Loading...
HomeMy WebLinkAboutSW8051136_APPROVED PLANS_20051219PERMIT NO DOC TYPE DOC DATE STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS sw ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION aTL52g,1j YYYYMMDD LEGEND SYM, BEARINGAND DISTANCE PROPERTY BOUNDARY PARKING LOT EXISTING TOPOGRAPHICAL LINE SEDIMENT FENCE TEMPORARY DRIVE ENTRANCE SPOT ELEVATION pp 7,5 INFILTRATION BED 1 r / / ,1 PLAN CHECKLIST OWNER/SITE INFORMATION SEE TITLE BLOCK ENGINEER AND FIRM SEE TITLE BLOCK LEGEND NORTH ARROW AS SHOWN ON PLAN SCALE SEE TITLE BLOCK REVISION NO, AND DATE SEE TITLE BLOCK MEAN HIGH WATERLINE NA DIMENSIONED PROPERTY/PROJECT BOUNDARY VICINITY MAPS SHOWN ON PLAN PROPOSED AND EXISTING CONTOURS ROAD AND SWALE DETAILS WETLAND BOUNDARIES CALCULATIONS DRAINAGE AREA VEGETATED BUFFERS SILT FENCE (LF) (1/4 ACRE/ 100 FT) 340 TOTAL STORAGE (ACRES) ,85 DISTURBED AREA (ACRES) }/— ,231 GENERAL PROJECT INFORMATION PROJECT NAME: SUMMERWINDS III PROJECT OWNER: A'N'A BUILDERS PO BOX 2110 SURF CITY, NC 28445 PROJECT ENGINEERING: MICHAEL C. GALLANT, P.E. 311 S. TOPSAIL DR. SURF CITY, NC. 28445 PROJECT SURVEYING: THE CLARK GROUP POST OFFICE BOX 10136 WILMINGTON, NC 28404 PROJECT ZONING: COUNTY ZONED MIXED USE PROJECT SIZE: .231 ACRE NOTE: SLOPE ALL FILLED AREAS @ 3:1 ALONG PROPERTY LINES & STABILIZE WITH EXCELSIOUR MAT. Y NOTE: ALL RCP TO BE CLASS IV. NOTE: NO WETLANDS ON THIS SITE. NOTE: SEE SEEDING CHART FOR POND BANK STABILIZATION. NOTE: SEE SEEDING CHART FOR DETAILS IN STABILIZING DISTURBED AREAS. STABILIZE ALL DISTURBED AREA WITHIN 15 DAYS MAXIMUM, FINISHED SITE TO BE LANDSCAPED PROFESSIONALLY WITH SOD AND NATIVE PLANT SPECIES. MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. ALL CONSTRUCTION ENTRANCES WILL BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. ANY SEDIMENT THAT IS TRACKED INTO THE STREET WILL BE IMMEDIATELY REMOVED. 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN 1T BECOMES .5 FEET DEEP AT THE FENCE, THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. SILT FENCE STAKES WILL BE SPACED 6 FEET APART UNLESS A WIRE BACKING IS USED NTH 8 FOOT STAKE SPACING. 4. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAONTAIN A VIGOROUS, DENSE VEGETATIVE COVER. STABILIZATION NOTES ALL DISTURBER AREAS WILL BE STABILIZED WITHIN 15 DAYS OF CEASE OF ANY PHASE OF ACTIVITY. THIS INCLUDES SLOPES, SWALES, STOCKPILES AND ANY OTHER UNSTABILIZED AREAS. 50' MIN 2% SLOPE LEVEL SECTIO 36' MIN 4' 10' ifl XISTING PAVEMENT-LOBLOLLY TRAIL a , ; ... ' -3' WASHED STONE 6' HUMP TO DIVERT RUNOFF TEMPORARY SITE ENTRANCE DETAIL NOTE: 1, TEMPORARY GRAVEL ENTRANCE TO BE 20' WIDE AND FLARED TO 25 FEET AT ROAD. 2, GRADE ROAD FOUNDATION S❑ THAT ENTRANCE WILL CROWN AND DRAIN. 3, USE WASHED 2`-3" STONE 4, MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE, SHOULD MUD BE WASHED OR TRACKED ❑NT❑ EXISTING PAVEMENT IT MUST BE REMOVED IMMEDIATELY, 0,23 DOWN SPOUT DETAIL ALLOW CORRUG TO OVERLAP D( ALL DOWN SPOT CONNECTED TO CORRUGATED PI DOWN SPOUT )OSE FIT FOR /ERFLOW RELIEF CORRUGATED PIPE NC HIGHWAY 210 100Fug! is R/W PROJECT BOUNDARY DROP INLET PROTECTION SEE DETAIL PAGE 1 OF 4 CB 3 RIM 9.3 INV OUT 5.75 SUMP 3.75 PROJECT BOUNDARY lJ`1 00 0 CP CAI � N 00 -P A N A BUILDERS INC DEED 2409 PAGE 978 ZONE C-1 86.7 LF OF 8" HDPE @ 07. SLOPE R 5' SWEEP MIN FOR LOAD DISTRIBUTION BETWEEN TRENCHES Z o � - G 5 - 11 4 ���/ � N 00 6 0 05 8'? SUMMERWINDS TOWNHOMES HOA INC DEED 2417 PAGE 244 ZONE R-5 BOUNDARY W r r� 0 P PIING LOT CR❑SS cECTI❑N SILT FENCE 1r5' HIGH MAX V MIN. BURY STAKES MINIMUM OF TWO FEET REINFORCE WITH WIRE MESH DROP INLET STABILIZATI❑N DETAIL NOT TO SCALE V STRIPS NOTE, A. DURING CONSTRUCTION AND BEFORE STABILIZATION OF CONTRIBUTING AREAS, INSTALL 4' PERIMETER OF GRAVEL, 3' DEEP AROUND DROP INLETS ENCLOSE WITH SEDIMENT FENCE, Br AFTER CONTRIBUTING AREAS HAVE BEEN STABILIZED INSTALL A 4' PERIMETER OF SOD IN I FT STRIPS AROUND DROP INLETS. (NOT IN PARKING AREAS.) 6,6 8• 0.Ec'5' ❑ ❑ ❑ " a lay❑ ❑ ❑ N 7s A A 01062, 4.75' PLAN SECTION 'A -A" GRE-VVC-6HD, CAST IRON OR EQUAL APPROXr WEIGHT 17t&s. HEAVY DUTY VALVE BOX _LID SD 14-08 NOT TIP SCALE -MORTAR —HEAVY DUTY LID /—SEE SD-1411 2' ASPHAL 4' BASE-/ I :5R OVER FLANGE FOR CASTING DETAILS MTARSE€ SD-I4 STANDARD BRICK ' 'RTAR WATER VALVE BOX EXTENSION AND CASTING CENTERED OVER VALVE NUT SEWER CLEAN -OUT CASTING NOTES, CENTERED OVER STACK "THIS INSTALLATION REQUIRED WHEN VALVE BOXES AND CLEAN -OATS ARE LOCATED IN PRESENT DR FUTURE PAVED AREAS. "PRIERi TO SETTING CASTINGS, NEW INSTALLATIONS VILL REQUIRE PRIER COMPACTION OR BACKFILL IN 6' LIFTS, TYPICAL DETAIL VALVEX AND CLEAN —OUT CASTING BASES SD 15-02_ NOT TO SCALE 0.87s' m I.5.z5'1_ 1� l 1/21/z` 15.25' L62s" 0.875' SECTION "A -A" SECTION "B-B" MINIMUM AVERAGE WEIGHT FRAME tar LBS. GRATE 145 LBS. GRILL BASIN CASTINGS SD 14--04 NOT To SCALE PLAN G`r SITE A T L A N T IC O C E A N VICINITY MAP NITS SUN1IvMRWINDS UI SOIL EROSION AND SEDIMENTATION CONTROL PLAN Construction Schedule 1. Pre cunt uW m meeting with surveyor, grading contractor, ovmm and Engineer. A meeting will take place involving all parties involved in the construction process. The soil erosion and storm water plans will be discussed, as well as the sequence and BMP's to be in place before, during and after constvctiorL 2. Temporary Gravel Construction Entrancer'E-at-Pracice 6.06 A temporary gravel oonstruction entrance?exdt will be installed at the entrance to the site. 3. Sediment Fence - Practice 6.62 A sediment fence will be erected around the prof ect boimdali es as shown on the plan. This fence will stay in place until the tract is stabili zcd «ith suitable ground cover and all grading is complete. Sediment fence will. also be erected around the top of the retaining wall when bade Ul ruches within 18" of the top of the wall. 4. Outlet Stabilization Stricture - Practice 6.41 Outlet stabilization is to be constructed as shown on the plan. 5. Land Grading - Practice 6.02 Filling of the lot and construction of the Iotdr ng wall will begin and allow the final grades to be set. 6. Constnu:tion of Buildings Construction of buildings will pmeeed to the point where heavy equipmerA will no longer be needed. 7. Utility Installation Underground Utilities are to be installed and swales and other BN9l's are to be repaile(1 as soon as possible. Reseeding of areas disturbed by utility work is to take place no later than 15 days alter installation is complete. 8. Paving 9. Surface Stabilization All disturbed surfaces that are not paved are to be, stabilized accorded to the vegetative plan All swales are to be stabiliwd with straw and net within 5 days of seeding. In case of a severe rain event in the interim, the swales will be reseeded before excelsior mat is installed TER �TALL S1 NOTE: SECTION "A-A"muss "A' CONC. FRAYIE ANO GRATE TO BE STANDARD CITY OF WLMINGTON CAST IRON FRAME AND GRATE PER SO 14-04 GRILL BASIN SD 2--02 NOT TO SCALE SEDIMENT FENCE DETAIL N TS DEr 14 8 Js1 l l V NOTE; SPACE STAKES 6' APART. 8' WACIN:G %AL'LO WIRE REINFORCEMENT ONLY. y VCHAEL C. GALLANT, PE,PA, MICHAEL C. GALLANT, PE,PA SUMMERWINDS III P.O. BOX 4039 SURF CITY, NC SURF CITY, NC 28445 PHONE: 910.328.2188 STORM WATER AND REVISIONS: SOIL EROSION PLAN 2 I I V Aj i �-, ' 7 4 h lu f SHEET: 1 OF r( NET PRAWN I ❑ SCALE LATE: SCALE: DRAWN BY: 2 / 12 /2005 1 "=10' FI LENAM E: INFILTRATION TRENCH NOTES: 1. INSTALL GEOTEXTILE FILTER FABRIC ON ALL SIDE AND BOTTOM OF TRENCH. COVER TOP OF TRENCH WITH GEOTEXTILE FILTER FABRIC BEFORE BASE COURSE OR BACKFILL IS ADDED. 2. PLACE 4" OF CLEAN SAND ON THE BOTTOM OF TRENCH. ADD MORE SAND AS NEEDED TO FILL EXISTING GROUND TO SPECIFIED TRENCH BOTTOM INVERT. 3. INFILTRATION TRENCH IS TO BE CONSTRUCTED AFTER ALL WORK REQUIRING HEAVY EQUIPMENT IS COMPLETED. 4. REMOVE EXISTING MARL FROM AREA OF TRENCH FOOTPRINT. DISK SOIL BEFORE ADDING SAND LAYER. 5. NO FLOE IS TO BE DIRECTED TO THE INFILTRATION TRENCH UNTIL ALL PAVING IS COMPLETE AND ALL SURFACES DRAING TO THE SYSTEM ARE STABILIZED. 7. SYSTEM MAINTENANCE; A. INSPECT ALL PORTS AND SUMPS EVERY 6 MONTHS MINIMUM. REMOVE ALL SEDIMENT FROM SUMPS AND PORTS WHEN DEPTH OF SEDIMENT IS 2'. B. FOLLOW MANUFACTUIRER'S RECCOMENDATIOND FOR MAINTAINING THE HYDRODYNAMIC SEPARATOR. C. INSPECT OVERFLOW OUTLET FOR SCOUR AND EROSION EVERY 6 MONTHS. D. INSPECT ALL SWALES AND VEGETATIVE FILTER EVERY 6 MONTHS FOR EROSION AND OR POOR FUNCTIONING. E. REPAIR ALL ERODED SWALES OR MALFUNTIONING PARTS OF THE SYSTEM IMMEDIATELY. 4" HOPE INSPECTION PORT TYPICAL SEE DETAIL SO 15-02 SHEET 7 0 NOTE: INSTALL 2 INSPECTION PORTS IN EACH BED AT ENDS AS SHOWN. f 4" HOPE INSPECTION PORT TYPICAL r-ELE. 9.83 ' CONCRETE PARKING LOT BASE COURSE GEOTEXTILE FILTER FABFRIC -29- WASHED 057 STONE ft 5.75 INFILTRATION TRENCH NOTES: 1. INSTALL GEOTEXTILE FILTER FABRIC ON ALL SIDE AND BOTTOM OF TRENCH. COVER TOP OF TRENCH WITH GEOTEXTILE FILTER FABRIC BEFORE BASE COURSE OR BACKFILL IS ADDED. 2. PLACE 4" OF CLEAN SAND ON THE BOTTOM OF TRENCH. ADD MORE SAND AS NEEDED TO FILL EXISTING GROUND TO SPECIFIED TRENCH BOTTOM INVERT. 3. INFILTRATION TRENCH IS TO BE CONSTRUCTED AFTER ALL WORK REQUIRING HEAVY EQUIPMENT IS COMPLETED. 4. REMOVE EXISTING MARL FROM AREA OF TRENCH FOOTPRINT. DISK SOIL BEFORE ADDING SAND LAYER. 5. NO FLOE IS TO BE DIRECTED TO THE INFILTRATION TRENCH UNTIL ALL PAVING IS COMPLETE AND ALL SURFACES DRAING TO THE SYSTEM ARE STABILIZED. 7. SYSTEM MAINTENANCE; A. INSPECT ALL PORTS AND SUMPS EVERY 6 MONTHS MINIMUM. REMOVE ALL SEDIMENT FROM SUMPS AND PORTS WHEN DEPTH OF SEDIMENT IS 2'. B. FOLLOW MANUFACTUIRER'S RECCOMENDATIOND FOR MAINTAINING THE HYDRODYNAMIC SEPARATOR. C. INSPECT OVERFLOW OUTLET FOR SCOUR AND EROSION EVERY 6 MONTHS. D. INSPECT ALL SWALES AND VEGETATIVE FILTER EVERY 6 MONTHS FOR EROSION AND OR POOR FUNCTIONING. E. REPAIR ALL ERODED SWALES OR MALFUNTIONING PARTS OF THE SYSTEM IMMEDIATELY. 4" HOPE INSPECTION PORT TYPICAL SEE DETAIL SO 15-02 SHEET 7 C NOTE: INSTALL 2 INSPECTION PORTS IN EACH BED AT ENDS AS SHOWN. f •A. d • a d d e e Q 4• 4' HOPE INSPECTION PORT TYPICAL I ELE. 9.83 " CONCRETE PARKING LOT BASE COURSE FILTER FABFRIC WASHED IJ#57 STONE P, zo, Y • • • • e • "=u=u=1l-l1=N-11= 7.'-i1-11-11 W 'LIT j1=11=11 1 u-nW11-II-11=11-1i-€1=I€ II 11=11=11 11-11 li-li !! Y 11=11=11�11=21=N=11=11=11=11=i1'-II-II-IE-II-II-11=11=€I=11=11=11=11=11=11=II=sr= r=It-ll=li-11=11=Ik=II-11=11=11=11=11=11=Il=11=11=13-Ih.11-11=11=1111--11=11=Il=11=II=11= il=ii= II 11-11=11=lI'-11=11=IE=11=fl=II=11=€I=il-II=11=11=11=II-1i=11= • ✓' lVIT-111=1i=€1=11- -n=1i=11=II=11=t1=Il=11=11=Il=11=11=11=11=11=11=11=Il=ll=li=11=11=H=II-11=11=11=N=N=II=lI=11=11=II=11= ==31-i1l1-=II-E1l1==l1-l1l1==II-k€l1==II-1I-1€==11-1111=-If-1i-1l=-II-II1I=-II-UEI=-II-1I1I= 11==li 1i==II-lI1I==II-1111==II -=1i 1! -=1u1=.-1I 1l-=l!Il---1I1I- 1I 11-=u-tf1t=="-1l1€==u-1111=-=11E11I ===IIII====-11 __= -_ ]1I11.=1-1i1==-k1T=11I11L==-1I1=1I,1€==-t1-=I1li===11-=l€11==-11- 11I ===-l1Ii1I 1III -===i�I�It 11I111I1 polummav -moor -- =I- -u-11=II--1=1l-l1=II-I1=II-11=iI-11=II-Il=II-11 -=n Il-€I-1Il-E Ti. -=- 11 =LI =I!_fl-iI-1 -1== II= =1= =1 LI-FE= == 11=-11=nII==111=2u1L=11T= =1111-�=1€11-=u1111-==1I1€==1{III1-==1l1t==!11#1€-==iitl==-111 1 != -=iIEI • Y • - --l111----11=lIiI=-i1-=II-I =II-I€--II-II--II -11-I-1i -IIII-I -Ii-IE -II-II •-1i-€1=-II -11---11-II -1I1I �1I- -1I -1I1! =I1-1 I =II -II --II- 11=II -II-1I»1I=-II=-1I1I=-1I1I�I1I=IIIl---il11= =IuI--- n-"-"u- -"-11=I[=11=IE=11-}I=lE=li=u==n-,I--��-,� ,---n-=ll = I I� I I=11=II-1l- I I- II=11-- €I=1l= I I=f I=I3= II=11= II =11=N= I I=k1=11= I I=! R ..-n-11=11=EI=Ik=11=11=Ik=11=Il=11=il=1i=11=IE=11=11=11=11=k1=11=EI=11=11=II=IE=11.=II=11= ---u=il=11=11=11=11=1E=11=t1=11=II•=11=11=€1=R=II=€1=11=EI=li= II-=11=11=11=Il=11=II=11=11=I1=1i=11=i1�=11=EI=1i=11=11=IE=11=11=11=11=1i=l1=11=11-11=t1=11=II-iI=II-ll-li-11=II-If=ll=li=11=11=Il=11=i1=11=11=11=If=11=lI-II-II-II-II-tI-II-II-#I=1€=11=II=11= = -= -=I�--=I-=I- -=----III LI 41 -;17-' 7141 T, 41 T, 4 T, 4 7T-14 714 T41 =1M, mil T-1 4 714 T, 41 ri2 712 I-n=u=u-tl=11-I1=11- --11-1I=11=11=i1=11=11=11=11=11=N=11=N=11=11-1i=11=11=11=11=i1=11=11=11=11=11=11=11=f1=1f=11=11=1f=11=11=11=11=11= =11= II=1i= II=II=1l=11=1 i=11=l1=I I=lI=11= i1=11= EI=11= I I=#1= I E= EI--IE=11=! 1-I€-11�1 E-11-11-1€� II =I I-11 _ I I-11=II=11=lI=1i= I I =11= II =41=1 i== I I=11=11-11==k1=11= 1=i1=-11=tl=1i=11=l1=I€=EI=11=II=II=II=11- =11=11=11=11=11=II=l1=II=11= I=l1= = 1= = i= _!= _ =1=11=11=Ik=11=11=II=II=1€=11=II=1E=1 = _ _ _ _ IWAA' Mr • r y -11-11-11-II'"'-[I-II-II-II-11-1I-If-II-II-1l-II-II-II-lI-II-II-�iI--II--II--II--�11--"11.-_II,....II--II-II--11--II-II-VI-II- ' 1-II-II-11-Ii-II-11-Il-II-II-11-11-II-II-II-II-II-11-,t- - _II-11-1i-II-II-11-i1-Il-II-11-li-II-II-II-II-fI-II-II-II-II-11-11-II-lI-If-II-II-II-II-II- ,A 11 � �, �1. f ;�. /..III. >• A W � a � � r �. ,.... ,�. �. ,.... ,..►. .. ������.�:��i���'�,.�___�.__�._,._,..,,rr-�.r,�.�.��....�,._.._.-�. PAF OAF wm IrAzowwwrAme,Ml �idr��/�-����-����►i.Nrlw....'.t�. /tea TRENCH 1 A INFILTRATION TRENCH CALCULATIONS TOTAL REQUIRED VOLUME = 2126.03 CU. FT. PIPE DIAMETER = 12" WIDTH = 2' DEPTH = 4' VOID SPACE = .4% VOL PROV/LF OF PIPE = 3.56 CU. FT. TOTAL GALLERY LENGTH = 32' IMPERVIOUS AREA = 4222,6 SQ, FT. VOL UME OF RUNOFF FROM 3' RAIN 422216 X 3' / 12' = 1055.65 CU. FT. DRAW DOWN CALCULATI❑NSs BOTTOM AREA = 640.0 SO, FT, REQUIRED VOLUME = 1055.65 CU. FT, VOLUME PR❑VIDED = 1138,49 CU, FT. NO. OF ROWS OF PIPE = 10 1055165 CU,FT, / 640.0 SQ,FT� = 1.65 FT GALLERY WIDTH = 20' 1,65 FT X 12' 19.8' TOTAL VOLUME PROVIDED = 1138.49 CU. FT. 19•8• / 4J" HR = 4183 HR 4,83 HR / 24HR = .201 DAY =1 DAY TOTAL VOLUME. TRENCHES 1A AND 1B TOTAL VOLUME REQURIED = 2126.025 CU, FT. TOTAL VOLUME PR❑VIDED = 2134,67 CU, FT. -� - r ar�r -c �I iI� �/ �. r -• �. � r -? y� T. gay �7y rt. �r z it psi/ �i�I �I psi% �, �/ �r�ir� p 'w"Awl ioip ip";'iPOP�i�1�I�i�I;,I�i;;��al�,i�f�i�1�I;,/�;,.I;,i;;I;;i;:f�i�� ��.I--�`i,.f-��li..f---1�1��� .1.'f��" 1�1,:.�-`I,,,I•,�` 1,.,1...I-�1�.1�.1--1�1,:.i���.. �; .Ta"-Y`r.�• .�• ,YYY. r .� � • � .-�� .. . r � r � • s . • � r . • Sys .� � * r �a`t+��aY���-a`rw..w!►�C''��-.a��a�. ail`�a��a't;Yart�aa��a`T.r a1`.-111M�'�i't.;a1��a������aa��a��a��.aZ��aT.r�i►���,r�c�i�''aaaa�� a�C'-i SECTION A- A N TS TRENCH 1B INFILTRATI❑N TRENCH CALCULATI❑NS TOTAL REQUIRED VOLUME = 1070.375 CU. FT, PIPE DIAMETER = 12' WIDTH = 2' DEPTH = 4' V❑ID SPACE = .4% VOL PR❑V/LF OF PIPE = 3.56 CU. FT. IMPERVI❑US AREA = 42815 SQ. FT, VOLUME OF RUNOFF FROM 3' RAIN 4281.5 X 3' / 12 = 1070.375 CU, FT. DRAY/ DOWN _CALLUL.ATI❑NS, BOTTOM AREA = 56010 SQ, FT. REQUIRED VOLUME = 1070,375 CU, FT, VOLUME PROVIDED = 99618 CU. FT, TOTAL GALLERY LENGTH = 56 1070,375 CU,FT, / 560.0 SQ,FT. = 1.91 FT NO. OF ROWS OF PIPE = 5 1.91 FT X 12' = 22,92' GALLERY WIDTH = 10' 22,92' / 4.1' HR = 5,59 HR TOTAL VOLUME PR❑VIDED = 996.18 CU, FT. 5 59 HR / 24HR = 233 DAYS �4' caNC1�1E BASE COURSE 0--l'-/67 STONE, MIN COVER 19- 12' HOPE PERFORATED PIPES 32 LF EACH-2r OC .,*,.�GEOTEXTILE FILTER FABRIC .00 -MINIMUM 4' CLEAN SAND �- EASTN€O GROUND OR SAND AS NEEDED =1 DAY TOTAL_ VOLUME TRENCHES IA AND 1B TOTAL VOLUME REQURIED = 2126,025 CU, FT. TOTAL VOLUME PROVIDED = 2134-67 CU. FT. ASK 'A IP i� 1i•� i�` ,L• IA� 4pa`,t`.�.at'�ar�r��`,!'..-.rt SECTION B-B NTS 4 CONCRETE 4 BASE COURSE GEOTEXTILE FILTER FABRIC /ST STONE MIN COVER 19" 12- HOPE PERFORATED PIPES r 96 LF EACH-24. OC �-GEOTEXIILE FILTER FABRIC MINIMUM 4' CLEAN SAND -011EXISTING GROUND OR SAND AS NEEDED --f I I-• � Y 1 -I �l - t- t. Ir ,r � r 11 ,_ I _ - - - - - - - •, Y I.t y. _ 1'll'I� '� � .(.,( � + tl •' � ' i 1 I! I •F � i tCIIi rl1 '.iJYI,: a' 1. i � e: . �.. � � ''t . p.�r , i .l •i l Y�i....lA .�.,.l,, I , i.'1..1 100 PUBLIC R/W mmmm SLOPE TO NATURAL GRADE =�.ftw 3:1 PROJECT BOUNDARY N61029'01 "E PROJECT 100-29' BOUNDARY . DRIVEWAY #1 95 52.�P 221.9 SQ.FT .7 B3 V 4 '/� - / -WA -J24" 9.3 /A. T SO "d Ar 0 4 9. 11.5 12.3 ..via 1 .4 DROP INLET PROTECTION SEE DETAIL PAGE 1 OF 4 A.(D CB 3 /6 RIM 9.3 INV OUT 5.75 SUMP 3.75 0 R E E 0 E L P E 1 4 2. co C iDo. 11 7 4. 1 U 0 1. ./ S P 7 0 CD > 4�- PROJECT BOUNDARY poN can c—_ BAD 0 6329 SQ. FT,N oT'll ACO0 00 . � —\ � � R ci > F9—.5 � N 00 4�- 00 SLOPE TO NATURAL GRADE 3:1 4.0 10 A N A BUILDERS INC — DEED 2409 PAGE 978 P I L R TI PROJECT--/ S E Al G 0 00 ZONE C-1 .9.""'A N �1. 9.\k BOUNDARY 1.7 14.8\ I v 0 5 M 3. p I V5WA Y:. J3.6, 1058.5 SQ,.FT,:\ ° 4\ cry �, c� 00 12.3 9.N) c� 41.3\ \` �. °� \ �\ SUMMERWINDS \�25.0 TOWNHOMES HOA INC PROJECT DEED 2417 PAGE 244 BOUNDARY SUMMERWINDS N61 15 1,3"E OJECT ZONE R-5 TOWNHOMES HOA INC BOUNDARY DEED 2417 PAGE 244 ZONE R-5 10 5 0 10 20 30 M I C HAEL C e GALLANT, P E, PA �w S! MICHAEL C. GALLANT, PE,PA SUMMERWINDS III P.O. BOX 4039 SURF CITY, NC 28445 SURF CITY, NC PHONE: 910.328-2188 REVISIONS: DIMENSIONSSHEET: 1 3 of ATE: SCALE: DRAWN BY: Fl LENAM E: 10/23/2005 1:10 SUMMERWINDS III rmm TOY - A too 102 1 A shol A '! .1:., ,, �-, " - I; it