shall be repaired immediately BMP element Potential problems How I will remediate the problem The entire BMP Trash/debris is present Remove the trash/debris The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed remove the gully, and then plant a ground cover and water until it is established Provide lime and a one-time fertilizer application The inlet device pipe, The pipe is clogged (if Unclog the pipe Dispose of the stone verge or swale applicable) sediment off -site The pipe is cracked or Replace the pipe otherwise damaged (if applicable) Erosion is occurring in the Regrade the swale if necessary to swale (if applicable) smooth it over and provide erosion control devices such as reinforced turf matting or nprap to avoid future problems with erosion Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone applicable) 71 NM 0 1 7011 i I, Form SW401-Bioretention O&M -Rev 3 Page l of 4 BMP element Potential problems How I will remediate the problem The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area gullies have formed Restabiltze the area after grading Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches possible Remove the sediment and restabilize the pretreatment area Erosion has occurred Provide additional erosion protection such as reinforced turf matting or nprap if needed to prevent future erosion 12roblems Weeds are present Remove the weeds, preferably by hand The bioretention cell Best professional practices Prune according to best professional vegetation show that pruning is needed practices to maintain optimal plant health Plants are dead, diseased or Determine the source of the dying problem soils, hydrology, disease, etc Remedy the problem and replace plants Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary Tree stakes/wires are present Remove tree stake/wires (which six months after planting can kill the tree if not removed The bioretention cell Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away void areas Replace whole mulch layer if necessary Remove the remammg much and replace with triple shredded hard wood mulch at a maximum depth of three inches Soils and/or mulch are Determine the extent of the clogging clogged with sediment - remove and replace either lust the top layers or the entire media as needed Dispose of the spoil in an appropriate off -site location Use triple shredded hard wood mulch at a maximum depth of three inches Search for the source of the sediment and remedy the problem if possible An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media disposed of properly and replaced with new planting media i Form SW401-Bioretention O&M -Rev 3 Page 2 of 4 BMP element Potential problems How 1 will remediate the problem The underdrain system Clogging has occurred Wash out the underdrain system (if applicable) The drop inlet Clogging has occurred Clean out the drop inlet Dispose of the sediment off -site The drop inlet is damaged Repair or re lace the drop inlet The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet 733-1786 Form SW401 -B toretention O&M -Rev 3 Page 3 of 4 Permit Number (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Project name 7976 Market Street BMP drainage area number , 1, 2, & 3 Print name Daniel D'Alessandro Title Property Owner Address 230 Bradley Drive Wilmington, NC 28409 Phon, Signa Date Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, _ 'C— Ukj, -z;,v11ne[cUV , a Notary Public for the State of ,NnfA+� CO Vt> J-Ooa , County of N� V4!S_, e , do hereby certify that personally appeared before me this Zt day of (')r,r11 , and acknowledge the due execution of the forgoing bioretention maintenance requirements Witness my hand and official seal, SEAL , My commission expires l 1 tip 14 Form SW401-Bioretention I&M-Rev 2 Page 4 of 4 Completeness Review Checklist Project Name 910 11 /AQ 741 Received Date Project Location NA {'w'k}sN JOyist tb _gym Accepted Date \1 Rule(s) 1:12008 Coastal 1995 Coastal Phase II (WiRO)Universal �1988 Coastal Type of Permit* New or Mod or PR Existing Permit # (Mod or PR). �PE Cert on File? Density. HD or LD I Type Commercial or Residential F-1NCG 1% _u(% OK?) ! ,Stream Class L JSA Map E "Offsite to SW8 Subdivided?. Subdivision or Single Lot �1 �ORW Map 1 IExempt Paperwork Emalled Engineer on, RUP ent(s) (1 original per BMP) BMP Type(s)v M with correct/original signatures (1 original per BMP except L5/VF5 and swales) 0��Pplication with correct/original signatures rp or LLC Sif,- Auth per So_Sor letter Note to Reviewer: $50S (within bmo) �t Re ort with SHWT ���L'e� `� V t'n�5 sl � V i5{� P FTakuiattons (signed/sealed) �No obvious errors Density includes common areas, etc d Restrictions, if subdivided Signed & Notarized Plans OTIS-e�ts Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) 17 Grading Wetlands Delineated or No Wetlands Vicinity Map Layout (proposed BUA dimensions) Legend �DA Maps Project Boundaries Infiltration Wet Pond Offsite Sods Report Fi5oils Report MPE Cert for Master Lot # SHWT SHWT Deed Rest for Master ElLot # Matches Master Bottom PP BUA Permitted (Master) sf Visited BUA Proposed (Offsite) sf Additional Information. Permitted BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) Proposed- Proposed. Proposed I z9wd nnumx muaon wm muµ-oolmuangwommuF19Do11+FRD ITMwFT MC MI OT6 Quo9d C6o►9L �Tl�� mix Wolmww A& PvDil Mod �l1od 16 D'I'Id ` WHEl moNa '1VZSVOWHINI 1 ON `A.LNn00-daAOWv H MaK JL2[JQJLS ao� Ualvmmols 'IOZLLKOD NoIS02IH ` NIQd2IO n £ N N >'Nf- 1 N Gn G 12.1 R � MI i� N w id d HAMa F I' I�