Loading...
HomeMy WebLinkAboutSW8060648_COMPLIANCE_20061117STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. DOC TYPE ❑ FINAL PERMIT ❑ MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ YYYYM M DD S1� '�K Permit No, hhV �- N b L',I(� (to be provided by UtVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : V 0A Contact Person: Phone Number: (74" 000 For projects with multiple infiltration systems, a supplement form must be completed for each system. This workshect applies to: Trench (from plans) in Drainage Area (from Form S PYU--101) II. DESIGN INFORMATION (attach supporting calculations/documentation): 5 Soils Report Summary (based upon an actual field investigation and soil borings) Soil Type K.nP-c. \`.1"+<n ♦ Swn�+ Infiltration Rate 1-i0 e% r in/hr or cf/hr/sf (circle appropriate units) SI-1 WT Elevation , O fmsl (Seasonal High Water Table elevation) Trench Design Parameters Design Volume Design Storm Drawdown Time Perforated Pipe Size Perforated Pipe Length No. Observation Wells Zti "-ko c. f. inch event (1.5 inch event for SA waters, I inch event for others) days g inch diameter ft. Stone Type (if used) -il 5 7 Stone Void Ratio 40 `70 (may be required on a case -by -case basis) Trench Elevations (in feet mean sea level) Bottom Elevation fmsl Storage/Overflow Elevation fmsl < - b Form SWU-107 Rev 3.99 Page 1 of 4 Trench Dimensions Height Width ►-� ft. Length "?'440 ft. ft. Volume Provided 7,7,A . 4 cu.ft. Ill. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials &N �( a. System is located 50 feet from class SA waters and 30 feet from other surface waters. f b. System is located at least 100 feet from water supply wells. I c. Bottom of system is at least 2 feet above the seasonal high water table. f d. Bottom of the system is 3 feet above any bedrock or, impervious soil horizon. e. Off-line system, runoff in excess of the design volume bypasses the system (bypass detail provided). +� f. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon infiltration through the bottom only (a hydrogeologic evaluation may be required). g. Soils have a minimum hydraulic conductivity of 0.52 inches per hour. h. System is not sited on or in fill material or DWQ approval has been obtained. �c, f i. Plans ensure that the installed system will meet design specifications (constricted or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. 6C,N& f J. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. 'h(,6L 'r k. System is located in a recorded drainage casement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. Glv 1. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). �c. ✓ m. Drainage area for the device is less than 5 acres. !&i�c �_ n. A pretreatment device ( filter strip, grassed swale, sediment trap, etc.) is provided. o. Trench bottom is covered with a layer of clean sand to an average depth of 4 inches. C"N6 p. Sides of the infiltration trench are lined with geotextile fabric. q. Rock used is free of fines (washed stone) and has a large void ratio. r. Side to bottom area ratio is less than 4:1. Form SWU-107 Rev 3.99 Page 2 of 4 s. Observation well(s) are provided (case -by -case basis). N//j t. Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters) and detail is shown on plans. c4y\ u. A benchmark for checking sediment accumulation is provided. IV. UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration and the infiltration system for erosion, trash accumulation, grass cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash and blockages as needed to maintain system performance. 3. Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth. Restore depth to original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. 4. The water level in any monitoring wells will be recorded after a I inch rainfall event and at least once a month. Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately. If DWQ determines that the system is failing, the system will immediately be repaired or replaced to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. 6. Remove accumulated sediment from the infiltration system annually or when depth in the unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over - excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the infiltration system. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the depth at the benchmark reads , the accumulated sediment shall be removed from the system. Form SWU-l07 Rev 3.99 Page 3 of 4 I acknowledge and agree by my signature below that t am responsible for maintaining the stormwater collection system in accordance with the six maintenance procedures listed above. l agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title Address: q"1 Phone: - Signature: L�SS- Z+�v Date: �� Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. i / 4 �r J o��v` f` a Notary Public for the State of �'�'t'�"'{ , County of 6eo!�k e 7 — do hereby certify that -' tJN �,A Z.C,..,n personally appeared before me this day of Z!4,c/ , O 6e;O 6' and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires 3' Qc °' r �ry r Form SWU-107 Rev 3.99 Page 4 of 4